1. CM-307 – Site Development April 9, 2011
Page 1
Pratt Institute
CM-307 – Site Development
April 9, 2011
9:00 AM – 12:00 PM
Site Surveying Field Trip to Franklin D. Roosevelt, Four Freedoms Park
Construction Manager: Sciame
Student Participants:
Norman Chan
Kurtis Egan
Robert Fazio
Fidan Gjonbalaj
Petronilla Gonzalez-Magno
Andy Kim
Jonah Klein
Sandy Noisette
Industry Representatives:
Joseph Mizzi/Sciame
Andrew Sciame/Sciame
Anthony Turturro/Sciame
Avraam Papzoglou/Fehringer Surveying
As part of the curriculum of CM-307 Site Development the students met with
professional constructors at the construction site of the Franklin D. Roosevelt Four
Freedoms Park Project from 9:00 AM until 12:00 PM on Saturday, April 9, 2011.
The Franklin D. Roosevelt Four Freedoms Park is a public park designed by the late
Louis I. Kahn, and currently under construction on the south point of Roosevelt
Island in the East River of New York City. Sciame is the Construction Manager for
the project. Fehringer Surveying provides site surveying and establishes
benchmarks and axis lines for the project. Project completion is anticipated in the
spring or summer of 2012.
The students were introduced to the surveyor’s equipment:
- CST Berger AK-10 Automatic Level
- Rod
- Trimble S6 Total Station
The students worked under the supervision of a licensed surveyor to confirm an
elevation at the far end of the site from an established benchmark. The students
learned about front sights and back sights. The students worked in two groups of
four students each and recorded the elevations from the benchmark. The actual
2. CM-307 – Site Development April 9, 2011
Page 2
elevation difference was 12.0 feet, the surveying teams surveyed elevation
differences of 11.985 feet and 11.95 feet. The surveying sheets are attached.
Following the surveying exercise, the students were given a demonstration of the
capabilities of a Trimble S6 Total Station to provide layout for a theoretical
foundation to set stake points. The labor saving advantages of Global Positioning
System (GPS) based surveying technology was discussed, as well as the continuing
need to understand and apply sound surveying principles in order to avoid costly
errors in the field.
Other topics discussed included:
- Goals of site surveying
- The different means and methods of surveying
- Assessing accuracy and cost for different surveying methods
- Assessing site access
- Developing a site logistics plan
- Developing a site development phasing plan
- Developing accurate scope of work for the sub-contractors
- Coordinating the schedule of work for multiple sub-contractors
- Reviewing cost of leasing equipment: cranes, excavation equipment, etc.
- Working with the A/E team to identify and resolve constructability issues
Students and surveyors
3. CM-307 – Site Development April 9, 2011
Page 3
Architect’s rendering
Architect’s rendering
Phasing and logistics plan
4. CM-307 – Site Development April 9, 2011
Page 4
Waste characterization plan
Site trailer
Setting up
5. CM-307 – Site Development April 9, 2011
Page 5
Setting up
Surveying instructions
6. CM-307 – Site Development April 9, 2011
Page 6
Surveying tools
Sighting through the level
7. CM-307 – Site Development April 9, 2011
Page 7
Equipment discussion
Site benchmark
8. CM-307 – Site Development April 9, 2011
Page 8
Site benchmark
Sighting through the level
9. CM-307 – Site Development April 9, 2011
Page 9
Holding the rod
Rod station point
10. CM-307 – Site Development April 9, 2011
Page 10
Formwork for new river wall
Detail of rod
11. CM-307 – Site Development April 9, 2011
Page 11
Rod level
Student holding the rod
12. CM-307 – Site Development April 9, 2011
Page 12
Sighting through the level
Sighting through the level
13. CM-307 – Site Development April 9, 2011
Page 13
Sighting through the level
Detail of level
14. CM-307 – Site Development April 9, 2011
Page 14
Detail of south point
Detail of south point
Detail of west wall and rip-rap
15. CM-307 – Site Development April 9, 2011
Page 15
Detail of pumps at south point
Rod at south point
16. CM-307 – Site Development April 9, 2011
Page 16
Level sighting rod at south point
Crane
17. CM-307 – Site Development April 9, 2011
Page 17
Northwest edge of site
The results!
Team A survey results
18. CM-307 – Site Development April 9, 2011
Page 18
Team B survey results
GPS total station demonstration
19. CM-307 – Site Development April 9, 2011
Page 19
GPS total station demonstration
GPS total station demonstration
GPS total station demonstration
20. CM-307 – Site Development April 9, 2011
Page 20
Station point
GPS total station demonstration
21. CM-307 – Site Development April 9, 2011
Page 21
GPS total station demonstration
GPS total station demonstration
22. CM-307 – Site Development April 9, 2011
Page 22
GPS total station demonstration
GPS total station demonstration