Wanzek Construction
2015-Present Construction Manager II
Manage the civil activities for the Frontier Windfarm in Blackwell, OK.
Responsible for the safety, quality and production as well as planning and
scheduling work activities with other trades to meet milestones. Manage the civil
activities so we stay within the budget and track areas that over run estimated
costs. Develop foreman and build crews to bolster the company’s talent at the
operator and laborer positions.
Phillips and Jordan
2015 Site Manager
Managed onsite construction activities in northern Maine for a 56.1 MW
windfarm. Duties included cost to complete reports, implementing safety program,
daily reports, budget review and reporting, quality control and production
tracking.
Blattner Energy, Inc., Avon, Minnesota
2014-2015 Superintendent-Grading
Manage and train civil crews from the start up of the project through the
reclamation. Responsible for Safety, quality, and production of the project. Work
closely with owner site management team to establish a good relationship, this is a
new owner that Blattner has not done work for in the past. Responsible for overall
civil budget, works closely with other trade superintendents to coordinate project
activities to keep project on schedule. Developed quality assurance and quality
forms to adhere to civil engineer requirements. Works with landowners to fulfill
requirements that are in the contract and easement documents that the landowners
had agreed to.
2013-2014 Blattner Site Superintendent
Oversee the construction of wind farm in Ontario, Canada were I am responsible
for developing a new site team for a company we have created for our work in
Canada. Responsible for installing company best practices procedures, QA/QC
John Hartman

program, risk management policy and procedure, production tracking, technical
knowledge of constructing roads, foundations, substation, underground collection
line and environmental compliance. Work with project and site manager to help
the site team work together to accomplish tight deadlines and stay within budget. I
have developed a strong positive relationship with land owners that were hesitant
to allow wind farm construction in their community and as the project is winding
down they see the positive impact in the community and that their land is still as
productive as before construction began.
2011 - 2013 Superintendent - Grading
Support and train project teams and Grading Superintendents during the start-up
and construction phases of the project. Support the company in scheduling,
coordinating and hiring grading resources for all projects. Support and ensure all
safe work methods and processes are being used on the projects. Follow up with
QA/QC engineer that all the documents and testing requirements are in place to
avoid noncompliance or testing issues that can effect quality and rework that
would incur extra costs. Provide project manager with a monthly cost to complete
report to project profit and loss for the project codes. Provide estimates and data
backup for change orders to the client. Review daily and weekly cost reports to
trade superintendents to monitor costs for each trade.
2009 - 2011 Assistant Grading Superintendent
Focuses on the completion of roads to access the wind turbines through the
following tasks: manages storm water plans and implement accordingly;
contacts land owners to establish an extensive working relationship; discovers
endangered species (plants or animals) in the area; partners with Installation
Superintendent by clearing areas for the assembly of rotors, and assists when
delivery trucks become immovable; work closely with concrete supervision
relating to excavation of foundations. i.e.: depth of foundation excavation, width
of foundation excavation; completes final grading of entire site; and responsible for
punch list development and final completion. Work closely with turbine
manufacturer trucking to insure the roads, approaches and turning radius are
adequate for over-size loads. Ability to read and understand prints and contract
documents.
D.H. Blattner & Sons, Inc., Avon, Minnesota
2008 - 2009 Assistant Grading Superintendent
Focuses on the completion of roads to access the wind turbines through the
following tasks: manages storm water plans and implement accordingly;
contacts land owners to establish an extensive working relationship; discovers
endangered species (plants or animals) in the area; partners with Installation
Superintendent by clearing areas for the assembly of rotors, and assists when
delivery trucks become immovable; work closely with concrete supervision
relating to excavation of foundations. i.e.: depth of foundation excavation, width
of foundation excavation; completes final grading of entire site; and responsible for
punch list development and final completion. Work closely with turbine
John Hartman

manufacturer trucking to insure the roads, approaches and turning radius are
adequate for over-size loads. Ability to read and understand prints and contract
documents.
2007 - 2008 Assistant Structures Superintendent
Focuses on the completion of concrete foundations for wind turbines and
their associated substations through the following tasks: works closely with
grading supervision relating to excavation of foundations; works closely
with subcontractors such as rebar and electrical to coordinate their scope
of work into the foundations; works closely with Ready Mix Plant to
schedule materials and trucks as needed; schedules delivery of materials
(rebar, anchor rods, template and embed rings); works closely with
suppliers for timely delivery with no delays; schedules all foundation work
to be completed on time and within budget; and communicates with
inspectors to deliver a quality product to the owners.
2006 - 2007 Assistant Project Superintendent
On-site supervision of forepersons, iron workers, carpenters, equipment
operators, and laborers to ensure a safe, productive quality job is attained
and costs are controlled in the construction field operations. Assists in
scheduling equipment and subcontractors to effectively utilize all resources.
Assists with specifications and contract requirements. Reviews contracts,
plans, and manuals. Coordinate schedule and oversee project production
for civil, assembly, foundation, underground collection, substation,
transmission line, and switch yard. Manage site safety coordinators to
ensure company safety policies and procedures are being followed to be in
compliance with current OSHA regulations.
2005 - 2006 Field/Project Engineer
Purchasing, preparing and processing invoices, assist in billing, coordinate on-site
inspections, safety officer, maintain computer equipment, provide necessary
communication with employees and vendors. Tracked and reported daily
production to run the daily cost reports. Generated and paid purchase orders for
project vendors. Performed duties of the site superintendent in their absence.
2004 - 2005 Carpenter
Basic carpentry skills (i.e. plan reading, linear dimensions and elevations, working
knowledge of mathematics, and proper tool usage). Carpenter will be responsible for the
following; use and/or installation of provided safety equipment (i.e. safety harnesses, static
lines, etc.), and accuracy of layout for form placement. Working knowledge of "crane hand
signals" is essential. These skills will be used in the performance of the following tasks:
assembly and/or construction of various concrete forms, pile driving, concrete and anchor
bolt placement.
1999-2004 Carpenter
John Hartman

Worked for Copp Construction building county bridges through out Montana. The
composite crew shared responsibilities, including driving pile, bridge demolition, setting
precast bridge beams, tying rebar, pouring concrete bridge deck, and civil dirt work.
1995-1999 Carpenter
Entered and completed the journeyman carpenter apprentaship program with Martel
Construction located in Bozeman, Montana. During the five years with company I spent
18 months constructing and operating a garnet processing mine in Dillion, MT. Develop
skills in lattice boom crane operation, shooting grades, driving piling, and pouring large
retaining walls.
Projects
2016-present Tyler Bluff Wind Farm EDF
Muenster, TX
2016 Frontier Wind Farm Duke Energy
200 MW Blackwell, OK
2115 Bull Mountain Wind Farm Sun Edison
Bangor, ME Phillips and Jordan
2115 Golden West Wind Farm-246.5 MW Next Era
Calhan, CO
2014-15 Spinning Spur 3-194 MW EDF
Adrian, TX
2014 Bluewater – 60 MW NextEra
Ontario, Canada
2013 Alamo 2 Solar OCI Solar Power
San Antonio, TX
2012 Minco III – 100.8 MW NextEra
Minco, OK
2011 Magic Valley – 201.6 MW E.ON
San Perlita, TX
2011 Minco II – 100.8 MW NextEra
Minco, OK
2011 Shepherds Flat – 845 MW Caithness
Arlington, OR
2010 Leaning Juniper II – 111 MW Iberdrola Renewables
Arlington, OR
2009 Day County – 99 MW NextEra
Groton, SD
2008 Panther Creek III – 199.5 MW E.ON
Sterling City, TX
2008 Pioneer Prairie – 300.3 MW Horizon
McIntire, IA
2007 Roscoe/ Champion Wind – 335.5 MW Airtricity
Roscoe, TX
2007 Peetz/Logan Wind Farm – 400.5 MW FPLE
Peetz, CO
2006 Sandbluff Wind – 90 MW Airtricity
John Hartman

Sterling City, TX
2005 Post Wind Project – 84 MW FPL Energy
Fluvanna, TX
2005 Judith Gap Wind Project – 135 MW Invenergy, LLC
Judith Gap, MT
2004 Generation Station Rocky Mountain Power
Grading, foundations & updating existing roads
Hardin, MT
Education
Minot State University
1991 to 1993-BS Criminal Justice
Dawson Community College
1989 to 1991-Associate Applied Science-Law Enforcement
Clyde Park High School
1989-High School Diploma
ASI Construction Estimating Certification
Skills and Qualifications
Heavy equipment operator
CPR and standard first aid training
ACI certification-concrete testing
Worked with landowners to develop positive relations with themselves and the project owner during construction
Serving on the corporate safety committee to develop a safer culture through out the company
Manage multiple construction crews and schedule work to maintain budget while finishing the project on time
John Hartman

Sterling City, TX
2005 Post Wind Project – 84 MW FPL Energy
Fluvanna, TX
2005 Judith Gap Wind Project – 135 MW Invenergy, LLC
Judith Gap, MT
2004 Generation Station Rocky Mountain Power
Grading, foundations & updating existing roads
Hardin, MT
Education
Minot State University
1991 to 1993-BS Criminal Justice
Dawson Community College
1989 to 1991-Associate Applied Science-Law Enforcement
Clyde Park High School
1989-High School Diploma
ASI Construction Estimating Certification
Skills and Qualifications
Heavy equipment operator
CPR and standard first aid training
ACI certification-concrete testing
Worked with landowners to develop positive relations with themselves and the project owner during construction
Serving on the corporate safety committee to develop a safer culture through out the company
Manage multiple construction crews and schedule work to maintain budget while finishing the project on time

More Related Content

What's hot (20)

CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
Resume
ResumeResume
Resume
 
1.QC-15
1.QC-151.QC-15
1.QC-15
 
Amey CV 2015
Amey CV 2015Amey CV 2015
Amey CV 2015
 
Resume ofwaynecohen vp-cellular_03.07.2016
Resume ofwaynecohen vp-cellular_03.07.2016Resume ofwaynecohen vp-cellular_03.07.2016
Resume ofwaynecohen vp-cellular_03.07.2016
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIR
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
 
EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6EAE Newsletter - Nov - Issue #6
EAE Newsletter - Nov - Issue #6
 
Jacob Walker - Resume
Jacob Walker - ResumeJacob Walker - Resume
Jacob Walker - Resume
 
abdi cv
abdi cvabdi cv
abdi cv
 
MARTIN Daniel CV
MARTIN Daniel CVMARTIN Daniel CV
MARTIN Daniel CV
 
Resume with System 3
Resume with System 3Resume with System 3
Resume with System 3
 
resumelarry
resumelarryresumelarry
resumelarry
 
0 ranny ancero CV
0 ranny ancero CV0 ranny ancero CV
0 ranny ancero CV
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Rusty McEacern Project Manager
Rusty McEacern Project ManagerRusty McEacern Project Manager
Rusty McEacern Project Manager
 
RESUME EN (SB)
RESUME EN (SB)RESUME EN (SB)
RESUME EN (SB)
 
GERRY PANTIG MANICLANG
GERRY PANTIG MANICLANGGERRY PANTIG MANICLANG
GERRY PANTIG MANICLANG
 
Sean Cody - Resume
Sean Cody - ResumeSean Cody - Resume
Sean Cody - Resume
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))
 

Viewers also liked (16)

Justin La Graff resume
Justin La Graff resumeJustin La Graff resume
Justin La Graff resume
 
Lemoine, Bryan
Lemoine, BryanLemoine, Bryan
Lemoine, Bryan
 
cv doc
cv doccv doc
cv doc
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Eng
 
CV Azhari MJ
CV Azhari MJCV Azhari MJ
CV Azhari MJ
 
Updated CV (06 April 2016)
Updated CV (06 April 2016)Updated CV (06 April 2016)
Updated CV (06 April 2016)
 
CV - Jorge Elias Maia - Mechanical Engineer
CV - Jorge Elias Maia - Mechanical EngineerCV - Jorge Elias Maia - Mechanical Engineer
CV - Jorge Elias Maia - Mechanical Engineer
 
Rudolf Germovsek - CV ENGLISH
Rudolf Germovsek - CV ENGLISHRudolf Germovsek - CV ENGLISH
Rudolf Germovsek - CV ENGLISH
 
2016 Resume
2016 Resume2016 Resume
2016 Resume
 
Timmey E Resume' 15
Timmey E Resume' 15Timmey E Resume' 15
Timmey E Resume' 15
 
CV
CVCV
CV
 
clarence Resume
clarence Resumeclarence Resume
clarence Resume
 
Hafriz Bin Samad Resume
Hafriz Bin Samad ResumeHafriz Bin Samad Resume
Hafriz Bin Samad Resume
 
coalpreparationandprocessing
coalpreparationandprocessingcoalpreparationandprocessing
coalpreparationandprocessing
 
randal-hayton-igor3
randal-hayton-igor3randal-hayton-igor3
randal-hayton-igor3
 
Akif malik 1
Akif malik 1Akif malik 1
Akif malik 1
 

Similar to Hartman, John - 2016 Resume

Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison
 
Bwk pipeline resume_0716
Bwk pipeline resume_0716Bwk pipeline resume_0716
Bwk pipeline resume_0716Bruce Kain
 
Resume_Gary Boulter_10-27-16
Resume_Gary Boulter_10-27-16Resume_Gary Boulter_10-27-16
Resume_Gary Boulter_10-27-16Gary Boulter
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam Keane
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Randy Seperak
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny Daigrepont
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 
2016 Resume and Construction Project Hist ory
2016 Resume and Construction Project Hist ory2016 Resume and Construction Project Hist ory
2016 Resume and Construction Project Hist oryEdward Pezzullo
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116Bruce Kain
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
Callahan_Allen_Resume
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_ResumeAl Callahan
 
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelPaul Snyder
 

Similar to Hartman, John - 2016 Resume (20)

Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015
 
Ben-Coleman II
Ben-Coleman IIBen-Coleman II
Ben-Coleman II
 
Bwk pipeline resume_0716
Bwk pipeline resume_0716Bwk pipeline resume_0716
Bwk pipeline resume_0716
 
Distefano_Marc_resume
Distefano_Marc_resumeDistefano_Marc_resume
Distefano_Marc_resume
 
Resume_Gary Boulter_10-27-16
Resume_Gary Boulter_10-27-16Resume_Gary Boulter_10-27-16
Resume_Gary Boulter_10-27-16
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
2016 Resume and Construction Project Hist ory
2016 Resume and Construction Project Hist ory2016 Resume and Construction Project Hist ory
2016 Resume and Construction Project Hist ory
 
CV 3
CV 3CV 3
CV 3
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Resume_Lois-12-2015
Resume_Lois-12-2015Resume_Lois-12-2015
Resume_Lois-12-2015
 
Resume lois 12-2015
Resume lois 12-2015Resume lois 12-2015
Resume lois 12-2015
 
Callahan_Allen_Resume
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_Resume
 
Project List 1
Project List 1Project List 1
Project List 1
 
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno Nobel
 

Hartman, John - 2016 Resume

  • 1. John Hartman  John Jacob Hartman 2208 Cedar Pointe Circle Edmond, OK 73044 Home Phone (405) 471-5203 Cell Phone (406) 861-5209 EXPERIENCE Wanzek Construction 2015-Present Construction Manager II Manage the civil activities for the Frontier Windfarm in Blackwell, OK. Responsible for the safety, quality and production as well as planning and scheduling work activities with other trades to meet milestones. Manage the civil activities so we stay within the budget and track areas that over run estimated costs. Develop foreman and build crews to bolster the company’s talent at the operator and laborer positions. Phillips and Jordan 2015 Site Manager Managed onsite construction activities in northern Maine for a 56.1 MW windfarm. Duties included cost to complete reports, implementing safety program, daily reports, budget review and reporting, quality control and production tracking. Blattner Energy, Inc., Avon, Minnesota 2014-2015 Superintendent-Grading Manage and train civil crews from the start up of the project through the reclamation. Responsible for Safety, quality, and production of the project. Work closely with owner site management team to establish a good relationship, this is a new owner that Blattner has not done work for in the past. Responsible for overall civil budget, works closely with other trade superintendents to coordinate project activities to keep project on schedule. Developed quality assurance and quality forms to adhere to civil engineer requirements. Works with landowners to fulfill requirements that are in the contract and easement documents that the landowners had agreed to. 2013-2014 Blattner Site Superintendent Oversee the construction of wind farm in Ontario, Canada were I am responsible for developing a new site team for a company we have created for our work in Canada. Responsible for installing company best practices procedures, QA/QC
  • 2. John Hartman  program, risk management policy and procedure, production tracking, technical knowledge of constructing roads, foundations, substation, underground collection line and environmental compliance. Work with project and site manager to help the site team work together to accomplish tight deadlines and stay within budget. I have developed a strong positive relationship with land owners that were hesitant to allow wind farm construction in their community and as the project is winding down they see the positive impact in the community and that their land is still as productive as before construction began. 2011 - 2013 Superintendent - Grading Support and train project teams and Grading Superintendents during the start-up and construction phases of the project. Support the company in scheduling, coordinating and hiring grading resources for all projects. Support and ensure all safe work methods and processes are being used on the projects. Follow up with QA/QC engineer that all the documents and testing requirements are in place to avoid noncompliance or testing issues that can effect quality and rework that would incur extra costs. Provide project manager with a monthly cost to complete report to project profit and loss for the project codes. Provide estimates and data backup for change orders to the client. Review daily and weekly cost reports to trade superintendents to monitor costs for each trade. 2009 - 2011 Assistant Grading Superintendent Focuses on the completion of roads to access the wind turbines through the following tasks: manages storm water plans and implement accordingly; contacts land owners to establish an extensive working relationship; discovers endangered species (plants or animals) in the area; partners with Installation Superintendent by clearing areas for the assembly of rotors, and assists when delivery trucks become immovable; work closely with concrete supervision relating to excavation of foundations. i.e.: depth of foundation excavation, width of foundation excavation; completes final grading of entire site; and responsible for punch list development and final completion. Work closely with turbine manufacturer trucking to insure the roads, approaches and turning radius are adequate for over-size loads. Ability to read and understand prints and contract documents. D.H. Blattner & Sons, Inc., Avon, Minnesota 2008 - 2009 Assistant Grading Superintendent Focuses on the completion of roads to access the wind turbines through the following tasks: manages storm water plans and implement accordingly; contacts land owners to establish an extensive working relationship; discovers endangered species (plants or animals) in the area; partners with Installation Superintendent by clearing areas for the assembly of rotors, and assists when delivery trucks become immovable; work closely with concrete supervision relating to excavation of foundations. i.e.: depth of foundation excavation, width of foundation excavation; completes final grading of entire site; and responsible for punch list development and final completion. Work closely with turbine
  • 3. John Hartman  manufacturer trucking to insure the roads, approaches and turning radius are adequate for over-size loads. Ability to read and understand prints and contract documents. 2007 - 2008 Assistant Structures Superintendent Focuses on the completion of concrete foundations for wind turbines and their associated substations through the following tasks: works closely with grading supervision relating to excavation of foundations; works closely with subcontractors such as rebar and electrical to coordinate their scope of work into the foundations; works closely with Ready Mix Plant to schedule materials and trucks as needed; schedules delivery of materials (rebar, anchor rods, template and embed rings); works closely with suppliers for timely delivery with no delays; schedules all foundation work to be completed on time and within budget; and communicates with inspectors to deliver a quality product to the owners. 2006 - 2007 Assistant Project Superintendent On-site supervision of forepersons, iron workers, carpenters, equipment operators, and laborers to ensure a safe, productive quality job is attained and costs are controlled in the construction field operations. Assists in scheduling equipment and subcontractors to effectively utilize all resources. Assists with specifications and contract requirements. Reviews contracts, plans, and manuals. Coordinate schedule and oversee project production for civil, assembly, foundation, underground collection, substation, transmission line, and switch yard. Manage site safety coordinators to ensure company safety policies and procedures are being followed to be in compliance with current OSHA regulations. 2005 - 2006 Field/Project Engineer Purchasing, preparing and processing invoices, assist in billing, coordinate on-site inspections, safety officer, maintain computer equipment, provide necessary communication with employees and vendors. Tracked and reported daily production to run the daily cost reports. Generated and paid purchase orders for project vendors. Performed duties of the site superintendent in their absence. 2004 - 2005 Carpenter Basic carpentry skills (i.e. plan reading, linear dimensions and elevations, working knowledge of mathematics, and proper tool usage). Carpenter will be responsible for the following; use and/or installation of provided safety equipment (i.e. safety harnesses, static lines, etc.), and accuracy of layout for form placement. Working knowledge of "crane hand signals" is essential. These skills will be used in the performance of the following tasks: assembly and/or construction of various concrete forms, pile driving, concrete and anchor bolt placement. 1999-2004 Carpenter
  • 4. John Hartman  Worked for Copp Construction building county bridges through out Montana. The composite crew shared responsibilities, including driving pile, bridge demolition, setting precast bridge beams, tying rebar, pouring concrete bridge deck, and civil dirt work. 1995-1999 Carpenter Entered and completed the journeyman carpenter apprentaship program with Martel Construction located in Bozeman, Montana. During the five years with company I spent 18 months constructing and operating a garnet processing mine in Dillion, MT. Develop skills in lattice boom crane operation, shooting grades, driving piling, and pouring large retaining walls. Projects 2016-present Tyler Bluff Wind Farm EDF Muenster, TX 2016 Frontier Wind Farm Duke Energy 200 MW Blackwell, OK 2115 Bull Mountain Wind Farm Sun Edison Bangor, ME Phillips and Jordan 2115 Golden West Wind Farm-246.5 MW Next Era Calhan, CO 2014-15 Spinning Spur 3-194 MW EDF Adrian, TX 2014 Bluewater – 60 MW NextEra Ontario, Canada 2013 Alamo 2 Solar OCI Solar Power San Antonio, TX 2012 Minco III – 100.8 MW NextEra Minco, OK 2011 Magic Valley – 201.6 MW E.ON San Perlita, TX 2011 Minco II – 100.8 MW NextEra Minco, OK 2011 Shepherds Flat – 845 MW Caithness Arlington, OR 2010 Leaning Juniper II – 111 MW Iberdrola Renewables Arlington, OR 2009 Day County – 99 MW NextEra Groton, SD 2008 Panther Creek III – 199.5 MW E.ON Sterling City, TX 2008 Pioneer Prairie – 300.3 MW Horizon McIntire, IA 2007 Roscoe/ Champion Wind – 335.5 MW Airtricity Roscoe, TX 2007 Peetz/Logan Wind Farm – 400.5 MW FPLE Peetz, CO 2006 Sandbluff Wind – 90 MW Airtricity
  • 5. John Hartman  Sterling City, TX 2005 Post Wind Project – 84 MW FPL Energy Fluvanna, TX 2005 Judith Gap Wind Project – 135 MW Invenergy, LLC Judith Gap, MT 2004 Generation Station Rocky Mountain Power Grading, foundations & updating existing roads Hardin, MT Education Minot State University 1991 to 1993-BS Criminal Justice Dawson Community College 1989 to 1991-Associate Applied Science-Law Enforcement Clyde Park High School 1989-High School Diploma ASI Construction Estimating Certification Skills and Qualifications Heavy equipment operator CPR and standard first aid training ACI certification-concrete testing Worked with landowners to develop positive relations with themselves and the project owner during construction Serving on the corporate safety committee to develop a safer culture through out the company Manage multiple construction crews and schedule work to maintain budget while finishing the project on time
  • 6. John Hartman  Sterling City, TX 2005 Post Wind Project – 84 MW FPL Energy Fluvanna, TX 2005 Judith Gap Wind Project – 135 MW Invenergy, LLC Judith Gap, MT 2004 Generation Station Rocky Mountain Power Grading, foundations & updating existing roads Hardin, MT Education Minot State University 1991 to 1993-BS Criminal Justice Dawson Community College 1989 to 1991-Associate Applied Science-Law Enforcement Clyde Park High School 1989-High School Diploma ASI Construction Estimating Certification Skills and Qualifications Heavy equipment operator CPR and standard first aid training ACI certification-concrete testing Worked with landowners to develop positive relations with themselves and the project owner during construction Serving on the corporate safety committee to develop a safer culture through out the company Manage multiple construction crews and schedule work to maintain budget while finishing the project on time