SlideShare a Scribd company logo
1 of 14
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
CURRICULUM VITAE (CV)
Position Title and No. Hydraulics Structures K-4
Name of Expert: Engr. Emeka Nweke
Date of Birth: 07 – 03 – 1960
Country of Citizenship/Residence NIGERIA
EDUCATION:
B. Sc. (Civil Eng): Univ. of Southampton England 1980 (B.Sc )
Archbishop Tenison’s Grammar School, Kenninghton Oval, London, England 1977 (A Level )
Wyvil Primary School, South Lambeth Road, Vauxhall, London 1971
Employment record relevant to the assignment
Period Employing organization and your
title/position. Contact info for
references
Country Summary of activities
performance relevant to the
Assignment
1978-1979
(Internship)
Ove Arup & Partners,
13 Fitzroy Street, London, W.1
England Design team that handled a
proposed multi-storeys building in
Hong Kong.
1979-1980
(Internship)
Department of Transport and
Environment
England Interchange along A3 Highway at
Portsmouth Interchange England
1980 - 1981 Per Roberto Nigeria Limited, Airport
Road, Warri
Nigeria Site engineer for construction of
Mosheshe Estate, Airport road,
Warri; -
- Structural interpretation
- Setting out & levelling
- Materials accounting
- Workforce Development
- Coordination of Electrical
& Plumbing works
NEST ENGINEERING LIMITED Page 1
Engr. Emeka Nweke
(Managing Director)
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
- External Civil works
1981-1985 Bouygues Nigeria Limited
Idejo Street, Victoria Island, Lagos
Nigeria Site engineer for construction of
University of Nigeria Teaching
Hospital, Enugu, KM 22, Enugu –
Port Harcourt expressway; -
- Structural interpretation
- Setting out & levelling
- Materials accounting
- Workforce Development
- Coordination of Electrical
& Mechanical/Plumbing
works
- Storm water & Sewerage
drainage control works
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications &
relationships
- Works Planning &
Programming
- Temporary & permanent
access roads
- Project Management
1985-1987 Bouygues Nigeria Limited
Idejo Street, Victoria Island, Lagos
Nigeria Project engineer for construction
of National Bank Multi storeys
Building, Broad Street, Lagos
Island, Lagos; -
- Project Management
- Design Review &
Management
- Structural interpretation
- Setting out & levelling
- Materials accounting
- Workforce Development
- Coordination of Electrical
& Mechanical/Plumbing
works
- Storm water & Sewerage
drainage control works
- Temporary formworks
design & fabrication
NEST ENGINEERING LIMITED Page 2
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications &
relationships
- Works Planning &
Programming
1987-1989 Bouygues Nigeria Limited
Idejo Street, Victoria Island, Lagos
Nigeria Project Engineer for construction
of 10008 Classrooms School
Project, Lagos; -
- Pre-Cast structural
elements design and
construction
- Project Management
- Design Review &
Management
- Structural interpretation
- Setting out & levelling
- Materials accounting
- Workforce Development
- Coordination of Electrical
& Mechanical/Plumbing
works
- Storm water & Sewerage
drainage control works
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications &
relationships
- Works Planning &
Programming
1989-1991 Bouygues Nigeria Limited
Idejo Street, Victoria Island, Lagos
Nigeria Project Engineer for construction
of 420 MW Combined Cycle Gas
Turbine Electricity Power
Generating Facility, at Egbin,
Ikorodu, Lagos State; -
- Hydraulics Modelling &
Analyses
- Pre-Cast structural
elements design and
construction
- Project Management
NEST ENGINEERING LIMITED Page 3
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
- Design Review &
Management
- Structural interpretation
- Setting out & levelling
- Materials accounting
- Workforce Development
- Coordination of Electrical
& Mechanical/Plumbing
works
- Storm water & Sewerage
drainage control works
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications &
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Erosion Control and mitigation
studies and engineering design
for Amuzam gully erosions,
Enugu Ngwo, Enugu North LGA,
Enugu State (2014)
(World Bank Assisted-Newmap)
; -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
NEST ENGINEERING LIMITED Page 4
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Erosion Control and mitigation
studies and engineering design
for Colliery gully erosions,
Enugu Ngwo, Enugu North LGA,
Enugu State (2014)
(World Bank Assisted-Newmap)
; -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Erosion Control and mitigation
studies and engineering design
for Ezata gully erosions, Enugu
Ngwo, Enugu North LGA, Enugu
State (2014) (World Bank
Assisted-Newmap)
; -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
NEST ENGINEERING LIMITED Page 5
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Erosion Control and mitigation
studies and engineering design
for Saint Theresa gully
erosions, Enugu Ngwo, Enugu
North LGA, Enugu State (2014)
(World Bank Assisted-Newmap)
; -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
NEST ENGINEERING LIMITED Page 6
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Erosion Control and mitigation
studies and engineering design
for Umudunu/Uruokpala
gully erosions, Abagana Njikoka
LGA, Anambra State (2013)
(World Bank Assisted-Newmap)
; -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Erosion Control and mitigation
studies and engineering design
for Ajali Water Works gully
erosions, Imezi-Owa, Ezeagu
LGA, Enugu State (World Bank
Assisted-Newmap Approved and
cleared November (2013) (2011
to date); -
- Geographic & Geo-
informatics Studies
NEST ENGINEERING LIMITED Page 7
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Erosion control and mitigation
studies and engineering design
for 9th
Mile Gully erosion, Udi
LGA, Enugu State (World Bank
Assisted-Newmap Approved and
cleared November (2013) (2011
to date); -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
NEST ENGINEERING LIMITED Page 8
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Assisted a National consultant in
Erosion control and mitigation
studies and engineering design
for Nguzu Edda Gully erosion,
Afikpo South LGA, Ebonyi State
(World Bank Assisted-Newmap
Approved and cleared November
(2013) (2011 to date); -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Assisted a National consultant in
Erosion control and mitigation
studies and engineering design
for Gully erosion, Amuda
Achara, Umunneochi LGA,
Abia State (World Bank
Assisted-Newmap Approved and
cleared November (2013) (2011
NEST ENGINEERING LIMITED Page 9
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
to date); -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Assisted a National consultant in
Erosion control and mitigation
studies and engineering design
for Gully erosion, Amuzukwu,
Isiala Ngwa LGA, Abia State
(World Bank Assisted-Newmap
Approved and cleared November
(2013) (2011 to date)
; -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
NEST ENGINEERING LIMITED Page
10
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
1991-Date Nest Engineering Limited
KM 10, Odume Mansion,
Uruekwo Village, Enugwu Ukwu
Old Awka – Onitsha Road, Anambra
State
Nigeria Design and Supervision of
Erosion Control and Mitigation
Work at Zaura Polder Pilot
Scheme Birnin Kebbi, Kebbi
State. (Client: Ecological Funds
Office at Presidency c/o Sokoto
Rima River Basin Development
Authority (2003)
; -
- Geographic & Geo-
informatics Studies
- Hydrology & Watershed
Studies
- Hydraulics Modelling &
Analyses
- Geotechnical Studies
- Structural Studies
- Bio-Engineering &
Environmental Studies
- Project Management &
Supervision Studies
- Design Review &
Management
- Temporary formworks
design & fabrication
- Works Evaluation &
Costing
- Budget Formulation
- Consultants’ – Contractors’
communications (Bidding
Documents & ancillary
relationships
- Works Planning &
Programming
NEST ENGINEERING LIMITED Page
11
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
Membership in Professional Associations and Publications:
Member, Nigeria Society of Engineer – 1989
Registered Engineer, Council for the Regulation of Engineering in Nigeria – 1992
Publications
1. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion
Control and Mitigation Works for Colliery gully erosion site, Enugu Ngwo, Enugu
North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE.
2. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion
Control and Mitigation Works for Amuzam gully erosion site, Enugu Ngwo, Enugu
North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE.
3. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion
Control and Mitigation Works for Ezata gully erosion site, Enugu Ngwo, Enugu
North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE.
4. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion
Control and Mitigation Works for Saint Theresa gully erosion site, Enugu Ngwo,
Enugu North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE
5. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion
Control and Mitigation Works for Agbaja Ngwo gully erosion site, Agbaja Ngwo,
Enugu North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE
6. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion
Control and Mitigation Works for Ajali Water Works gully erosion site, Imezi Owa
Udi LGA, Enugu State. November 2014 – NEWMP ENUGU STATE
7. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion
Control and Mitigation Works for 9th
Mile gully erosion site, Ameke Ngwo Udi LGA,
Enugu State. November 2014 – NEWMP ENUGU STATE
8. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion
Control and Mitigation Works for Umudunu/Uruokpala gully erosion site,
Abagana, Njikoka LGA, Anambra. May, 2013 – NEWMP ANAMBRA STATE
NEST ENGINEERING LIMITED Page
12
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
Language Skills Igbo Language (Fluent)
English Language (Fluent)
Detailed Tasks Assigned on Consultant’s
Team of Experts
Reference to Prior Work/Assignments that
best illustrates capability to handle the
Assigned Tasks
K- 4: Hydraulics Structures Detailed Engineering Designs for 11 numbers
erosion control sites in 4 states (Anambra (1),
Enugu (7), Ebonyi (1), and Abia (2)) Approved
and Cleared By World Bank/Food and
Agricultural Organization (WB/FAO)
Research Structured Vegetation – Bio-Engineering
techniques in erosion control and mitigation
works.
Structural Design Detailed Engineering Designs for 11 numbers
erosion control sites in 4 states (Anambra (1),
Enugu (7), Ebonyi (1), and Abia (2)) Approved
and Cleared By World Bank/Food and
Agricultural Organization (WB/FAO)
Flood/Erosion Design Detailed Engineering Designs for 11 numbers
erosion control sites in 4 states (Anambra (1),
Enugu (7), Ebonyi (1), and Abia (2)) Approved
and Cleared By World Bank/Food and
Agricultural Organization (WB/FAO)
Expert’s contact information: +2348033254381, +2348023178067.
nestnig2002@yahoo.com
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly
describes myself, my qualifications, and my experience, and I am available to undertake
the assignment in case of an award. I understand that any misstatement or
misrepresentation described herein may lead to my disqualification or dismissal by the
Client, and/or sanctions by the Bank.
EMEKA E. NWEKE
Name of Expert Signature Date
CHRIS C. OYEKA
Name of authorized Signature Date
NEST ENGINEERING LIMITED Page
13
NEWMAP/ANAMBRA STATE/TECHNICAL
PROPOSAL/ENGINEERING DESIGN & SUPERVISION
Representative of the Consultant
(the same who signs the Proposal)
NEST ENGINEERING LIMITED Page
14

More Related Content

What's hot

What's hot (20)

CV-Dirk - Latest 2016
CV-Dirk - Latest 2016CV-Dirk - Latest 2016
CV-Dirk - Latest 2016
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
Sisay Debele CV 31 JUNE 2016
Sisay Debele CV 31 JUNE 2016Sisay Debele CV 31 JUNE 2016
Sisay Debele CV 31 JUNE 2016
 
AKINSANYA ABIODUN AKINLABI
AKINSANYA ABIODUN AKINLABIAKINSANYA ABIODUN AKINLABI
AKINSANYA ABIODUN AKINLABI
 
Ngoho Gezar CE
Ngoho Gezar CENgoho Gezar CE
Ngoho Gezar CE
 
NwankwoIkennaCV
NwankwoIkennaCVNwankwoIkennaCV
NwankwoIkennaCV
 
Ici individual
Ici individualIci individual
Ici individual
 
European-CV 2016_01
European-CV 2016_01 European-CV 2016_01
European-CV 2016_01
 
Peter Chakwenya Curriculum Vitae
Peter Chakwenya  Curriculum VitaePeter Chakwenya  Curriculum Vitae
Peter Chakwenya Curriculum Vitae
 
cvJP301015(English)
cvJP301015(English)cvJP301015(English)
cvJP301015(English)
 
Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
resume_odesio mariano
resume_odesio marianoresume_odesio mariano
resume_odesio mariano
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
cv1
cv1cv1
cv1
 
CV_Rizeq 2016
CV_Rizeq 2016CV_Rizeq 2016
CV_Rizeq 2016
 
CV_Isilony Juliana 2016 01
CV_Isilony Juliana 2016 01CV_Isilony Juliana 2016 01
CV_Isilony Juliana 2016 01
 
Wang Haron & Goh Company Profile
Wang Haron & Goh Company Profile Wang Haron & Goh Company Profile
Wang Haron & Goh Company Profile
 
Sunil resume
Sunil resumeSunil resume
Sunil resume
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
Sankar CV
Sankar CVSankar CV
Sankar CV
 

Viewers also liked

Academic brief(ebsu)
Academic brief(ebsu)Academic brief(ebsu)
Academic brief(ebsu)PAUL IGBOJI
 
RCSTEM 2016- Press Release
RCSTEM 2016- Press ReleaseRCSTEM 2016- Press Release
RCSTEM 2016- Press ReleaseJose Diaz
 
Semana del 14 al 18 de marzo
Semana del 14 al 18 de marzoSemana del 14 al 18 de marzo
Semana del 14 al 18 de marzochotecamilo2
 
Presentation1 class five
Presentation1 class fivePresentation1 class five
Presentation1 class fivenurrikta
 
DiB QLD 31 Oct 2015 Attendee List
DiB QLD 31 Oct 2015 Attendee ListDiB QLD 31 Oct 2015 Attendee List
DiB QLD 31 Oct 2015 Attendee ListBlake Barrett CSC
 
Objetivo 2 gestión_comunidad_segundo_periodo_2016
Objetivo 2 gestión_comunidad_segundo_periodo_2016Objetivo 2 gestión_comunidad_segundo_periodo_2016
Objetivo 2 gestión_comunidad_segundo_periodo_2016Paulo Delgado Ordóñez
 
Guía para la elaboración de una sistematización
Guía para la elaboración de una sistematizaciónGuía para la elaboración de una sistematización
Guía para la elaboración de una sistematizaciónchotecamilo2
 
PROGRAMMA20-21novembre
PROGRAMMA20-21novembrePROGRAMMA20-21novembre
PROGRAMMA20-21novembreKatia Insogna
 
Work study-150303084338-conversion-gate01
Work study-150303084338-conversion-gate01Work study-150303084338-conversion-gate01
Work study-150303084338-conversion-gate01fazle dayan hakim
 
1º de Bachillerato HMC - Tema 2 - La crisis del Antiguo Régimen
1º de Bachillerato HMC - Tema 2 - La crisis del Antiguo Régimen1º de Bachillerato HMC - Tema 2 - La crisis del Antiguo Régimen
1º de Bachillerato HMC - Tema 2 - La crisis del Antiguo RégimenSergio García Arama
 
1º de Bachillerato HMC - Tema 4 - La Primera Revolución Industrial
1º de Bachillerato HMC - Tema 4 - La Primera Revolución Industrial1º de Bachillerato HMC - Tema 4 - La Primera Revolución Industrial
1º de Bachillerato HMC - Tema 4 - La Primera Revolución IndustrialSergio García Arama
 

Viewers also liked (16)

Academic brief(ebsu)
Academic brief(ebsu)Academic brief(ebsu)
Academic brief(ebsu)
 
RCSTEM 2016- Press Release
RCSTEM 2016- Press ReleaseRCSTEM 2016- Press Release
RCSTEM 2016- Press Release
 
Semana del 14 al 18 de marzo
Semana del 14 al 18 de marzoSemana del 14 al 18 de marzo
Semana del 14 al 18 de marzo
 
Presentation1 class five
Presentation1 class fivePresentation1 class five
Presentation1 class five
 
Res 0024 enero_06_de_2016
Res 0024 enero_06_de_2016Res 0024 enero_06_de_2016
Res 0024 enero_06_de_2016
 
Community ventures
Community venturesCommunity ventures
Community ventures
 
DiB QLD 31 Oct 2015 Attendee List
DiB QLD 31 Oct 2015 Attendee ListDiB QLD 31 Oct 2015 Attendee List
DiB QLD 31 Oct 2015 Attendee List
 
Objetivo 2 gestión_comunidad_segundo_periodo_2016
Objetivo 2 gestión_comunidad_segundo_periodo_2016Objetivo 2 gestión_comunidad_segundo_periodo_2016
Objetivo 2 gestión_comunidad_segundo_periodo_2016
 
Faed
FaedFaed
Faed
 
Google.com
Google.comGoogle.com
Google.com
 
Guía para la elaboración de una sistematización
Guía para la elaboración de una sistematizaciónGuía para la elaboración de una sistematización
Guía para la elaboración de una sistematización
 
музей
музеймузей
музей
 
PROGRAMMA20-21novembre
PROGRAMMA20-21novembrePROGRAMMA20-21novembre
PROGRAMMA20-21novembre
 
Work study-150303084338-conversion-gate01
Work study-150303084338-conversion-gate01Work study-150303084338-conversion-gate01
Work study-150303084338-conversion-gate01
 
1º de Bachillerato HMC - Tema 2 - La crisis del Antiguo Régimen
1º de Bachillerato HMC - Tema 2 - La crisis del Antiguo Régimen1º de Bachillerato HMC - Tema 2 - La crisis del Antiguo Régimen
1º de Bachillerato HMC - Tema 2 - La crisis del Antiguo Régimen
 
1º de Bachillerato HMC - Tema 4 - La Primera Revolución Industrial
1º de Bachillerato HMC - Tema 4 - La Primera Revolución Industrial1º de Bachillerato HMC - Tema 4 - La Primera Revolución Industrial
1º de Bachillerato HMC - Tema 4 - La Primera Revolución Industrial
 

Similar to NEWMAP/ANAMBRA CV

CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015jingo allan
 
OLADIPUPO OSIBAJO Resume 13
OLADIPUPO OSIBAJO Resume 13OLADIPUPO OSIBAJO Resume 13
OLADIPUPO OSIBAJO Resume 13OSIBAJO
 
CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1Johan Kruger
 
Consultant's Experience - emeka nweke-nest
Consultant's Experience - emeka nweke-nestConsultant's Experience - emeka nweke-nest
Consultant's Experience - emeka nweke-nestEmeka Nweke
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)afzaal ahmad
 
Instrument and Control Engineer
Instrument and Control EngineerInstrument and Control Engineer
Instrument and Control EngineerVICTORIA NGOZI U.
 
Resume - Lingasami K
Resume - Lingasami KResume - Lingasami K
Resume - Lingasami KLingasami K
 
HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016Hamza DAKMAN
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527Rob Smith
 

Similar to NEWMAP/ANAMBRA CV (20)

CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015
 
MONG-CV-KABIA-Newest
MONG-CV-KABIA-NewestMONG-CV-KABIA-Newest
MONG-CV-KABIA-Newest
 
CV - Hassan Ssentamu
CV - Hassan SsentamuCV - Hassan Ssentamu
CV - Hassan Ssentamu
 
John Asuquo
John AsuquoJohn Asuquo
John Asuquo
 
John Asuquo
John AsuquoJohn Asuquo
John Asuquo
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
OLADIPUPO OSIBAJO Resume 13
OLADIPUPO OSIBAJO Resume 13OLADIPUPO OSIBAJO Resume 13
OLADIPUPO OSIBAJO Resume 13
 
Ojuri Olufemi Victor-CVx2016
Ojuri Olufemi Victor-CVx2016Ojuri Olufemi Victor-CVx2016
Ojuri Olufemi Victor-CVx2016
 
CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1CV Kruger Barend Johannes (Johan)1
CV Kruger Barend Johannes (Johan)1
 
WILSON SAPIEN CV
WILSON SAPIEN CVWILSON SAPIEN CV
WILSON SAPIEN CV
 
Consultant's Experience - emeka nweke-nest
Consultant's Experience - emeka nweke-nestConsultant's Experience - emeka nweke-nest
Consultant's Experience - emeka nweke-nest
 
AKINWANDE G.T
AKINWANDE G.TAKINWANDE G.T
AKINWANDE G.T
 
John Okusolubo Resume 2015
John Okusolubo Resume 2015John Okusolubo Resume 2015
John Okusolubo Resume 2015
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 
BABATUNDE RESUME
BABATUNDE RESUMEBABATUNDE RESUME
BABATUNDE RESUME
 
Instrument and Control Engineer
Instrument and Control EngineerInstrument and Control Engineer
Instrument and Control Engineer
 
Resume - Lingasami K
Resume - Lingasami KResume - Lingasami K
Resume - Lingasami K
 
HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
CV -Nildo M. Nhaliginga
CV -Nildo M. NhaligingaCV -Nildo M. Nhaliginga
CV -Nildo M. Nhaliginga
 

NEWMAP/ANAMBRA CV

  • 1. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION CURRICULUM VITAE (CV) Position Title and No. Hydraulics Structures K-4 Name of Expert: Engr. Emeka Nweke Date of Birth: 07 – 03 – 1960 Country of Citizenship/Residence NIGERIA EDUCATION: B. Sc. (Civil Eng): Univ. of Southampton England 1980 (B.Sc ) Archbishop Tenison’s Grammar School, Kenninghton Oval, London, England 1977 (A Level ) Wyvil Primary School, South Lambeth Road, Vauxhall, London 1971 Employment record relevant to the assignment Period Employing organization and your title/position. Contact info for references Country Summary of activities performance relevant to the Assignment 1978-1979 (Internship) Ove Arup & Partners, 13 Fitzroy Street, London, W.1 England Design team that handled a proposed multi-storeys building in Hong Kong. 1979-1980 (Internship) Department of Transport and Environment England Interchange along A3 Highway at Portsmouth Interchange England 1980 - 1981 Per Roberto Nigeria Limited, Airport Road, Warri Nigeria Site engineer for construction of Mosheshe Estate, Airport road, Warri; - - Structural interpretation - Setting out & levelling - Materials accounting - Workforce Development - Coordination of Electrical & Plumbing works NEST ENGINEERING LIMITED Page 1 Engr. Emeka Nweke (Managing Director)
  • 2. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION - External Civil works 1981-1985 Bouygues Nigeria Limited Idejo Street, Victoria Island, Lagos Nigeria Site engineer for construction of University of Nigeria Teaching Hospital, Enugu, KM 22, Enugu – Port Harcourt expressway; - - Structural interpretation - Setting out & levelling - Materials accounting - Workforce Development - Coordination of Electrical & Mechanical/Plumbing works - Storm water & Sewerage drainage control works - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications & relationships - Works Planning & Programming - Temporary & permanent access roads - Project Management 1985-1987 Bouygues Nigeria Limited Idejo Street, Victoria Island, Lagos Nigeria Project engineer for construction of National Bank Multi storeys Building, Broad Street, Lagos Island, Lagos; - - Project Management - Design Review & Management - Structural interpretation - Setting out & levelling - Materials accounting - Workforce Development - Coordination of Electrical & Mechanical/Plumbing works - Storm water & Sewerage drainage control works - Temporary formworks design & fabrication NEST ENGINEERING LIMITED Page 2
  • 3. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications & relationships - Works Planning & Programming 1987-1989 Bouygues Nigeria Limited Idejo Street, Victoria Island, Lagos Nigeria Project Engineer for construction of 10008 Classrooms School Project, Lagos; - - Pre-Cast structural elements design and construction - Project Management - Design Review & Management - Structural interpretation - Setting out & levelling - Materials accounting - Workforce Development - Coordination of Electrical & Mechanical/Plumbing works - Storm water & Sewerage drainage control works - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications & relationships - Works Planning & Programming 1989-1991 Bouygues Nigeria Limited Idejo Street, Victoria Island, Lagos Nigeria Project Engineer for construction of 420 MW Combined Cycle Gas Turbine Electricity Power Generating Facility, at Egbin, Ikorodu, Lagos State; - - Hydraulics Modelling & Analyses - Pre-Cast structural elements design and construction - Project Management NEST ENGINEERING LIMITED Page 3
  • 4. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION - Design Review & Management - Structural interpretation - Setting out & levelling - Materials accounting - Workforce Development - Coordination of Electrical & Mechanical/Plumbing works - Storm water & Sewerage drainage control works - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications & relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Erosion Control and mitigation studies and engineering design for Amuzam gully erosions, Enugu Ngwo, Enugu North LGA, Enugu State (2014) (World Bank Assisted-Newmap) ; - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation NEST ENGINEERING LIMITED Page 4
  • 5. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Erosion Control and mitigation studies and engineering design for Colliery gully erosions, Enugu Ngwo, Enugu North LGA, Enugu State (2014) (World Bank Assisted-Newmap) ; - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Erosion Control and mitigation studies and engineering design for Ezata gully erosions, Enugu Ngwo, Enugu North LGA, Enugu State (2014) (World Bank Assisted-Newmap) ; - - Geographic & Geo- informatics Studies - Hydrology & Watershed NEST ENGINEERING LIMITED Page 5
  • 6. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Erosion Control and mitigation studies and engineering design for Saint Theresa gully erosions, Enugu Ngwo, Enugu North LGA, Enugu State (2014) (World Bank Assisted-Newmap) ; - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation NEST ENGINEERING LIMITED Page 6
  • 7. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Erosion Control and mitigation studies and engineering design for Umudunu/Uruokpala gully erosions, Abagana Njikoka LGA, Anambra State (2013) (World Bank Assisted-Newmap) ; - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Erosion Control and mitigation studies and engineering design for Ajali Water Works gully erosions, Imezi-Owa, Ezeagu LGA, Enugu State (World Bank Assisted-Newmap Approved and cleared November (2013) (2011 to date); - - Geographic & Geo- informatics Studies NEST ENGINEERING LIMITED Page 7
  • 8. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Erosion control and mitigation studies and engineering design for 9th Mile Gully erosion, Udi LGA, Enugu State (World Bank Assisted-Newmap Approved and cleared November (2013) (2011 to date); - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing NEST ENGINEERING LIMITED Page 8
  • 9. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Assisted a National consultant in Erosion control and mitigation studies and engineering design for Nguzu Edda Gully erosion, Afikpo South LGA, Ebonyi State (World Bank Assisted-Newmap Approved and cleared November (2013) (2011 to date); - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Assisted a National consultant in Erosion control and mitigation studies and engineering design for Gully erosion, Amuda Achara, Umunneochi LGA, Abia State (World Bank Assisted-Newmap Approved and cleared November (2013) (2011 NEST ENGINEERING LIMITED Page 9
  • 10. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION to date); - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Assisted a National consultant in Erosion control and mitigation studies and engineering design for Gully erosion, Amuzukwu, Isiala Ngwa LGA, Abia State (World Bank Assisted-Newmap Approved and cleared November (2013) (2011 to date) ; - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & NEST ENGINEERING LIMITED Page 10
  • 11. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming 1991-Date Nest Engineering Limited KM 10, Odume Mansion, Uruekwo Village, Enugwu Ukwu Old Awka – Onitsha Road, Anambra State Nigeria Design and Supervision of Erosion Control and Mitigation Work at Zaura Polder Pilot Scheme Birnin Kebbi, Kebbi State. (Client: Ecological Funds Office at Presidency c/o Sokoto Rima River Basin Development Authority (2003) ; - - Geographic & Geo- informatics Studies - Hydrology & Watershed Studies - Hydraulics Modelling & Analyses - Geotechnical Studies - Structural Studies - Bio-Engineering & Environmental Studies - Project Management & Supervision Studies - Design Review & Management - Temporary formworks design & fabrication - Works Evaluation & Costing - Budget Formulation - Consultants’ – Contractors’ communications (Bidding Documents & ancillary relationships - Works Planning & Programming NEST ENGINEERING LIMITED Page 11
  • 12. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION Membership in Professional Associations and Publications: Member, Nigeria Society of Engineer – 1989 Registered Engineer, Council for the Regulation of Engineering in Nigeria – 1992 Publications 1. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion Control and Mitigation Works for Colliery gully erosion site, Enugu Ngwo, Enugu North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE. 2. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion Control and Mitigation Works for Amuzam gully erosion site, Enugu Ngwo, Enugu North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE. 3. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion Control and Mitigation Works for Ezata gully erosion site, Enugu Ngwo, Enugu North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE. 4. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion Control and Mitigation Works for Saint Theresa gully erosion site, Enugu Ngwo, Enugu North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE 5. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion Control and Mitigation Works for Agbaja Ngwo gully erosion site, Agbaja Ngwo, Enugu North LGA, Enugu State. February, 2015 – NEWMP ENUGU STATE 6. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion Control and Mitigation Works for Ajali Water Works gully erosion site, Imezi Owa Udi LGA, Enugu State. November 2014 – NEWMP ENUGU STATE 7. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion Control and Mitigation Works for 9th Mile gully erosion site, Ameke Ngwo Udi LGA, Enugu State. November 2014 – NEWMP ENUGU STATE 8. Egnr. Emeka Nweke (Nest Engineering Ltd) Engineering Design Report for Erosion Control and Mitigation Works for Umudunu/Uruokpala gully erosion site, Abagana, Njikoka LGA, Anambra. May, 2013 – NEWMP ANAMBRA STATE NEST ENGINEERING LIMITED Page 12
  • 13. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION Language Skills Igbo Language (Fluent) English Language (Fluent) Detailed Tasks Assigned on Consultant’s Team of Experts Reference to Prior Work/Assignments that best illustrates capability to handle the Assigned Tasks K- 4: Hydraulics Structures Detailed Engineering Designs for 11 numbers erosion control sites in 4 states (Anambra (1), Enugu (7), Ebonyi (1), and Abia (2)) Approved and Cleared By World Bank/Food and Agricultural Organization (WB/FAO) Research Structured Vegetation – Bio-Engineering techniques in erosion control and mitigation works. Structural Design Detailed Engineering Designs for 11 numbers erosion control sites in 4 states (Anambra (1), Enugu (7), Ebonyi (1), and Abia (2)) Approved and Cleared By World Bank/Food and Agricultural Organization (WB/FAO) Flood/Erosion Design Detailed Engineering Designs for 11 numbers erosion control sites in 4 states (Anambra (1), Enugu (7), Ebonyi (1), and Abia (2)) Approved and Cleared By World Bank/Food and Agricultural Organization (WB/FAO) Expert’s contact information: +2348033254381, +2348023178067. nestnig2002@yahoo.com Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience, and I am available to undertake the assignment in case of an award. I understand that any misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank. EMEKA E. NWEKE Name of Expert Signature Date CHRIS C. OYEKA Name of authorized Signature Date NEST ENGINEERING LIMITED Page 13
  • 14. NEWMAP/ANAMBRA STATE/TECHNICAL PROPOSAL/ENGINEERING DESIGN & SUPERVISION Representative of the Consultant (the same who signs the Proposal) NEST ENGINEERING LIMITED Page 14