SlideShare a Scribd company logo
1 of 4
CURRICULUM VITAE
Personal Data
Name : Junaidi
Sex : Male
Place, Date of birth : Batang Toru, 11 June 1966
Religion : Moslem
Address : Wek II Pasar Batang toru,
North Sumatra
Email id : medyjunaidi@yahoo.com
Phone Number : + 62 0813 6172 1385,
Formal Education
 Senior High School
Course / Training Attend
 H2S Hazards and Effects Level-3 Training, held by Rutledge
 Safety Leader Training
 Leadership in safety Workshop & Critical Thinking Workshop Training
 First Aid & CPR Training
 H2S Safety Awareness Level II Training
 Confined Space Entry Training
 Basic Rigging Course
 Incident Investigation Overview Training Course
 Authorized Gas Tester Training Course
 ExxonMobil Control Awareness Training
 Training TBOSIETBT,
Advantage
 Good analytical thinking, adaptable and flexible.
 Willing to work for project any place in Indonesia and overseas.
Referees
• John Kent , Project Manager Exxon Mobil EPC 1 Project
John.kent@exxonmobil.com
• Keith Wilson, Construction Lead Exxon Mobil EPC 1 Project
keithwilson30@aol.com / Keithwilson@exxonmobil.com
• Christophe.Dhalluin, Project Manager Exxon Mobil EPC 2 Project
Christophe.Dhalluin@exxonmobil.com
• Adam.h.kalmbach, Construction Engineering Specialist Exxon Mobil EPC 2 Project
adam.h.kalmbach@exxonmobil.com
JOB EXPERIENCES SUMARY
1. Experiences to prepare and supervise operation and maintenance activity.
2. Experiences to managed minimize total loss materials, consumables and manpower to effectively and economic
objectively.
3. Experiences to organized to ensure best allocation of workers according requirement condition.
4. Experiences to coordinates our discipline with others, when conflicts arise, to resolve problems and prevent
delays.
5. Experiences to conduct maintenance schedule weekly, monthly and annual shutdown including prepare spare part.
6. Experiences for preventive, corrective maintenance and troubleshooting of all mechanical equipment such as
motor, compressor, pump, fan.
7. Experiences for overhaul and repairing motor, pump, fan compressor and other mechanical rotating equipment
8. Experiences for start up (commissioning) pump, fan, coal mill, compressor, steam turbine, gas turbine and other
mechanical rotating equipment.
9. Experiences for work on the preservation of all mechanical rotating equipment
10. Experiences for prepare material, erection, fit up, check orientation as per isometric drawing for pipeline
installation.
11. Experiences for install valve, instrument and support as per isometric drawing for pipeline installation.
12. Experiences to supervise pipeline installations to ensure that work is installed in accordance with drawings,
specifications & applicable codes.
13. Experiences for supervise, co-ordinate and schedule the activities of workers who install, repair and maintain
pipeline systems used for the transmission of steam, heat, water and oil.
14. Experiences for instalation of pump, fan, coal mill, compressor, steam turbine, gas turbine and other mechanical
rotating equipment
15. Experiences for instalation of steam drum, vessel, coal, tank and other mechanical static equipment
16. Experiences for aligment for steam turbine to gear box to generator, pump, fan, commpressor and other
mechanical rotating equipment.
17. Experiences for inspection of static and rotating equipment as per detail drawing, specification, procedure, CODE
and contract document
Experiences:
1. Exxon Mobil Cepu Limited .(Juni 2016 – Present)
Banyu Urip Project (Operation Tehcnical Project and CPO)
Project Location: Bojonegoro East Java,
Occupation: Constuction Mechanical Supervisor
2. Exxon Mobil Cepu Limited .(December 2013 – May 2016)
Banyu Urip Project (EPC1 CPF Onshore )
Project Location: Bojonegoro East Java,
Occupation: Constuction Mechanical Rotating / Machinery
3. Exxon Mobil Cepu Limited .(September 2012 – December 2013)
Banyu Urip Project (EPC2 Onshore Export Pipeline Syetem – 72 Km)
Project Location: Bojonegoro – Tuban East Java,
Occupation: Constuction Superintendent
4. PT. Ferrostaal Indonesia, (December 2011 – May 2012)
Bangka Belitung 4 Coal Fired Steam Power Plant Project Unit-1 & 2 ( 2 x 16.5 MW)
Project Location: Belitung – South Sumatra, Indonesia
Occupation: Mechanical/ Superintendent
Client / Owner: PT. Poeser Indonesia / PT. PLN (Persero) UIPP Sumatra II
5. PT. Ferrostaal Indonesia, (July 2011 – December 2011)
Doopless Seamless Pipe Revitalization Project
Project Location: PT. Tenaris - SPIJ
Occupation: Mechanical/ Superintendent
Client: Tenaris
Owner: Tenaris
6. PT. Ferrostaal Indonesia, (June 2010 – June 2011)
Krakatau Steel 88” Hot Strip Mill Revitalization
Project Location: PT. Krakatau Steel, Cilegon – West Java, Indonesia
Occupation: Mechanical/ Superintendent
Client: SMS Siemag / PT. Lykamandiri Sentosajaya (Likmas Jaya)
Owner: PT. Krakatau Steel
7. PT. MAN Ferrostaal Indonesia, (May 2008 – April 2010)
EPF2-Weldpad-A interconnecting corridor,
Project Location: Banyu Urip – East Java, Indonesia
Occupation: Mechanical/ Superintendent
Client / Owner: Mobil Cepu Limited
8. PT. Samudra Ferro Engineering (MAN Ferrostaal Indonesia), (June 2005 – May 2008)
Construction Agreement Service Project
Project Location: Bula - Seram Island
Occupation: Mechanical Supervisor
Client / Owner: Kuwait Foreign Petroleum Company (Limited) Indonesia
9. PT. Samudra Ferro Engineering, (February 2004 – June 2005)
Kujang 1B–Ammonia Project,
Project Location: Cikampek - West Java
Occupation: Mechanical Supervisor
Client: PT. Rekayasa Industri
10. PT. Samudra Ferro Engineering, (December 2002 – February 2004)
NSO “A” Remedial work Project and Air Separation Unit,
Project Location: Arun Field – North Aceh
Occupation: Mechanical Superviso
Client / Owner: ExxonMobil Oil Indonesia
11. PT. Samudra Ferro Engineering, (May 1997 – December 2002)
Steam Turbine Assembly,2 X 650 Mw Paiton Private Power Project Phase II
Project Location: Paiton – East Java, Indonesia
Occupation: Mechanical Supervisor / Mechanical Warranty
Client: Siemens Kwu.
12. PT. Samudra Ferro Engineering, (January 1997 – May 1997)
Polysindo 2-Texmaco
Project Location: Karawang – West Java, Indonesia
Occupation: Mechanical Foreman
Client: Texmaco
13. PT. Samudra Ferro Engineering, (February 1992 – December 1996)
Steam Turbine Assembly, 2 X 450 MW Combine Cycle Power Plant
Project Location: Belawan – North Sumatra, Indonesia
Occupation: Mechanical Foreman / Mechanical Warranty
Client: Siemens Kwu.
Bojonegoro 06 Juni 2016.
Junaidi

More Related Content

Viewers also liked

えむたま(仮)
えむたま(仮)えむたま(仮)
えむたま(仮)Shouta Inoue
 
FLIPKART Online Shopping In India
FLIPKART Online Shopping In IndiaFLIPKART Online Shopping In India
FLIPKART Online Shopping In IndiaVishal Pawar
 
OSINt framework :who dreams about banned self memory
OSINt framework :who dreams about banned self memoryOSINt framework :who dreams about banned self memory
OSINt framework :who dreams about banned self memoryJulian Davidoff
 
LA EMPATÍA Y LA ASERTIVIDAD
LA EMPATÍA Y LA ASERTIVIDAD LA EMPATÍA Y LA ASERTIVIDAD
LA EMPATÍA Y LA ASERTIVIDAD nelso18
 
Trabajo final uvirtual 2016
Trabajo final uvirtual 2016Trabajo final uvirtual 2016
Trabajo final uvirtual 2016elkadan
 

Viewers also liked (11)

Solución Punto 3.3 Proyecto SENA
Solución Punto 3.3 Proyecto SENASolución Punto 3.3 Proyecto SENA
Solución Punto 3.3 Proyecto SENA
 
えむたま(仮)
えむたま(仮)えむたま(仮)
えむたま(仮)
 
FLIPKART Online Shopping In India
FLIPKART Online Shopping In IndiaFLIPKART Online Shopping In India
FLIPKART Online Shopping In India
 
Resume for LinkedIn
Resume for LinkedInResume for LinkedIn
Resume for LinkedIn
 
Music: A Therapeutic Tool
Music: A Therapeutic ToolMusic: A Therapeutic Tool
Music: A Therapeutic Tool
 
OSINt framework :who dreams about banned self memory
OSINt framework :who dreams about banned self memoryOSINt framework :who dreams about banned self memory
OSINt framework :who dreams about banned self memory
 
LA EMPATÍA Y LA ASERTIVIDAD
LA EMPATÍA Y LA ASERTIVIDAD LA EMPATÍA Y LA ASERTIVIDAD
LA EMPATÍA Y LA ASERTIVIDAD
 
Name
NameName
Name
 
Info 1
Info 1Info 1
Info 1
 
Oracle Management Cloud
Oracle Management Cloud Oracle Management Cloud
Oracle Management Cloud
 
Trabajo final uvirtual 2016
Trabajo final uvirtual 2016Trabajo final uvirtual 2016
Trabajo final uvirtual 2016
 

Similar to Update CV-Junaidi_Juni 2016

Similar to Update CV-Junaidi_Juni 2016 (20)

CV Hendra mai muklis
CV Hendra mai muklisCV Hendra mai muklis
CV Hendra mai muklis
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
CV
CVCV
CV
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
 
My CV
My CVMy CV
My CV
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
Yaya Sunarya CV
Yaya Sunarya CVYaya Sunarya CV
Yaya Sunarya CV
 
jragojo CV
jragojo CVjragojo CV
jragojo CV
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
CV.HARIS SIREGAR
CV.HARIS SIREGARCV.HARIS SIREGAR
CV.HARIS SIREGAR
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Sanjeev Barwal
Sanjeev BarwalSanjeev Barwal
Sanjeev Barwal
 
Joe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDFJoe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDF
 
CV Kitjuk Harijanto
CV Kitjuk HarijantoCV Kitjuk Harijanto
CV Kitjuk Harijanto
 
CV_Arijanto EP_2016
CV_Arijanto EP_2016CV_Arijanto EP_2016
CV_Arijanto EP_2016
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
B. Jufri-2015 - EDIT
B. Jufri-2015 - EDITB. Jufri-2015 - EDIT
B. Jufri-2015 - EDIT
 
New CV Donny Baru
New CV Donny BaruNew CV Donny Baru
New CV Donny Baru
 
Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015Stewart Spence Maintenance Manager CV 2015
Stewart Spence Maintenance Manager CV 2015
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 

Update CV-Junaidi_Juni 2016

  • 1. CURRICULUM VITAE Personal Data Name : Junaidi Sex : Male Place, Date of birth : Batang Toru, 11 June 1966 Religion : Moslem Address : Wek II Pasar Batang toru, North Sumatra Email id : medyjunaidi@yahoo.com Phone Number : + 62 0813 6172 1385, Formal Education  Senior High School Course / Training Attend  H2S Hazards and Effects Level-3 Training, held by Rutledge  Safety Leader Training  Leadership in safety Workshop & Critical Thinking Workshop Training  First Aid & CPR Training  H2S Safety Awareness Level II Training  Confined Space Entry Training  Basic Rigging Course  Incident Investigation Overview Training Course  Authorized Gas Tester Training Course  ExxonMobil Control Awareness Training  Training TBOSIETBT,
  • 2. Advantage  Good analytical thinking, adaptable and flexible.  Willing to work for project any place in Indonesia and overseas. Referees • John Kent , Project Manager Exxon Mobil EPC 1 Project John.kent@exxonmobil.com • Keith Wilson, Construction Lead Exxon Mobil EPC 1 Project keithwilson30@aol.com / Keithwilson@exxonmobil.com • Christophe.Dhalluin, Project Manager Exxon Mobil EPC 2 Project Christophe.Dhalluin@exxonmobil.com • Adam.h.kalmbach, Construction Engineering Specialist Exxon Mobil EPC 2 Project adam.h.kalmbach@exxonmobil.com JOB EXPERIENCES SUMARY 1. Experiences to prepare and supervise operation and maintenance activity. 2. Experiences to managed minimize total loss materials, consumables and manpower to effectively and economic objectively. 3. Experiences to organized to ensure best allocation of workers according requirement condition. 4. Experiences to coordinates our discipline with others, when conflicts arise, to resolve problems and prevent delays. 5. Experiences to conduct maintenance schedule weekly, monthly and annual shutdown including prepare spare part. 6. Experiences for preventive, corrective maintenance and troubleshooting of all mechanical equipment such as motor, compressor, pump, fan. 7. Experiences for overhaul and repairing motor, pump, fan compressor and other mechanical rotating equipment 8. Experiences for start up (commissioning) pump, fan, coal mill, compressor, steam turbine, gas turbine and other mechanical rotating equipment. 9. Experiences for work on the preservation of all mechanical rotating equipment 10. Experiences for prepare material, erection, fit up, check orientation as per isometric drawing for pipeline installation. 11. Experiences for install valve, instrument and support as per isometric drawing for pipeline installation. 12. Experiences to supervise pipeline installations to ensure that work is installed in accordance with drawings, specifications & applicable codes. 13. Experiences for supervise, co-ordinate and schedule the activities of workers who install, repair and maintain pipeline systems used for the transmission of steam, heat, water and oil. 14. Experiences for instalation of pump, fan, coal mill, compressor, steam turbine, gas turbine and other mechanical rotating equipment 15. Experiences for instalation of steam drum, vessel, coal, tank and other mechanical static equipment 16. Experiences for aligment for steam turbine to gear box to generator, pump, fan, commpressor and other mechanical rotating equipment. 17. Experiences for inspection of static and rotating equipment as per detail drawing, specification, procedure, CODE and contract document
  • 3. Experiences: 1. Exxon Mobil Cepu Limited .(Juni 2016 – Present) Banyu Urip Project (Operation Tehcnical Project and CPO) Project Location: Bojonegoro East Java, Occupation: Constuction Mechanical Supervisor 2. Exxon Mobil Cepu Limited .(December 2013 – May 2016) Banyu Urip Project (EPC1 CPF Onshore ) Project Location: Bojonegoro East Java, Occupation: Constuction Mechanical Rotating / Machinery 3. Exxon Mobil Cepu Limited .(September 2012 – December 2013) Banyu Urip Project (EPC2 Onshore Export Pipeline Syetem – 72 Km) Project Location: Bojonegoro – Tuban East Java, Occupation: Constuction Superintendent 4. PT. Ferrostaal Indonesia, (December 2011 – May 2012) Bangka Belitung 4 Coal Fired Steam Power Plant Project Unit-1 & 2 ( 2 x 16.5 MW) Project Location: Belitung – South Sumatra, Indonesia Occupation: Mechanical/ Superintendent Client / Owner: PT. Poeser Indonesia / PT. PLN (Persero) UIPP Sumatra II 5. PT. Ferrostaal Indonesia, (July 2011 – December 2011) Doopless Seamless Pipe Revitalization Project Project Location: PT. Tenaris - SPIJ Occupation: Mechanical/ Superintendent Client: Tenaris Owner: Tenaris 6. PT. Ferrostaal Indonesia, (June 2010 – June 2011) Krakatau Steel 88” Hot Strip Mill Revitalization Project Location: PT. Krakatau Steel, Cilegon – West Java, Indonesia Occupation: Mechanical/ Superintendent Client: SMS Siemag / PT. Lykamandiri Sentosajaya (Likmas Jaya) Owner: PT. Krakatau Steel 7. PT. MAN Ferrostaal Indonesia, (May 2008 – April 2010) EPF2-Weldpad-A interconnecting corridor, Project Location: Banyu Urip – East Java, Indonesia Occupation: Mechanical/ Superintendent Client / Owner: Mobil Cepu Limited 8. PT. Samudra Ferro Engineering (MAN Ferrostaal Indonesia), (June 2005 – May 2008) Construction Agreement Service Project Project Location: Bula - Seram Island Occupation: Mechanical Supervisor Client / Owner: Kuwait Foreign Petroleum Company (Limited) Indonesia 9. PT. Samudra Ferro Engineering, (February 2004 – June 2005) Kujang 1B–Ammonia Project,
  • 4. Project Location: Cikampek - West Java Occupation: Mechanical Supervisor Client: PT. Rekayasa Industri 10. PT. Samudra Ferro Engineering, (December 2002 – February 2004) NSO “A” Remedial work Project and Air Separation Unit, Project Location: Arun Field – North Aceh Occupation: Mechanical Superviso Client / Owner: ExxonMobil Oil Indonesia 11. PT. Samudra Ferro Engineering, (May 1997 – December 2002) Steam Turbine Assembly,2 X 650 Mw Paiton Private Power Project Phase II Project Location: Paiton – East Java, Indonesia Occupation: Mechanical Supervisor / Mechanical Warranty Client: Siemens Kwu. 12. PT. Samudra Ferro Engineering, (January 1997 – May 1997) Polysindo 2-Texmaco Project Location: Karawang – West Java, Indonesia Occupation: Mechanical Foreman Client: Texmaco 13. PT. Samudra Ferro Engineering, (February 1992 – December 1996) Steam Turbine Assembly, 2 X 450 MW Combine Cycle Power Plant Project Location: Belawan – North Sumatra, Indonesia Occupation: Mechanical Foreman / Mechanical Warranty Client: Siemens Kwu. Bojonegoro 06 Juni 2016. Junaidi