1. RESUME
AR.Mohamed Iqbal
(Electrical Engineer)
Mob: Res: +971-505126275
Email : armi.eee@gmail.com
------------------------------------------------------------------------------------------------
OBJECTIVE:
Having 10 Years’ experience in the field of Testing & Commissioning of various Power
plant ,substation from 415 V to 400 KV of various AIS and GIS substation and Execution
of projects related to Electrical systems.
PROFESSIONAL QUALIFICATION:
Technical : Diploma (D.E.E.E)
Discipline : Electrical and Electronic Engineering
University : State Board of Technical Education and Training
Period : 2006
Positions:
Senior Electrical Engineer ( System start-up Engineer)
Current Employer :
Korea Hydro & Nuclear Power.co.LLC
Abu Dhabi Nuclear Power Site;(BNPP)
Korea Hydro & Nuclear Power Co., Ltd.
PO. Box 11760 Ruwais, Abu Dhabi, UAE
2. Professional Experience :
I was working Arab Gulf Voltech Services Co.LLC .Abudhabi, UAE
( VOLTECH ENGINEERS PVT. LTD., Chennai) as Electrical Engineer. Extensive
experience in testing, commissioning, maintenance, troubleshooting of utilities and
equipments in Power Plants and Switchyards like Transformers, Breakers, Relays,
Motors, Current Transformers, Potential Transformers etc.
Executed Testing & Commissioning of :
Testing and commissioning of all Electrical equipment from 415V to 400KV Both
AIS And GIS System. DC System, SCMS, FMS and MCR interfacing as per
TRANSCO Standards
Familiar with 400KV GIS Interlock Scheme, protection scheme Metering
Scheme checks Mechanical & Electrical operation interlocks for Circuit
breaker for 400KV, Disconnectors & Earth Switches as per standard &
customer’s specification.
Primary and Secondary injection for 400KV GIS System
( protection ,Metering, signal ,transducers, end to end test, inter trip and
interlock test from upstream to downstream )
Inspection of Relay Metering panel, preparation of Test Report and cable schedule
for sub-station, power plant.
Testing of Protective auxiliary Relays for various needs. Experience with relays.
FAT(Factory Acceptance Test) for Transformer witnessed with vendor
Transformer Site Acceptance Test Performed up to 5MVA
Differential and REF Stability test for Transformer;
LVAC 415V panel Board installation & Testing & commissioning
LVAC 2/3 scheme; and 5/7 Scheme with 1 Bus tie and 4 Incomer and 2 Bus
coupler ATS Testing and commission
110V & 48V DC System and battery bank Installation & testing and commissioning
Trouble shooting of all Electrical circuits, control and protection circuits.
Testing and Commissioning of power control centre and motor control centre.
3. Component Test performed with of CT, P.T, Circuit breaker, Meters, Transducers,
Auxiliary Relays(86,TCS,Timer)
Testing & Commissioning of OC/EF Relay and UV Relay
switch gear and Power Transformer.
High Voltage (HV) test for bus bars & cables upto 33KV System
Annual Maintenance of Power Plant, Process plant and sub-station
Executed Installation of :
Panel Board installation
(LVAC, PCC, MCC, SMDB, DB, UPS, DCDB, Batteries)
Panel Modification at site (louver, ventilation system)
Components Assembling (CT,VT,MCB,RELAYS,TRANSDUCERS)& Inter Panel
wiring, Bus wiring
Control & Power cable laying from LCP to Protection, Metering, interfacing
Signal
Snag List Clearance work performed at live system
Executed Documentation of :
Preparing of as built Red Mark drawing.
Scheme Review & Modification works carried out.
WMS Preparation
RFI Document preparation
Test Report Preparation
Schedule preparation of commissioning activity
Co-ordinate with Vendors for Material Arrangement
Above documents submission and get approval from consultant
Preparation of Interfacing cable & termination schedule
Co-ordination with client in As Built Scheme drawing submission, test report
submission.
4. EQUIPMENT HANDLING:
SVERKER; FREJA 300; ODEN; OMICRON CT Analyzer; OMICRON
CPC 100; OMICRON CMC 256,356,156; Megger (programma EGIL)
;KOCUS
COMPUTER KNOWLEDGE:
OPERATING SYSTEM : DOS, ALL VERSIONS OF WINDOWS-7,8,10
APPLICATION SOFTWARES : MS OFFICE 2OO3, 2007.auto cad 2007)
EXPERIENCE DETAILS:
Overseas Experience:-
1 Project : Reinforcement of 380/110/13.8 KV GIS SHARORAH PP
Extension-II
Client : M/s Al-Toukhi, Saudi Arabia
2 Project : 380/110/13.8KV GIS Makkah North
Client : M/s Al-Toukhi, Saudi Arabia
3 Project : 380/230KV GIS, Wasit Gas Plant
Client : M/s ABB, Dammam, Saudi Arabia
4 Project : 380/230KV GIS, Al Daeree,BSP
Client :M/s ABB, Dammam, Saudi Arabia
5 Project :400/132KV Grid Substation,TRANSCO Al-Bahia,UAE, Abudhabi
Client :M/s TOSHIBA, UAE, Abudhabi
6 Project : 220/110KV GIS, Dhakka
Client : M/s Siemens, Dhakka, Bangladesh
5. 7 Project : 132/13.8KV GIS and Switch Gear, MC SET, Jeddah Port
Client : M/s Schneider Electric, Jeddah, Saudi Arabia
8 Project : 132/13.8KV GIS and Switch Gear, MC SET, Jeddah Airport
Client : M/s Schneider Electric, Jeddah, Saudi Arabia
9 Project : 132/13.8KV GIS and Switch gear MC SET, Al-Alawi Tunsi,
Madinah
Client : M/s Schneider Electric, Jeddah, Saudi Arabia
10 Project : Replacement of 33/11 KV Project GASCO Buhasa, Abudhabi,
UAE
Client : M/s Control & Application Emirates, UAE, Abudhabi
11 Project : BNPP (Brakka Neuclear Power Plant)
Client : M/s TOSHIBA, UAE, Abudhabi
Domestic Experience:
1. Project : 33KV/6.6KV/415V Switchgear (STPS).
Client : M/s ABB Ltd, Surathghar, Rajasthan.
2. Project : MSEDCL Akola Infra Phase- II 33KV / 11KV SubStations
Client : M/s L&T, Akola M.H.
3. Project : 11KV / 415V & 11KV / 11.5KV SubstationClient :
Client : M/s.Mukand engineering Ltd .LANCO, Anpara, UP
6. Personal Details :
Name : AR.Mohamed Iqbal
Date of Birth : 14-06-1983
Nationality : Indian
Sex : Male
Marital status : Married
Languages Known : Tamil, English and Hindi
Passport Details:
Passport Number : J 9111699
Place of Issue : TRICHY
Date of Issue : 17.08.2012
Date of Expiry : 16.08.2022
Declaration: -
I hereby declare that the information furnished by me in this application
is true and complete to the best of my knowledge and belief.
Yours sincerely,