SlideShare a Scribd company logo
1 of 25
CURRICULUM VITAE
FULL NAME: DIMITRAKOPOULOS CHARALAMBOS
NATIONALITY: GREEK
RESIDENCE: PYRGOS / Prefecture Of ILIAS / GREECE
FAMILY STATUS: MARRIED (2 CHILDREN)
DATE OF BIRTH: 8th of September 1973
PROFESSION: Civil Engineer
Contact: +30 6981031504 (mobile)
email: omilosdest@gmail.com
linkedin : Charalambos Dimitrakopoulos
Skype id: lambis_dimitrakopoulos
EDUCATION / SKILLS
University: Technological Educational Institution of Athens.
Specialty: “CIVIL & INFRASTRUCTURE ENGINEERING” (roads, highways,
harbors, retaining walls, hydraulic & irrigation works, sewage,
culverts, drainages, ect)
Year of graduation: 1998
Graduation Degree 6, 8
 Member of the Project Management Institute (PMI).
Member ID: 2390919
 Charteredmember of the Civil & infrastructure Technological
Engineers Greek Accosiation Member ID: 25323
Languages spoken: English (fluently) – French (fluently)
Computer software: Office 2007 – AutoCAD 2008/09 – Primavera Project Planner
Driver License: Yes (international)
Equipment manipulation: Leica TS02 total station / Hitachi 106 crawler crane manipulation
/Cat 950H Wheel Loader manipulation.
INTERESTS - HOBBIES
Literature – Computer hardware – Photography – Languages – Classical Music – Puzzles
Availability
Immediate (Notice period 15~30 days for relocation & visa arrangements)
EXPERIENCE
May 2014 ~ today (staff)
Municipality of Pyrgos – Greece Lead Engineer of urban & rural road maintenance works.
Supervisor Engineer in significant Projects financed by the
Municipality of Pyrgos.
May 2013 ~ May 2014 (contract)
JP Contractors Nig. Ltd Site Engineer / foreman on road & infrastructure works at Imo State in
Nigeria.
Project Manager at the Company's asphalt plant.
Site Engineer-foreman on asphalt works
December 2009 ~ May 2013(staff)
Municipality of Pyrgos – Greece Site engineer on road construction and infrastructure maintenance
works.
Cost engineer & Supervisor engineer in significant Projects financed by
the Municipality of Pyrgos.
Lead Engineer of urban & rural road works executed by the Municipality
of Pyrgos with its own fleet of heavy machinery.
July 2008 ~ December 2009 (contract)
Theodosis Constructions S.A. Construction Engineer , Cost Engineer & Quantity Surveyor for Private
Building Projects (turn key luxurious houses & blocks of flats) & Public
Projects (retaining walls – optical fiber- schools- churches –
earthworks-infrastructure)
Site engineer-foreman for frameworks & reinforced concrete works.
August 2005 ~ July 2008 (contract)
Egnatia Odos S.A. Supervisor Site Manager during the construction of
Komotini~Alexandroupoli Highway. Role: Quantity Surveyor – Cost
Engineer – Project Engineer
September 2004 ~ August 2005 (contract)
Ergodomiki S.A. Site Manager & Quantity Surveyor during the framework construction of
the main repair shop of KOSMOCAR S.A. & the framework
construction of the Head Office of EUROBANK ERGASIAS S.A. in
Athens
Site engineer-foreman for frameworks & reinforced concrete works.
December 2002 ~ September 2004 (staff)
Olympic Village 2004 S.A. Supervisor Engineer & Quantity Surveyor during the construction of the
athletes’ houses in the Olympic Village for the Olympic Games
of 2004 in Athens.
September 2001 ~ September 2002 (contract)
ERGODRAGAGE S.A. Site Manager of aggregates quarrying (sand & gravel) using dredge-
boat & drag line in TCHAD in Central Africa.
June 2000 ~ September 2001 (staff)
KLEARXOS ROUTSIS S.A. Construction engineer responsible of naval works during the
construction of the extension of Piraeus harbor (Queen Mary II dock
at Themistocles Pier)
March 1997~June 2000 (contract)
ELTER S.A. Construction engineer during the construction of natural gas pipe-line
(PE) network in Athens. Role: Quantity Surveyor – Cost Engineer –
Schedule control engineer
February 1995 ~ March 1997 (staff)
ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S.
Office & technical assistant for the construction sites of sewage &
water treatment plants.
Major Public Projects (in Greece & abroad)
 Harbor of Piraeus
 Olympic Village
 Komotini – Alexandoupolis Highway – Egnatia Odos subsector “Mesti-Makri 15.4”
 Construction of the Creche Building Complex at Karatoula Ilias financed by the Church
of Cyprus
 The expansion of the MGBEE road from Olru to Ideato South at Imo State (Nigeria)
Projects Certifications available upon request
REFERENCES
Upon Request
PROJECTS INDEX
May 2014 ~ today (stuff)
Municipality of Pyrgos – Greece
Lead Engineer of urban & rural road maintenance works.
Supervisor Engineer in significant Projects financed by the Municipality of Pyrgos.
May 2013 ~ May 2014 (contract)
JP Contractors Nig. Ltd
Thiswas myrecent international positionasSite Engineer,workingforan IrishContractor.
The Project’title wasthe “Expansionof the MGBEE road from“Orlu” to“IdeatoSouth”includingthe anti-
erosionworks.The budgetof the Projectwas2.602.414.000 ₦ (12.333.715€)
My salaryagreementwasat40.000€ annually(notincludingaccommodation,transport,flightticketsevery3
months)
My responsibilitywasthe organizationof the groupof labors& the machines, in orderto achieve the
maximumproductivity.
Brief ProjectDescription:
 Constructionof the drainage system(1mwidth&1m height) onbothsidesof the road& connection
withthe natural water-sources
 Excavationof the extensionof the road(double sideexpansion)
 Backfillingwithlaterite.
 Constructionof the infrastructure of the road(30 cm of stone base)
 Constructionof the roaddemarcation
 Constructionof the asphaltlayer(5cmcompacted)
Duringthe rainyseason,Iconstructedthe AsphaltPlantof the Company&I trainedthe AsphaltOperator,the
loaderoperator,the mechanic&the labors.
The manufacturerof the plantwasthe IndianCompany“Capious”andthe model of the plantwasthe
DM 60-90
December 2009 ~ May 2013(stuff)
Municipality of Pyrgos – Greece
 As Lead Engineer of Urban & Rural Road works, I was responsible of evaluating the citizen’s requests,
scheduling & monitoring the daily plan using the Municipality’s fleet of heavy machinery (1 loader, 1
Crawler Excavator, 6 JCB loader backhoes, 8 trucks, 2 graders )
 As Supervisor Engineer I was responsible for the onsite construction of the Public Projects financed by
the Municipality. My additional role was to monitor the implementation of the quality tests and the
inspection of the safety measures. I was also responsible for the Cost Control of the Projects & for the
compliance with the Time-Schedule.
Major Public Projects
1. Solid Waste Management Budget: 550.000€
2. Erosion Control project at St. Georgios Budget: 203.000€
3. Erosion control project at Skafidia Budget: 300.000€
4. Restoration of the old hospital “Manolopoulio”
after the earthquakes on 1993 & 2008 Budget: 1.200.000€
5. 2nd project of permanent Traffic interventions
at Pyrgos town. Budget: 320.000€
6. Construction of the Skourochori – Skafidia
intersection Budget: 114.000€
7. Redevelopment of the old square at EleonasBudjet: 128.000€
 As site Engineer, I was charged of the construction of multiples urban road works executed by the
labors and the machinery of the Municipality of Pyrgos. The projects were supervised by the Technical
Department of the Municipality. The budget was ~ 750.000€
July 2008 ~ December 2009 (contract)
Theodosis Constructions S.A.
Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn key
luxurious houses & blocks of flats) & Public Projects (retaining walls – optical fiber- schools- churches
Public buildings - earthworks-infrastructure)
Site superintendent on frameworks & reinforced concrete works.
My salaryagreementwas2.000€ monthly
August 2005 ~ July 2008 (contract)
Egnatia Odos S.A.
The 1st Project’ subject was:
 the expansion of the old National road from Komotini to Alexandroupoli ,
Subsector Mesti~Makri (17Km)
 the expansion of the Motorway from Komotini to Alexandroupoli ,
Subsector Mesti – Makri (14.7 Km)
The Project’ budget was 21.000.000€
The 2nd Project subject was:
 The construction of the slip resistance asphalt layer from New Karvali to Xrisoupoli (14.5 Km)
 >> >> >> of the Alexandroupolis Ring Road (20,5 Km)
 >> of the remaining asphalt works from New Karvali to Alexandroupolis
The Project’ budget was 24.000.000€
My salaryagreementwas27.000€ annually(includingaccommodation,transport and life-assurance)
My role, as a member of the supervising team, considering the field works, was the daily monitoring of the
executed earthworks & the concrete works (extensions of existing culverts & retaining walls), the monitoring of
the explosions, the inspection of the safety measures, the control of the infrastructure construction, the
implementation of the quality tests , the monitoring of the asphalt works & the control of the safety barrier
installation works.
Considering the office job, I was the Lead Quantity Surveyor with extra duties as Cost Controller assistant.
September 2004 ~ August 2005 (contract)
Ergodomiki S.A.
The Project’subjectwasthe constructionof the concrete structure of:
 The main work-shopof KosmocarS.A.(2.200 m2 surface,2 floors+ 1 basement) atElefsina
 The constructionof EUROBANK ERGASIAS S.A. mainoffice(4.300m2 surface,6 floors+ 4 basements+
treasury) inAthens
My salaryagreementwas1.800€ monthly
My responsibilityassite Engineer wasthe dailyschedulingof the works(frameworkssetting –concrete casting
– frameworksstriping),the guidance of the craftsmenandthe labors,the qualitytests,the monitoringof the
workprogress.
Consideringthe paperwork,Iwasincharge of the QuantitySurveillanceandthe verificationof the
subcontractorspayrolls.
December 2002 ~ September 2004 (staff)
Olympic Village 2004 S.A.
The Project’ subject was:
 The construction of the athletes’ houses in the Olympic Village for the Olympic Games of 2004 in
Athens
 The construction of the roads and the roads infrastructure inside the Olympic Village
 The construction of the connecting roads
The project’ Budget was 100.000.000€
Additional projects:
 The construction of the athletic compound (1 football stadium, 2 indoor multipurpose gymnasiums, 1
swimming pool constructed according to the Olympic standards, 4 tennis playgrouns).
Budget: 4.500.000 €
 The construction of the main Fire Station of Parnitha Mountain. Budget: 600.000€
My responsibility as Site Engineer – Foreman, was to monitor the works progress, to ensure the safety & the
quality, and make sure that everything was executed according to the regulations and the instructions of the
Olympic Committee.
Considering the office work, my duty was the Quality and the Quantity surveillance.
My salary agreement was 1.500€ monthly, including assurance.
Athletic
compound
Main Fire
Station
Olympic
village
September 2001 ~ September 2002 (contract)
ERGODRAGAGE S.A.
This is my first attempt to work abroad, so I came to an agreement with a Greek Contractor who was planning
to construct a quarry.
My responsibilities in Greece:
 I was responsible to choose the appropriate machinery, (1 crawler crane Hitachi of 40tn, 1 truck
Mercedes 2626, 1 vibrating screen).
 I was monitoring the construction of the screen, & the maintenance of the crane and the truck.
 I was trained to operate the crawler crane as drag-line
 I organized the custom-clearance, the shipping and the expedition.
My responsibilities in Chad
 I organized the custom clearance and the transport from Duala (the Cameroonian harbor) to
N’Djamena.
 I assembled the vibrating screen and I trained the mechanic, the operators & the labors.
My salary agreement was 1.500€ monthly in Greece during the fabrication and the expedition & 3000€ in Africa
June 2000 ~ September 2001 (staff)
KLEARXOS ROUTSIS S.A.
Brief Project description:
 Silt dredging from the sea bottom
 Underwater drilling and placement of the explosives
 Underwater explosions
 Underwater excavations with clamshells and floating excavator
 Construction of the concrete blocks
 Construction of the underwater infrastructure
 Positioning of the blocks
 Construction of the upper structure
The budget of the Project was 16.727.806€
My responsibility as naval Engineer was the daily measurement of the depth of the sea bottom, the scheduling
and the monitoring of the underwater blasts, the guidance of the clamshells and the floating excavator,, the
scheduling of the blocks positioning and the surveillance of the immersion.
March 1997~June 2000 (contract)
ELTER S.A.
The Project was the construction of natural gas pipe-line (PE) basic network of 4bars pressure, in the
sectors 16,17,18,21,22,68,71,73 & 83 of Attika
The budget of the Project was 5.282.465€
My responsibilityasjuniorsite Engineerwasthe dailyschedulingof the works(machines&labors),the
inspectionof the safetymeasures,the qualitytests&the monitoringof the pipe welders.
Consideringthe paperwork,Iwasincharge of the Quantity& CostSurveillance aswell asthe time-scheduling
usingPrimaverasoftware.
February 1995 ~ March 1997 (staff)
ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S.
I started working on 1995 at a reputed Contractor, specialized on water treatment plants, during my early years
as a student. I had the chance to work side by side with very experienced Engineers and that was the source of
my passion for the constructions.
Slowly slowly from a shy office assistant I was transformed to a useful cadre and I took in charge the office
support of the working sites.
The support was:
 Correspondence with the authorities
 Control of the subcontractors payrolls
 Detailed construction drawings according to tech. specifications
Sincerely yours
Lambis Dimitrakopoulos
Civil & infrastructure Engineer
Projects certifications officially translated, available upon request
Additional documentary (passport - degree - yellow cart e.c.t) available upon request

More Related Content

Similar to Cv & projects updated

Similar to Cv & projects updated (20)

PROJECTS index updated
PROJECTS index updatedPROJECTS index updated
PROJECTS index updated
 
Syntosis vasileios.
Syntosis vasileios.Syntosis vasileios.
Syntosis vasileios.
 
Curriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major ProjectsCurriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major Projects
 
CV_baroutzoglou
CV_baroutzoglouCV_baroutzoglou
CV_baroutzoglou
 
CV_G_DALGKALIS
CV_G_DALGKALISCV_G_DALGKALIS
CV_G_DALGKALIS
 
PANOU-eng_cv_DRAFT
PANOU-eng_cv_DRAFTPANOU-eng_cv_DRAFT
PANOU-eng_cv_DRAFT
 
2016.06 CV DELERNIAS_N_GBR
2016.06  CV DELERNIAS_N_GBR2016.06  CV DELERNIAS_N_GBR
2016.06 CV DELERNIAS_N_GBR
 
KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016
 
Michalis CV new 110616
Michalis CV new 110616Michalis CV new 110616
Michalis CV new 110616
 
Michalis cv new 110616
Michalis cv new 110616Michalis cv new 110616
Michalis cv new 110616
 
CV_E.Sidira_160309_EN
CV_E.Sidira_160309_ENCV_E.Sidira_160309_EN
CV_E.Sidira_160309_EN
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
CV G Tryfonas 2014 EUROPASS1
CV G Tryfonas 2014 EUROPASS1CV G Tryfonas 2014 EUROPASS1
CV G Tryfonas 2014 EUROPASS1
 
Curriculum Vitae Papastamatis-May 2015
Curriculum Vitae Papastamatis-May 2015Curriculum Vitae Papastamatis-May 2015
Curriculum Vitae Papastamatis-May 2015
 
John Asuquo
John AsuquoJohn Asuquo
John Asuquo
 
John Asuquo
John AsuquoJohn Asuquo
John Asuquo
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
C.V 17-S
C.V 17-SC.V 17-S
C.V 17-S
 
C.V. Z. Zografos
C.V.   Z. ZografosC.V.   Z. Zografos
C.V. Z. Zografos
 
Eng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photoEng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photo
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 

Cv & projects updated

  • 1. CURRICULUM VITAE FULL NAME: DIMITRAKOPOULOS CHARALAMBOS NATIONALITY: GREEK RESIDENCE: PYRGOS / Prefecture Of ILIAS / GREECE FAMILY STATUS: MARRIED (2 CHILDREN) DATE OF BIRTH: 8th of September 1973 PROFESSION: Civil Engineer Contact: +30 6981031504 (mobile) email: omilosdest@gmail.com linkedin : Charalambos Dimitrakopoulos Skype id: lambis_dimitrakopoulos EDUCATION / SKILLS University: Technological Educational Institution of Athens. Specialty: “CIVIL & INFRASTRUCTURE ENGINEERING” (roads, highways, harbors, retaining walls, hydraulic & irrigation works, sewage, culverts, drainages, ect) Year of graduation: 1998 Graduation Degree 6, 8  Member of the Project Management Institute (PMI). Member ID: 2390919  Charteredmember of the Civil & infrastructure Technological Engineers Greek Accosiation Member ID: 25323 Languages spoken: English (fluently) – French (fluently) Computer software: Office 2007 – AutoCAD 2008/09 – Primavera Project Planner Driver License: Yes (international) Equipment manipulation: Leica TS02 total station / Hitachi 106 crawler crane manipulation /Cat 950H Wheel Loader manipulation. INTERESTS - HOBBIES Literature – Computer hardware – Photography – Languages – Classical Music – Puzzles Availability Immediate (Notice period 15~30 days for relocation & visa arrangements)
  • 2. EXPERIENCE May 2014 ~ today (staff) Municipality of Pyrgos – Greece Lead Engineer of urban & rural road maintenance works. Supervisor Engineer in significant Projects financed by the Municipality of Pyrgos. May 2013 ~ May 2014 (contract) JP Contractors Nig. Ltd Site Engineer / foreman on road & infrastructure works at Imo State in Nigeria. Project Manager at the Company's asphalt plant. Site Engineer-foreman on asphalt works December 2009 ~ May 2013(staff) Municipality of Pyrgos – Greece Site engineer on road construction and infrastructure maintenance works. Cost engineer & Supervisor engineer in significant Projects financed by the Municipality of Pyrgos. Lead Engineer of urban & rural road works executed by the Municipality of Pyrgos with its own fleet of heavy machinery. July 2008 ~ December 2009 (contract) Theodosis Constructions S.A. Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn key luxurious houses & blocks of flats) & Public Projects (retaining walls – optical fiber- schools- churches – earthworks-infrastructure) Site engineer-foreman for frameworks & reinforced concrete works. August 2005 ~ July 2008 (contract) Egnatia Odos S.A. Supervisor Site Manager during the construction of Komotini~Alexandroupoli Highway. Role: Quantity Surveyor – Cost Engineer – Project Engineer September 2004 ~ August 2005 (contract) Ergodomiki S.A. Site Manager & Quantity Surveyor during the framework construction of the main repair shop of KOSMOCAR S.A. & the framework construction of the Head Office of EUROBANK ERGASIAS S.A. in Athens Site engineer-foreman for frameworks & reinforced concrete works. December 2002 ~ September 2004 (staff) Olympic Village 2004 S.A. Supervisor Engineer & Quantity Surveyor during the construction of the athletes’ houses in the Olympic Village for the Olympic Games of 2004 in Athens. September 2001 ~ September 2002 (contract) ERGODRAGAGE S.A. Site Manager of aggregates quarrying (sand & gravel) using dredge- boat & drag line in TCHAD in Central Africa.
  • 3. June 2000 ~ September 2001 (staff) KLEARXOS ROUTSIS S.A. Construction engineer responsible of naval works during the construction of the extension of Piraeus harbor (Queen Mary II dock at Themistocles Pier) March 1997~June 2000 (contract) ELTER S.A. Construction engineer during the construction of natural gas pipe-line (PE) network in Athens. Role: Quantity Surveyor – Cost Engineer – Schedule control engineer February 1995 ~ March 1997 (staff) ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S. Office & technical assistant for the construction sites of sewage & water treatment plants. Major Public Projects (in Greece & abroad)  Harbor of Piraeus  Olympic Village  Komotini – Alexandoupolis Highway – Egnatia Odos subsector “Mesti-Makri 15.4”  Construction of the Creche Building Complex at Karatoula Ilias financed by the Church of Cyprus  The expansion of the MGBEE road from Olru to Ideato South at Imo State (Nigeria) Projects Certifications available upon request REFERENCES Upon Request
  • 4. PROJECTS INDEX May 2014 ~ today (stuff) Municipality of Pyrgos – Greece Lead Engineer of urban & rural road maintenance works. Supervisor Engineer in significant Projects financed by the Municipality of Pyrgos.
  • 5. May 2013 ~ May 2014 (contract) JP Contractors Nig. Ltd Thiswas myrecent international positionasSite Engineer,workingforan IrishContractor. The Project’title wasthe “Expansionof the MGBEE road from“Orlu” to“IdeatoSouth”includingthe anti- erosionworks.The budgetof the Projectwas2.602.414.000 ₦ (12.333.715€) My salaryagreementwasat40.000€ annually(notincludingaccommodation,transport,flightticketsevery3 months) My responsibilitywasthe organizationof the groupof labors& the machines, in orderto achieve the maximumproductivity. Brief ProjectDescription:  Constructionof the drainage system(1mwidth&1m height) onbothsidesof the road& connection withthe natural water-sources  Excavationof the extensionof the road(double sideexpansion)  Backfillingwithlaterite.  Constructionof the infrastructure of the road(30 cm of stone base)
  • 6.  Constructionof the roaddemarcation  Constructionof the asphaltlayer(5cmcompacted) Duringthe rainyseason,Iconstructedthe AsphaltPlantof the Company&I trainedthe AsphaltOperator,the loaderoperator,the mechanic&the labors. The manufacturerof the plantwasthe IndianCompany“Capious”andthe model of the plantwasthe DM 60-90
  • 7. December 2009 ~ May 2013(stuff) Municipality of Pyrgos – Greece  As Lead Engineer of Urban & Rural Road works, I was responsible of evaluating the citizen’s requests, scheduling & monitoring the daily plan using the Municipality’s fleet of heavy machinery (1 loader, 1 Crawler Excavator, 6 JCB loader backhoes, 8 trucks, 2 graders )
  • 8.  As Supervisor Engineer I was responsible for the onsite construction of the Public Projects financed by the Municipality. My additional role was to monitor the implementation of the quality tests and the inspection of the safety measures. I was also responsible for the Cost Control of the Projects & for the compliance with the Time-Schedule. Major Public Projects 1. Solid Waste Management Budget: 550.000€ 2. Erosion Control project at St. Georgios Budget: 203.000€ 3. Erosion control project at Skafidia Budget: 300.000€ 4. Restoration of the old hospital “Manolopoulio” after the earthquakes on 1993 & 2008 Budget: 1.200.000€ 5. 2nd project of permanent Traffic interventions at Pyrgos town. Budget: 320.000€ 6. Construction of the Skourochori – Skafidia intersection Budget: 114.000€ 7. Redevelopment of the old square at EleonasBudjet: 128.000€
  • 9.  As site Engineer, I was charged of the construction of multiples urban road works executed by the labors and the machinery of the Municipality of Pyrgos. The projects were supervised by the Technical Department of the Municipality. The budget was ~ 750.000€
  • 10. July 2008 ~ December 2009 (contract) Theodosis Constructions S.A. Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn key luxurious houses & blocks of flats) & Public Projects (retaining walls – optical fiber- schools- churches Public buildings - earthworks-infrastructure) Site superintendent on frameworks & reinforced concrete works. My salaryagreementwas2.000€ monthly
  • 11.
  • 12.
  • 13. August 2005 ~ July 2008 (contract) Egnatia Odos S.A.
  • 14. The 1st Project’ subject was:  the expansion of the old National road from Komotini to Alexandroupoli , Subsector Mesti~Makri (17Km)  the expansion of the Motorway from Komotini to Alexandroupoli , Subsector Mesti – Makri (14.7 Km) The Project’ budget was 21.000.000€ The 2nd Project subject was:  The construction of the slip resistance asphalt layer from New Karvali to Xrisoupoli (14.5 Km)  >> >> >> of the Alexandroupolis Ring Road (20,5 Km)  >> of the remaining asphalt works from New Karvali to Alexandroupolis The Project’ budget was 24.000.000€ My salaryagreementwas27.000€ annually(includingaccommodation,transport and life-assurance) My role, as a member of the supervising team, considering the field works, was the daily monitoring of the executed earthworks & the concrete works (extensions of existing culverts & retaining walls), the monitoring of the explosions, the inspection of the safety measures, the control of the infrastructure construction, the implementation of the quality tests , the monitoring of the asphalt works & the control of the safety barrier installation works. Considering the office job, I was the Lead Quantity Surveyor with extra duties as Cost Controller assistant.
  • 15.
  • 16. September 2004 ~ August 2005 (contract) Ergodomiki S.A. The Project’subjectwasthe constructionof the concrete structure of:  The main work-shopof KosmocarS.A.(2.200 m2 surface,2 floors+ 1 basement) atElefsina  The constructionof EUROBANK ERGASIAS S.A. mainoffice(4.300m2 surface,6 floors+ 4 basements+ treasury) inAthens My salaryagreementwas1.800€ monthly My responsibilityassite Engineer wasthe dailyschedulingof the works(frameworkssetting –concrete casting – frameworksstriping),the guidance of the craftsmenandthe labors,the qualitytests,the monitoringof the workprogress. Consideringthe paperwork,Iwasincharge of the QuantitySurveillanceandthe verificationof the subcontractorspayrolls.
  • 17.
  • 18. December 2002 ~ September 2004 (staff) Olympic Village 2004 S.A. The Project’ subject was:  The construction of the athletes’ houses in the Olympic Village for the Olympic Games of 2004 in Athens  The construction of the roads and the roads infrastructure inside the Olympic Village  The construction of the connecting roads The project’ Budget was 100.000.000€ Additional projects:  The construction of the athletic compound (1 football stadium, 2 indoor multipurpose gymnasiums, 1 swimming pool constructed according to the Olympic standards, 4 tennis playgrouns). Budget: 4.500.000 €  The construction of the main Fire Station of Parnitha Mountain. Budget: 600.000€ My responsibility as Site Engineer – Foreman, was to monitor the works progress, to ensure the safety & the quality, and make sure that everything was executed according to the regulations and the instructions of the Olympic Committee. Considering the office work, my duty was the Quality and the Quantity surveillance. My salary agreement was 1.500€ monthly, including assurance. Athletic compound Main Fire Station Olympic village
  • 19.
  • 20. September 2001 ~ September 2002 (contract) ERGODRAGAGE S.A. This is my first attempt to work abroad, so I came to an agreement with a Greek Contractor who was planning to construct a quarry. My responsibilities in Greece:  I was responsible to choose the appropriate machinery, (1 crawler crane Hitachi of 40tn, 1 truck Mercedes 2626, 1 vibrating screen).  I was monitoring the construction of the screen, & the maintenance of the crane and the truck.  I was trained to operate the crawler crane as drag-line  I organized the custom-clearance, the shipping and the expedition. My responsibilities in Chad  I organized the custom clearance and the transport from Duala (the Cameroonian harbor) to N’Djamena.  I assembled the vibrating screen and I trained the mechanic, the operators & the labors. My salary agreement was 1.500€ monthly in Greece during the fabrication and the expedition & 3000€ in Africa
  • 21. June 2000 ~ September 2001 (staff) KLEARXOS ROUTSIS S.A. Brief Project description:  Silt dredging from the sea bottom  Underwater drilling and placement of the explosives  Underwater explosions  Underwater excavations with clamshells and floating excavator  Construction of the concrete blocks  Construction of the underwater infrastructure  Positioning of the blocks  Construction of the upper structure The budget of the Project was 16.727.806€ My responsibility as naval Engineer was the daily measurement of the depth of the sea bottom, the scheduling and the monitoring of the underwater blasts, the guidance of the clamshells and the floating excavator,, the scheduling of the blocks positioning and the surveillance of the immersion.
  • 22.
  • 23.
  • 24. March 1997~June 2000 (contract) ELTER S.A. The Project was the construction of natural gas pipe-line (PE) basic network of 4bars pressure, in the sectors 16,17,18,21,22,68,71,73 & 83 of Attika The budget of the Project was 5.282.465€ My responsibilityasjuniorsite Engineerwasthe dailyschedulingof the works(machines&labors),the inspectionof the safetymeasures,the qualitytests&the monitoringof the pipe welders. Consideringthe paperwork,Iwasincharge of the Quantity& CostSurveillance aswell asthe time-scheduling usingPrimaverasoftware.
  • 25. February 1995 ~ March 1997 (staff) ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S. I started working on 1995 at a reputed Contractor, specialized on water treatment plants, during my early years as a student. I had the chance to work side by side with very experienced Engineers and that was the source of my passion for the constructions. Slowly slowly from a shy office assistant I was transformed to a useful cadre and I took in charge the office support of the working sites. The support was:  Correspondence with the authorities  Control of the subcontractors payrolls  Detailed construction drawings according to tech. specifications Sincerely yours Lambis Dimitrakopoulos Civil & infrastructure Engineer Projects certifications officially translated, available upon request Additional documentary (passport - degree - yellow cart e.c.t) available upon request