Gary W. Boulter is an experienced project manager specializing in managing complex cell tower and fiber optic construction projects. He has managed over 200 cell tower construction sites across multiple states. Currently, he supervises 20 concurrent fiber optic projects, ensuring on-schedule completion through tracking progress and scope. Boulter also has experience ordering materials, coordinating logistics, and providing guidance to field technicians and contractors. He aims to foster collaborative relationships and drive projects to completion through all phases of the project lifecycle.
1. Gary W. Boulter
PARKER, CO 80138 | (303) 519-3945 | GARY.BOULTER@MAC.COM
Project Manager
An established project manager, experienced in managing both complex cell tower construction
projects, as well as aerial fiber optic construction projects. A strategic thinker who can establish and
manage plans, while building and fostering collaborative relationships. Leverages expertise in driving
projects to completion, with oversight of the end-to-end project lifecycle. Experience includes;
managing multiple teams, partnering with outside vendors and manufacturers, equipment planning,
site and design walks, as well as logistics. Responsible for managing construction projects on 200+
cell tower sites, within multiple states.
PROFESSIONAL EXPERIENCE ____
Pauley Construction, LLC Sept. 2016 - Present
Fiber optic Construction Field Supervisor
Provideson-site supervision for 20+ concurrent aerial and underground fiber optic construction projects.
Responsible forreviewingblue printdesigns, projectscope and requirements, evaluatingconstructionsites
and make recommendations for changes, to ensure project delivery.
Ensures on schedule project completion, by tracking, managing, and reporting on progress and scope.
Collaborates with Federal, State, and Local Municipalities for permits and inspection requirements.
Responsible foradheringto OwenCorningfiberopticproductspecifications, toensure properinstallation.
Provides technical, procedural and product guidance for up to 40 field technicians and contractors.
Interfaceswiththe Engineeringteamtocoordinateprojectconstructionactivitiesandchange management.
Responsible for coordinating field personnel to mitigate inspection finding.
Ensures all field personnel adheres to OSHA safety regulations.
Review all sub-contractor performance and support their efforts as needed.
Colorado Department of Transportation April 2016 – Sept. 2016
Maintenance Technician
Maintained state highway and roadway systems.
MaintainedequipmenttoDepartmentof Transportationstandards. Identifiedconstructionequipment and
mechanical needs. Maintained records and prepared equipment reports.
Maintenance isfrequentlyperformed these duties underhazardous,highvolumetrafficsituations
includingadverse weatherconditions.
Mastec / WesTower Communications Inc. 2013 - 2015
Project Manager
Successfullymanaged200+ cell towerconstructionprojects, inmultiplestates.
Coordinated schedulesandcosts, withutilitycompanies thatprovide infrastructureandservices for
construction projects.
Monitored workmanshipqualityof contractors.
Reviewed change proposals,proposal requests,requestsforinformation,supplemental instructions,and
othercontract documentationasrequiredonbehalf of the client’sinterests.
CollaboratedwithFederal,State,and Local Municipalities forpermitsand inspectionrequirements.
2. Successfullymaintainedprojectmilestones andworked withinthe PACEsystem.
Participatedwiththe clienton cell towerdesignwalks,tovalidate cell siteconfiguration.
Managed powerplants andbatterybackup configurationand loadparameters.
Managed EPL,whichincludedtrackingEPLmilestone dateswithinthe PACEsystemandcreatedExcel
spreadsheetswithpivottables,fortrackingandreportingof EPL
Identifiedareasof opportunity withequipmentorderingprocess andimplemented solutionsto streamline
the orderingprocess.
Successfully upgradedcell sitetechnology fromcoax tofiberoptic.
Construction Manager
Responsible for equipment planning and logistics milestone dates.
Ordered, managed, and coordinated materials for cell towers construction projects in multiple states.
Performed direct site supervisionof cell tower EPL installation during construction, making sure that all
cabling AC, DC, fiber and Cat 5 cabling was installed to specifications and properly labeled.
Worked with microwave teams in mounting and general alignment of microwave antenna and cabling.
Coordinatedthe transportof construction materialsbothinboundandoutboundfromvariouswarehouses.
Warehouse Manager
Managed a startup warehouse in Denver, Colorado. Helped streamline operations and set up an efficient
transportation program.
General Dynamics Information Technology 2012 - 2013
Materials Manager
Managed, delivered and coordinated materials for cell tower construction projects.
Coordinated the transport of materials both inbound and outbound from various warehouses.
Created inventory, warranty service and returned merchandise authorization reports.
Tracked high value assets.
Worked alongside project managers to coordinate material deliveries for proposed construction sites.
Horizon Transportation 2011 - 2011
Independent transportation contractor
Responsible for the overall operations of the transportation of trailers, recreational vehicles and boats.
Henderson Trucking 2011 - 2011
Commercial Driver
Over the road tractor trailer driver.
Rocky Mountain Productions, LLP 2005 - 2011
General Partner
(GAP:January 2000 to July 2005 was a stay-at-home dad).
ADDITIONAL WORKEXPERIENCE .
ConstructionSupervisor,Ayars&AyarsCommercial Construction.ElectronicsService Technician, Yant
EquipmentCompany (1985-1991). Line Pilot, DuncanAviation (1980-1985). UnitedStatesNavy (1976-1980).
EDCATION & TRAINING .
HighSchool Diploma, WhittierHighSchool- Whittier, CA. RioHondoCollege-Whittier, CA &CerritosCollege-
Norwalk,CA. Microsoft;Outlook, Excel,Word andPowerPoint. CASPR, PACE.
CERTIFICATIONS .
Commercial DriverLicense,ClassA., ASHICertified inCPR&AED. OSHA 10-hour Course
EnclosedSpace EntryCert, TrenchExcavationCert, CompetentPersonCert.