1. CURRICULUM VITAE
Personal Data
Name : Junaidi
Sex : Male
Place, Date of birth : Batang Toru, 11 June 1966
Religion : Moslem
Address : Wek II Pasar Batang toru,
North Sumatra
Email id : medyjunaidi@yahoo.com
Phone Number : + 62 0813 6172 1385,
Formal Education
Senior High School
Course / Training Attend
H2S Hazards and Effects Level-3 Training, held by Rutledge
Safety Leader Training
Leadership in safety Workshop & Critical Thinking Workshop Training
First Aid & CPR Training
H2S Safety Awareness Level II Training
Confined Space Entry Training
Basic Rigging Course
Incident Investigation Overview Training Course
Authorized Gas Tester Training Course
ExxonMobil Control Awareness Training
Training TBOSIETBT,
2. Advantage
Good analytical thinking, adaptable and flexible.
Willing to work for project any place in Indonesia and overseas.
Referees
• John Kent , Project Manager Exxon Mobil EPC 1 Project
John.kent@exxonmobil.com
• Keith Wilson, Construction Lead Exxon Mobil EPC 1 Project
keithwilson30@aol.com / Keithwilson@exxonmobil.com
• Christophe.Dhalluin, Project Manager Exxon Mobil EPC 2 Project
Christophe.Dhalluin@exxonmobil.com
• Adam.h.kalmbach, Construction Engineering Specialist Exxon Mobil EPC 2 Project
adam.h.kalmbach@exxonmobil.com
JOB EXPERIENCES SUMARY
1. Experiences to prepare and supervise operation and maintenance activity.
2. Experiences to managed minimize total loss materials, consumables and manpower to effectively and economic
objectively.
3. Experiences to organized to ensure best allocation of workers according requirement condition.
4. Experiences to coordinates our discipline with others, when conflicts arise, to resolve problems and prevent
delays.
5. Experiences to conduct maintenance schedule weekly, monthly and annual shutdown including prepare spare part.
6. Experiences for preventive, corrective maintenance and troubleshooting of all mechanical equipment such as
motor, compressor, pump, fan.
7. Experiences for overhaul and repairing motor, pump, fan compressor and other mechanical rotating equipment
8. Experiences for start up (commissioning) pump, fan, coal mill, compressor, steam turbine, gas turbine and other
mechanical rotating equipment.
9. Experiences for work on the preservation of all mechanical rotating equipment
10. Experiences for prepare material, erection, fit up, check orientation as per isometric drawing for pipeline
installation.
11. Experiences for install valve, instrument and support as per isometric drawing for pipeline installation.
12. Experiences to supervise pipeline installations to ensure that work is installed in accordance with drawings,
specifications & applicable codes.
13. Experiences for supervise, co-ordinate and schedule the activities of workers who install, repair and maintain
pipeline systems used for the transmission of steam, heat, water and oil.
14. Experiences for instalation of pump, fan, coal mill, compressor, steam turbine, gas turbine and other mechanical
rotating equipment
15. Experiences for instalation of steam drum, vessel, coal, tank and other mechanical static equipment
16. Experiences for aligment for steam turbine to gear box to generator, pump, fan, commpressor and other
mechanical rotating equipment.
17. Experiences for inspection of static and rotating equipment as per detail drawing, specification, procedure, CODE
and contract document
3. Experiences:
1. Exxon Mobil Cepu Limited .(Juni 2016 – Present)
Banyu Urip Project (Operation Tehcnical Project and CPO)
Project Location: Bojonegoro East Java,
Occupation: Constuction Mechanical Supervisor
2. Exxon Mobil Cepu Limited .(December 2013 – May 2016)
Banyu Urip Project (EPC1 CPF Onshore )
Project Location: Bojonegoro East Java,
Occupation: Constuction Mechanical Rotating / Machinery
3. Exxon Mobil Cepu Limited .(September 2012 – December 2013)
Banyu Urip Project (EPC2 Onshore Export Pipeline Syetem – 72 Km)
Project Location: Bojonegoro – Tuban East Java,
Occupation: Constuction Superintendent
4. PT. Ferrostaal Indonesia, (December 2011 – May 2012)
Bangka Belitung 4 Coal Fired Steam Power Plant Project Unit-1 & 2 ( 2 x 16.5 MW)
Project Location: Belitung – South Sumatra, Indonesia
Occupation: Mechanical/ Superintendent
Client / Owner: PT. Poeser Indonesia / PT. PLN (Persero) UIPP Sumatra II
5. PT. Ferrostaal Indonesia, (July 2011 – December 2011)
Doopless Seamless Pipe Revitalization Project
Project Location: PT. Tenaris - SPIJ
Occupation: Mechanical/ Superintendent
Client: Tenaris
Owner: Tenaris
6. PT. Ferrostaal Indonesia, (June 2010 – June 2011)
Krakatau Steel 88” Hot Strip Mill Revitalization
Project Location: PT. Krakatau Steel, Cilegon – West Java, Indonesia
Occupation: Mechanical/ Superintendent
Client: SMS Siemag / PT. Lykamandiri Sentosajaya (Likmas Jaya)
Owner: PT. Krakatau Steel
7. PT. MAN Ferrostaal Indonesia, (May 2008 – April 2010)
EPF2-Weldpad-A interconnecting corridor,
Project Location: Banyu Urip – East Java, Indonesia
Occupation: Mechanical/ Superintendent
Client / Owner: Mobil Cepu Limited
8. PT. Samudra Ferro Engineering (MAN Ferrostaal Indonesia), (June 2005 – May 2008)
Construction Agreement Service Project
Project Location: Bula - Seram Island
Occupation: Mechanical Supervisor
Client / Owner: Kuwait Foreign Petroleum Company (Limited) Indonesia
9. PT. Samudra Ferro Engineering, (February 2004 – June 2005)
Kujang 1B–Ammonia Project,
4. Project Location: Cikampek - West Java
Occupation: Mechanical Supervisor
Client: PT. Rekayasa Industri
10. PT. Samudra Ferro Engineering, (December 2002 – February 2004)
NSO “A” Remedial work Project and Air Separation Unit,
Project Location: Arun Field – North Aceh
Occupation: Mechanical Superviso
Client / Owner: ExxonMobil Oil Indonesia
11. PT. Samudra Ferro Engineering, (May 1997 – December 2002)
Steam Turbine Assembly,2 X 650 Mw Paiton Private Power Project Phase II
Project Location: Paiton – East Java, Indonesia
Occupation: Mechanical Supervisor / Mechanical Warranty
Client: Siemens Kwu.
12. PT. Samudra Ferro Engineering, (January 1997 – May 1997)
Polysindo 2-Texmaco
Project Location: Karawang – West Java, Indonesia
Occupation: Mechanical Foreman
Client: Texmaco
13. PT. Samudra Ferro Engineering, (February 1992 – December 1996)
Steam Turbine Assembly, 2 X 450 MW Combine Cycle Power Plant
Project Location: Belawan – North Sumatra, Indonesia
Occupation: Mechanical Foreman / Mechanical Warranty
Client: Siemens Kwu.
Bojonegoro 06 Juni 2016.
Junaidi