SlideShare a Scribd company logo
1 of 6
IAN C SHANNON
Contact Details Personal Details
Gardeners cottage
Brimpsfield park
Brimpsfield
Gloucestershire
GL4 8LE
Tel: 01452 909527
MOBILE: 07849 222 522
E-MAIL; iancshannon@hotmail.com
Nationality: British/Scottish.
Date of Birth:
Marital Status:
Dependants:
Driving Licence:
Salary:
Languages
CSCS: SMSTS & PTS
FIRST AID at Work (Inc AED):
MEWPs For managers
NEC 3 & JCT trained
:
27/01/1960
married
Both grown up
Full (Clean)
Negotiable
CAREER HISTORY
02/2015 - to
09/2016
MJ Church
Saltersford Lane
Chippenham
Wiltshire
SN14 0RN
(Newbury racecourse,
Rodbourne, M3 upgrade,
Bristol ring road A4174)
Ref: Steve Daniels(contracts
manager)
07557651085
Paul whitehead (Contracts
Manager Balfour Beatty)
07967578539
POST: Site Manager bridge renewal (Rail) (Sub con to Balfour Beatty) Site manager for M3 motor
way & Ring road upgrade, Bristol..
- Overseeing the MJC personnel on site
- Allocating plant/Personnel to site. Ordering material (Cement Etc.)
- Acting as first aider on site
- Dealing with work packages, task briefs. H&S on site
- Report writing. Giving details on work required, work to be done.
- Liaison between MJC and Client
- M3 Proj Site manager/deputy Contracts manager
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in co-operation with QS assigned.
- Look at the costs associated with changes and budget
- Attend site and office meetings.
- Be No 1 on site and client facing
- Issuing of permits on projects
11/2014 to
02/2015
Short term
contract
Murphy Group
Cannock Rail
Cannock
Ref: Garry Smith
Mob: 07921406755
POST: Site Manager bridge renewal (Rail)
- Overseeing the trades on site
- Doing inductions of new personal allocated to the site
- Acting as first aider on site
- Dealing with work packages, task briefs. To ORR standard
- Report writing. Giving details on work required, work to be done.
- Liaison between site and Network Rail.
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
- Issuing of permits
06/2014 to
11/2014
Volkerfitzpatrick’ IEP site
Filton Stoke Gifford. Bristol
Client volkerfitzpatrick
construction
Allteck recruitment Bristol
Ref:Paul Raynor Snr PM
07876876066
POST: Site Manager Hitachi IEP maintenance depot Bristol (80 million rail project)
- Overseeing the trades on site
- Doing inductions of new personal allocated to the site
- Acting as first aider on site
- Dealing with work packages, task briefs. To ORR standard
- Report writing. Giving details on work required, work to be done.
- Giving details of work done and any issues on site that should be made aware.
- Pre start meeting, progress meeting and daily brief meeting to the supervisors..
- Dealing with all HS on site
- Progress of work and liaison with other agents on site to ensure work is on schedule and no
hold ups.
- Dealing with lift plans and acting temp work supervisor for lifts, mewps and other plant
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
- Issuing permits
05
05/2014 to to
06/2014
Gallifordtry Construction
Gainsborough hotel refit
Client Galliford try
Sphere recruitment Bristol
POST: Site Manager (night shift) (Hotel refit) Fixed term contract.
- Overseeing the trades on night shift
- Doing inductions of new personal allocated to the night shift
- Acting as first aider on site
- Allocating work in conjunction with dayshift
- Report writing. Giving details on work required for day shift for work to be done.
- Giving details of work done and any issues on site that should be made aware
- Issuing of permits
04/2014 to
05/14
ISG Construction
Bristol Airport
Central pier project (phase 1)
Client ISG Neil Spurney
Mobile:07972 190867 (For
ref)
Sphere recruitment Bristol
POST: Site Manager/Project Manager (night shift) (Aviation) Fixed term contract.
- Overseeing the trades on night shift
- Doing inductions of new personal allocated to the night shift
- Acting as first aider on site
- Allocating work in conjunction with dayshift
- Report writing. Giving details on work required for day shift for work to be done.
- Giving details of work done and any issues on site that should be made aware
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
01/14 to 04/14 Highlands and island
Airports Limited
Inverness Airport
Inverness
IV2 7JB
POST: Project Manager (Aviation) Fixed term contract.
- Overseeing a 2.3 million renovation to Sumburgh Airport in Shetland
- Being the lead in contractors and designers
- Producing reports to the HAIL executive.
- Full financial control.
- Liaison between HAIL and contractors
- Reviewing risk assessments and methods statements.
- Chair progress meetings and coordination meetings.
- Decision maker on site.
Review bids in line with DfT SMS
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
- Issuing of all permits
06/13 to 10/13 BDP Architects/First great
western
7 Hill Street
Bristol
POST: Project Manager (Rail transportation) Fixed term contract.
- Overseeing a 3 level multi-storey car park.
- Acting as first great western PM on site, and their clerk of works
- Producing reports for the rail executive.
- Full financial control.
- Liaison between BDP and FGW and Network Rail.
- Reviewing RAMS prior to submission to network rail.
- Chair progress meetings and coordination meetings.
- Take responsibility for issues on site, (when things go wrong).
- Authorised CRE on site.
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
09/10 – 11/12 Veritas Architects
148 Jalan Ampang
Kuala Lumpar
Malaysia
POST: Project Manager (Rail transportation. Aviation)
- Overseeing the design of 16 elevated and 4 underground stations along with a
maintenance yard.
- Coordinate engineers and Electrical engineers. As well as Architects, draught persons and
Design architects.
- Attend stakeholder meetings with Prime Minister of Malaysia and attend progress
meetings with client.
- Overseeing the new Air Asia HQ at Kuala Lumpur International Airport.
- Overseeing the high rise development at Penang. 3 x 5 storey with 5 x 20 storey and 5x 10
storey apartments. Including shopping mall.
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
05/2009-
06/2010
BIFAB Fabricators
West shore Road Burntisland
Fife
POST: Project Co-ordinator/manager (Oil Rig modules. Accommodation Block)
- Oversee construction between M&E, Electrical, engineering and architectural fit out to
SOLAS regs.
- Attend progress meeting and stakeholder meetings and chair when required.
- Ensure Health and safety standards are met.
- Update planning requirement, Hire additional staff when required
- Procure equipment and hire all tools required.
- Write weekly reports on progress. Any delays, Additional expenditure.
- Fix budget requirements
- Deal with health and safety, Method and risk assessments prior to commencement of work
- Finalise Final hand over documents for client (SAP system)
- Put together bid for another accommodation block with Helicopter landing pad.
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
01/2009-
05/2009
06/2007-
09/2007
06/2006 –
09/2006
09/2003-
04/2004
06/2002-
07/2003
RAF Lauchars (MOD)
DCRE Building 34A
Leuchars
Nr St Andrews
POST: Snr Architectural technician/Asst Project Manager (MOD Airbase)
- Produce working drawings for RAF (Refurb and new build)
- Oversee work by sub contractors.
- Attend and chair progress meetings with client (MOD DCRE) and sub contractors on site.
- Produce reports on progress to MOD and central government
- Check work and make sure of value for money requirements set by government.
- Deal with health and safety, Method and risk assessments prior to commencement of work
- Electrical survey of HV and LV and produce feasibility study for future expansion and all
requirements required.
- Legionella survey all RAF bases and RM condor (commando unit)
- Prepare drawings for new runway.
- Prepare layout for Camp Bastion.
02/2008-
01/2009
Wilson Design
Park Circle
Glasgow
POST: Project Manager/Snr Designer (Housing Estate 300+ units)
- Design Housing types (2 to 5 bedroom)
- Design road layout, street lighting, Drainage.
- Deal with all local authority requirements (planning, warrants)
- Deal with Tender documents (JCT form of contract)
- Attend and chair progress meetings on site.
- Check all subcontractors drawings and work on site.
- Deal with health and safety, Method and risk assessments prior to commencement
08/2007-
02/2008
Fairhursts Design Group
Faulkener Street
Manchester
POST: Project coordinator /Snr Architectural Technician (BAE Systems) (Offices, warehouse,
workshop F16 fighter)
- Design Offices and workshops for new aircraft (F16).
- Attend progress meetings and chair when required. Lead kick off meeting on site with all
sub contractors concerned.
- Coordinate between services and deal with any environmental issues.
- Distribute work between assistant and designers.
04/2007-
06/2007.
Jacobs Engineering
GSK Site, Irvine
POST: Snr Architectural Technician. (Chemical plant)
- Design offices and laboratory (Clean room)
- Produce layouts for pipe runs within plant.
- Coordinate with M&E .
- method statement and risk assessments to GSK requirements.
- Attend progress meetings and reports to GSK requirements.
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
09/2006-
01/2007.
Jacobs Engineering
Aldermaston (AWE)
POST: Project Coordinator/Snr Arch Technician. (MOD Weapons research)
- Design Explosion proof underground facilities in line with explosives regulations.
- Produce layouts M&E layouts and Electrical P&C
- Attend stakeholder meetings and produce written progress reports
09/2005-
04/2006.
Jacobs Engineering
Prestwick Air traffic control
POST: Project Coordinator (Civil Air traffic control)
- Coordinate between Sub contractors on site.
- Make sure Security and health and safety where adhered to
- Deal with any construction issues redesign where necessary liaise with Head office.
- Attend progress meetings and raise any issues.
- Cost new work.
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
04/2005-
09/2005
01/2004-
08/2004
Taylor Woodrow
2 Gabbert Road
Kirkton Campus
Livingston
West Lothian
1
POST: Project Manager/Coordinator/Designer (Housing Development)
- Produce new working drawing for site relating to new housing stock.
- Review old stock and renew.
- Over see site manager on 2 estates,
- Review method statements and risk assessments, review health and safety in regard to
new guidelines.
- Review planned layout of roads etc.
- Set budget.
08/2004-
04/2005
BRH Architects
Martins Building
Water street
Liverpool
POST: Project Coordinator/Snr Architectural Technician, (108 Apartment block with 3 storey under
ground parking)
- Produce working detailed drawings. For apartments and car parking.
- Oversee assistants under my control. Check work.
- Coordinate between sub contractors (engineers, M&E, local authorities).
- Set budget
06/2003-
09/2003
Foster Wheeler Civils
Seaward Road
Glasgow
POST: Snr Architectural Technician (Refinery, Pharmaceutical/Petrochemical).
- Production of working drawings for blast proof buildings in a chemical Refinery setting.
- Production of working drawings for clean room and laboratory environment.
- Coordinate between M&E, Electrical, and client,
- Attend progress meetings on a weekly basis.
- Attend site and write reports on progress.
04/2002-
07/2002
Waring and Netts
Arcadia House.
Balliol Business Park.
Benton Lane
Newcastle.
POST: Snr Architectural Technician/Coordinator. PFI, PPP, Schools and sport centre.
- Produce off working drawings relating to school and a sports centre.
- Coordinate between services.
- Attend weekly progress meetings with client.
- Delegate work packages.
- Attend kick off meetings.
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
01/2002-
04/2002
Aardvark Storage
Unit 16
30 Bankhead
Edinburgh
POST: Project manager/Designer for storage facilities, Manchester, Crowley, Leeds, London.
- Oversee the design of storage facilities. Planning building warrants.
- Coordinate with services.
- Ensure drawings sent for tender. And receive bids, Coordinate with winning company.
- Chair progress meeting.
- Employ additional work force and deal with all health and safety issues.
- Deal with all issues arising from construction.
08/2001-
01/2002
Jacobs Engineering
Grangemouth refinary
POST: Snr Architectural Technician/Coordinator (refinery, Laboratories, Clean room and fire
fighting)
- Produce working detailed drawings for laboratories, Associated offices, new drawings for
fire fighting building with up to date equipment.
- Coordinate all construction with other sub contractors
- Attend weekly progress meetings
01/2001-
08/2001
TPS consult.
86 Commercial Quay
Edinburgh
POST: Snr Architectural Technician/Coordinator (Police station/SPS)
- Produce working detailed drawings for new police station D&B.
- Coordinate all construction with other sub contractors
- Attend weekly progress meetings with local police force and prison services.
06/2000-
01/2001
Tannson design and build
2 Randolph Terrace
Stirling
Edinburgh
POST: Project Manager (Industrial , retail and industrial)
- Oversee projects under my control.
- Hire additional staff on sites when required.
- Redesign where and when necessary pass to draughtsmen under my control.
- Chair weekly progress meetings with site manager and deal with health and safety.
- Be commercially aware of changes brought about by VI’s or SI’s and cost where
appropriate.
- Oversee the finance in cooperation with QS assigned.
- Look at the costs associated with changes and budget
02/2000-
06/2000
Edinburgh Royal joint venture
Edinburgh royal infirmary
POST: Snr Architectural technician (New build hospital)
- Produce working detailed drawings for the construction of hospital.
- Coordinate between other sub contractors
- Delegate work and hire additional staff if required.
- Attend weekly progress meetings and raise any issues.
02/1998-
02/2000
Astra/Zenecca
Earls road
Grangemouth
POST: Snr Architectural technician (Chemical/Petrochemical))
- Produce working detailed drawings for Electrical, Pipe runs and architectural refurb
- Attend weekly progress meeting and raise any issues
- coordinate between sub contractors and other areas on site
Education & Qualifications (Relevant)
2011 University of Malaysia Prince 2
1995 - 1998 Glenrothes college of technology HNC Auto CAD.
1994 - 1995 SCOTVEC (Advanced course Part 2) Auto CAD Release 13.
1986 - 1987 Fife college of technology SCOTVEC Accountancy
1987 - 1990 HND BUILDING - Quantity Surveying. Mechanical,
Civil/structural Engineering, Building Management Law, Building
Technology, Mathematics & Physics. Topographic Surveys.
1976 - 1979 Glenrothes college of technology Business Management
ICT Skills
Microsoft Office++----------------------------- Word, Excel, Power point, Access, Microsoft Project
Packages: AutoCAD Release 10 to 2013, Building Design Suite (ultimate 2013) , Revit 2013, Cad Duct 2013,
Max3D package, PDMS Cad system. Sketch up, NBS Specification Writer, MOD Software,
Areas of Experience:
PPP, PFI
Project management/ Coordination/Design
Air traffic control; Airfields (Civil, MOD)
Telecom; Commercial, Offices; Retail, Industrial.
Housing estates from 20 to 300+ units ( Inc high rise up to 45 stories) Hotels (1 million square foot shopping mall)
Oil and Gas; Petro chemical; Refinery; Chemical; Clean rooms
Railways; Transportation;
CAREER SUMMARY
My career covers all aspects of construction, Rail related projects, Airports including MoD airfield and civilian, petro chemical, oil and gas,
refinery, retail, commercial, industrial, and housing (including social, student accommodation, au Fait with NHBC standards), Hotel and shop fit
outs, accommodation blocks for oil rigs. I have experience in PFI hospitals and education establishments. Over the years I have gained extensive
knowledge M & E, structural and HVAC. My main background is in architecture but the experience I have gained in other fields is very extensive
and varied which over the years has proved invaluable.
In addition I have over the years dealt with all forms of contracts including the newer NEC 3, JCT, Bespoke contracts and the coloured contracts
for petro chemical and very computer literate with all Microsoft and extensively with AutoCAD and Revit including BDS 14
Over the years I have become extensively involved in site health safety and also a first aider with AED training.
ICT Skills
Microsoft Office++----------------------------- Word, Excel, Power point, Access, Microsoft Project
Packages: AutoCAD Release 10 to 2013, Building Design Suite (ultimate 2013) , Revit 2013, Cad Duct 2013,
Max3D package, PDMS Cad system. Sketch up, NBS Specification Writer, MOD Software,
Areas of Experience:
PPP, PFI
Project management/ Coordination/Design
Air traffic control; Airfields (Civil, MOD)
Telecom; Commercial, Offices; Retail, Industrial.
Housing estates from 20 to 300+ units ( Inc high rise up to 45 stories) Hotels (1 million square foot shopping mall)
Oil and Gas; Petro chemical; Refinery; Chemical; Clean rooms
Railways; Transportation;
CAREER SUMMARY
My career covers all aspects of construction, Rail related projects, Airports including MoD airfield and civilian, petro chemical, oil and gas,
refinery, retail, commercial, industrial, and housing (including social, student accommodation, au Fait with NHBC standards), Hotel and shop fit
outs, accommodation blocks for oil rigs. I have experience in PFI hospitals and education establishments. Over the years I have gained extensive
knowledge M & E, structural and HVAC. My main background is in architecture but the experience I have gained in other fields is very extensive
and varied which over the years has proved invaluable.
In addition I have over the years dealt with all forms of contracts including the newer NEC 3, JCT, Bespoke contracts and the coloured contracts
for petro chemical and very computer literate with all Microsoft and extensively with AutoCAD and Revit including BDS 14
Over the years I have become extensively involved in site health safety and also a first aider with AED training.

More Related Content

What's hot (18)

ray resume (1)
ray resume (1)ray resume (1)
ray resume (1)
 
Nick Kennedy cv
Nick Kennedy cvNick Kennedy cv
Nick Kennedy cv
 
Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18
 
CVLA updated
CVLA updatedCVLA updated
CVLA updated
 
Chronological resume
Chronological resumeChronological resume
Chronological resume
 
John Asuquo
John AsuquoJohn Asuquo
John Asuquo
 
Mike Powell CV 2
Mike Powell CV 2Mike Powell CV 2
Mike Powell CV 2
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cv
 
Resume BFG (CV)-Updated
Resume BFG (CV)-UpdatedResume BFG (CV)-Updated
Resume BFG (CV)-Updated
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cv
 
Mr Hugh McCaffrey cv
Mr Hugh McCaffrey cvMr Hugh McCaffrey cv
Mr Hugh McCaffrey cv
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cv
 
Updated Dewatering Engineer
Updated Dewatering EngineerUpdated Dewatering Engineer
Updated Dewatering Engineer
 
CVBERTRANDeng
CVBERTRANDengCVBERTRANDeng
CVBERTRANDeng
 
Mohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cv
 
Mohamed ashraf Land Surveyor
Mohamed ashraf Land SurveyorMohamed ashraf Land Surveyor
Mohamed ashraf Land Surveyor
 
Kd6
Kd6Kd6
Kd6
 
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
 

Similar to Ian C. Shannon

Similar to Ian C. Shannon (20)

CV4updated November 2014
CV4updated November 2014CV4updated November 2014
CV4updated November 2014
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Isagani M Porcina14
Isagani M  Porcina14Isagani M  Porcina14
Isagani M Porcina14
 
CV Steven Danson English
CV Steven Danson EnglishCV Steven Danson English
CV Steven Danson English
 
Updated aded cv 4-12-2017
Updated aded cv 4-12-2017Updated aded cv 4-12-2017
Updated aded cv 4-12-2017
 
012741
012741012741
012741
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
SAA CV May 2016
SAA CV May 2016SAA CV May 2016
SAA CV May 2016
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
 
altaf resume work preparation
altaf resume work preparationaltaf resume work preparation
altaf resume work preparation
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
 
Michael Street CV.2016
Michael Street CV.2016Michael Street CV.2016
Michael Street CV.2016
 
Nady Boktor Resume
Nady Boktor ResumeNady Boktor Resume
Nady Boktor Resume
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
CV_Muhammad Iqbal
CV_Muhammad IqbalCV_Muhammad Iqbal
CV_Muhammad Iqbal
 
Graeme Fulton Resume Rev A
Graeme Fulton Resume Rev A Graeme Fulton Resume Rev A
Graeme Fulton Resume Rev A
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 

Ian C. Shannon

  • 1. IAN C SHANNON Contact Details Personal Details Gardeners cottage Brimpsfield park Brimpsfield Gloucestershire GL4 8LE Tel: 01452 909527 MOBILE: 07849 222 522 E-MAIL; iancshannon@hotmail.com Nationality: British/Scottish. Date of Birth: Marital Status: Dependants: Driving Licence: Salary: Languages CSCS: SMSTS & PTS FIRST AID at Work (Inc AED): MEWPs For managers NEC 3 & JCT trained : 27/01/1960 married Both grown up Full (Clean) Negotiable CAREER HISTORY 02/2015 - to 09/2016 MJ Church Saltersford Lane Chippenham Wiltshire SN14 0RN (Newbury racecourse, Rodbourne, M3 upgrade, Bristol ring road A4174) Ref: Steve Daniels(contracts manager) 07557651085 Paul whitehead (Contracts Manager Balfour Beatty) 07967578539 POST: Site Manager bridge renewal (Rail) (Sub con to Balfour Beatty) Site manager for M3 motor way & Ring road upgrade, Bristol.. - Overseeing the MJC personnel on site - Allocating plant/Personnel to site. Ordering material (Cement Etc.) - Acting as first aider on site - Dealing with work packages, task briefs. H&S on site - Report writing. Giving details on work required, work to be done. - Liaison between MJC and Client - M3 Proj Site manager/deputy Contracts manager - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in co-operation with QS assigned. - Look at the costs associated with changes and budget - Attend site and office meetings. - Be No 1 on site and client facing - Issuing of permits on projects 11/2014 to 02/2015 Short term contract Murphy Group Cannock Rail Cannock Ref: Garry Smith Mob: 07921406755 POST: Site Manager bridge renewal (Rail) - Overseeing the trades on site - Doing inductions of new personal allocated to the site - Acting as first aider on site - Dealing with work packages, task briefs. To ORR standard - Report writing. Giving details on work required, work to be done. - Liaison between site and Network Rail. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget - Issuing of permits 06/2014 to 11/2014 Volkerfitzpatrick’ IEP site Filton Stoke Gifford. Bristol Client volkerfitzpatrick construction Allteck recruitment Bristol Ref:Paul Raynor Snr PM 07876876066 POST: Site Manager Hitachi IEP maintenance depot Bristol (80 million rail project) - Overseeing the trades on site - Doing inductions of new personal allocated to the site - Acting as first aider on site - Dealing with work packages, task briefs. To ORR standard - Report writing. Giving details on work required, work to be done. - Giving details of work done and any issues on site that should be made aware. - Pre start meeting, progress meeting and daily brief meeting to the supervisors.. - Dealing with all HS on site - Progress of work and liaison with other agents on site to ensure work is on schedule and no hold ups. - Dealing with lift plans and acting temp work supervisor for lifts, mewps and other plant - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget - Issuing permits 05 05/2014 to to 06/2014 Gallifordtry Construction Gainsborough hotel refit Client Galliford try Sphere recruitment Bristol POST: Site Manager (night shift) (Hotel refit) Fixed term contract. - Overseeing the trades on night shift - Doing inductions of new personal allocated to the night shift - Acting as first aider on site - Allocating work in conjunction with dayshift
  • 2. - Report writing. Giving details on work required for day shift for work to be done. - Giving details of work done and any issues on site that should be made aware - Issuing of permits 04/2014 to 05/14 ISG Construction Bristol Airport Central pier project (phase 1) Client ISG Neil Spurney Mobile:07972 190867 (For ref) Sphere recruitment Bristol POST: Site Manager/Project Manager (night shift) (Aviation) Fixed term contract. - Overseeing the trades on night shift - Doing inductions of new personal allocated to the night shift - Acting as first aider on site - Allocating work in conjunction with dayshift - Report writing. Giving details on work required for day shift for work to be done. - Giving details of work done and any issues on site that should be made aware - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget 01/14 to 04/14 Highlands and island Airports Limited Inverness Airport Inverness IV2 7JB POST: Project Manager (Aviation) Fixed term contract. - Overseeing a 2.3 million renovation to Sumburgh Airport in Shetland - Being the lead in contractors and designers - Producing reports to the HAIL executive. - Full financial control. - Liaison between HAIL and contractors - Reviewing risk assessments and methods statements. - Chair progress meetings and coordination meetings. - Decision maker on site. Review bids in line with DfT SMS - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget - Issuing of all permits 06/13 to 10/13 BDP Architects/First great western 7 Hill Street Bristol POST: Project Manager (Rail transportation) Fixed term contract. - Overseeing a 3 level multi-storey car park. - Acting as first great western PM on site, and their clerk of works - Producing reports for the rail executive. - Full financial control. - Liaison between BDP and FGW and Network Rail. - Reviewing RAMS prior to submission to network rail. - Chair progress meetings and coordination meetings. - Take responsibility for issues on site, (when things go wrong). - Authorised CRE on site. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget 09/10 – 11/12 Veritas Architects 148 Jalan Ampang Kuala Lumpar Malaysia POST: Project Manager (Rail transportation. Aviation) - Overseeing the design of 16 elevated and 4 underground stations along with a maintenance yard. - Coordinate engineers and Electrical engineers. As well as Architects, draught persons and Design architects. - Attend stakeholder meetings with Prime Minister of Malaysia and attend progress meetings with client. - Overseeing the new Air Asia HQ at Kuala Lumpur International Airport. - Overseeing the high rise development at Penang. 3 x 5 storey with 5 x 20 storey and 5x 10 storey apartments. Including shopping mall. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget 05/2009- 06/2010 BIFAB Fabricators West shore Road Burntisland Fife POST: Project Co-ordinator/manager (Oil Rig modules. Accommodation Block) - Oversee construction between M&E, Electrical, engineering and architectural fit out to SOLAS regs. - Attend progress meeting and stakeholder meetings and chair when required. - Ensure Health and safety standards are met. - Update planning requirement, Hire additional staff when required - Procure equipment and hire all tools required. - Write weekly reports on progress. Any delays, Additional expenditure.
  • 3. - Fix budget requirements - Deal with health and safety, Method and risk assessments prior to commencement of work - Finalise Final hand over documents for client (SAP system) - Put together bid for another accommodation block with Helicopter landing pad. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget 01/2009- 05/2009 06/2007- 09/2007 06/2006 – 09/2006 09/2003- 04/2004 06/2002- 07/2003 RAF Lauchars (MOD) DCRE Building 34A Leuchars Nr St Andrews POST: Snr Architectural technician/Asst Project Manager (MOD Airbase) - Produce working drawings for RAF (Refurb and new build) - Oversee work by sub contractors. - Attend and chair progress meetings with client (MOD DCRE) and sub contractors on site. - Produce reports on progress to MOD and central government - Check work and make sure of value for money requirements set by government. - Deal with health and safety, Method and risk assessments prior to commencement of work - Electrical survey of HV and LV and produce feasibility study for future expansion and all requirements required. - Legionella survey all RAF bases and RM condor (commando unit) - Prepare drawings for new runway. - Prepare layout for Camp Bastion. 02/2008- 01/2009 Wilson Design Park Circle Glasgow POST: Project Manager/Snr Designer (Housing Estate 300+ units) - Design Housing types (2 to 5 bedroom) - Design road layout, street lighting, Drainage. - Deal with all local authority requirements (planning, warrants) - Deal with Tender documents (JCT form of contract) - Attend and chair progress meetings on site. - Check all subcontractors drawings and work on site. - Deal with health and safety, Method and risk assessments prior to commencement 08/2007- 02/2008 Fairhursts Design Group Faulkener Street Manchester POST: Project coordinator /Snr Architectural Technician (BAE Systems) (Offices, warehouse, workshop F16 fighter) - Design Offices and workshops for new aircraft (F16). - Attend progress meetings and chair when required. Lead kick off meeting on site with all sub contractors concerned. - Coordinate between services and deal with any environmental issues. - Distribute work between assistant and designers. 04/2007- 06/2007. Jacobs Engineering GSK Site, Irvine POST: Snr Architectural Technician. (Chemical plant) - Design offices and laboratory (Clean room) - Produce layouts for pipe runs within plant. - Coordinate with M&E . - method statement and risk assessments to GSK requirements. - Attend progress meetings and reports to GSK requirements. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget 09/2006- 01/2007. Jacobs Engineering Aldermaston (AWE) POST: Project Coordinator/Snr Arch Technician. (MOD Weapons research) - Design Explosion proof underground facilities in line with explosives regulations. - Produce layouts M&E layouts and Electrical P&C - Attend stakeholder meetings and produce written progress reports 09/2005- 04/2006. Jacobs Engineering Prestwick Air traffic control POST: Project Coordinator (Civil Air traffic control) - Coordinate between Sub contractors on site. - Make sure Security and health and safety where adhered to - Deal with any construction issues redesign where necessary liaise with Head office. - Attend progress meetings and raise any issues. - Cost new work. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget 04/2005- 09/2005 01/2004- 08/2004 Taylor Woodrow 2 Gabbert Road Kirkton Campus Livingston West Lothian 1 POST: Project Manager/Coordinator/Designer (Housing Development) - Produce new working drawing for site relating to new housing stock. - Review old stock and renew. - Over see site manager on 2 estates, - Review method statements and risk assessments, review health and safety in regard to new guidelines. - Review planned layout of roads etc. - Set budget.
  • 4. 08/2004- 04/2005 BRH Architects Martins Building Water street Liverpool POST: Project Coordinator/Snr Architectural Technician, (108 Apartment block with 3 storey under ground parking) - Produce working detailed drawings. For apartments and car parking. - Oversee assistants under my control. Check work. - Coordinate between sub contractors (engineers, M&E, local authorities). - Set budget 06/2003- 09/2003 Foster Wheeler Civils Seaward Road Glasgow POST: Snr Architectural Technician (Refinery, Pharmaceutical/Petrochemical). - Production of working drawings for blast proof buildings in a chemical Refinery setting. - Production of working drawings for clean room and laboratory environment. - Coordinate between M&E, Electrical, and client, - Attend progress meetings on a weekly basis. - Attend site and write reports on progress. 04/2002- 07/2002 Waring and Netts Arcadia House. Balliol Business Park. Benton Lane Newcastle. POST: Snr Architectural Technician/Coordinator. PFI, PPP, Schools and sport centre. - Produce off working drawings relating to school and a sports centre. - Coordinate between services. - Attend weekly progress meetings with client. - Delegate work packages. - Attend kick off meetings. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget 01/2002- 04/2002 Aardvark Storage Unit 16 30 Bankhead Edinburgh POST: Project manager/Designer for storage facilities, Manchester, Crowley, Leeds, London. - Oversee the design of storage facilities. Planning building warrants. - Coordinate with services. - Ensure drawings sent for tender. And receive bids, Coordinate with winning company. - Chair progress meeting. - Employ additional work force and deal with all health and safety issues. - Deal with all issues arising from construction. 08/2001- 01/2002 Jacobs Engineering Grangemouth refinary POST: Snr Architectural Technician/Coordinator (refinery, Laboratories, Clean room and fire fighting) - Produce working detailed drawings for laboratories, Associated offices, new drawings for fire fighting building with up to date equipment. - Coordinate all construction with other sub contractors - Attend weekly progress meetings 01/2001- 08/2001 TPS consult. 86 Commercial Quay Edinburgh POST: Snr Architectural Technician/Coordinator (Police station/SPS) - Produce working detailed drawings for new police station D&B. - Coordinate all construction with other sub contractors - Attend weekly progress meetings with local police force and prison services. 06/2000- 01/2001 Tannson design and build 2 Randolph Terrace Stirling Edinburgh POST: Project Manager (Industrial , retail and industrial) - Oversee projects under my control. - Hire additional staff on sites when required. - Redesign where and when necessary pass to draughtsmen under my control. - Chair weekly progress meetings with site manager and deal with health and safety. - Be commercially aware of changes brought about by VI’s or SI’s and cost where appropriate. - Oversee the finance in cooperation with QS assigned. - Look at the costs associated with changes and budget 02/2000- 06/2000 Edinburgh Royal joint venture Edinburgh royal infirmary POST: Snr Architectural technician (New build hospital) - Produce working detailed drawings for the construction of hospital. - Coordinate between other sub contractors - Delegate work and hire additional staff if required. - Attend weekly progress meetings and raise any issues. 02/1998- 02/2000 Astra/Zenecca Earls road Grangemouth POST: Snr Architectural technician (Chemical/Petrochemical)) - Produce working detailed drawings for Electrical, Pipe runs and architectural refurb - Attend weekly progress meeting and raise any issues - coordinate between sub contractors and other areas on site Education & Qualifications (Relevant) 2011 University of Malaysia Prince 2 1995 - 1998 Glenrothes college of technology HNC Auto CAD. 1994 - 1995 SCOTVEC (Advanced course Part 2) Auto CAD Release 13. 1986 - 1987 Fife college of technology SCOTVEC Accountancy 1987 - 1990 HND BUILDING - Quantity Surveying. Mechanical, Civil/structural Engineering, Building Management Law, Building Technology, Mathematics & Physics. Topographic Surveys. 1976 - 1979 Glenrothes college of technology Business Management
  • 5. ICT Skills Microsoft Office++----------------------------- Word, Excel, Power point, Access, Microsoft Project Packages: AutoCAD Release 10 to 2013, Building Design Suite (ultimate 2013) , Revit 2013, Cad Duct 2013, Max3D package, PDMS Cad system. Sketch up, NBS Specification Writer, MOD Software, Areas of Experience: PPP, PFI Project management/ Coordination/Design Air traffic control; Airfields (Civil, MOD) Telecom; Commercial, Offices; Retail, Industrial. Housing estates from 20 to 300+ units ( Inc high rise up to 45 stories) Hotels (1 million square foot shopping mall) Oil and Gas; Petro chemical; Refinery; Chemical; Clean rooms Railways; Transportation; CAREER SUMMARY My career covers all aspects of construction, Rail related projects, Airports including MoD airfield and civilian, petro chemical, oil and gas, refinery, retail, commercial, industrial, and housing (including social, student accommodation, au Fait with NHBC standards), Hotel and shop fit outs, accommodation blocks for oil rigs. I have experience in PFI hospitals and education establishments. Over the years I have gained extensive knowledge M & E, structural and HVAC. My main background is in architecture but the experience I have gained in other fields is very extensive and varied which over the years has proved invaluable. In addition I have over the years dealt with all forms of contracts including the newer NEC 3, JCT, Bespoke contracts and the coloured contracts for petro chemical and very computer literate with all Microsoft and extensively with AutoCAD and Revit including BDS 14 Over the years I have become extensively involved in site health safety and also a first aider with AED training.
  • 6. ICT Skills Microsoft Office++----------------------------- Word, Excel, Power point, Access, Microsoft Project Packages: AutoCAD Release 10 to 2013, Building Design Suite (ultimate 2013) , Revit 2013, Cad Duct 2013, Max3D package, PDMS Cad system. Sketch up, NBS Specification Writer, MOD Software, Areas of Experience: PPP, PFI Project management/ Coordination/Design Air traffic control; Airfields (Civil, MOD) Telecom; Commercial, Offices; Retail, Industrial. Housing estates from 20 to 300+ units ( Inc high rise up to 45 stories) Hotels (1 million square foot shopping mall) Oil and Gas; Petro chemical; Refinery; Chemical; Clean rooms Railways; Transportation; CAREER SUMMARY My career covers all aspects of construction, Rail related projects, Airports including MoD airfield and civilian, petro chemical, oil and gas, refinery, retail, commercial, industrial, and housing (including social, student accommodation, au Fait with NHBC standards), Hotel and shop fit outs, accommodation blocks for oil rigs. I have experience in PFI hospitals and education establishments. Over the years I have gained extensive knowledge M & E, structural and HVAC. My main background is in architecture but the experience I have gained in other fields is very extensive and varied which over the years has proved invaluable. In addition I have over the years dealt with all forms of contracts including the newer NEC 3, JCT, Bespoke contracts and the coloured contracts for petro chemical and very computer literate with all Microsoft and extensively with AutoCAD and Revit including BDS 14 Over the years I have become extensively involved in site health safety and also a first aider with AED training.