John M. Asuquo has over 30 years of experience in civil engineering projects in Nigeria. He has worked on infrastructure projects such as road construction and rehabilitation, airport construction, and dam construction. His roles have included materials coordination, load-out supervision, project coordination, and site engineering. Asuquo's education includes an HND in Civil Engineering from the State Institute of Technology in Jesi, Italy. He is currently a materials load-out supervisor and coordinator based in Port Harcourt, Nigeria.
1. JOB PROFILE-John M. Asuquo
Education:
State Institute of Technology, Jesi - Italy (Italian HND - Geometra) in Civil
Engineering) - 1979 - 1983.
Contact Address: No6 Udoekong Akpabio Street, Anua Obio,Uyo.
Phone: 08037436154
Email: johnmasuquo@yahoo.co
Projects types executed:
OIL & GAS – Load-outSupervision Project Material coordination-MOBIL PRODUCING
NIGERIA UNLIMITED
Infra-structure construction– ALSCON Ikot Abasi –MCC NIGERIA LIMITED
Road Construction & Rehabilitation – MCC NIGERIA LIMITED
International Airport Construction, Minna- PW.NIGERIA LIMITED
Dam construction – J.V.TORNO FOR SHIRORO
Work Experience ( From the most resent down)
. Mobil Producing Nigeria: OIL AND GAS (December 1, 2008 till June 2015)
Position1:MaterialLoad-out Supervisor attached to Mobil contractor’s fabrication yards of
Project Master Nigeria Limited, Amber Resources Nigeria limited, Tombim Services
Limited,Turnkey Petroleum Project Limited, Orbital&Orange Nigeria Limited yards all in
Port Harcourt from December 1, 2008 to October 2013
Position11:Material Load-out supervisor and coordinator at Federal Ocean
Terminal(FOT), Onne storage Shore base location from October 2013 till June 30, 2015
Responsibilities:
a) Supervision of project materials reception,storageand preservation, issuing and
transport management process thus;
- Driving of MPN Safety policy of NO BODY GETS HURT in all our operations during activities.
-Analyzing project Material Issuing Form (MIF) and putting necessary advanced reception
arrangements in place for incoming and load-out project materials
-Ensuring safe material manual and mechanical handling during lifting operations
-Ensuring necessary follow-ups on Material Reception Reports (MRR) to capture correct status of
materials received
-Prompt treatment of technical queries (TQ) and close-out
-Pursuing and attending promptly to project Material Issuing Form/Material Take –off
-Raising and submitting weekly project material reconciliation reports (MR/RR) to MPN
management
- Obtaining necessary Mill Certificates and raising project material reception reports accordingly
- Treatment of Material Transfer Instruction (MTI) with contractor
- Raising material tracking sheets on received/issued materials
2. - Following-ups on the release of material return form (MRF) and effecting return of project excess
materials to FOT-ONNE for storage.
b)Supervision ofLoad-outs of project’s fabricated structures/installation materials to offshore as
follows;
- Ensuring follow-up on readiness of fabricated structures,relevant tests certificates and release
notes
- Raising ofdaily reports on completed of load-out items to management
- Providing and effectively coordinating transport management processfor materials’ movement
- Ensuring effective documentation of project materialmovement, storage and preservation with
backup manifests and correspondences
c) Supervising and jointly effecting final projectmaterial verification and reconciliations with
contractor at close ofproject, pursuing approved MRF for return ofexcess projectmaterials to
FOT, Onne and coordinating safe material movementwith advanced information to end receivers
1) Activities at Federal Ocean Terminal (FOT), Onne;
- Driving MPN safety policies within my operational areas
- Supervising MPN material handling process by Nigeria Project Organization Logistics (NPOL)
thus; raising advices such as material issuing form(MIF), Material Transfer Form (MTF),Material
Return Form (MRF) to standardize material handling operation with NPOL
- Verifying and endorsing for movement of materials on load-out and receiving manifests jointly
with NPOL representatives
- Coordination of bothExxonMobil onshore and offshore material movement operations.
- Issuance of periodic material/personnel status reports to MPN management
- Coordinating offshore material personnel shifts
2) MCC Nig Ltd: Project coordinator:
- (2000–2003) – Rehabilitation/construction of Orlu – Urualla – Akokwa road
-(2003-2004) – Rehabilitation/construction of Nwesenyi – Effium road
-(2004 - 2008) – Rehabilitation/construction of Amaraku – Nwangele road and Ihiala – Orlu –
Umuduru road
3) MCC Nig Ltd: Site Engineer/Agent.
- (1992 - 1993) and (1995-1998)– Construction ofinfrastructures in Alscon Township - Ikot
Abasi.roads/slabs and car parks all in phases 1, 2, and 3 ofthe project.
- (1993-1994) – Construction of Okorotte – Iko road/bridge
- (1994-1995) Rehabilitation/construction ofEket-Etinan road
- 1998-2000) Rehabilitation/construction of Port Harcourt – Warri (East-West) road
4.) P. W. Nig. Ltd: Site Engineer
- (1986-1990) Construction of MinnaInternationalAirport by PW. (Nig.) Ltd.
- (1990-1992) Rehabilitation/construction of Panyam – Dawaki road.
KEY ACTIVITIES
-General survey/setting out of the runway, turning areas, taxiways, aprons and service roads,
3. -Raising programme of work, sketches, organizing supervision/ construction of runway, taxiway,
turning area, crash roads in laterite and asphalt as well as concreting of apron, culverts and line
drains.
-Computation /raising of interim/final certificates for claims.
-Supervising construction of Kafingoro Road in Niger state and Dawaki-Panyam road in Plateau
state
5. J V. Torno for Shiroro –Niger State,Nigeria:
NYSC(1983 – 1984) – Shiroro dam project by J V. Torno for Shiroro - Niger State, Nigeria.
-Measurement Engineer (1984-1986) – Shiroro Dam project NigerState.
KEY ACTIVITIES
-Production of as-built drawings of power intake, dam lifts, dam-face concrete
slabs, spillway/chute, penstocks, power house and switch yard.
-Representing company during1985 Minna trade-fare to showcase company’s
fame on Dam works.
Industrial Training:
-1982 and 1983 –Attached to GrandiLavori Construction Company at Bologna – Italy.
Hobbies: Travelling, Site seeing and In-door games
Asuquo, John Michael