SlideShare a Scribd company logo
1 of 3
JOB PROFILE-John M. Asuquo
Education:
State Institute of Technology, Jesi - Italy (Italian HND - Geometra) in Civil
Engineering) - 1979 - 1983.
Contact Address: No6 Udoekong Akpabio Street, Anua Obio,Uyo.
Phone: 08037436154
Email: johnmasuquo@yahoo.co
Projects types executed:
OIL & GAS – Load-outSupervision Project Material coordination-MOBIL PRODUCING
NIGERIA UNLIMITED
Infra-structure construction– ALSCON Ikot Abasi –MCC NIGERIA LIMITED
Road Construction & Rehabilitation – MCC NIGERIA LIMITED
International Airport Construction, Minna- PW.NIGERIA LIMITED
Dam construction – J.V.TORNO FOR SHIRORO
Work Experience ( From the most resent down)
. Mobil Producing Nigeria: OIL AND GAS (December 1, 2008 till June 2015)
Position1:MaterialLoad-out Supervisor attached to Mobil contractor’s fabrication yards of
Project Master Nigeria Limited, Amber Resources Nigeria limited, Tombim Services
Limited,Turnkey Petroleum Project Limited, Orbital&Orange Nigeria Limited yards all in
Port Harcourt from December 1, 2008 to October 2013
Position11:Material Load-out supervisor and coordinator at Federal Ocean
Terminal(FOT), Onne storage Shore base location from October 2013 till June 30, 2015
Responsibilities:
a) Supervision of project materials reception,storageand preservation, issuing and
transport management process thus;
- Driving of MPN Safety policy of NO BODY GETS HURT in all our operations during activities.
-Analyzing project Material Issuing Form (MIF) and putting necessary advanced reception
arrangements in place for incoming and load-out project materials
-Ensuring safe material manual and mechanical handling during lifting operations
-Ensuring necessary follow-ups on Material Reception Reports (MRR) to capture correct status of
materials received
-Prompt treatment of technical queries (TQ) and close-out
-Pursuing and attending promptly to project Material Issuing Form/Material Take –off
-Raising and submitting weekly project material reconciliation reports (MR/RR) to MPN
management
- Obtaining necessary Mill Certificates and raising project material reception reports accordingly
- Treatment of Material Transfer Instruction (MTI) with contractor
- Raising material tracking sheets on received/issued materials
- Following-ups on the release of material return form (MRF) and effecting return of project excess
materials to FOT-ONNE for storage.
b)Supervision ofLoad-outs of project’s fabricated structures/installation materials to offshore as
follows;
- Ensuring follow-up on readiness of fabricated structures,relevant tests certificates and release
notes
- Raising ofdaily reports on completed of load-out items to management
- Providing and effectively coordinating transport management processfor materials’ movement
- Ensuring effective documentation of project materialmovement, storage and preservation with
backup manifests and correspondences
c) Supervising and jointly effecting final projectmaterial verification and reconciliations with
contractor at close ofproject, pursuing approved MRF for return ofexcess projectmaterials to
FOT, Onne and coordinating safe material movementwith advanced information to end receivers
1) Activities at Federal Ocean Terminal (FOT), Onne;
- Driving MPN safety policies within my operational areas
- Supervising MPN material handling process by Nigeria Project Organization Logistics (NPOL)
thus; raising advices such as material issuing form(MIF), Material Transfer Form (MTF),Material
Return Form (MRF) to standardize material handling operation with NPOL
- Verifying and endorsing for movement of materials on load-out and receiving manifests jointly
with NPOL representatives
- Coordination of bothExxonMobil onshore and offshore material movement operations.
- Issuance of periodic material/personnel status reports to MPN management
- Coordinating offshore material personnel shifts
2) MCC Nig Ltd: Project coordinator:
- (2000–2003) – Rehabilitation/construction of Orlu – Urualla – Akokwa road
-(2003-2004) – Rehabilitation/construction of Nwesenyi – Effium road
-(2004 - 2008) – Rehabilitation/construction of Amaraku – Nwangele road and Ihiala – Orlu –
Umuduru road
3) MCC Nig Ltd: Site Engineer/Agent.
- (1992 - 1993) and (1995-1998)– Construction ofinfrastructures in Alscon Township - Ikot
Abasi.roads/slabs and car parks all in phases 1, 2, and 3 ofthe project.
- (1993-1994) – Construction of Okorotte – Iko road/bridge
- (1994-1995) Rehabilitation/construction ofEket-Etinan road
- 1998-2000) Rehabilitation/construction of Port Harcourt – Warri (East-West) road
4.) P. W. Nig. Ltd: Site Engineer
- (1986-1990) Construction of MinnaInternationalAirport by PW. (Nig.) Ltd.
- (1990-1992) Rehabilitation/construction of Panyam – Dawaki road.
KEY ACTIVITIES
-General survey/setting out of the runway, turning areas, taxiways, aprons and service roads,
-Raising programme of work, sketches, organizing supervision/ construction of runway, taxiway,
turning area, crash roads in laterite and asphalt as well as concreting of apron, culverts and line
drains.
-Computation /raising of interim/final certificates for claims.
-Supervising construction of Kafingoro Road in Niger state and Dawaki-Panyam road in Plateau
state
5. J V. Torno for Shiroro –Niger State,Nigeria:
NYSC(1983 – 1984) – Shiroro dam project by J V. Torno for Shiroro - Niger State, Nigeria.
-Measurement Engineer (1984-1986) – Shiroro Dam project NigerState.
KEY ACTIVITIES
-Production of as-built drawings of power intake, dam lifts, dam-face concrete
slabs, spillway/chute, penstocks, power house and switch yard.
-Representing company during1985 Minna trade-fare to showcase company’s
fame on Dam works.
Industrial Training:
-1982 and 1983 –Attached to GrandiLavori Construction Company at Bologna – Italy.
Hobbies: Travelling, Site seeing and In-door games
Asuquo, John Michael

More Related Content

What's hot

Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtNewington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtFairfax County
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016hee siek fung
 
McCormick DA - WSP CV - Feb 2015
McCormick DA - WSP CV - Feb 2015McCormick DA - WSP CV - Feb 2015
McCormick DA - WSP CV - Feb 2015Dave McCormick
 
Site_Surveying_Class (2)
Site_Surveying_Class (2)Site_Surveying_Class (2)
Site_Surveying_Class (2)Sandy Noisette
 
Cv of ian shannon
Cv of ian shannonCv of ian shannon
Cv of ian shannonian shannon
 
Ali Seenah C.V.
Ali Seenah C.V.Ali Seenah C.V.
Ali Seenah C.V.Ali Seenah
 
Colin Perryman CV[1] (1)
Colin Perryman CV[1] (1)Colin Perryman CV[1] (1)
Colin Perryman CV[1] (1)colin perryman
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015Hassan gariesh
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed Ahmed
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016Ronaldo Jugueta
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copydon rawson
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar
 

What's hot (18)

Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtNewington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016
 
McCormick DA - WSP CV - Feb 2015
McCormick DA - WSP CV - Feb 2015McCormick DA - WSP CV - Feb 2015
McCormick DA - WSP CV - Feb 2015
 
Site_Surveying_Class (2)
Site_Surveying_Class (2)Site_Surveying_Class (2)
Site_Surveying_Class (2)
 
Cv of ian shannon
Cv of ian shannonCv of ian shannon
Cv of ian shannon
 
Ian C. Shannon
Ian C. ShannonIan C. Shannon
Ian C. Shannon
 
Ali Seenah C.V.
Ali Seenah C.V.Ali Seenah C.V.
Ali Seenah C.V.
 
Colin Perryman CV[1] (1)
Colin Perryman CV[1] (1)Colin Perryman CV[1] (1)
Colin Perryman CV[1] (1)
 
Resume of Mohammad Kamruzzaman
Resume of Mohammad KamruzzamanResume of Mohammad Kamruzzaman
Resume of Mohammad Kamruzzaman
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
RESUME
RESUMERESUME
RESUME
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
CV
CVCV
CV
 
C V GERBER T
C V  GERBER TC V  GERBER T
C V GERBER T
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016
 

Viewers also liked

Penélope y Casandra
Penélope y CasandraPenélope y Casandra
Penélope y CasandraIreneadd
 
Hispania Romana.
Hispania Romana.Hispania Romana.
Hispania Romana.Ireneadd
 
Photoshoot presentation pdf
Photoshoot presentation pdfPhotoshoot presentation pdf
Photoshoot presentation pdfchloejane16
 
Photoshop contents pp
Photoshop contents ppPhotoshop contents pp
Photoshop contents ppchloejane16
 
Архітектура ПК
Архітектура ПКАрхітектура ПК
Архітектура ПКPulsar1962
 
Evaluation media pp
Evaluation media ppEvaluation media pp
Evaluation media ppchloejane16
 
Front cover photoshop pp
Front cover photoshop ppFront cover photoshop pp
Front cover photoshop ppchloejane16
 
Photoshop front cover pp
Photoshop front cover ppPhotoshop front cover pp
Photoshop front cover ppchloejane16
 
Camera angles pp
Camera angles ppCamera angles pp
Camera angles ppchloejane16
 
La antigua roma
La antigua romaLa antigua roma
La antigua romaIreneadd
 
8 OpenCart Blogs You Need to Follow
8 OpenCart Blogs You Need to Follow8 OpenCart Blogs You Need to Follow
8 OpenCart Blogs You Need to FollowMihail Savov
 
Camera angles pdf
Camera angles pdfCamera angles pdf
Camera angles pdfchloejane16
 
Hispania Romana
Hispania RomanaHispania Romana
Hispania RomanaIreneadd
 
Hiapania romana
Hiapania romanaHiapania romana
Hiapania romanaIreneadd
 
10 Examples of Exit Popups Used as a Customer Retention Strategy
10 Examples of Exit Popups Used as a Customer Retention Strategy10 Examples of Exit Popups Used as a Customer Retention Strategy
10 Examples of Exit Popups Used as a Customer Retention StrategyMihail Savov
 

Viewers also liked (19)

Penélope y Casandra
Penélope y CasandraPenélope y Casandra
Penélope y Casandra
 
Hispania Romana.
Hispania Romana.Hispania Romana.
Hispania Romana.
 
Photoshoot presentation pdf
Photoshoot presentation pdfPhotoshoot presentation pdf
Photoshoot presentation pdf
 
Hairstyles pdf
Hairstyles pdfHairstyles pdf
Hairstyles pdf
 
Photoshop contents pp
Photoshop contents ppPhotoshop contents pp
Photoshop contents pp
 
Jonas blue bio
Jonas blue bioJonas blue bio
Jonas blue bio
 
Архітектура ПК
Архітектура ПКАрхітектура ПК
Архітектура ПК
 
Evaluation media pp
Evaluation media ppEvaluation media pp
Evaluation media pp
 
Front cover photoshop pp
Front cover photoshop ppFront cover photoshop pp
Front cover photoshop pp
 
Interview pdf
Interview pdfInterview pdf
Interview pdf
 
Photoshop front cover pp
Photoshop front cover ppPhotoshop front cover pp
Photoshop front cover pp
 
Camera angles pp
Camera angles ppCamera angles pp
Camera angles pp
 
La antigua roma
La antigua romaLa antigua roma
La antigua roma
 
8 OpenCart Blogs You Need to Follow
8 OpenCart Blogs You Need to Follow8 OpenCart Blogs You Need to Follow
8 OpenCart Blogs You Need to Follow
 
Camera angles pdf
Camera angles pdfCamera angles pdf
Camera angles pdf
 
Hispania Romana
Hispania RomanaHispania Romana
Hispania Romana
 
Trabajo
TrabajoTrabajo
Trabajo
 
Hiapania romana
Hiapania romanaHiapania romana
Hiapania romana
 
10 Examples of Exit Popups Used as a Customer Retention Strategy
10 Examples of Exit Popups Used as a Customer Retention Strategy10 Examples of Exit Popups Used as a Customer Retention Strategy
10 Examples of Exit Popups Used as a Customer Retention Strategy
 

Similar to John Asuquo (20)

Update - CV[2 e] - --AIS
Update - CV[2 e] - --AISUpdate - CV[2 e] - --AIS
Update - CV[2 e] - --AIS
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 
Basheer C.V.1
Basheer C.V.1Basheer C.V.1
Basheer C.V.1
 
Updated CV Aug 6 2015
Updated CV Aug 6 2015Updated CV Aug 6 2015
Updated CV Aug 6 2015
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
CURRICULUM VITAE 4 for bidding-nest
CURRICULUM VITAE 4 for bidding-nestCURRICULUM VITAE 4 for bidding-nest
CURRICULUM VITAE 4 for bidding-nest
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
updated Curriculum -osama[1]
updated Curriculum -osama[1]updated Curriculum -osama[1]
updated Curriculum -osama[1]
 
CURRICULUM_VITAE_Y 2015
CURRICULUM_VITAE_Y 2015CURRICULUM_VITAE_Y 2015
CURRICULUM_VITAE_Y 2015
 
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
 
CV -Nildo M. Nhaliginga
CV -Nildo M. NhaligingaCV -Nildo M. Nhaliginga
CV -Nildo M. Nhaliginga
 
CV_JAKKARIN PAETPITAK_(ENG)_141015
CV_JAKKARIN PAETPITAK_(ENG)_141015CV_JAKKARIN PAETPITAK_(ENG)_141015
CV_JAKKARIN PAETPITAK_(ENG)_141015
 
GERALD ROMINGER RESUME
GERALD ROMINGER RESUMEGERALD ROMINGER RESUME
GERALD ROMINGER RESUME
 
Cv & projects updated
Cv & projects updatedCv & projects updated
Cv & projects updated
 
Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
Update CV-Junaidi_Juni 2016
Update CV-Junaidi_Juni 2016Update CV-Junaidi_Juni 2016
Update CV-Junaidi_Juni 2016
 
Tony achkar cv
Tony achkar cvTony achkar cv
Tony achkar cv
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
Cv Mohamed Gaber eng.
Cv Mohamed Gaber eng.Cv Mohamed Gaber eng.
Cv Mohamed Gaber eng.
 

John Asuquo

  • 1. JOB PROFILE-John M. Asuquo Education: State Institute of Technology, Jesi - Italy (Italian HND - Geometra) in Civil Engineering) - 1979 - 1983. Contact Address: No6 Udoekong Akpabio Street, Anua Obio,Uyo. Phone: 08037436154 Email: johnmasuquo@yahoo.co Projects types executed: OIL & GAS – Load-outSupervision Project Material coordination-MOBIL PRODUCING NIGERIA UNLIMITED Infra-structure construction– ALSCON Ikot Abasi –MCC NIGERIA LIMITED Road Construction & Rehabilitation – MCC NIGERIA LIMITED International Airport Construction, Minna- PW.NIGERIA LIMITED Dam construction – J.V.TORNO FOR SHIRORO Work Experience ( From the most resent down) . Mobil Producing Nigeria: OIL AND GAS (December 1, 2008 till June 2015) Position1:MaterialLoad-out Supervisor attached to Mobil contractor’s fabrication yards of Project Master Nigeria Limited, Amber Resources Nigeria limited, Tombim Services Limited,Turnkey Petroleum Project Limited, Orbital&Orange Nigeria Limited yards all in Port Harcourt from December 1, 2008 to October 2013 Position11:Material Load-out supervisor and coordinator at Federal Ocean Terminal(FOT), Onne storage Shore base location from October 2013 till June 30, 2015 Responsibilities: a) Supervision of project materials reception,storageand preservation, issuing and transport management process thus; - Driving of MPN Safety policy of NO BODY GETS HURT in all our operations during activities. -Analyzing project Material Issuing Form (MIF) and putting necessary advanced reception arrangements in place for incoming and load-out project materials -Ensuring safe material manual and mechanical handling during lifting operations -Ensuring necessary follow-ups on Material Reception Reports (MRR) to capture correct status of materials received -Prompt treatment of technical queries (TQ) and close-out -Pursuing and attending promptly to project Material Issuing Form/Material Take –off -Raising and submitting weekly project material reconciliation reports (MR/RR) to MPN management - Obtaining necessary Mill Certificates and raising project material reception reports accordingly - Treatment of Material Transfer Instruction (MTI) with contractor - Raising material tracking sheets on received/issued materials
  • 2. - Following-ups on the release of material return form (MRF) and effecting return of project excess materials to FOT-ONNE for storage. b)Supervision ofLoad-outs of project’s fabricated structures/installation materials to offshore as follows; - Ensuring follow-up on readiness of fabricated structures,relevant tests certificates and release notes - Raising ofdaily reports on completed of load-out items to management - Providing and effectively coordinating transport management processfor materials’ movement - Ensuring effective documentation of project materialmovement, storage and preservation with backup manifests and correspondences c) Supervising and jointly effecting final projectmaterial verification and reconciliations with contractor at close ofproject, pursuing approved MRF for return ofexcess projectmaterials to FOT, Onne and coordinating safe material movementwith advanced information to end receivers 1) Activities at Federal Ocean Terminal (FOT), Onne; - Driving MPN safety policies within my operational areas - Supervising MPN material handling process by Nigeria Project Organization Logistics (NPOL) thus; raising advices such as material issuing form(MIF), Material Transfer Form (MTF),Material Return Form (MRF) to standardize material handling operation with NPOL - Verifying and endorsing for movement of materials on load-out and receiving manifests jointly with NPOL representatives - Coordination of bothExxonMobil onshore and offshore material movement operations. - Issuance of periodic material/personnel status reports to MPN management - Coordinating offshore material personnel shifts 2) MCC Nig Ltd: Project coordinator: - (2000–2003) – Rehabilitation/construction of Orlu – Urualla – Akokwa road -(2003-2004) – Rehabilitation/construction of Nwesenyi – Effium road -(2004 - 2008) – Rehabilitation/construction of Amaraku – Nwangele road and Ihiala – Orlu – Umuduru road 3) MCC Nig Ltd: Site Engineer/Agent. - (1992 - 1993) and (1995-1998)– Construction ofinfrastructures in Alscon Township - Ikot Abasi.roads/slabs and car parks all in phases 1, 2, and 3 ofthe project. - (1993-1994) – Construction of Okorotte – Iko road/bridge - (1994-1995) Rehabilitation/construction ofEket-Etinan road - 1998-2000) Rehabilitation/construction of Port Harcourt – Warri (East-West) road 4.) P. W. Nig. Ltd: Site Engineer - (1986-1990) Construction of MinnaInternationalAirport by PW. (Nig.) Ltd. - (1990-1992) Rehabilitation/construction of Panyam – Dawaki road. KEY ACTIVITIES -General survey/setting out of the runway, turning areas, taxiways, aprons and service roads,
  • 3. -Raising programme of work, sketches, organizing supervision/ construction of runway, taxiway, turning area, crash roads in laterite and asphalt as well as concreting of apron, culverts and line drains. -Computation /raising of interim/final certificates for claims. -Supervising construction of Kafingoro Road in Niger state and Dawaki-Panyam road in Plateau state 5. J V. Torno for Shiroro –Niger State,Nigeria: NYSC(1983 – 1984) – Shiroro dam project by J V. Torno for Shiroro - Niger State, Nigeria. -Measurement Engineer (1984-1986) – Shiroro Dam project NigerState. KEY ACTIVITIES -Production of as-built drawings of power intake, dam lifts, dam-face concrete slabs, spillway/chute, penstocks, power house and switch yard. -Representing company during1985 Minna trade-fare to showcase company’s fame on Dam works. Industrial Training: -1982 and 1983 –Attached to GrandiLavori Construction Company at Bologna – Italy. Hobbies: Travelling, Site seeing and In-door games Asuquo, John Michael