1 | Mohamed Ibrahim
Mohamed Ibrahim
Senior Electrical Engineer
Mobile : +971503249126
E-mail : eng_melbayomy@yahoo.com
Senior Electrical Engineer with 13+
years of extensive experience in testing
and commissioning of Protection Relays,
Switchgear & Transformers , Quality
Implementation, Installation, Capacity
Utilization, Construction & Site
Management escalating productivity &
operational efficiencies; while curtailing
the costs / expenses.
Adept at supervision, co-ordination and
managing the day-to-day and round the
clock MV/HV FS .
Proficiencies in managing Testing ,
commissioning , start-up , operations of
Equipment and Utilities with proven
abilities in reducing downtime and
enhancing operational efficiencies.
Testing & Commissioning for Oil & GAS
, industries & Utilities within Gulf and
North Africa.
Completed Bachelor of Science in Electrical Power and Machine Engineering
From Mansoura University in 2002 ( with Very good Grade ).
Graduation Project ( with Excellent Grade ).
[ Mansoura University classified as 1st
University in EGYPT & 9th
in all AFRICA ]
Nationality : EGYPTIAN
Date of Birth : 6
th
DEC 1980
Marital Status : Married
Visa Status : Resident
UAE driving Licence : Valid up to 2019
Languages : English, Arabic, French
LinkedIn Profile : https://www.linkedin.com/profile/view?id=332461402&trk=hp-identity-name
J o b r e s p o n s i b i l i t i e s
Lead Commissioning electrical systems
and equipments.
Overseas travel for site around the gulf
and north Africa .
Setup and commissioning of HV & MV
switchgear , Transformers , Motors &
Capacitors Banks .
Setup and commissioning of Protection
Relay [ Generation – Transmission &
Distribution ].
Training to Customers
Liaise with engineers and sales managers
to create specifications according to
product requirements.
Support and supervision of site staff and
service personnel.
Active market and promote company after
sales ,service and commissioning
functions.
Sales office support for engineers and
sales managers with quotations and
technical issues.
Setup and commissioning of
communication devices such as low power
radios , GSM/GPRS and fiber optic links.
P r o f i l e S u m m a r y
Q u a l i f i c a t i o n s
P e r s o n a l D e t a i l s
2 | Mohamed Ibrahim
Senior Electrical Engineer:
SIEMENS L.L.C
March 2011 – Up to Present
Siemens is a global powerhouse focusing on the areas of electrification, automation and
digitalization. One of the world’s largest producers of energy-efficient, resource-saving
technologies, Siemens is a leading supplier of systems for power generation and transmission as
well as medical diagnosis
March 2008 – March 2011
Senior Installation and commissioning Engineer
Lucy Electric
Lucy Electric over 100 years’ industry experience, supplies an extensive range of high
performance, medium and low voltage switchgear suitable for a wide variety of industrial and
commercial applications.
October 2002 – February 2008
Protection and control Engineer
NDEDC
(NDEDC) is responsible for distributing of high quality electricity services to all customers in 3
states 8 Million Person [12% of Egypt population] , NDEDC’s core business is the planning,
design, construction, and operation of electricity distribution network 11 kV / LV levels throughout
three states .
Testing / Commissioning of Siemens SWG / Protection Relays . (Germany)
Installation of SIEMENS GIS switchgear . ( Germany ).
Retrofit of Switchgear/RMU at Lucy switchgear. (UK)
RTU training at Lucy Switchgear LONDON. (UK)
Lucy Automation UK SCADA Training Banbary Oxford . (UK)
RTU / Power supply at Siemens Factory in (Austria).
Installation, testing & Commissioning of Auto-Recloser / Sectionaliser ( Ukraine ).
Automation and Communication server & Manager Tavrida electric ( Ukraine ) .
Distribution Management System ( DMS/SCADA) in EPS . (Consultant of electricity Ministry)
Auto-Recloser & Sectionaliser at Schneider electric Factory (NU-LEC).
Operation & Control of HV/MV Substations (EGYPT).
Battery and chargers at Egyptian transmission company (N.Center) (EGYPT).
Rec-TEL of Tavrida electric at MEMCO Company (EGYPT) .
NOVA 15 Recloser Training cooper power at Al-Ain ( UAE )
Talkha Electrical GAS Power Station (2.5 GW) (EGYPT).
Supply Quality, Continuity & Reliability Achievements (EGYPT).
FORM 6 cooper power control unit at Al-Ain (UAE).
T ra i n i n g s
E x p e r i e n c e
3 | Mohamed Ibrahim
Fist Aid Training in the ETSDC Abu-Dhabi (UAE)
Fire Fighting training in the ETSDC Abu-Dhabi (UAE)
H2S & Breathing Apparatus training ( OPITO standard ) (UAE)
Tropical Helicopter Under water Escape Training ( OPITO standard ) (Qatar)
Basic Offshore Safety Induction & Emergency Training.(T-BOSIET) ( OPITO standard ) (UAE)
[Authorized trainer from SIEMENS ]
Qatar Petroleum 33KV 8DB10 , Double Bus-bar Switchgear . QATAR
KPIZ , Taweela Site. 8DA10 33KV & 11KV GIS switchgear , UAE
GASCO / Petrofac Ruwais 8DA10 33KV GIS Switchgear & Protection relays. , UAE
Al-Hosn GAS 8DA10 Switchgear GIS 33KV , SIEMENS Protection Relays , SHAH UAE.
KAHRAMA/Blackcat NX-AIR M 11KV switchgear , QATAR.
ADGAS , DAS ISLAND 8DA10 33KV GIS & SIPROTEC Relays , UAE
GASCO / Technip ASAB 8DA10 33KV GIS switchgear , Protection relays & IEC 61850. , UAE
Al-Hosn GAS SIMOPRIME Switchgear 11/3.3KV , SIEMENS Protection Relays , SHAH UAE.
ADGAS , DAS ISLAND, NX-AIR P 11KV & 3.3KV & SIPROTEC Relays, UAE
ADDC . NX-PLUS C & 8DA10 Switchgear , UAE
1-
2- 220/33KV SHAH GAS Developing Project Al Hosn Gas , testing and commissioning of SWG 8DB10 125 Panel
includes Contact Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing ,Scheme checks, Protection relay
testing 7SJ647 , line Diff 7SD523 , 7SJ80 & BB Diff DAD-N .UAE
3- 11/3.3 SHAH Gas Developing Project Al-Hosn GAS testing and commissioning of SIMOPRIME switchgear
,Protection relays of transformer Differential 7UT , Motor Differential 7UM , 7SJ64 , 7SJ63 , Bus Bar Differential
Relay 7VH & 6MD relay SHAH UAE.
4- 33KV SEEt-1 & SEET-2 CCC SSSP Project , testing And Commissioning of 8DA10 SWG , Including switchgear ,
Protection Relays 7SJ64 BCPU , 7RW , DAD, 7SR23 BB Differential . SHAH UAE.
5- 132/33KV , ADCO/PETROFAC ASAB CDS SS-1 testing and commissioning of SIEMENS 8DA10 GIS switchgear
43 Panel includes Contact Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing ,Scheme checks, 7UT
trans Diff , 7SD61 Line Diff , 7SD52 Line Diff , 7SJ61 SBEF RES, 7SJ647 BCPU , GE MIB Bus-Bar Diff Relay ,
UAE
6- 11/3.3 KV SIMOPRIME Switchgear AL-HOSN ADNOC. includes Contact Resistance, High voltage Test, CT,VT
Testing ,Scheme checks Protection Relay testing Motor Diff 7UM, TR Diff 7UT, 7SJ64 Motor Protection relay ,
7SJ62 , BB Diff 7VH relay.UAE
7- GT12 , GT31 & GT22 DEWA , Jebel Ali power & Desalination Plant Commissioning of Synch Relays 7VE632 ,
7VE611 for 400KV CB , 20KV GT CB & 11KV Aux-CB.
8- 33KV OXY (Mukhazina) Switchgear includes Contact Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing
,Scheme checks / Protection Relay testing 8DA10 SWG , 7SJ61 , 7SD61 , 7SJ63 Relays., OMAN
9- 33KV/ 11KV FEWA E06,E07/E09 , Testing of Siemens Relays 7SJ63 , 7SJ64 , 7VH , 7RW600 , 7SR11 , 7SR12 ,
Solker N 87L , Argus7.Sycnh , 7SR242 Duobias , DAD-N Bus Diff , UAE
10- 33KV QP/KHAHRAMA RLESC Switchgear includes Contact Resistance, SF6 Gas Test, High voltage Test,
CT,VT Testing ,Scheme checks / Protection relay testing 8DA10 SWG & Protection relays, 7SJ63 , 7SJ64 ,
7UT613 , 7SD532 & 7SV600 QATAR.
11- 33KV ADGAS SS-L01 Switchgear extension of Bus Bar including testing 8DB10 SWG includes Contact
Resistance, SF6 Gas Test, High voltage Test. UAE
12- 33KV site Protection relay 7SD522 testing for Technip France GASCO Site ASAB III Substation 09 including End
to End test , IEC61850 Integration testing with ABB IPCS .UAE
I n s t r u c t o r , T r a i n i n g s
W o r k E xp e ri e n c e
S a f e t y T ra i n i n g s
4 | Mohamed Ibrahim
13- 22KV 8DA10 Switchgear testing and commissioning for ADDC N7204 Project Al FALLAH Site includes Contact
Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing ,Scheme/ Functionality ,interlocks checks UAE.
14- 220KV station ASAB II Substation Protection relay Testing 7SD522 , GE 7SR750 , IEC61850 Integration testing
with ABB IPCS , S&I UK for Technip France. UAE
15- 11KV SIMOSEC , 3.3 SIMOPRIME SIEMENS switchgear & 3.3KV Auto-Transformer for start sequence of 1.5MVA
Motor - testing and commissioning of GC07 , KOC/SAIPEM , Kuwait.
16- 415 SIVACON Switchgear , TOTAL France Platform Extension for VFD Panel , Including installation and
commissioning of 3WL Built in protection relay. QATAR HALUL Island
17- 415 SIVACON Switchgear , Gulf Fluor installation and commissioning . ICAD UAE
18- 132KV E13 PETROFAC Interlocking modification & testing Petrofac / ADCO , ASAB UAE.
19- 11KV Auto-Recloser Cooper power (500 PCs) testing and commissioning including HV test , contact resistance &
protection relay testing A2943 , AADC , UAE.
20- 11KV Ring Main Unit retrofitting , testing and commissioning of GEMINI RTUs , D-8579 ADDC,UAE
21- Al Baraka Nuclear Plant , Interlocking modification /commissioning for 33/11KV switchgears for Ruwais 03 , 04
Substations Samsung/Huyndai Abu-Dhabi UAE.
22- 11KV Nora Cement Factory testing Pilot-Wire Current Differential Protection Relay 7SD600.UAE
23-
24- 11KV ADDC Sir Bani Yas , HV test for SWG 8DA10 ,UAE
25- Talkha 750MW, Nubaria 750MW Power Plants testing of generator CTs and Diff stability/ sensitivity of Generators
. EGYPT
26- 11/3.3 KV FERTIL Station-Al Rwais Modifications.UAE
27- Testing and commissioning of SIMOPRIME Switchgear scheme functionality / interlocks checks & SIEMENS
7RW600 under Voltage relay. UAE
28- 22 KV ADMM Yas marina circuit Stations(15Substation) –Yas Island Maintenance & Testing of the 7SJ602 ,
7SJ62 & REYROLLE Line differential relay. UAE
29- Commissioning of Al-Saad water waste treatment project stations (S30 – S29 – S31 –S82) Al-Ain.UAE
30- Commissioning of Al-Wathba water waste treatment project stations (W30–W29–W31–W82) .Abu Dhabi UAE
31- Installation and commissioning of SIEMENS Primary RTUs for Substations 66/11 KV and mini RTUs , Distribution
points 11 KV , MV/LV substation 11/0.4 Kv (Siemens Spectrum ). EGYPT
32- 33KV Riffah 132/33KV Substation Wiring Modification FEWA L&T . UAE
33- 13.8 KV RMUs Installation and commissioning of DAMAM pilot DMS/SCADA Project. KSA
34- 11KV RMUs Retrofitting / automation of Dubai international Airport expansion stations (CUC4). UAE
35- Installation and commissioning of FEWA pilot SCADA / 3 Substation retrofitting Project. UAE
36- Commissioning of SIEMENS Relay IEC 61850 with IPCS ABB for ASAB3 . GASCO SS09. UAE
37- 66/11KV SS, testing and commissioning of SIEMENS relays 7SJ602 , 7SJ62, Point to point test to DMS . EGYPT
38- 11KV Switchgear SIEMENS , ABB testing and commissioning , NDEDC . EGYPT
39- 11KV switchgear Schnieder RONIX , testing & commissioning SEPAM S20 , S40 & S42. WASCO Gas Plant
EGYPT.
40- Participating SIEMENS in the installation of the SCADA/DMS Project of North Delta Electricity Distribution
Company
41- ( NDEDC ) ( 3 Years ) .
42- Change all electro-mechanical Relays by Digital Relay for el Dakahlia Sector ( 38 Distribution Points about 450
Relays
43- ( 7SJ6025 – 7SJ6225 ) testing and commissioning .
44- Installation and commissioning of primary RTUs for Substations 66/11 KV and mini RTUs , Distribution points 11
Kv , MV/Lv substation 11/0.4 Kv (Siemens Spectrum ) .
45- Retrofitting of MIN & bulk oil Circuit breaker 11 Kv to Vacuum & SF6 CB . (ABB – Siemens-…….)
46- Installation & commissioning of ( 11KV) Auto-Reclosers & Sectionalisers manufactured by ( Sechneider
"Australia"– ABB "USA" – Tavrida-EL " Russia " – Cooper power “USA” ).
47- Routine test for the MV equipment (Switchgear – CB – Transformers- RMU – LV piller-…..).
48- Lecturer in the training Center of NDEDC .
49- Participating in the creation of the general specification of NDEDC equipment .
50- Member in the study & analysis committee of NDEDC .
51- Participating in the installation, commissioning & startup of (more 40) Distribution Points (11 kv ) .
52- Installing, testing & commissioning of the 11 K.V Switchgear of WASCO Gas Company (Canada) in cooperation
with Schneider electric.
53- Testing and Commissioning engineer for Project A2943 (testing & commissioning of 11 KV Cooper power Auto-
Reclosers [500 Auto-Recloser] ) for Al-Ain OH MV network [ UAE ].
54- Coordination between protection relays and Reclosers in Al-Ain [UAE]
55- Installation and commissioning of DAMAM pilot DMS/SCADA Project. [ KSA].
W o r k E xp e ri e n c e
5 | Mohamed Ibrahim
56- Commissioning of the ADDC project of Automation D-8579 (Lucy part)[UAE].
57- Retrofitting / automation of Dubai international Airport expansion stations (CUC4). [UAE]
58- Installation and commissioning of Oman switchgear retrofit / automation. [Oman].
59- Installation and commissioning of retrofit kits oil/SF6 ring main units [Jordan].
60- Installation and commissioning of FEWA pilot SCADA / 3 Substation Project. [UAE].
61- Commissioning of Al-Saad water waste treatment project stations (S30 – S29 – S31 –S82) . [UAE]
62- Preventive maintenance of all 22KV Siemens SWG stations at Formula 1 Yas Island(14 station)[UAE]
63- Commissioning of Al-Wathba water waste treatment project stations (W30–W29–W31–W82) .[UAE]
64- Wiring / adaptation work for control /SCADA circuits of Al-Riffah 33KV. Ras Al-Khaima [UAE]
65- FERTIL-UDP Modification Project for 11KV , 3.3 KV. ( Fertil Ruwais.)[UAE]
66- Installation , testing & commissioning of Under-voltage protection relays 7RW600 For (11KV &3.3 KV Siemens
SWG Fertil Ruwais.)[UAE].
67- Control wiring modification for 8DA10 Siemens SWG 33KV , Zaid University. [UAE]
68- Maintenance of Yas Island Formula 1 22KV substations [ 14 Sub ]
69- Modification of Abu-Hasa 8 Power Skids 6.6KV & 3.3KV.
Most Effective employee in SIEMENS IC LMV for the Year 2013.
Distribution Automation Based on coordination between Auto-Reclosers, Sectionalisers &
limit fuses (CIRED2007) (Paper no 0278).
*Supporting Documents and References will be provided on request *
I hereby attested the accuracy of the information declared above are true and correct to the best of
my knowledge and belief.
Mohamed Ibrahim
R e f e r e n c e s
W o r k E xp e ri e n c e
T ec h n i c a l P a p e r s / A w a rd s : -

More Related Content

What's hot (20)

Shah faisal shah cv
Shah faisal shah cvShah faisal shah cv
Shah faisal shah cv
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
joshi-CV_design (2)
joshi-CV_design (2)joshi-CV_design (2)
joshi-CV_design (2)
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
 
Siva relay engg
Siva relay enggSiva relay engg
Siva relay engg
 
CV
CVCV
CV
 
Afroz cv
Afroz cvAfroz cv
Afroz cv
 
asaires
asairesasaires
asaires
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
ENGHOSSAM kHAIRY
ENGHOSSAM kHAIRY ENGHOSSAM kHAIRY
ENGHOSSAM kHAIRY
 
RESUME
RESUMERESUME
RESUME
 
Mukesh_Kumar_(1)
Mukesh_Kumar_(1)Mukesh_Kumar_(1)
Mukesh_Kumar_(1)
 
DG CV (2016_09_26)
DG CV (2016_09_26)DG CV (2016_09_26)
DG CV (2016_09_26)
 
MY CV
MY CVMY CV
MY CV
 
GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA GCCIA POWER SYSTEM installed by AREVA
GCCIA POWER SYSTEM installed by AREVA
 
02 qb-rx63_th-21x
 02 qb-rx63_th-21x 02 qb-rx63_th-21x
02 qb-rx63_th-21x
 
Curriculum Vitae Sarel Mouton
Curriculum Vitae Sarel MoutonCurriculum Vitae Sarel Mouton
Curriculum Vitae Sarel Mouton
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Protection engineer cv
Protection engineer cvProtection engineer cv
Protection engineer cv
 

Similar to M.Ibrahim_Adv

Mohamed_mohamed Mohamed ibrahim mohamed.jan 2015
Mohamed_mohamed Mohamed ibrahim mohamed.jan 2015Mohamed_mohamed Mohamed ibrahim mohamed.jan 2015
Mohamed_mohamed Mohamed ibrahim mohamed.jan 2015Mohamed ibrahim
 
Elec Eng Karim CV
Elec Eng Karim CVElec Eng Karim CV
Elec Eng Karim CVkarim amer
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newosama atef
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin ResumeVipin Das
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning EngineerKumaresanT7
 
Eng.Tamer CV
Eng.Tamer CVEng.Tamer CV
Eng.Tamer CVTamer Ali
 
Abdel Rahman Mokhtar C.V. updated
Abdel Rahman Mokhtar C.V. updatedAbdel Rahman Mokhtar C.V. updated
Abdel Rahman Mokhtar C.V. updatedAbdelrahman Mokhtar
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_originalNagaganesh M
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 

Similar to M.Ibrahim_Adv (20)

Mohamed_mohamed Mohamed ibrahim mohamed.jan 2015
Mohamed_mohamed Mohamed ibrahim mohamed.jan 2015Mohamed_mohamed Mohamed ibrahim mohamed.jan 2015
Mohamed_mohamed Mohamed ibrahim mohamed.jan 2015
 
Elec Eng Karim CV
Elec Eng Karim CVElec Eng Karim CV
Elec Eng Karim CV
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) new
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin Resume
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Eng.Tamer CV
Eng.Tamer CVEng.Tamer CV
Eng.Tamer CV
 
Abdel Rahman Mokhtar C.V. updated
Abdel Rahman Mokhtar C.V. updatedAbdel Rahman Mokhtar C.V. updated
Abdel Rahman Mokhtar C.V. updated
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 
Saladin c.v
Saladin c.vSaladin c.v
Saladin c.v
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
Mohamed ElGazzar Egypt
Mohamed ElGazzar EgyptMohamed ElGazzar Egypt
Mohamed ElGazzar Egypt
 
CV_Shahzad Ali SEC-CSD Engineer
CV_Shahzad Ali SEC-CSD EngineerCV_Shahzad Ali SEC-CSD Engineer
CV_Shahzad Ali SEC-CSD Engineer
 
Mohamed Azzouz C.V
Mohamed  Azzouz C.VMohamed  Azzouz C.V
Mohamed Azzouz C.V
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_original
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
C.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawiC.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawi
 

M.Ibrahim_Adv

  • 1. 1 | Mohamed Ibrahim Mohamed Ibrahim Senior Electrical Engineer Mobile : +971503249126 E-mail : eng_melbayomy@yahoo.com Senior Electrical Engineer with 13+ years of extensive experience in testing and commissioning of Protection Relays, Switchgear & Transformers , Quality Implementation, Installation, Capacity Utilization, Construction & Site Management escalating productivity & operational efficiencies; while curtailing the costs / expenses. Adept at supervision, co-ordination and managing the day-to-day and round the clock MV/HV FS . Proficiencies in managing Testing , commissioning , start-up , operations of Equipment and Utilities with proven abilities in reducing downtime and enhancing operational efficiencies. Testing & Commissioning for Oil & GAS , industries & Utilities within Gulf and North Africa. Completed Bachelor of Science in Electrical Power and Machine Engineering From Mansoura University in 2002 ( with Very good Grade ). Graduation Project ( with Excellent Grade ). [ Mansoura University classified as 1st University in EGYPT & 9th in all AFRICA ] Nationality : EGYPTIAN Date of Birth : 6 th DEC 1980 Marital Status : Married Visa Status : Resident UAE driving Licence : Valid up to 2019 Languages : English, Arabic, French LinkedIn Profile : https://www.linkedin.com/profile/view?id=332461402&trk=hp-identity-name J o b r e s p o n s i b i l i t i e s Lead Commissioning electrical systems and equipments. Overseas travel for site around the gulf and north Africa . Setup and commissioning of HV & MV switchgear , Transformers , Motors & Capacitors Banks . Setup and commissioning of Protection Relay [ Generation – Transmission & Distribution ]. Training to Customers Liaise with engineers and sales managers to create specifications according to product requirements. Support and supervision of site staff and service personnel. Active market and promote company after sales ,service and commissioning functions. Sales office support for engineers and sales managers with quotations and technical issues. Setup and commissioning of communication devices such as low power radios , GSM/GPRS and fiber optic links. P r o f i l e S u m m a r y Q u a l i f i c a t i o n s P e r s o n a l D e t a i l s
  • 2. 2 | Mohamed Ibrahim Senior Electrical Engineer: SIEMENS L.L.C March 2011 – Up to Present Siemens is a global powerhouse focusing on the areas of electrification, automation and digitalization. One of the world’s largest producers of energy-efficient, resource-saving technologies, Siemens is a leading supplier of systems for power generation and transmission as well as medical diagnosis March 2008 – March 2011 Senior Installation and commissioning Engineer Lucy Electric Lucy Electric over 100 years’ industry experience, supplies an extensive range of high performance, medium and low voltage switchgear suitable for a wide variety of industrial and commercial applications. October 2002 – February 2008 Protection and control Engineer NDEDC (NDEDC) is responsible for distributing of high quality electricity services to all customers in 3 states 8 Million Person [12% of Egypt population] , NDEDC’s core business is the planning, design, construction, and operation of electricity distribution network 11 kV / LV levels throughout three states . Testing / Commissioning of Siemens SWG / Protection Relays . (Germany) Installation of SIEMENS GIS switchgear . ( Germany ). Retrofit of Switchgear/RMU at Lucy switchgear. (UK) RTU training at Lucy Switchgear LONDON. (UK) Lucy Automation UK SCADA Training Banbary Oxford . (UK) RTU / Power supply at Siemens Factory in (Austria). Installation, testing & Commissioning of Auto-Recloser / Sectionaliser ( Ukraine ). Automation and Communication server & Manager Tavrida electric ( Ukraine ) . Distribution Management System ( DMS/SCADA) in EPS . (Consultant of electricity Ministry) Auto-Recloser & Sectionaliser at Schneider electric Factory (NU-LEC). Operation & Control of HV/MV Substations (EGYPT). Battery and chargers at Egyptian transmission company (N.Center) (EGYPT). Rec-TEL of Tavrida electric at MEMCO Company (EGYPT) . NOVA 15 Recloser Training cooper power at Al-Ain ( UAE ) Talkha Electrical GAS Power Station (2.5 GW) (EGYPT). Supply Quality, Continuity & Reliability Achievements (EGYPT). FORM 6 cooper power control unit at Al-Ain (UAE). T ra i n i n g s E x p e r i e n c e
  • 3. 3 | Mohamed Ibrahim Fist Aid Training in the ETSDC Abu-Dhabi (UAE) Fire Fighting training in the ETSDC Abu-Dhabi (UAE) H2S & Breathing Apparatus training ( OPITO standard ) (UAE) Tropical Helicopter Under water Escape Training ( OPITO standard ) (Qatar) Basic Offshore Safety Induction & Emergency Training.(T-BOSIET) ( OPITO standard ) (UAE) [Authorized trainer from SIEMENS ] Qatar Petroleum 33KV 8DB10 , Double Bus-bar Switchgear . QATAR KPIZ , Taweela Site. 8DA10 33KV & 11KV GIS switchgear , UAE GASCO / Petrofac Ruwais 8DA10 33KV GIS Switchgear & Protection relays. , UAE Al-Hosn GAS 8DA10 Switchgear GIS 33KV , SIEMENS Protection Relays , SHAH UAE. KAHRAMA/Blackcat NX-AIR M 11KV switchgear , QATAR. ADGAS , DAS ISLAND 8DA10 33KV GIS & SIPROTEC Relays , UAE GASCO / Technip ASAB 8DA10 33KV GIS switchgear , Protection relays & IEC 61850. , UAE Al-Hosn GAS SIMOPRIME Switchgear 11/3.3KV , SIEMENS Protection Relays , SHAH UAE. ADGAS , DAS ISLAND, NX-AIR P 11KV & 3.3KV & SIPROTEC Relays, UAE ADDC . NX-PLUS C & 8DA10 Switchgear , UAE 1- 2- 220/33KV SHAH GAS Developing Project Al Hosn Gas , testing and commissioning of SWG 8DB10 125 Panel includes Contact Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing ,Scheme checks, Protection relay testing 7SJ647 , line Diff 7SD523 , 7SJ80 & BB Diff DAD-N .UAE 3- 11/3.3 SHAH Gas Developing Project Al-Hosn GAS testing and commissioning of SIMOPRIME switchgear ,Protection relays of transformer Differential 7UT , Motor Differential 7UM , 7SJ64 , 7SJ63 , Bus Bar Differential Relay 7VH & 6MD relay SHAH UAE. 4- 33KV SEEt-1 & SEET-2 CCC SSSP Project , testing And Commissioning of 8DA10 SWG , Including switchgear , Protection Relays 7SJ64 BCPU , 7RW , DAD, 7SR23 BB Differential . SHAH UAE. 5- 132/33KV , ADCO/PETROFAC ASAB CDS SS-1 testing and commissioning of SIEMENS 8DA10 GIS switchgear 43 Panel includes Contact Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing ,Scheme checks, 7UT trans Diff , 7SD61 Line Diff , 7SD52 Line Diff , 7SJ61 SBEF RES, 7SJ647 BCPU , GE MIB Bus-Bar Diff Relay , UAE 6- 11/3.3 KV SIMOPRIME Switchgear AL-HOSN ADNOC. includes Contact Resistance, High voltage Test, CT,VT Testing ,Scheme checks Protection Relay testing Motor Diff 7UM, TR Diff 7UT, 7SJ64 Motor Protection relay , 7SJ62 , BB Diff 7VH relay.UAE 7- GT12 , GT31 & GT22 DEWA , Jebel Ali power & Desalination Plant Commissioning of Synch Relays 7VE632 , 7VE611 for 400KV CB , 20KV GT CB & 11KV Aux-CB. 8- 33KV OXY (Mukhazina) Switchgear includes Contact Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing ,Scheme checks / Protection Relay testing 8DA10 SWG , 7SJ61 , 7SD61 , 7SJ63 Relays., OMAN 9- 33KV/ 11KV FEWA E06,E07/E09 , Testing of Siemens Relays 7SJ63 , 7SJ64 , 7VH , 7RW600 , 7SR11 , 7SR12 , Solker N 87L , Argus7.Sycnh , 7SR242 Duobias , DAD-N Bus Diff , UAE 10- 33KV QP/KHAHRAMA RLESC Switchgear includes Contact Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing ,Scheme checks / Protection relay testing 8DA10 SWG & Protection relays, 7SJ63 , 7SJ64 , 7UT613 , 7SD532 & 7SV600 QATAR. 11- 33KV ADGAS SS-L01 Switchgear extension of Bus Bar including testing 8DB10 SWG includes Contact Resistance, SF6 Gas Test, High voltage Test. UAE 12- 33KV site Protection relay 7SD522 testing for Technip France GASCO Site ASAB III Substation 09 including End to End test , IEC61850 Integration testing with ABB IPCS .UAE I n s t r u c t o r , T r a i n i n g s W o r k E xp e ri e n c e S a f e t y T ra i n i n g s
  • 4. 4 | Mohamed Ibrahim 13- 22KV 8DA10 Switchgear testing and commissioning for ADDC N7204 Project Al FALLAH Site includes Contact Resistance, SF6 Gas Test, High voltage Test, CT,VT Testing ,Scheme/ Functionality ,interlocks checks UAE. 14- 220KV station ASAB II Substation Protection relay Testing 7SD522 , GE 7SR750 , IEC61850 Integration testing with ABB IPCS , S&I UK for Technip France. UAE 15- 11KV SIMOSEC , 3.3 SIMOPRIME SIEMENS switchgear & 3.3KV Auto-Transformer for start sequence of 1.5MVA Motor - testing and commissioning of GC07 , KOC/SAIPEM , Kuwait. 16- 415 SIVACON Switchgear , TOTAL France Platform Extension for VFD Panel , Including installation and commissioning of 3WL Built in protection relay. QATAR HALUL Island 17- 415 SIVACON Switchgear , Gulf Fluor installation and commissioning . ICAD UAE 18- 132KV E13 PETROFAC Interlocking modification & testing Petrofac / ADCO , ASAB UAE. 19- 11KV Auto-Recloser Cooper power (500 PCs) testing and commissioning including HV test , contact resistance & protection relay testing A2943 , AADC , UAE. 20- 11KV Ring Main Unit retrofitting , testing and commissioning of GEMINI RTUs , D-8579 ADDC,UAE 21- Al Baraka Nuclear Plant , Interlocking modification /commissioning for 33/11KV switchgears for Ruwais 03 , 04 Substations Samsung/Huyndai Abu-Dhabi UAE. 22- 11KV Nora Cement Factory testing Pilot-Wire Current Differential Protection Relay 7SD600.UAE 23- 24- 11KV ADDC Sir Bani Yas , HV test for SWG 8DA10 ,UAE 25- Talkha 750MW, Nubaria 750MW Power Plants testing of generator CTs and Diff stability/ sensitivity of Generators . EGYPT 26- 11/3.3 KV FERTIL Station-Al Rwais Modifications.UAE 27- Testing and commissioning of SIMOPRIME Switchgear scheme functionality / interlocks checks & SIEMENS 7RW600 under Voltage relay. UAE 28- 22 KV ADMM Yas marina circuit Stations(15Substation) –Yas Island Maintenance & Testing of the 7SJ602 , 7SJ62 & REYROLLE Line differential relay. UAE 29- Commissioning of Al-Saad water waste treatment project stations (S30 – S29 – S31 –S82) Al-Ain.UAE 30- Commissioning of Al-Wathba water waste treatment project stations (W30–W29–W31–W82) .Abu Dhabi UAE 31- Installation and commissioning of SIEMENS Primary RTUs for Substations 66/11 KV and mini RTUs , Distribution points 11 KV , MV/LV substation 11/0.4 Kv (Siemens Spectrum ). EGYPT 32- 33KV Riffah 132/33KV Substation Wiring Modification FEWA L&T . UAE 33- 13.8 KV RMUs Installation and commissioning of DAMAM pilot DMS/SCADA Project. KSA 34- 11KV RMUs Retrofitting / automation of Dubai international Airport expansion stations (CUC4). UAE 35- Installation and commissioning of FEWA pilot SCADA / 3 Substation retrofitting Project. UAE 36- Commissioning of SIEMENS Relay IEC 61850 with IPCS ABB for ASAB3 . GASCO SS09. UAE 37- 66/11KV SS, testing and commissioning of SIEMENS relays 7SJ602 , 7SJ62, Point to point test to DMS . EGYPT 38- 11KV Switchgear SIEMENS , ABB testing and commissioning , NDEDC . EGYPT 39- 11KV switchgear Schnieder RONIX , testing & commissioning SEPAM S20 , S40 & S42. WASCO Gas Plant EGYPT. 40- Participating SIEMENS in the installation of the SCADA/DMS Project of North Delta Electricity Distribution Company 41- ( NDEDC ) ( 3 Years ) . 42- Change all electro-mechanical Relays by Digital Relay for el Dakahlia Sector ( 38 Distribution Points about 450 Relays 43- ( 7SJ6025 – 7SJ6225 ) testing and commissioning . 44- Installation and commissioning of primary RTUs for Substations 66/11 KV and mini RTUs , Distribution points 11 Kv , MV/Lv substation 11/0.4 Kv (Siemens Spectrum ) . 45- Retrofitting of MIN & bulk oil Circuit breaker 11 Kv to Vacuum & SF6 CB . (ABB – Siemens-…….) 46- Installation & commissioning of ( 11KV) Auto-Reclosers & Sectionalisers manufactured by ( Sechneider "Australia"– ABB "USA" – Tavrida-EL " Russia " – Cooper power “USA” ). 47- Routine test for the MV equipment (Switchgear – CB – Transformers- RMU – LV piller-…..). 48- Lecturer in the training Center of NDEDC . 49- Participating in the creation of the general specification of NDEDC equipment . 50- Member in the study & analysis committee of NDEDC . 51- Participating in the installation, commissioning & startup of (more 40) Distribution Points (11 kv ) . 52- Installing, testing & commissioning of the 11 K.V Switchgear of WASCO Gas Company (Canada) in cooperation with Schneider electric. 53- Testing and Commissioning engineer for Project A2943 (testing & commissioning of 11 KV Cooper power Auto- Reclosers [500 Auto-Recloser] ) for Al-Ain OH MV network [ UAE ]. 54- Coordination between protection relays and Reclosers in Al-Ain [UAE] 55- Installation and commissioning of DAMAM pilot DMS/SCADA Project. [ KSA]. W o r k E xp e ri e n c e
  • 5. 5 | Mohamed Ibrahim 56- Commissioning of the ADDC project of Automation D-8579 (Lucy part)[UAE]. 57- Retrofitting / automation of Dubai international Airport expansion stations (CUC4). [UAE] 58- Installation and commissioning of Oman switchgear retrofit / automation. [Oman]. 59- Installation and commissioning of retrofit kits oil/SF6 ring main units [Jordan]. 60- Installation and commissioning of FEWA pilot SCADA / 3 Substation Project. [UAE]. 61- Commissioning of Al-Saad water waste treatment project stations (S30 – S29 – S31 –S82) . [UAE] 62- Preventive maintenance of all 22KV Siemens SWG stations at Formula 1 Yas Island(14 station)[UAE] 63- Commissioning of Al-Wathba water waste treatment project stations (W30–W29–W31–W82) .[UAE] 64- Wiring / adaptation work for control /SCADA circuits of Al-Riffah 33KV. Ras Al-Khaima [UAE] 65- FERTIL-UDP Modification Project for 11KV , 3.3 KV. ( Fertil Ruwais.)[UAE] 66- Installation , testing & commissioning of Under-voltage protection relays 7RW600 For (11KV &3.3 KV Siemens SWG Fertil Ruwais.)[UAE]. 67- Control wiring modification for 8DA10 Siemens SWG 33KV , Zaid University. [UAE] 68- Maintenance of Yas Island Formula 1 22KV substations [ 14 Sub ] 69- Modification of Abu-Hasa 8 Power Skids 6.6KV & 3.3KV. Most Effective employee in SIEMENS IC LMV for the Year 2013. Distribution Automation Based on coordination between Auto-Reclosers, Sectionalisers & limit fuses (CIRED2007) (Paper no 0278). *Supporting Documents and References will be provided on request * I hereby attested the accuracy of the information declared above are true and correct to the best of my knowledge and belief. Mohamed Ibrahim R e f e r e n c e s W o r k E xp e ri e n c e T ec h n i c a l P a p e r s / A w a rd s : -