SUMMARY
Fifteen (15) years of experience in the field of Inspection, Quality Control/Assurance,Mechanical,
Welding, Painting & NDT. Experience in the field of third party inspection for various job orders,
Painting & Coating inspection, Welding Inspection, NDT Inspection, Cross Country Pipeline, spool and
Structural Fabrication in on shore and offshore. Worked with various companies such as Chevron,
Intertek Moody International, Bechtel Inc, McDermott, Technip, Nacap, MMG Saudi Arabia, Hands on
Experience includes but not limited to inspection, volumetric testing of welds, Painting Coating
Inspection. Duties involved were Implementing Quality Control Procedure, Provide Technical Support to
other departments, Testing Utilizing Various NDT Methods, Review, Maintenance & follow-up of
Welding Procedure Specification, co-ordination for qualifying the test specimens with regard to PQR
(Procedure Qualification Record) WPQT (Welder Performance Qualification Test) and PWQT
(Production Weld Qualification Test) and various types of MOCK-UP tests as per the approved
specification based on international codes & standards.
LOCATION Sichuan, China
EDUCATION Diploma in Mechanical Engineering from Kerala Board of Technical
Education – 2000
LANGUAGES English ,Hindi & Malayalam (Comprehensive, Reading, Writing)
PROFESSIONAL
QUALIFICATIONS
TWI Certified Welding Inspector ( Cert No: 47770 )
TWI Certified Painting Inspector ( Cert No: 56811 )
AWS Certified Welding Inspector ( Cert No: 09122421 )
ISO Lead Auditor course ( Cert No: Q8/IN/8/06 )
Level II in UT, RT, PT & MPT ( Certified as per ASNT TC-1A)
BOSIET Trained ( cert No :622857001107130010)
Saudi Aramco Approved Welding Inspector
Saudi Aramco Approved Coating Inspector
Bechtel Approved SQM
KJO Approved offshore Welding/ Coating/Mechanical Inspector
EQUIPMENT Structural Steels, Critical and Non Critical Coatings(FBE,
Concrete),Line Pipes, Fabricated piping,
CODES/STANDARDS ASME-IX, ASME VIII, , ASME-V,ASME-31.1, ASME-II, ASME-31.3,
ASME- 31.8, API 570, API 5L, API-1104, AWS D1.1,SAES &
GB Codes.
PROFESSIONAL EXPERIENCE
Chevron –CDB Gas Project
PRC,
Through Air Swift
2016 –April
Maintenance Fixed Equipment & Piping Advisor
The Piping/Mechanical Advisor is to provide assurance of Contractor's engineering, maintenance activities
on all piping systems as well as fixed mechanical equipment. The Piping/Mechanical Advisor is to
provide Operation support during Production.
Piping modifications associated with implementation on field
Together with planning, ensure that shutdown execution is handled in an efficient manner to reduce the
overall shutdown time.
Necessary QA/QC execution and follow-up within own discipline responsibility
Interface with Operations and project technical authorities related to execution of mechanical and piping
works.
Ensure that the Project HSSE Policy, no accidents, no harm to people and no damage to the environment
is strictly observed;
Review and approval of contractor documentation, including method statement, fabrication drawings
and other technical documentation that may be relevant to a particular scope of work
Follow up of Contractors inspection and test plans (ITP)
Follow up of Contractors Audit plans
Be familiar with all aspects of project fixed mechanical equipment
Follow up of contractor’s physical work in field to secure quality standard according to project
requirements
Be familiar with all aspects of project procedures for cleanliness, joint integrity, leak testing, etc for
piping systems.
Ensure that preservation and maintenance on piping systems, static and rotating mechanical equipment
is correctly identified and is being carried out
Participate in punch list sub-system walk down at MC, for sub-systems with piping or static and rotating
mechanical equipment content.
Ensure safety critical mechanical equipment meets the performance standards defined
Provide technical support to Completions Team Leader as required by reviewing system handover
packs, prior to approval by Completions Team Leader
Chevron –CDB Gas Project PRC,
Through Worley Parsons,
2014 –April to 2016 -April
Piping Lead
Prepare Piping Work Instructions, implement and utilize piping Engineering methodologies, system and
tools as defined by Company, develop work practices for the piping engineering and coordinate with
other engineering discipline Team Leaders.
Supports Engineering commissioning supervisor in setting up a plan for development of engineering
capabilities.
Supporting Engineering Manager in preparing Engineering Procedures and Engineering Execution Plan.
In charge for teaching/training/instructing/knowledge transferring of engineering work for piping
engineers in Company/Project.
Establish database and library for Power Plant / Oil and Gas Piping Engineering/ Designing.
To manage and control piping engineering works and to ensure that the works get complete within budget
and meet the schedule.
Perform engineering conceptual, FEED and detail design and calculations.
Initiates and reviews material lists, data sheets, specifications, model review, and design reports.
Participate in HAZOP studies.
Initiate and review enquiry, evaluates quotations and prepares bid technical tabulations and
recommendation.
Provides technical assistance and input to construction department for site fabrication, hook-up, testing of
piping, commissioning and start-up as required.
Technically assist Procurement Department in project bidding, procuring equipment, materials, and
services relating piping discipline.
Perform other related piping engineering works as required Engineering Department Manager.
Effective analytical and problem-solving skills with the ability to work with minimal supervision.
Capable of using software relating to piping engineering calculation/modeling and engineering
management work.
Effective communication skills both verbally and in writing with superiors, colleagues, and individuals
inside and outside the Company.
May propose cost effective solutions.
Ensures that the discipline engineering deliverables are compliant with project.
Works towards development and training of subordinates.
Contributes to project close out and lessons learned.
Intertek Moody International Saudi Arabia
Limited,
2013 -January to 2014 March
Technical Specialist @ onshore & offshore
Secondaryto Technip(OFFSHORE)asQA/QC
KHAFJI CRUDE RELATED OFFSHORE PROJECTS (KJO)
Fabrication, Construction, Installation, Hook-Up, Pre-commissioning, commissioning works of offshore
Process platform. Rehabilitation works for offshore complexes, reconditioning, shut down and
replacement of process piping, Fabrication of pressure vessels, tanks, piping works and heat exchangers.
Review of Inspection and Test Plan, Material Verification, All stages of Inspection, Final Visual,
Dimensional, Welding & Painting Inspection and Review of Final Dossiers prior to acceptance of the
product. Witnessing RT, MPT, LPT & Interpretation of films. Inspection of piping insulation and Witness
Painter qualification tests. Experienced in Pickling & Passivation of stainless steel components and
checking the process as per the approved procedure and maintaining the records. Worked as client's
inspector for Pre Service Inspection of Piping and Pre commissioning activities.
Responsibilities: -
 Review of the final issue of PID’s from point of view of commissioning and start-up, issuing of
PID’s modification according with project standards and regulations.
 Preparation of scope and the responsibilities for pre-commissioning and commissioning
activities, pre-commissioning & commissioning plan.
 To define the organization chart and necessary resources for pre-commissioning and
commissioning activities.
 Identification of systems and sub-systems by marking up of PFD’s and PID’s – system
definition.
 To assist construction departments by defining of priority systems according with overall
construction and pre-commissioning & commissioning planning and schedule. Participate in
constructability analyze in order to meet project schedule.
 Preparation of operating manuals in cooperation with the Process Department, Process Licensors
and Vendors.
 Preparation of pre-commissioning, commissioning and start-up execution plan; development of
planning and scheduling of pre-commissioning and commissioning plan for entire projects and
integration with Client planning for commissioning and start-up.
 Preparation of pre-commissioning & commissioning manuals.
 Development of pre-commissioning & commissioning procedures (air blowing, chemical
cleaning, water flushing philosophies, E&I test and functional test, refractory drying, catalyst and
adsorbents loading, steam blowing, etc.)
 Development of scope of work for chemical cleaning of special equipments such as steam
boilers, well control panel’s, amine systems, compressors suction lines, etc.. Technicalevaluation
of sub-contractors bids for work packs.
 Development of safety procedures to be used during pre-commissioning & commissioning
activities such as tagging, vessels entry for inspections, isolation & blind installation procedures
and work permit procedures in collaboration with HSE department.
 Preparation of commissioning and operational test procedures for packages unit, specific utility
or process systems in collaboration with licensors, vendors and engineering department.
 Preparation of performance test procedures in collaboration with licensors and engineering
department.
 Development of pre-commissioning & commissioning list for populating of the commissioning
IT tracking tool (Win PCS) with engineering data. I.e. : equipment list, instrument list, cable
schedule, load list, etc.
 Development of punch list procedure and exception list for handover.
 Development, review of pre-commissioning scenarios and material list for pre-commissioning
and commissioning such as sacrificial valves, quick opening valves, temporary spools, temporary
silencers, temporary strainers, etc.
 Development and review with vendors of lube oil and sealgas systems flushing/cleaning
procedures for compressors, gas turbines, steam turbines, etc.
 Outline and preparation of Ready Of Commissioning – Mechanical Completion Certificates and
Handover Dossiers through commissioning IT tracking tool (WinPCS).
 Preparation of the Client personnel training execution plan defining the following steps basic
training, industrial training, specific industrial training, training during commissioning and start-
up with external assistance for package equipments and licensed process units.
Intertek Moody International Bahrain,
2012 - January to 2012- December
Technical Specialist
 Inspection of Cross country pipeline joint Fit-up, welding and visual inspection. Welding
surveillance, monitoring and reporting of Wellhead piping, Plot piping as per Code and Standard
requirements.
 Responsible for maintaining and establishing Quality Control Records as per ISO 9000.
 Involved in documentation of hydro test packages, punch listing, coordinating and arranging hydro
testing for client inspection.
 Experienced with the preparation & maintenance of welders performance qualification record and
welders performance rating through welding control log.
 Responsible for walk through, pigging and hydro testing of pipe lines.
 Finalizing QA/QC documents for final hand over to Tatweer Petroleum, Assisting Project
management team etc.
Intertek Moody International Saudi Arabia LTD,
2010 – August to 2011 – December
Secondary to GAS ARABIAN SERVISES CO
SALES GAS DELIVERY SYSTEM TO RIYADH PP-11
Client : SAUDI ARAMCO / SECO
Designation : QA/QC Mechanical Welding + coating Inspector
Inspection of welding fit-up to final inspection for 38”,56” & 24” pipes, Witness Painter qualification
tests, inspection of Painting /coating application & wrapping over the joints, inspection of holiday testing
over the wrapping and FBE coated pipes before back filling. Inspection of incoming materials such as
Fittings, Gaskets, Pipes and fabricated spools
Abdullah Ahamed Al Enzi Group KSA,
2008 – September to 2010 – August
Client : SAUDI ARAMCO
Project : Manifa Downstream Pipeline Project
Designation : QA/QC Welding Inspector
195 Km cross country Pipe Line Project –Manifa Water supply and Water Storage Tanks. Responsible for
welding & painting inspection on tie-ins, road crossings and fabricated spools in various locations of
Pipeline from Manifa to Rastanurah and plant pipe work. Duties covered on inspection of welding &
painting, organizing NDT, Hot tapping, Holiday test & Hydro tests. Front end inspection and back end
inspection by GMAW, STT- FCAW process, Inspection of trench before back fill.
Mohammed Al Mojil Group Dammam,KSA ,
2005 – March to 2008 – July
Designation : QA/QC Mechanical Inspector
Projects : KAYAN-24,FOSTERWHEELER,SASREF
Clients : FLOUR ARABIA,SHARQ,SHELL- ARAMCO
Review of Inspection and Test Plan, Material Verification, All stages of Inspection, Final Visual,
Dimensional, Welding & Painting Inspection and Review of Final Dossiers prior to acceptance of the
product. Witnessing UT, MPT, LPT & Interpretation of films. Inspection of piping insulation and Witness
Painter qualification tests. Experienced in Pickling & Passivation of stainless steel components and
checking the process as per the approved procedure and maintaining the records. Worked as client's
inspector for Pre Service Inspection of Secondary Cycle Piping.
IIS NDT AND ALLIED SERVICES PVT LTD, Mumbai, India,
2001 – July to 2005 – January
Designation : QA/QC Mechanical Inspector / NDT Engineer
Clients : Tarapur Atomic Power Plant (TAPP),L&T Hazhira, Surendra Engineering
(Mumbai), Rajendra Mechanical Industries (REMI), Boiser.
Preparation of Project quality plans, ITP for various activities, submitting method of statements as per
client requirements. Inspection of Tanks, Process equipments at Vendors fabrication shop for each stage.
Inspection of incoming materials as per the purchase order and ensure free from defects. Inspection of
Piping and Structural steel fabrication. Inspection of PRV station installations for boilers inside the plant.
Verification of rotating equipments alignments and weight balancing. Inspection of bucket elevators and
chain drives. Witness hydrostatic tests for piping, tanks, vessels and valves according to the applicable
standards. Final inspection and pre commissioning of continuous extraction plants .Non Destructive
Testing at Metals using techniques like Ultrasonic Testing, Radiographic Testing, and Visual Testing,
Preparation of Inspection reports.
References will be available upon requests.

More Related Content

What's hot (17)

Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
ColinHunt.CV.May.16
ColinHunt.CV.May.16ColinHunt.CV.May.16
ColinHunt.CV.May.16
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector  Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector
 
Sujit TPI CV
Sujit TPI CVSujit TPI CV
Sujit TPI CV
 
MADHAN RESUME - UPDATED
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
 
Resume Abdulbari
Resume   AbdulbariResume   Abdulbari
Resume Abdulbari
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
qaiserQAQcEngg002
qaiserQAQcEngg002qaiserQAQcEngg002
qaiserQAQcEngg002
 
Cv precast concrete
Cv   precast concreteCv   precast concrete
Cv precast concrete
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
 
Donald Wilkinson-Resume
Donald Wilkinson-ResumeDonald Wilkinson-Resume
Donald Wilkinson-Resume
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor Mechanical
 

Viewers also liked

Viewers also liked (7)

VH Deck-F
VH Deck-FVH Deck-F
VH Deck-F
 
personal_report_rowan_smith
personal_report_rowan_smithpersonal_report_rowan_smith
personal_report_rowan_smith
 
Manual instalacion Arranque Dual - Johan Collazos
Manual instalacion Arranque Dual - Johan CollazosManual instalacion Arranque Dual - Johan Collazos
Manual instalacion Arranque Dual - Johan Collazos
 
CVMarine.doc
CVMarine.docCVMarine.doc
CVMarine.doc
 
HLONGWANE AGNESS
HLONGWANE AGNESSHLONGWANE AGNESS
HLONGWANE AGNESS
 
GEM-Groupe Espectrum Mexico
GEM-Groupe Espectrum MexicoGEM-Groupe Espectrum Mexico
GEM-Groupe Espectrum Mexico
 
Universidad nacional de chimborazo (1)
Universidad nacional de chimborazo (1)Universidad nacional de chimborazo (1)
Universidad nacional de chimborazo (1)
 

Similar to Jiju new cv

CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016Dayananda Hebbar
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxleonkidlat
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanShabin Shajahan
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziMohamed S. Hegazi
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)Sunkara Gsk
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTORNASEEB AHMAD
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish Murugesan
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 

Similar to Jiju new cv (20)

CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016CV - Dayananda Hebbar 24-10-2016
CV - Dayananda Hebbar 24-10-2016
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Construction Engineer(Oil&GasResume
Construction Engineer(Oil&GasResumeConstruction Engineer(Oil&GasResume
Construction Engineer(Oil&GasResume
 
Rudyard Ejercito - Resume
Rudyard Ejercito - ResumeRudyard Ejercito - Resume
Rudyard Ejercito - Resume
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
PIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docxPIPING SUPERVISOR Kz.docx
PIPING SUPERVISOR Kz.docx
 
Social Media Profile_Shabin Shajahan
Social Media Profile_Shabin ShajahanSocial Media Profile_Shabin Shajahan
Social Media Profile_Shabin Shajahan
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif Hegazi
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
Giridhar
GiridharGiridhar
Giridhar
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
Imran CV
Imran CVImran CV
Imran CV
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 

Jiju new cv

  • 1. Jiju Janardanan Nair QC Mechanical/Welding/ Coating +8618581815630 +919539371480 SUMMARY Fifteen (15) years of experience in the field of Inspection, Quality Control/Assurance,Mechanical, Welding, Painting & NDT. Experience in the field of third party inspection for various job orders, Painting & Coating inspection, Welding Inspection, NDT Inspection, Cross Country Pipeline, spool and Structural Fabrication in on shore and offshore. Worked with various companies such as Chevron, Intertek Moody International, Bechtel Inc, McDermott, Technip, Nacap, MMG Saudi Arabia, Hands on Experience includes but not limited to inspection, volumetric testing of welds, Painting Coating Inspection. Duties involved were Implementing Quality Control Procedure, Provide Technical Support to other departments, Testing Utilizing Various NDT Methods, Review, Maintenance & follow-up of Welding Procedure Specification, co-ordination for qualifying the test specimens with regard to PQR (Procedure Qualification Record) WPQT (Welder Performance Qualification Test) and PWQT (Production Weld Qualification Test) and various types of MOCK-UP tests as per the approved specification based on international codes & standards. LOCATION Sichuan, China EDUCATION Diploma in Mechanical Engineering from Kerala Board of Technical Education – 2000 LANGUAGES English ,Hindi & Malayalam (Comprehensive, Reading, Writing) PROFESSIONAL QUALIFICATIONS TWI Certified Welding Inspector ( Cert No: 47770 ) TWI Certified Painting Inspector ( Cert No: 56811 ) AWS Certified Welding Inspector ( Cert No: 09122421 ) ISO Lead Auditor course ( Cert No: Q8/IN/8/06 ) Level II in UT, RT, PT & MPT ( Certified as per ASNT TC-1A) BOSIET Trained ( cert No :622857001107130010) Saudi Aramco Approved Welding Inspector Saudi Aramco Approved Coating Inspector Bechtel Approved SQM KJO Approved offshore Welding/ Coating/Mechanical Inspector EQUIPMENT Structural Steels, Critical and Non Critical Coatings(FBE, Concrete),Line Pipes, Fabricated piping, CODES/STANDARDS ASME-IX, ASME VIII, , ASME-V,ASME-31.1, ASME-II, ASME-31.3, ASME- 31.8, API 570, API 5L, API-1104, AWS D1.1,SAES & GB Codes.
  • 2. PROFESSIONAL EXPERIENCE Chevron –CDB Gas Project PRC, Through Air Swift 2016 –April Maintenance Fixed Equipment & Piping Advisor The Piping/Mechanical Advisor is to provide assurance of Contractor's engineering, maintenance activities on all piping systems as well as fixed mechanical equipment. The Piping/Mechanical Advisor is to provide Operation support during Production. Piping modifications associated with implementation on field Together with planning, ensure that shutdown execution is handled in an efficient manner to reduce the overall shutdown time. Necessary QA/QC execution and follow-up within own discipline responsibility Interface with Operations and project technical authorities related to execution of mechanical and piping works. Ensure that the Project HSSE Policy, no accidents, no harm to people and no damage to the environment is strictly observed; Review and approval of contractor documentation, including method statement, fabrication drawings and other technical documentation that may be relevant to a particular scope of work Follow up of Contractors inspection and test plans (ITP) Follow up of Contractors Audit plans Be familiar with all aspects of project fixed mechanical equipment Follow up of contractor’s physical work in field to secure quality standard according to project requirements Be familiar with all aspects of project procedures for cleanliness, joint integrity, leak testing, etc for piping systems. Ensure that preservation and maintenance on piping systems, static and rotating mechanical equipment is correctly identified and is being carried out Participate in punch list sub-system walk down at MC, for sub-systems with piping or static and rotating mechanical equipment content. Ensure safety critical mechanical equipment meets the performance standards defined Provide technical support to Completions Team Leader as required by reviewing system handover packs, prior to approval by Completions Team Leader
  • 3. Chevron –CDB Gas Project PRC, Through Worley Parsons, 2014 –April to 2016 -April Piping Lead Prepare Piping Work Instructions, implement and utilize piping Engineering methodologies, system and tools as defined by Company, develop work practices for the piping engineering and coordinate with other engineering discipline Team Leaders. Supports Engineering commissioning supervisor in setting up a plan for development of engineering capabilities. Supporting Engineering Manager in preparing Engineering Procedures and Engineering Execution Plan. In charge for teaching/training/instructing/knowledge transferring of engineering work for piping engineers in Company/Project. Establish database and library for Power Plant / Oil and Gas Piping Engineering/ Designing. To manage and control piping engineering works and to ensure that the works get complete within budget and meet the schedule. Perform engineering conceptual, FEED and detail design and calculations. Initiates and reviews material lists, data sheets, specifications, model review, and design reports. Participate in HAZOP studies. Initiate and review enquiry, evaluates quotations and prepares bid technical tabulations and recommendation. Provides technical assistance and input to construction department for site fabrication, hook-up, testing of piping, commissioning and start-up as required. Technically assist Procurement Department in project bidding, procuring equipment, materials, and services relating piping discipline. Perform other related piping engineering works as required Engineering Department Manager. Effective analytical and problem-solving skills with the ability to work with minimal supervision. Capable of using software relating to piping engineering calculation/modeling and engineering management work. Effective communication skills both verbally and in writing with superiors, colleagues, and individuals inside and outside the Company. May propose cost effective solutions. Ensures that the discipline engineering deliverables are compliant with project. Works towards development and training of subordinates. Contributes to project close out and lessons learned.
  • 4. Intertek Moody International Saudi Arabia Limited, 2013 -January to 2014 March Technical Specialist @ onshore & offshore Secondaryto Technip(OFFSHORE)asQA/QC KHAFJI CRUDE RELATED OFFSHORE PROJECTS (KJO) Fabrication, Construction, Installation, Hook-Up, Pre-commissioning, commissioning works of offshore Process platform. Rehabilitation works for offshore complexes, reconditioning, shut down and replacement of process piping, Fabrication of pressure vessels, tanks, piping works and heat exchangers. Review of Inspection and Test Plan, Material Verification, All stages of Inspection, Final Visual, Dimensional, Welding & Painting Inspection and Review of Final Dossiers prior to acceptance of the product. Witnessing RT, MPT, LPT & Interpretation of films. Inspection of piping insulation and Witness Painter qualification tests. Experienced in Pickling & Passivation of stainless steel components and checking the process as per the approved procedure and maintaining the records. Worked as client's inspector for Pre Service Inspection of Piping and Pre commissioning activities. Responsibilities: -  Review of the final issue of PID’s from point of view of commissioning and start-up, issuing of PID’s modification according with project standards and regulations.  Preparation of scope and the responsibilities for pre-commissioning and commissioning activities, pre-commissioning & commissioning plan.  To define the organization chart and necessary resources for pre-commissioning and commissioning activities.  Identification of systems and sub-systems by marking up of PFD’s and PID’s – system definition.  To assist construction departments by defining of priority systems according with overall construction and pre-commissioning & commissioning planning and schedule. Participate in constructability analyze in order to meet project schedule.  Preparation of operating manuals in cooperation with the Process Department, Process Licensors and Vendors.  Preparation of pre-commissioning, commissioning and start-up execution plan; development of planning and scheduling of pre-commissioning and commissioning plan for entire projects and integration with Client planning for commissioning and start-up.  Preparation of pre-commissioning & commissioning manuals.
  • 5.  Development of pre-commissioning & commissioning procedures (air blowing, chemical cleaning, water flushing philosophies, E&I test and functional test, refractory drying, catalyst and adsorbents loading, steam blowing, etc.)  Development of scope of work for chemical cleaning of special equipments such as steam boilers, well control panel’s, amine systems, compressors suction lines, etc.. Technicalevaluation of sub-contractors bids for work packs.  Development of safety procedures to be used during pre-commissioning & commissioning activities such as tagging, vessels entry for inspections, isolation & blind installation procedures and work permit procedures in collaboration with HSE department.  Preparation of commissioning and operational test procedures for packages unit, specific utility or process systems in collaboration with licensors, vendors and engineering department.  Preparation of performance test procedures in collaboration with licensors and engineering department.  Development of pre-commissioning & commissioning list for populating of the commissioning IT tracking tool (Win PCS) with engineering data. I.e. : equipment list, instrument list, cable schedule, load list, etc.  Development of punch list procedure and exception list for handover.  Development, review of pre-commissioning scenarios and material list for pre-commissioning and commissioning such as sacrificial valves, quick opening valves, temporary spools, temporary silencers, temporary strainers, etc.  Development and review with vendors of lube oil and sealgas systems flushing/cleaning procedures for compressors, gas turbines, steam turbines, etc.  Outline and preparation of Ready Of Commissioning – Mechanical Completion Certificates and Handover Dossiers through commissioning IT tracking tool (WinPCS).  Preparation of the Client personnel training execution plan defining the following steps basic training, industrial training, specific industrial training, training during commissioning and start- up with external assistance for package equipments and licensed process units. Intertek Moody International Bahrain, 2012 - January to 2012- December Technical Specialist  Inspection of Cross country pipeline joint Fit-up, welding and visual inspection. Welding surveillance, monitoring and reporting of Wellhead piping, Plot piping as per Code and Standard requirements.  Responsible for maintaining and establishing Quality Control Records as per ISO 9000.  Involved in documentation of hydro test packages, punch listing, coordinating and arranging hydro testing for client inspection.  Experienced with the preparation & maintenance of welders performance qualification record and welders performance rating through welding control log.  Responsible for walk through, pigging and hydro testing of pipe lines.  Finalizing QA/QC documents for final hand over to Tatweer Petroleum, Assisting Project management team etc.
  • 6. Intertek Moody International Saudi Arabia LTD, 2010 – August to 2011 – December Secondary to GAS ARABIAN SERVISES CO SALES GAS DELIVERY SYSTEM TO RIYADH PP-11 Client : SAUDI ARAMCO / SECO Designation : QA/QC Mechanical Welding + coating Inspector Inspection of welding fit-up to final inspection for 38”,56” & 24” pipes, Witness Painter qualification tests, inspection of Painting /coating application & wrapping over the joints, inspection of holiday testing over the wrapping and FBE coated pipes before back filling. Inspection of incoming materials such as Fittings, Gaskets, Pipes and fabricated spools Abdullah Ahamed Al Enzi Group KSA, 2008 – September to 2010 – August Client : SAUDI ARAMCO Project : Manifa Downstream Pipeline Project Designation : QA/QC Welding Inspector 195 Km cross country Pipe Line Project –Manifa Water supply and Water Storage Tanks. Responsible for welding & painting inspection on tie-ins, road crossings and fabricated spools in various locations of Pipeline from Manifa to Rastanurah and plant pipe work. Duties covered on inspection of welding & painting, organizing NDT, Hot tapping, Holiday test & Hydro tests. Front end inspection and back end inspection by GMAW, STT- FCAW process, Inspection of trench before back fill.
  • 7. Mohammed Al Mojil Group Dammam,KSA , 2005 – March to 2008 – July Designation : QA/QC Mechanical Inspector Projects : KAYAN-24,FOSTERWHEELER,SASREF Clients : FLOUR ARABIA,SHARQ,SHELL- ARAMCO Review of Inspection and Test Plan, Material Verification, All stages of Inspection, Final Visual, Dimensional, Welding & Painting Inspection and Review of Final Dossiers prior to acceptance of the product. Witnessing UT, MPT, LPT & Interpretation of films. Inspection of piping insulation and Witness Painter qualification tests. Experienced in Pickling & Passivation of stainless steel components and checking the process as per the approved procedure and maintaining the records. Worked as client's inspector for Pre Service Inspection of Secondary Cycle Piping. IIS NDT AND ALLIED SERVICES PVT LTD, Mumbai, India, 2001 – July to 2005 – January Designation : QA/QC Mechanical Inspector / NDT Engineer Clients : Tarapur Atomic Power Plant (TAPP),L&T Hazhira, Surendra Engineering (Mumbai), Rajendra Mechanical Industries (REMI), Boiser. Preparation of Project quality plans, ITP for various activities, submitting method of statements as per client requirements. Inspection of Tanks, Process equipments at Vendors fabrication shop for each stage. Inspection of incoming materials as per the purchase order and ensure free from defects. Inspection of Piping and Structural steel fabrication. Inspection of PRV station installations for boilers inside the plant. Verification of rotating equipments alignments and weight balancing. Inspection of bucket elevators and chain drives. Witness hydrostatic tests for piping, tanks, vessels and valves according to the applicable standards. Final inspection and pre commissioning of continuous extraction plants .Non Destructive Testing at Metals using techniques like Ultrasonic Testing, Radiographic Testing, and Visual Testing, Preparation of Inspection reports. References will be available upon requests.