SlideShare a Scribd company logo
1 of 2
Gary W. Boulter
PARKER, CO 80138 | (303) 519-3945 | GARY.BOULTER@MAC.COM
Project Manager
An established project manager, experienced in managing both complex cell tower construction
projects, as well as aerial fiber optic construction projects. A strategic thinker who can establish and
manage plans, while building and fostering collaborative relationships. Leverages expertise in driving
projects to completion, with oversight of the end-to-end project lifecycle. Experience includes;
managing multiple teams, partnering with outside vendors and manufacturers, equipment planning,
site and design walks, as well as logistics. Responsible for managing construction projects on 200+
cell tower sites, within multiple states.
PROFESSIONAL EXPERIENCE ____
Pauley Construction, LLC Sept. 2016 - Present
Fiber optic Construction Field Supervisor
 Provideson-site supervision for 20+ concurrent aerial and underground fiber optic construction projects.
 Responsible forreviewingblue printdesigns, projectscope and requirements, evaluatingconstructionsites
and make recommendations for changes, to ensure project delivery.
 Ensures on schedule project completion, by tracking, managing, and reporting on progress and scope.
 Collaborates with Federal, State, and Local Municipalities for permits and inspection requirements.
 Responsible foradheringto OwenCorningfiberopticproductspecifications, toensure properinstallation.
 Provides technical, procedural and product guidance for up to 40 field technicians and contractors.
 Interfaceswiththe Engineeringteamtocoordinateprojectconstructionactivitiesandchange management.
 Responsible for coordinating field personnel to mitigate inspection finding.
 Ensures all field personnel adheres to OSHA safety regulations.
 Review all sub-contractor performance and support their efforts as needed.
Colorado Department of Transportation April 2016 – Sept. 2016
Maintenance Technician
 Maintained state highway and roadway systems.
 MaintainedequipmenttoDepartmentof Transportationstandards. Identifiedconstructionequipment and
mechanical needs. Maintained records and prepared equipment reports.
 Maintenance isfrequentlyperformed these duties underhazardous,highvolumetrafficsituations
includingadverse weatherconditions.
Mastec / WesTower Communications Inc. 2013 - 2015
Project Manager
 Successfullymanaged200+ cell towerconstructionprojects, inmultiplestates.
 Coordinated schedulesandcosts, withutilitycompanies thatprovide infrastructureandservices for
construction projects.
 Monitored workmanshipqualityof contractors.
 Reviewed change proposals,proposal requests,requestsforinformation,supplemental instructions,and
othercontract documentationasrequiredonbehalf of the client’sinterests.
 CollaboratedwithFederal,State,and Local Municipalities forpermitsand inspectionrequirements.
 Successfullymaintainedprojectmilestones andworked withinthe PACEsystem.
 Participatedwiththe clienton cell towerdesignwalks,tovalidate cell siteconfiguration.
 Managed powerplants andbatterybackup configurationand loadparameters.
 Managed EPL,whichincludedtrackingEPLmilestone dateswithinthe PACEsystemandcreatedExcel
spreadsheetswithpivottables,fortrackingandreportingof EPL
 Identifiedareasof opportunity withequipmentorderingprocess andimplemented solutionsto streamline
the orderingprocess.
 Successfully upgradedcell sitetechnology fromcoax tofiberoptic.
Construction Manager
 Responsible for equipment planning and logistics milestone dates.
 Ordered, managed, and coordinated materials for cell towers construction projects in multiple states.
 Performed direct site supervisionof cell tower EPL installation during construction, making sure that all
cabling AC, DC, fiber and Cat 5 cabling was installed to specifications and properly labeled.
 Worked with microwave teams in mounting and general alignment of microwave antenna and cabling.
 Coordinatedthe transportof construction materialsbothinboundandoutboundfromvariouswarehouses.
Warehouse Manager
 Managed a startup warehouse in Denver, Colorado. Helped streamline operations and set up an efficient
transportation program.
General Dynamics Information Technology 2012 - 2013
Materials Manager
 Managed, delivered and coordinated materials for cell tower construction projects.
 Coordinated the transport of materials both inbound and outbound from various warehouses.
 Created inventory, warranty service and returned merchandise authorization reports.
 Tracked high value assets.
 Worked alongside project managers to coordinate material deliveries for proposed construction sites.
Horizon Transportation 2011 - 2011
Independent transportation contractor
 Responsible for the overall operations of the transportation of trailers, recreational vehicles and boats.
Henderson Trucking 2011 - 2011
Commercial Driver
 Over the road tractor trailer driver.
Rocky Mountain Productions, LLP 2005 - 2011
General Partner
(GAP:January 2000 to July 2005 was a stay-at-home dad).
ADDITIONAL WORKEXPERIENCE .
ConstructionSupervisor,Ayars&AyarsCommercial Construction.ElectronicsService Technician, Yant
EquipmentCompany (1985-1991). Line Pilot, DuncanAviation (1980-1985). UnitedStatesNavy (1976-1980).
EDCATION & TRAINING .
HighSchool Diploma, WhittierHighSchool- Whittier, CA. RioHondoCollege-Whittier, CA &CerritosCollege-
Norwalk,CA. Microsoft;Outlook, Excel,Word andPowerPoint. CASPR, PACE.
CERTIFICATIONS .
Commercial DriverLicense,ClassA., ASHICertified inCPR&AED. OSHA 10-hour Course
EnclosedSpace EntryCert, TrenchExcavationCert, CompetentPersonCert.

More Related Content

What's hot (20)

Hartman, John - 2016 Resume
Hartman, John - 2016 ResumeHartman, John - 2016 Resume
Hartman, John - 2016 Resume
 
MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727
 
MUGHAL 2
MUGHAL 2MUGHAL 2
MUGHAL 2
 
jovy's RESUME
jovy's RESUMEjovy's RESUME
jovy's RESUME
 
C.V,,,,,,
C.V,,,,,,C.V,,,,,,
C.V,,,,,,
 
Thomas Maher C.V
Thomas Maher C.VThomas Maher C.V
Thomas Maher C.V
 
Joe Howard CV
Joe Howard CVJoe Howard CV
Joe Howard CV
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
 
STEPHEN HESKETH
STEPHEN HESKETHSTEPHEN HESKETH
STEPHEN HESKETH
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
1.QC-15
1.QC-151.QC-15
1.QC-15
 
Jacob J Speight Resume 2015
Jacob J Speight Resume 2015Jacob J Speight Resume 2015
Jacob J Speight Resume 2015
 
Victor Duplessis Resume
Victor Duplessis ResumeVictor Duplessis Resume
Victor Duplessis Resume
 
Bwk pipeline resume_0716
Bwk pipeline resume_0716Bwk pipeline resume_0716
Bwk pipeline resume_0716
 
Jim styles CV May 2015
Jim styles CV  May 2015Jim styles CV  May 2015
Jim styles CV May 2015
 
Resume
ResumeResume
Resume
 
Resume ofwaynecohen vp-cellular_03.07.2016
Resume ofwaynecohen vp-cellular_03.07.2016Resume ofwaynecohen vp-cellular_03.07.2016
Resume ofwaynecohen vp-cellular_03.07.2016
 
updated Sotelo resume 8-12-16
updated Sotelo resume 8-12-16updated Sotelo resume 8-12-16
updated Sotelo resume 8-12-16
 
Duane Fox
Duane FoxDuane Fox
Duane Fox
 
JEarle_2016
JEarle_2016JEarle_2016
JEarle_2016
 

Similar to Resume_Gary Boulter_10-27-16

Nichlaus Jay Rowe 2016
Nichlaus Jay Rowe 2016Nichlaus Jay Rowe 2016
Nichlaus Jay Rowe 2016Nichlaus Rowe
 
Nichlaus Jay Rowe 2016
Nichlaus Jay Rowe 2016Nichlaus Jay Rowe 2016
Nichlaus Jay Rowe 2016Nichlaus Rowe
 
Construction cv 2015 aug revised (1)
Construction cv 2015  aug revised (1)Construction cv 2015  aug revised (1)
Construction cv 2015 aug revised (1)Brian Joyner, MBA
 
Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015Emilio Hoyos
 
gene-malboeuf-resume
gene-malboeuf-resumegene-malboeuf-resume
gene-malboeuf-resumeGene Malboeuf
 
Marco Montano Resume 2
Marco Montano Resume 2Marco Montano Resume 2
Marco Montano Resume 2Marco Montano
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong
 
Construction CV 2015- May Revised
Construction CV 2015- May RevisedConstruction CV 2015- May Revised
Construction CV 2015- May RevisedBrian Joyner, MBA
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry RodgersJerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry RodgersJerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry RodgersJerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry RodgersJerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry RodgersJerry Rodgers
 
Resume for Scott McKeen 2016 -REV1
Resume for Scott McKeen 2016 -REV1Resume for Scott McKeen 2016 -REV1
Resume for Scott McKeen 2016 -REV1Scott McKeen
 
Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison
 

Similar to Resume_Gary Boulter_10-27-16 (20)

Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
Nichlaus Jay Rowe 2016
Nichlaus Jay Rowe 2016Nichlaus Jay Rowe 2016
Nichlaus Jay Rowe 2016
 
Nichlaus Jay Rowe 2016
Nichlaus Jay Rowe 2016Nichlaus Jay Rowe 2016
Nichlaus Jay Rowe 2016
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 
Construction cv 2015 aug revised (1)
Construction cv 2015  aug revised (1)Construction cv 2015  aug revised (1)
Construction cv 2015 aug revised (1)
 
Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015
 
gene-malboeuf-resume
gene-malboeuf-resumegene-malboeuf-resume
gene-malboeuf-resume
 
Marco Montano Resume 2
Marco Montano Resume 2Marco Montano Resume 2
Marco Montano Resume 2
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
 
Construction CV 2015- May Revised
Construction CV 2015- May RevisedConstruction CV 2015- May Revised
Construction CV 2015- May Revised
 
Dale Girling Resume 2014
Dale Girling Resume 2014Dale Girling Resume 2014
Dale Girling Resume 2014
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
 
Resume for Jerry Rodgers
Resume for Jerry RodgersResume for Jerry Rodgers
Resume for Jerry Rodgers
 
Dale Girling Resume 2014
Dale Girling Resume 2014Dale Girling Resume 2014
Dale Girling Resume 2014
 
Resume for Scott McKeen 2016 -REV1
Resume for Scott McKeen 2016 -REV1Resume for Scott McKeen 2016 -REV1
Resume for Scott McKeen 2016 -REV1
 
Dale Girling Resume 2014
Dale Girling Resume 2014Dale Girling Resume 2014
Dale Girling Resume 2014
 
Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015Peter Morrison Resume Sept 2015
Peter Morrison Resume Sept 2015
 

Resume_Gary Boulter_10-27-16

  • 1. Gary W. Boulter PARKER, CO 80138 | (303) 519-3945 | GARY.BOULTER@MAC.COM Project Manager An established project manager, experienced in managing both complex cell tower construction projects, as well as aerial fiber optic construction projects. A strategic thinker who can establish and manage plans, while building and fostering collaborative relationships. Leverages expertise in driving projects to completion, with oversight of the end-to-end project lifecycle. Experience includes; managing multiple teams, partnering with outside vendors and manufacturers, equipment planning, site and design walks, as well as logistics. Responsible for managing construction projects on 200+ cell tower sites, within multiple states. PROFESSIONAL EXPERIENCE ____ Pauley Construction, LLC Sept. 2016 - Present Fiber optic Construction Field Supervisor  Provideson-site supervision for 20+ concurrent aerial and underground fiber optic construction projects.  Responsible forreviewingblue printdesigns, projectscope and requirements, evaluatingconstructionsites and make recommendations for changes, to ensure project delivery.  Ensures on schedule project completion, by tracking, managing, and reporting on progress and scope.  Collaborates with Federal, State, and Local Municipalities for permits and inspection requirements.  Responsible foradheringto OwenCorningfiberopticproductspecifications, toensure properinstallation.  Provides technical, procedural and product guidance for up to 40 field technicians and contractors.  Interfaceswiththe Engineeringteamtocoordinateprojectconstructionactivitiesandchange management.  Responsible for coordinating field personnel to mitigate inspection finding.  Ensures all field personnel adheres to OSHA safety regulations.  Review all sub-contractor performance and support their efforts as needed. Colorado Department of Transportation April 2016 – Sept. 2016 Maintenance Technician  Maintained state highway and roadway systems.  MaintainedequipmenttoDepartmentof Transportationstandards. Identifiedconstructionequipment and mechanical needs. Maintained records and prepared equipment reports.  Maintenance isfrequentlyperformed these duties underhazardous,highvolumetrafficsituations includingadverse weatherconditions. Mastec / WesTower Communications Inc. 2013 - 2015 Project Manager  Successfullymanaged200+ cell towerconstructionprojects, inmultiplestates.  Coordinated schedulesandcosts, withutilitycompanies thatprovide infrastructureandservices for construction projects.  Monitored workmanshipqualityof contractors.  Reviewed change proposals,proposal requests,requestsforinformation,supplemental instructions,and othercontract documentationasrequiredonbehalf of the client’sinterests.  CollaboratedwithFederal,State,and Local Municipalities forpermitsand inspectionrequirements.
  • 2.  Successfullymaintainedprojectmilestones andworked withinthe PACEsystem.  Participatedwiththe clienton cell towerdesignwalks,tovalidate cell siteconfiguration.  Managed powerplants andbatterybackup configurationand loadparameters.  Managed EPL,whichincludedtrackingEPLmilestone dateswithinthe PACEsystemandcreatedExcel spreadsheetswithpivottables,fortrackingandreportingof EPL  Identifiedareasof opportunity withequipmentorderingprocess andimplemented solutionsto streamline the orderingprocess.  Successfully upgradedcell sitetechnology fromcoax tofiberoptic. Construction Manager  Responsible for equipment planning and logistics milestone dates.  Ordered, managed, and coordinated materials for cell towers construction projects in multiple states.  Performed direct site supervisionof cell tower EPL installation during construction, making sure that all cabling AC, DC, fiber and Cat 5 cabling was installed to specifications and properly labeled.  Worked with microwave teams in mounting and general alignment of microwave antenna and cabling.  Coordinatedthe transportof construction materialsbothinboundandoutboundfromvariouswarehouses. Warehouse Manager  Managed a startup warehouse in Denver, Colorado. Helped streamline operations and set up an efficient transportation program. General Dynamics Information Technology 2012 - 2013 Materials Manager  Managed, delivered and coordinated materials for cell tower construction projects.  Coordinated the transport of materials both inbound and outbound from various warehouses.  Created inventory, warranty service and returned merchandise authorization reports.  Tracked high value assets.  Worked alongside project managers to coordinate material deliveries for proposed construction sites. Horizon Transportation 2011 - 2011 Independent transportation contractor  Responsible for the overall operations of the transportation of trailers, recreational vehicles and boats. Henderson Trucking 2011 - 2011 Commercial Driver  Over the road tractor trailer driver. Rocky Mountain Productions, LLP 2005 - 2011 General Partner (GAP:January 2000 to July 2005 was a stay-at-home dad). ADDITIONAL WORKEXPERIENCE . ConstructionSupervisor,Ayars&AyarsCommercial Construction.ElectronicsService Technician, Yant EquipmentCompany (1985-1991). Line Pilot, DuncanAviation (1980-1985). UnitedStatesNavy (1976-1980). EDCATION & TRAINING . HighSchool Diploma, WhittierHighSchool- Whittier, CA. RioHondoCollege-Whittier, CA &CerritosCollege- Norwalk,CA. Microsoft;Outlook, Excel,Word andPowerPoint. CASPR, PACE. CERTIFICATIONS . Commercial DriverLicense,ClassA., ASHICertified inCPR&AED. OSHA 10-hour Course EnclosedSpace EntryCert, TrenchExcavationCert, CompetentPersonCert.