Godavari Delta
Coastal Andhra Pradesh - East and
West Godavari Districts
Third largest delta in the country
Godavari and its distributaries form a
symmetrical delta
Geomorphology: Bay-Estuary Lagoon
complex
IGCIGC--2011 Kochi2011 Kochi
In the Godavari Delta
Soft clays met to substantial depth
High Moisture content – close to liquid
limit
Low Shear Strength
High Salinity
Shallow water table
Challenge to geotechnical engineer
IGCIGC--2011 Kochi2011 Kochi
Vicinity Map
Project Site
IGCIGC--2011 Kochi2011 Kochi
Site Location
PROJECT SITEPROJECT SITE
IGCIGC--2011 Kochi2011 Kochi
Onshore Gas Terminal
Low lying, close to sea-coast, has fish
ponds & marshy soils
Facilities Planned:
Captive Power Plant
Cooling Tower
Gas Dehydration Unit
Nitrogen Plant
Admn building & associated units
IGCIGC--2011 Kochi2011 Kochi
Geotechnical Investigations – 2
stages
Preliminary Investigation to evaluate soil
characteristics
24 boreholes, 16 SCPT, 4 ERT
Preloading by placing 4-4.5 m dredged
sand and installing PVD to 12 m depth
Second Stage investigation: 7-8 months
after installing PVD
47 BH, 18 SCPT, 3 CHST, 4 ERT
IGCIGC--2011 Kochi2011 Kochi
Layout Plan - Geotechnical
Investigation
IGCIGC--2011 Kochi2011 Kochi
Installation of PVD
PVD to 12 m depth; spacing: 1.5PVD to 12 m depth; spacing: 1.5--2 m2 m
PVD
IGCIGC--2011 Kochi2011 Kochi
Stratigraphy
IGCIGC--2011 Kochi2011 Kochi
Contours of Depth of Cemented
Sand Stratum
IGCIGC--2011 Kochi2011 Kochi
SPT & SCPT Profile
Improvement MarginalImprovement Marginal after 7after 7--8 months8 months –– May take more time??May take more time??
IGCIGC--2011 Kochi2011 Kochi
Design Profile
IGCIGC--2011 Kochi2011 Kochi
Engineering Properties
(Post Improvement)
Depth,Depth,
mm
Strata DescriptionStrata Description
SPT NSPT N--
valuesvalues
qqcc MPaMPa
qquuuu
KN/mKN/m22 φφ°°
00--44 Dredged Sand (Fill)Dredged Sand (Fill) 55--4040 22--1616 2828--3535
55--1010 Soft Silty ClaySoft Silty Clay 22--88 11--22 3030--6060
1010--1313
Silty SandSilty Sand
(discontinuous)(discontinuous)
55--2020 22--1515 2929--3434
1313--2525 Firm Silty ClayFirm Silty Clay 44--1212 11--33 4040--100100
2525--4444 Stiff Silty ClayStiff Silty Clay 1010--2828 6060--160160
4444--5555 Cemented SandCemented Sand 5050--100+100+ 3232--4040
IGCIGC--2011 Kochi2011 Kochi
Corrosivity
Low Electrical Resistivity – 0.5-2.1
ohm-m
High corrosion potential for buried
metallic pipelines / utility lines
Salinity: Chlorides > 20,000 ppm in
groundwater
Potential for corrosion of embedded
reinforcement steel in concrete
IGCIGC--2011 Kochi2011 Kochi
Dynamic Characteristics
CROSSHOLECROSSHOLE
SEISMIC TESTSEISMIC TEST
Test at 3 locations
1 source hole & 2
receiver holes
IGCIGC--2011 Kochi2011 Kochi
P & S Wave Velocities
Vs: 80-150 m /s
Vp: 1400-1800
m/s, wave vel
in water
So Vp
interpreted,
assuming μ
IGCIGC--2011 Kochi2011 Kochi
Dynamic Shear & Young’s modulus
IGCIGC--2011 Kochi2011 Kochi
Dynamic Parameters Cu, Cτ, Cψ, Cφ
IGCIGC--2011 Kochi2011 Kochi
Foundation System
Driven Precast Piles installed
350 mm square piles driven 1-1.5 m into
the underlying cemented sand met below
45 m depth
M-30 grade concrete with corrosion
resistant steel (CRS) – piles precast at site
End bearing mobilized in sand stratum
Negative Skin Friction considered in the
soft clay to about 25 m depth due to low
N-values and very low shear strength
IGCIGC--2011 Kochi2011 Kochi
Design Pile Capacities
Compression : 420 kN
Pullout : 210 kN
Factor of Safety : 2.5
Lateral : 34 kN
for 5 mm deflection of pile head
IGCIGC--2011 Kochi2011 Kochi
Pile Load Test
Vertical Load TestVertical Load Test Lateral Load TestLateral Load Test
IGCIGC--2011 Kochi2011 Kochi
Concluding Remarks
In the Godavari delta, soft clays in the
coastal belt extend to substantial depth,
underlain by cemented sand
Characterized by low electrical resistivity,
high salinity
The improvement 7-8 months after
installing PVD is marginal
Driven Precast Pile seated in the deep-
seated sand is a suitable foundation option
IGCIGC--2011 Kochi2011 Kochi
Thank You!Thank You!
CENGRS GEOTECHNICA PVT LTDCENGRS GEOTECHNICA PVT LTD

More Related Content

What's hot

Subsea Pipeline Engineering
Subsea Pipeline EngineeringSubsea Pipeline Engineering
Subsea Pipeline EngineeringpetroEDGE
 
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...Michael Hewitt, GISP
 
BJ Engineering news executive summary spring 2008
BJ Engineering news executive summary spring 2008BJ Engineering news executive summary spring 2008
BJ Engineering news executive summary spring 2008Manuel S. Navarro
 
Project ppt guide shri a.n.dabhade sir 1
Project ppt guide  shri a.n.dabhade sir 1Project ppt guide  shri a.n.dabhade sir 1
Project ppt guide shri a.n.dabhade sir 1Awanish Shukla
 
underground_4-page_12142015_LR
underground_4-page_12142015_LRunderground_4-page_12142015_LR
underground_4-page_12142015_LRAnne Fellini
 
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...Michael Hewitt, GISP
 
City Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity of San Angelo Texas
 
2.8 "Doswiadczenia BNK w wydobyciu gazu z lupkow" – Jacek Wroblewski [EN]
2.8 "Doswiadczenia BNK w wydobyciu gazu z lupkow" – Jacek Wroblewski [EN]2.8 "Doswiadczenia BNK w wydobyciu gazu z lupkow" – Jacek Wroblewski [EN]
2.8 "Doswiadczenia BNK w wydobyciu gazu z lupkow" – Jacek Wroblewski [EN]Pomcert
 
Spring Creek Transmission Line Reconductor
Spring Creek Transmission Line ReconductorSpring Creek Transmission Line Reconductor
Spring Creek Transmission Line ReconductorCity of College Station
 
Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelop...
Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelop...Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelop...
Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelop...TRC Companies, Inc.
 
City Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory updateCity Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory updateCity of San Angelo Texas
 
Installation of an Impervious Cap for Control of Residual NAPL Migration, Con...
Installation of an Impervious Cap for Control of Residual NAPL Migration, Con...Installation of an Impervious Cap for Control of Residual NAPL Migration, Con...
Installation of an Impervious Cap for Control of Residual NAPL Migration, Con...TRC Companies, Inc.
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012Mike Vernon
 
CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1Mark Fayle
 
Slideshare September 2010
Slideshare September 2010Slideshare September 2010
Slideshare September 2010Joel Johnson
 
Project_Profile-World-Trade-Center
Project_Profile-World-Trade-CenterProject_Profile-World-Trade-Center
Project_Profile-World-Trade-CenterTim Thomas
 
ITZ in Recycled Aggregate Concrete presentation
ITZ in Recycled Aggregate Concrete  presentationITZ in Recycled Aggregate Concrete  presentation
ITZ in Recycled Aggregate Concrete presentationbirbal singh
 

What's hot (20)

Subsea Pipeline Engineering
Subsea Pipeline EngineeringSubsea Pipeline Engineering
Subsea Pipeline Engineering
 
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...
 
BJ Engineering news executive summary spring 2008
BJ Engineering news executive summary spring 2008BJ Engineering news executive summary spring 2008
BJ Engineering news executive summary spring 2008
 
Project ppt guide shri a.n.dabhade sir 1
Project ppt guide  shri a.n.dabhade sir 1Project ppt guide  shri a.n.dabhade sir 1
Project ppt guide shri a.n.dabhade sir 1
 
underground_4-page_12142015_LR
underground_4-page_12142015_LRunderground_4-page_12142015_LR
underground_4-page_12142015_LR
 
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
 
City Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project Update
 
2.8 "Doswiadczenia BNK w wydobyciu gazu z lupkow" – Jacek Wroblewski [EN]
2.8 "Doswiadczenia BNK w wydobyciu gazu z lupkow" – Jacek Wroblewski [EN]2.8 "Doswiadczenia BNK w wydobyciu gazu z lupkow" – Jacek Wroblewski [EN]
2.8 "Doswiadczenia BNK w wydobyciu gazu z lupkow" – Jacek Wroblewski [EN]
 
03_WP-CPL_0704_LR
03_WP-CPL_0704_LR03_WP-CPL_0704_LR
03_WP-CPL_0704_LR
 
Spring Creek Transmission Line Reconductor
Spring Creek Transmission Line ReconductorSpring Creek Transmission Line Reconductor
Spring Creek Transmission Line Reconductor
 
Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelop...
Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelop...Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelop...
Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelop...
 
City Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory updateCity Council January 3, 2012 Hickory update
City Council January 3, 2012 Hickory update
 
Installation of an Impervious Cap for Control of Residual NAPL Migration, Con...
Installation of an Impervious Cap for Control of Residual NAPL Migration, Con...Installation of an Impervious Cap for Control of Residual NAPL Migration, Con...
Installation of an Impervious Cap for Control of Residual NAPL Migration, Con...
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
Water Management Financing in the Caribbean - Part 2
Water Management Financing in the Caribbean - Part 2Water Management Financing in the Caribbean - Part 2
Water Management Financing in the Caribbean - Part 2
 
CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1CV_Fayle_Mark _Rev.1
CV_Fayle_Mark _Rev.1
 
Slideshare September 2010
Slideshare September 2010Slideshare September 2010
Slideshare September 2010
 
Project_Profile-World-Trade-Center
Project_Profile-World-Trade-CenterProject_Profile-World-Trade-Center
Project_Profile-World-Trade-Center
 
ITZ in Recycled Aggregate Concrete presentation
ITZ in Recycled Aggregate Concrete  presentationITZ in Recycled Aggregate Concrete  presentation
ITZ in Recycled Aggregate Concrete presentation
 
316b Booklet for S&L
316b Booklet for S&L316b Booklet for S&L
316b Booklet for S&L
 

Similar to Geotechnical characterizaton of soft clays of the godavari delta

QUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdfQUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdfNeerajOjha17
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGDEEPAK MALLICK
 
Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxmuk7971
 
GEOTECHNICAL INTERPRETATION OF SOIL FOR PROPOSED UTILITY TUNNEL FROM KURIL TO...
GEOTECHNICAL INTERPRETATION OF SOIL FOR PROPOSED UTILITY TUNNEL FROM KURIL TO...GEOTECHNICAL INTERPRETATION OF SOIL FOR PROPOSED UTILITY TUNNEL FROM KURIL TO...
GEOTECHNICAL INTERPRETATION OF SOIL FOR PROPOSED UTILITY TUNNEL FROM KURIL TO...Johana Sharmin
 
Eia lucky electric power company 660 mw coal power project
Eia  lucky electric power company  660 mw coal power projectEia  lucky electric power company  660 mw coal power project
Eia lucky electric power company 660 mw coal power projectzubeditufail
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitaeSunil Singh
 
INVESTIGATION ON RHEOLOGICAL PROPERTIES OF GEOPOLYMER CONCRETE
INVESTIGATION ON RHEOLOGICAL PROPERTIES OF GEOPOLYMER CONCRETEINVESTIGATION ON RHEOLOGICAL PROPERTIES OF GEOPOLYMER CONCRETE
INVESTIGATION ON RHEOLOGICAL PROPERTIES OF GEOPOLYMER CONCRETEVyChry
 
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”IRJET Journal
 
IRJET- Experimental Study on Strength Enhancement of Concrete by using Magnet...
IRJET- Experimental Study on Strength Enhancement of Concrete by using Magnet...IRJET- Experimental Study on Strength Enhancement of Concrete by using Magnet...
IRJET- Experimental Study on Strength Enhancement of Concrete by using Magnet...IRJET Journal
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptxAmirShafiq25
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)jamsheer p
 
Analysis of Circular Water Tanks under Different SeismicConditions For Two Di...
Analysis of Circular Water Tanks under Different SeismicConditions For Two Di...Analysis of Circular Water Tanks under Different SeismicConditions For Two Di...
Analysis of Circular Water Tanks under Different SeismicConditions For Two Di...IRJET Journal
 
Capture Facility & CO2 Stream Composition and Characterization
Capture Facility & CO2 Stream Composition and CharacterizationCapture Facility & CO2 Stream Composition and Characterization
Capture Facility & CO2 Stream Composition and CharacterizationGlobal CCS Institute
 
Published-Badovli Mixture proportioning
Published-Badovli Mixture proportioningPublished-Badovli Mixture proportioning
Published-Badovli Mixture proportioningHamidreza Araghian
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower ProjectAli Sial
 
Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019MomentumPR
 

Similar to Geotechnical characterizaton of soft clays of the godavari delta (20)

QUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdfQUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
QUATRZ DRILLING AND LAB COMPANY PROFILE.pdf
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
 
Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptx
 
GEOTECHNICAL INTERPRETATION OF SOIL FOR PROPOSED UTILITY TUNNEL FROM KURIL TO...
GEOTECHNICAL INTERPRETATION OF SOIL FOR PROPOSED UTILITY TUNNEL FROM KURIL TO...GEOTECHNICAL INTERPRETATION OF SOIL FOR PROPOSED UTILITY TUNNEL FROM KURIL TO...
GEOTECHNICAL INTERPRETATION OF SOIL FOR PROPOSED UTILITY TUNNEL FROM KURIL TO...
 
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
 
Eia lucky electric power company 660 mw coal power project
Eia  lucky electric power company  660 mw coal power projectEia  lucky electric power company  660 mw coal power project
Eia lucky electric power company 660 mw coal power project
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
INVESTIGATION ON RHEOLOGICAL PROPERTIES OF GEOPOLYMER CONCRETE
INVESTIGATION ON RHEOLOGICAL PROPERTIES OF GEOPOLYMER CONCRETEINVESTIGATION ON RHEOLOGICAL PROPERTIES OF GEOPOLYMER CONCRETE
INVESTIGATION ON RHEOLOGICAL PROPERTIES OF GEOPOLYMER CONCRETE
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
 
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
 
IRJET- Experimental Study on Strength Enhancement of Concrete by using Magnet...
IRJET- Experimental Study on Strength Enhancement of Concrete by using Magnet...IRJET- Experimental Study on Strength Enhancement of Concrete by using Magnet...
IRJET- Experimental Study on Strength Enhancement of Concrete by using Magnet...
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
Analysis of Circular Water Tanks under Different SeismicConditions For Two Di...
Analysis of Circular Water Tanks under Different SeismicConditions For Two Di...Analysis of Circular Water Tanks under Different SeismicConditions For Two Di...
Analysis of Circular Water Tanks under Different SeismicConditions For Two Di...
 
Capture Facility & CO2 Stream Composition and Characterization
Capture Facility & CO2 Stream Composition and CharacterizationCapture Facility & CO2 Stream Composition and Characterization
Capture Facility & CO2 Stream Composition and Characterization
 
CV LS Khalsa -2015
CV LS Khalsa -2015CV LS Khalsa -2015
CV LS Khalsa -2015
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Published-Badovli Mixture proportioning
Published-Badovli Mixture proportioningPublished-Badovli Mixture proportioning
Published-Badovli Mixture proportioning
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower Project
 
Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019
 

More from Infocengrs63

Foundation stabilization of the janmabhoomi temple at mangarh
Foundation stabilization of the janmabhoomi temple at mangarhFoundation stabilization of the janmabhoomi temple at mangarh
Foundation stabilization of the janmabhoomi temple at mangarhInfocengrs63
 
Geotechnics of artesian flow – case study of river shivganga, nepal
Geotechnics of artesian flow – case study of river shivganga, nepalGeotechnics of artesian flow – case study of river shivganga, nepal
Geotechnics of artesian flow – case study of river shivganga, nepalInfocengrs63
 
In situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsIn situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsInfocengrs63
 
Geotechnical investigations dune sands of the thar desert
Geotechnical investigations  dune sands of the thar desertGeotechnical investigations  dune sands of the thar desert
Geotechnical investigations dune sands of the thar desertInfocengrs63
 
Mitigating foundation distress
Mitigating foundation distressMitigating foundation distress
Mitigating foundation distressInfocengrs63
 
Dynamic characteristics of alluvial deposits a case study
Dynamic characteristics of alluvial deposits a case studyDynamic characteristics of alluvial deposits a case study
Dynamic characteristics of alluvial deposits a case studyInfocengrs63
 
Geotechnical characterization of dune sands of the thar desert
Geotechnical characterization of dune sands of the thar desertGeotechnical characterization of dune sands of the thar desert
Geotechnical characterization of dune sands of the thar desertInfocengrs63
 
Pile integrity testing for monitoring pile construction
Pile integrity testing for monitoring pile constructionPile integrity testing for monitoring pile construction
Pile integrity testing for monitoring pile constructionInfocengrs63
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyInfocengrs63
 
Liquefaction susceptibility study at commonwealth games village delhi
Liquefaction susceptibility study at commonwealth games village delhiLiquefaction susceptibility study at commonwealth games village delhi
Liquefaction susceptibility study at commonwealth games village delhiInfocengrs63
 
Performance of a large diameter oil storage tank on improved clay deposit
Performance of a large diameter oil storage tank on improved clay depositPerformance of a large diameter oil storage tank on improved clay deposit
Performance of a large diameter oil storage tank on improved clay depositInfocengrs63
 
Constructing foundations on red mud
Constructing foundations on red mudConstructing foundations on red mud
Constructing foundations on red mudInfocengrs63
 
Dynamic compaction to mitigate liquefaction potential
Dynamic compaction to mitigate liquefaction potentialDynamic compaction to mitigate liquefaction potential
Dynamic compaction to mitigate liquefaction potentialInfocengrs63
 
Liquefaction risk mitigation for a power plant in the indo gengatic alluvium
Liquefaction risk mitigation for a power plant in the indo gengatic alluviumLiquefaction risk mitigation for a power plant in the indo gengatic alluvium
Liquefaction risk mitigation for a power plant in the indo gengatic alluviumInfocengrs63
 
Quality assurance for_deep_bored_piles
Quality assurance for_deep_bored_pilesQuality assurance for_deep_bored_piles
Quality assurance for_deep_bored_pilesInfocengrs63
 
DFI india 2014 defects in piles
DFI india 2014 defects in pilesDFI india 2014 defects in piles
DFI india 2014 defects in pilesInfocengrs63
 
In-situ testing to verify ground improvement
In-situ testing to verify ground improvementIn-situ testing to verify ground improvement
In-situ testing to verify ground improvementInfocengrs63
 
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsBuilding a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsInfocengrs63
 

More from Infocengrs63 (18)

Foundation stabilization of the janmabhoomi temple at mangarh
Foundation stabilization of the janmabhoomi temple at mangarhFoundation stabilization of the janmabhoomi temple at mangarh
Foundation stabilization of the janmabhoomi temple at mangarh
 
Geotechnics of artesian flow – case study of river shivganga, nepal
Geotechnics of artesian flow – case study of river shivganga, nepalGeotechnics of artesian flow – case study of river shivganga, nepal
Geotechnics of artesian flow – case study of river shivganga, nepal
 
In situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsIn situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigations
 
Geotechnical investigations dune sands of the thar desert
Geotechnical investigations  dune sands of the thar desertGeotechnical investigations  dune sands of the thar desert
Geotechnical investigations dune sands of the thar desert
 
Mitigating foundation distress
Mitigating foundation distressMitigating foundation distress
Mitigating foundation distress
 
Dynamic characteristics of alluvial deposits a case study
Dynamic characteristics of alluvial deposits a case studyDynamic characteristics of alluvial deposits a case study
Dynamic characteristics of alluvial deposits a case study
 
Geotechnical characterization of dune sands of the thar desert
Geotechnical characterization of dune sands of the thar desertGeotechnical characterization of dune sands of the thar desert
Geotechnical characterization of dune sands of the thar desert
 
Pile integrity testing for monitoring pile construction
Pile integrity testing for monitoring pile constructionPile integrity testing for monitoring pile construction
Pile integrity testing for monitoring pile construction
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case study
 
Liquefaction susceptibility study at commonwealth games village delhi
Liquefaction susceptibility study at commonwealth games village delhiLiquefaction susceptibility study at commonwealth games village delhi
Liquefaction susceptibility study at commonwealth games village delhi
 
Performance of a large diameter oil storage tank on improved clay deposit
Performance of a large diameter oil storage tank on improved clay depositPerformance of a large diameter oil storage tank on improved clay deposit
Performance of a large diameter oil storage tank on improved clay deposit
 
Constructing foundations on red mud
Constructing foundations on red mudConstructing foundations on red mud
Constructing foundations on red mud
 
Dynamic compaction to mitigate liquefaction potential
Dynamic compaction to mitigate liquefaction potentialDynamic compaction to mitigate liquefaction potential
Dynamic compaction to mitigate liquefaction potential
 
Liquefaction risk mitigation for a power plant in the indo gengatic alluvium
Liquefaction risk mitigation for a power plant in the indo gengatic alluviumLiquefaction risk mitigation for a power plant in the indo gengatic alluvium
Liquefaction risk mitigation for a power plant in the indo gengatic alluvium
 
Quality assurance for_deep_bored_piles
Quality assurance for_deep_bored_pilesQuality assurance for_deep_bored_piles
Quality assurance for_deep_bored_piles
 
DFI india 2014 defects in piles
DFI india 2014 defects in pilesDFI india 2014 defects in piles
DFI india 2014 defects in piles
 
In-situ testing to verify ground improvement
In-situ testing to verify ground improvementIn-situ testing to verify ground improvement
In-situ testing to verify ground improvement
 
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsBuilding a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sands
 

Recently uploaded

Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 

Recently uploaded (20)

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 

Geotechnical characterizaton of soft clays of the godavari delta