SlideShare a Scribd company logo
1 of 12
Download to read offline
CURRICULUM VITAE
Er. Lakhwant Singh Khalsa
H.No. 58, BMSL Nagar,
Near Mitha Pur Chowk,
Jalandhar City. 144001,
Punjab. India.
Mob. No.: +91 9596743926.
E-mail : ls_khalsa13@rediffmail.com
sen_lakhwant@konkanrailway.gov.in
1. PERSONAL DETAILS :
 Name : Lakhwant Singh Khalsa.
 Father’s Name : Late S. Piara singh.
 Date of Birth : 3rd
March 1959.
 Nationality : INDIAN.
 Passport No. : B – 0895371. Validity expired applied for
renew/reissue
 Languages Known : English, Punjabi andHindi.
 Permanent Address : H.No.58, BMSL Nagar,
Near Mitha Pur Chowk,
Jalandhar City.Punjab. India.
 PAN : ACYPK-7474N.
 Mobile No. : +91 9596743926.
 Email : ls_khalsa13@rediffmail.com
: sen_lakhwant@konkanrailway.gov.in
2. OPTIONAL PERSONAL INFORMATION:
 Marital Status : Married.
 Spouse's Name : Smt Surinder Kaur
 Children : Two Sons
3. QUALIFICATION.
3.1 ACADEMIC QUALIFICATION:
• Matriculation from Punjab School Education Board Chandigarh during 1975
• Diploma in Civil Engineering from Punjab Technical Education Board Chandigarh
during 1978
Page 1 of 12
3.2 PROFESSIONAL QUALIFICATION:
• Date of appointment in Railway : 13-01-1982
• Designation : SEN/Fabrication/Chenab/KRCL
• Grade and Pay : 15600-39100+(6600), Rs31400/-
• Division in which presently working : USBRL Project J&K-Konkan Railway
3.3 ADDITIONAL QUALIFICATION & (Professional Membership)
• Life Member of Institution of Permanent Way Engineers (India)-IPWE
• Life Member of Indian Institution of Bridge Engineers-IIBE
• Certified Welding Inspector course for welding at welding research
institute BHEL Trichy (Tamil Nadu)
• Level II Certification in Non Destructing Testing for DPT, MPT & UT as per
SNT TC IA-2006.
• Familiar with IS, IRS and BS Codes, which are relevant for the steel and
concrete works.
• Also has experience of working in hilly terrains in the Himalayan Ranges
with critical environmental conditions.
4. KEY QUALIFICATION : Having 33years of rich & extensive experience in Steel Bridge
works.
4.1 National Deputation: ( 2006 –till date )
• On Deputation to Konkan Railway Corporation Ltd for National Project of
Udhampur Srinagar Baramulla Rail Link Project in J&K for Construction of Special
Bridges at Anji Khad River, Chenab bridge at Chenab River and Tunnel (T3).
• Presently also looking after the duty of DyCE/Bridges/Reasi for the works of
Major Bridges from km 30.0 to 50.40 of USBRLP.
4.2 Foreign Deputation: ( 1999 -2003 )
• On Deputation to IRCON INTERNATIONAL PVT LTD for three years from DEC.-
1999 to DEC.-2003 in Bangladesh for Rehabilitation of Track and Bridges on
Jamuna Bridge Railway link Project Contract No.2, for Bangladesh Rly for Dual
Gauge track (247 km).
• On Short Term Deputation to IRCON INTERNATIONAL PVT LTD in LIBERIA
( West Africa) (09.03.06 to 20.03.06) for Survey and Inspection of Bridges,
Culverts & Armco Pipes for the Rehabilitation of Track and Bridges for 267 km
length.
Page 2 of 12
4.3 Northern Railway: ( 1981 -2006 )
• Having rich experience in Project Planning and Management, site construction
management of civil works in the field of bridges.
• Inspection, Maintenance, Regirdering, Strengthening, Fabrication & Erection and
Launching of Major bridges, ROBs, RUBs, FOBs, Microwave Tower, etc.
• Visiting Bridge Safety Training School at Tugalkabad New Delhi for delivering
lectures.
5. POST HELD AND PROMOTIONS:-
6. EXPERIENCE:
6.1. ON National Project: (2006 –till date)
A) On Deputation to Konkan Railway Corporation Ltd for National Project of Udhampur
Srinagar Baramulla Rail Link Project in J &K for Construction of Special Bridge at Anji
Khad River, Chenab Bridge, Tunnel and major bridges from km 30-50.4.
S. No. Designation Period
1 SENIOR ENGINEER/FAB/CHENAB/KRCL/REASI 18.04.2011 to present
2 SENIOR ENGINEER/ANJI/KRCL/REASI 18.04.2011 to present
3 ASSISTANT ENGINEER/Anji/KRCL/Reasi 06.11.06 to 17.04.2011
4 SSE/BRIDGES/M/Pathankot 1.11.05 to 05.11.06
5 SSE/BRIDGES/M/ Jalandhar city 1.11.03 to 31.10.05
6 S.E/.BRIDGE/M/ Jalandhar city 03-01-2003 to 31.10.03
7 S.E/.BRIDGE/IRCON/BANGLADESH 15-12-1999 to 02.01.03
8 S.E./BRIDGE/M/ Jalandhar city 1995-99
9 S.E/.BRIDGE/M/Pathankot 1995
10 BRI-Gd-II/M/Pathankot 1989-95
11 BRI-Gd-III/ Jalandhar city 1984-89
12 BRI-Gd-III/NDLS 1982-84
APPRENTICE-BRI N. Rly. 1981-82
Page 3 of 12
i) Construction of Special Bridge across the river Anji Khad at Km. 38/670 on the Katra –
Dharam section of the USBRL project in J&K.
 Scope of Works (Works Handled):-
• Involved in QA and QC of civil and fabrication work with detailed survey work, Plate
Load Test, Implementation of construction activities as per approved methodology and
quality assurance plan (as per IS and IRS standards),
• Supervising const. activities like foundation excavation, Concreting of Foundations,
Piers (Slip form & Conventional method) and Pier caps as per approved methodology.
• Execution of Works as per approved GAD and approved Drawing.
• Checking and approval of BBS as per approved drawings .
• Reviewing and Approval of methodology for different activities regarding concreting of
foundations, piers, pier caps and excavation of foundations.
• Preparation of testing procedure.
• To check physical tests done at site lab as per codal requirement on Cement, coarse&
fine aggregates, fresh and hardened concrete and admixture.
• Review and approval of Mix design and trial mix.
• Survey work of site by grid survey, contour survey and 3D laser Scanning survey of
area.
• QA/QC for foundation, footing, Piers and Pier Cap.
• Preparation and Finalization of WPS/WPQR for welding.
• Geo-Tech investigation of Bridge:
o Bore Hole Investigation by Double and triple Barrel method.
o Making Drifts at P-1 & P-10 Location and preparations of Testing Blocks.
o Conducting In Situ Shear Test and Cyclic Plate Load Test By M/s CSMRS-
NDLS
o Conducting MASW Test By M/s NGRI -Hyderabad
• Liasoning with forest department for land acquisition.
• Reply of Arbitration case of M/s GAJV for Anji Bridge.
o Study of Statements of Claims by Claimant.
o Reply of SOC by Respondent i.e. CSOC.
o Presenting the arbitration case as Presenting Officer (PO)
o Reply of rejoinder
Page 4 of 12
o Attending hearing and arguing the claims during Arbitration hearings
o Submission of Final written statements of oral arguments during hearings
• Measurement and processing of RA Bills
• Preparation and processing of NS-Items.
• Preparation of Final Bill.
• Preparation of Fresh Tender for Balance work of Anji Bridge including BOQ.
ii) Supervision for Construction of Tunnel T-3.
 Scope of Works (Works Handled):-
• Dewatering work inside the Tunnel.
• Monitoring Instrumentation of Tunnel.
• Final Survey work for Approach road.
• Measurement and processing of RA Bills and NS-Items
• Preparation of Final Bill.
• Survey for Escape Adit and approach road.
• Preparation of Tender documents for T3
iii) Construction of special bridge across the river Chenab on Katra – Dharam section of
the USBRL project in J&K. (Additional charge of Fabrication work)
 Scope of Works (Works Handled):-
• Supervision of Steel Fabrication work of Chenab Bridge.
• Preparation/Scrutiny of WPS/WPQR and witnessing of Weld Sample for WPS/WPQR.
• Also involved in supervision of Fabrication work and NDT testing of Viaduct Super
Structure as per WPS, WPQR, QAP and Approved Methodology.
• Fit up check (Before welding), Inspection during welding, Visual inspection after
welding and NDT testing of Steel work.
• Inspection of Steel Plants for Vendors approval at manufacturer’s premises for
supplying of structural steel plates as per IS 2062 2011.
• Inspection of Steel plates at manufacturer’s premises for witnessing of rolling
process as per ITP & TDC which includes:
o Review of Laddle Analysis of slabs for each Heat.
o Witnessing of rolling
Page 5 of 12
o Online UT of plates
o Sampling and Stamping
o Witnessing of Tests such as Tensile, Bend, Micro, Chemical and Charpy
Impact tests at manufacturer’s lab as well as in NABL accredited lab.
o Dimensional checks of plates.
o Visual inspections of plates from top & bottom for surface defects.
o Review of MTCs and issue of release note for accepted plates.
• Inspection of Paints at manufacturer’s premises for witnessing of testing process
as per ITP & TDC which includes:
o Review of
o Witnessing of Tests
o Sampling and Stamping
o Review of Test results
o Review of MTCs and issue of release note for accepted paints.
iv) Construction of civil works of Major bridges, Earth work in Embankment and Cutting,
Feeder Roads, Protection and allied works between km30.0 t0 50.40of Single BG line
on Katra – Dharam section of the USBRL project in J&K.
 Scope of Works (Works Handled):-
• Study of Tender documents/contract Agreement.
• Study of all the drawings for all works.
• Execution of Works as per approved GAD and approved Drawing.
• Approval of Method Statements for various activities
• Checking and approval of BBS.
• Preparation, Finalisation and approval of testing procedure.
• Excavation of Foundations.
i. Constructions of Foundations and Pedestals.
ii. Construction of Piers by Slip Form.
iii. Constrictions of Pier cap.
• Ensure that the quality, QA/QC policies are effectively implemented in the project.
• QA/QC as per Methodology and QAP-Civil of Civil works related to this bridge for
foundation, footing, Piers and Pier Cap.
• Reply of Arbitration case of M/s GAJV for Anji Bridge.
o Study of Statements of Claims by Claimant.
o Reply of SOC by Respondent i.e. CSOC.
o Presenting the arbitration case as Presenting Officer (PO)
Page 6 of 12
o Reply of rejoinder
o Attending hearing and arguing the claims during Arbitration hearings
o Making written final submission to Arbitral Tribunal
V) Work of New Anji Bridge in c/w Review of Alignment of Katra- Qazigund Section.
 Scope of Works (Works Handled):-
• Preliminary Abstract Estimate of new Anji Bridge Location.
o Marking on the ground of proposed alignment of Anji Bridge.
o Coordination of geological survey of the India who have been engaged by
NR for carrying out detailed mapping of revised T-2 and T-3 along with
bridge abutment and portal location.
o Carrying out Bore holes at new location site as per advice of GSI.
• Preparation of cost estimate of new alignment
6.2 ON NORTHERN RAILWAY:-
 Scope of Works (Works Handled):-
 Inspection & Maintenance i.e. (Detail Technical Inspection, Oiling & Greasing, Painting)
of Major bridges, ROBs, FOBs, T/Tables and EOT-Gantries.
 Repair & Strengthening of bridges special repair, replacing loose rivets, Erection of
Bridges, FOBs, ROBs, PF.Shelter, and Goods sheds Microwave tower, Flood light tower,
etc.
 Erection & Launching of CH Span, Service spans during breaches at various sites
manually/by cranes.
 Strengthening of existing steel structures under traffic. (Addition & alteration).
 Launching of girders on new construction line as well as on running lines, Regirdering on
existing running lines under traffic block.
 Reconstruction of 1 x 450’ span at Akhnoor Bridge over river Chenab in J&K for Ministry
of Defence.
 Raising of existing girders of Road Over Bridges/ Foot Over Bridges for Railway
Electrification from Ludhiana to Amritsar for vertical clearance.
 Maintaining & keeping Stores in neat, clean & working condition and also up keeping
machinery with least break down and maintained ledgers & Records.
Page 7 of 12
 Up keeping & Maintaining of Service records and other files of establishment of staff &
welfare of staff.
 Attending Inspection of higher officer such as GM, PCE & CBE’s Inspection, with full
record.
6.2 ON DEPUTATION
6.2.1 ON FOREIGN PROJECT:
a) On Deputation to IRCON INTERNATIONAL PVT LTD in Bangladesh from DEC.99 to
DEC.03. Worked on Jamuna Bridge Railway link Project Contract No.2 , Bangladesh
Railway for Dual Gauge and Rehabilitation of Track and Bridges on Ishurdi-Jamtoil and
Ishurdi- Parbatipur - Section. (247KM) for three years.
 Scope of Works (Works Handled):-
 Survey and Inspection of bridges and preparing reports, & Making working drawings for
the works to be done preparation of method statements and got approved from
Consultants.
 Replacement of existing wooden sleepers of all the girder bridges with new rolled H
Beam sleepers and laying of third rail for conversion to dual gauge.
 Installation of H-Beam Sleeper on Bridges including fixing Track & Guard rails.
 Repair, replacement of corroded steel in girders, pointing, repair & rebuilding of Brick
work.
 Replacement of Span, bearings, bed plates, Anchor Bolts & nuts.
 Replacement of corroded, loose & defective rivets with bolts,
 Shot blast & painting of corroded area of the girder, bearing and bed plates.
 Removing ballast of trough girder , clean and painting the steel and reinstall ballast
 Repair concrete bridge seats and deteriorated bricks
 Levelling & Resetting of Spans, Bearings, Bed plates, Epoxy Resin Injection in bed blocks.
 Preparation of Final Drawings.
b) On Short Term Deputation to LIBERIA in West Africa for Survey and Inspection of
Bridges, Culverts &Armco Pipes for the Rehabilitation of Track and Bridges on
Buchanan-- Nimba --Section, 267 KM in 10 days with GM /Bridges of IRCON
(09.03.06 to 20.03.06)
 Scope of Works (Works Handled):-
 Inspected all the Major Steel Bridges : 8 Nos. Bridges. (Span up to 42mtr).
 Inspection of RCC Box Culverts : 12 Nos. Bridges (Span 11to 14mtr.)
 Inspection of Armco CG metal pipes : 698 Nos. bridges (1.05m to 3.05m dia.)
 Digitalization : Taken Photographs of all the bridges with
Digital camera for record.
Page 8 of 12
 Submission of Report : Prepare the Survey report showing
quantum of work to be done, including
rough estimate and submitted in
Corporate Office
7. MAJOR CONSTRUCTION WORKS HANDLED AND ACHIEVEMENTS.
 Constructions of Piers which includes Foundations and Sub structures of Anji Khad
Bridge on Reasi side.
o Excavation of Foundations.
o Constructions of Foundations and Pedestals.
o Construction of Piers by Slip Form.
o Constrictions of Pier cap.
 Finalisation of QAPs for Civil and Fabrication work of Anji Bridge.
 Preparation of WPS and WPQR which includes Testing of Welders and witnessing of Test
Samples at Approved Lab.
 Making Drifts of 45m and 80 m (Size 2x2m) at P-1 and P-10 locations of Anji Bridge for
conducting Tests.
 Preparations of Tests Blocks & Conducting Tests In- Situ Shear and Cyclic Plate Load
Tests in Drifts.
 Conducting MASW Test in drifts
 Contour Survey with L. Section and Cross sections of Anji Bridge site for Slope Stability
 3D Laser Scanning Survey for slope Stability of Anji Bridge and Chenab Bridge which
includes L-Sections and Cross Sections of whole area.
 Rehabilitation of Bridges and Track in Bangladesh Railway in 247KM during deputation in
IRCON.
 Survey and Inspection of Bridges, Culverts & Armco Pipes for the Rehabilitation of
Track and Bridges on Buchanan-Nimba-Section in Liberia, 267 KM in 10 days with GM
/Bridges of IRCON (09.03.06 to 20.03.06).
 Fabrication & Erection of 1x450’ long span of Akhnoor bridge (Single largest span)
Border Road Organization on Jammu-Poonch Highway in J&K state.
 Deck modification of 14x150; spans in Br.No.188 Mirthal; on JUC-PTK Sec.
Page 9 of 12
 Erection of 2x100; Plate Girder at Br.no. 128-A on Mukerian Hydel Channel on JUC- PTK
Sec.
 Erection of 1x 150’ through & 2x40`, 60’Pl.Gr. on BEAS –GOINDWAL Sec.
 Erection of PF Shelters in Delhi during Asaid 82 on Ring railway.
 Dismantling and erection of FOBs on Ring railway during Asaid 82
 Erection of Foot Over Bridges, PF shelter on Ferozepur division.
 Rebuilding of bridges with the help of Temp. S/Spans, during breaches on FZR Division.
 Erection of Microwave Towers at Jammu Tawi and Bari Brahmans on FZR Division
 Raising of all existing girders of Road Over Bridges/ Foot Over Bridges for Railway
Electrification from Ludhiana to Amritsar for vertical clearance.
 Regirdering of Br. No.55 (7x45’) spans on Up & Down line JUC-ASR SEC. With the help of
140T ART crane and road cranes. Regirdering of Br. No.70 (12x45’) spans on JUC-HSX SEC.
 Unloading of 60`Girder from BOM and Erection at Br.no.2 RUB on BHR- JAT SEC. with the
help of road cranes.
 Regirdering of Br. No.280 (3x60’) spans (early steel) on ASR-PTK SEC. With the help of
140T ART crane.
 Installation of Innovative Inspection Trolley on Br.No.5A for Inspection of Bottom flooring
members of Triangulated Girders.
 Erection of 1x60’ span with the help of 140 ton ART Crane at RUB 224-A on JUC–PTK- SEC.
in c/w doubling of line.
 Dismantling and Erection of FOB/BEAS (375MT) on JUC-ASR Section before target.
Page 10 of 12
8. Awards and Commendations:
S.No. Year Awards/ Commendation Certificates
1. 2009
Director(W&W)’s
Foundation Day
Award
Certificate of Merit for Meritorious service on 20th
Foundation
Day of Konkan Railway Corporation Ltd. on 15/10/2009.
2 2008 ED (P) Foundation
Day Award
Certificate of Merit for Meritorious service on 19th
Foundation
Day of Konkan Railway Corporation Ltd. on 15/10/2008.
3. 2006 CBE’s Award Commendation Certificate & cash award of Rs 350/- in
connection with inspection of CBE’s N.R during the year 2006.
4. 2005 Pr. CE Award Commendation Certificate & cash award of Rs 1000/- for
meritorious services for the year 2004-05.
5. 2005 GM/ N. Rly. Group
Award
Commendation Certificate & cash award of Rs 600/- for
Installation of Innovative Inspection Trolley during the year
2004-05
6. 2003 Dy. CBE/JRC
Award
Commendation Certificate & cash award of Rs 200/- for doing
Hindi work during the year 2003-04
8, 1997 Dy.CBE/ JRC Commendation Certificate by Dy.CBE/JRC for Raising of
FOB/LDH1997
9. 1996 Dy.CBE/JRC Commendation Certificate by Dy.CBE/JRC in c/w Training to TA
Personnel. 1996
10. 1996 CE’s Award Certificate of Merits & Cash award of Rs 350/-for exceptional
services rendered during floods and Breaches in 1995-96
11. 1994 GM’s Award Cash award Rs 750/- for the excellent work done for
reconstruction of Akhnoor bridge in J&K State for BRO1994
12. 1994 CE/Bridge/NR Commendation Certificate in connection with reconstruction
of Akhnoor Bridge in J&K Dt: 01/05/93.
13. 1993 CE/Bridge/NR Commendation Certificate in connection with reconstruction
of Akhnoor Bridge in J&K Dt: 12/08/93.
14. 1993 CE/Bridge/NR Commendation Certificate in connection with reconstruction
of Akhnoor Bridge in J&K Dt: 13/10/93.
15. 1992 CE’s Award Certificate of Merits & Cash award of Rs 400/- for Meritorious
services done during 91-92
16. 1992 GM/NR Group
Award
Group award in connection with Deck Modification of Major
Bridge no. 188 on JUC-PTK Section.
17. 1992 Appreciation
letter by Dy
CBE/JRC
for Meritorious work of erection done for Deck modification
of Br.No.188 (14x150’) 1992
Page 11 of 12
9. SPECIAL TRAININGS:-
S.No. Year
Training
1 2014
Skill Upgradation Training Programs on "Leadership and Communication Skills
Development “by ISDA at India habitat Center Lodhi Road, New Delhi on 04.01. 14
2 2013 NDT & DT Training Programme by WRI at Chenab site .
3 2013
Training on Surface Preparation and Painting at ED/P/KRCL office at Reasi By
TATA Project Ltd (Quality Services) from 06.05.2013 to 07-05-2013
4 2011
Training on Welding and fabrication Inspection Workshop at GM/P/KRCL office
at Reasi By TATA Project Ltd (Quality Services) from 30-01-11 to 02-02-2011
5 2010 Training on PIMS from 03-03-10 to 05-03-10 at ED (P) office Reasi.
6 2010 Seminar on Primavera (PMIS) from 22-02-10 to 24-02-10 at ED (P) office Reasi.
7 2009 Seminar on Tunnelling on 27-08-09 at Katra Organised by Constructions Org. of NR
8
2009
Training on Indian Contract Management 17-07-09 to 19-07-09 at ED (P) office
Reasi by Prof.ML Jand.
9 2007 Training on Arbitration from 22/10/07 to 25/10/07 at ED (P) office Reasi by Prof.ML
Jand.
10 2007 Training course on welding for Certified Welding Inspector from 18/06/07 to
28/06/07 at WRI Tiruchirappalli.
11 2003 Attended National Technical Seminar on “Design, Construction, Inspection,
Rehabilitation and Maintenance of Rly. Bridges at Chennai Organized by IPWE”
12 2005 Undergone one week “Special course on Management Development” at Safety
Camp/ Dharmpur/ Himachal from 08/08/05 to 12/08/05.
13 2003 Attended seminar cum workshop “Working on girder bridges in electrified section”
at CAMTECH Gwalior.
14 1996 Undergone one week special course on MDP course at Jharipani/ Massoori from
03/06/96 to 07/06/96.
15 1988 Undergone one week Training at BST/TKD Welding Course.
16 1987 Undergone one week Training at BST/TKD Bridge Safety Course.
17 1986 Undergone one week Training at BST/TKD Riveting Course.
18 1981 Undergone 1 year Training course in Bridge works as Apprentice BRI in N. Rly from
07/01/81 to 12/01/82.
L.S.Khalsa
SEN/Fabrication/Chenab
KRCL/Reasi
Emp. No 5151
USBRL Project
Page 12 of 12

More Related Content

What's hot

midhunakbar_original
midhunakbar_originalmidhunakbar_original
midhunakbar_original
midhun akbar
 
Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Nirmal_Kumar_Sinha - Sr. Quality cum Material ExpertNirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Sinha Sab
 
Gudekar Mitesh Dilipbhai
Gudekar Mitesh DilipbhaiGudekar Mitesh Dilipbhai
Gudekar Mitesh Dilipbhai
Mitesh Gudekar
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
Javad Akhtar
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
Shyamal Sahu
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
Cameron Punton
 
training report civil engg. 7th sem
training report civil engg. 7th semtraining report civil engg. 7th sem
training report civil engg. 7th sem
Rajat kashv
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)
Sher Zaman
 

What's hot (20)

midhunakbar_original
midhunakbar_originalmidhunakbar_original
midhunakbar_original
 
Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Nirmal_Kumar_Sinha - Sr. Quality cum Material ExpertNirmal_Kumar_Sinha - Sr. Quality cum Material Expert
Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert
 
CV-RC.-2015
CV-RC.-2015CV-RC.-2015
CV-RC.-2015
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
 
midhun akbar CV
midhun akbar CVmidhun akbar CV
midhun akbar CV
 
CV HMS
CV HMSCV HMS
CV HMS
 
Gudekar Mitesh Dilipbhai
Gudekar Mitesh DilipbhaiGudekar Mitesh Dilipbhai
Gudekar Mitesh Dilipbhai
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
cv 2016 dec
cv 2016 deccv 2016 dec
cv 2016 dec
 
Continuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodhaContinuously reinforced concrete pavement seminar report by chandramohan lodha
Continuously reinforced concrete pavement seminar report by chandramohan lodha
 
Ncbadvt2015
Ncbadvt2015Ncbadvt2015
Ncbadvt2015
 
Curriculum Vitae - Rama Narayana Murty
Curriculum Vitae - Rama Narayana MurtyCurriculum Vitae - Rama Narayana Murty
Curriculum Vitae - Rama Narayana Murty
 
Muhammad Khadim2013
Muhammad Khadim2013Muhammad Khadim2013
Muhammad Khadim2013
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 
training report civil engg. 7th sem
training report civil engg. 7th semtraining report civil engg. 7th sem
training report civil engg. 7th sem
 
QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)
 

Similar to CV LS Khalsa -2015

Asstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghAsstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder Singh
BHUPINDER SINGH
 
Khan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar New C.V.DOC
Khan Sardar New C.V.DOC
Khan Sardar
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
Sunil Singh
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
Rajib Ali
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1
Rajendra Yadav
 
palani new resume recent 2013-2015
palani new resume recent 2013-2015palani new resume recent 2013-2015
palani new resume recent 2013-2015
palani kambhampati
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- Tiwari
Ak Tiwari
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Chandra ABS IV
 

Similar to CV LS Khalsa -2015 (20)

Asstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghAsstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder Singh
 
Khan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar New C.V.DOC
Khan Sardar New C.V.DOC
 
Nirala_CV (1)
Nirala_CV (1)Nirala_CV (1)
Nirala_CV (1)
 
Prakash cv update
Prakash cv updatePrakash cv update
Prakash cv update
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Resume_-_Muthalib_Mohammad1
Resume_-_Muthalib_Mohammad1Resume_-_Muthalib_Mohammad1
Resume_-_Muthalib_Mohammad1
 
MOHAN KUMAR S
MOHAN KUMAR SMOHAN KUMAR S
MOHAN KUMAR S
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
GOPAL
GOPALGOPAL
GOPAL
 
CV_Debajit
CV_DebajitCV_Debajit
CV_Debajit
 
CV Mr. Haribabu
CV Mr. HaribabuCV Mr. Haribabu
CV Mr. Haribabu
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
Khizer CV 2016
Khizer CV 2016Khizer CV 2016
Khizer CV 2016
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1
 
palani new resume recent 2013-2015
palani new resume recent 2013-2015palani new resume recent 2013-2015
palani new resume recent 2013-2015
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- Tiwari
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 

CV LS Khalsa -2015

  • 1. CURRICULUM VITAE Er. Lakhwant Singh Khalsa H.No. 58, BMSL Nagar, Near Mitha Pur Chowk, Jalandhar City. 144001, Punjab. India. Mob. No.: +91 9596743926. E-mail : ls_khalsa13@rediffmail.com sen_lakhwant@konkanrailway.gov.in 1. PERSONAL DETAILS :  Name : Lakhwant Singh Khalsa.  Father’s Name : Late S. Piara singh.  Date of Birth : 3rd March 1959.  Nationality : INDIAN.  Passport No. : B – 0895371. Validity expired applied for renew/reissue  Languages Known : English, Punjabi andHindi.  Permanent Address : H.No.58, BMSL Nagar, Near Mitha Pur Chowk, Jalandhar City.Punjab. India.  PAN : ACYPK-7474N.  Mobile No. : +91 9596743926.  Email : ls_khalsa13@rediffmail.com : sen_lakhwant@konkanrailway.gov.in 2. OPTIONAL PERSONAL INFORMATION:  Marital Status : Married.  Spouse's Name : Smt Surinder Kaur  Children : Two Sons 3. QUALIFICATION. 3.1 ACADEMIC QUALIFICATION: • Matriculation from Punjab School Education Board Chandigarh during 1975 • Diploma in Civil Engineering from Punjab Technical Education Board Chandigarh during 1978 Page 1 of 12
  • 2. 3.2 PROFESSIONAL QUALIFICATION: • Date of appointment in Railway : 13-01-1982 • Designation : SEN/Fabrication/Chenab/KRCL • Grade and Pay : 15600-39100+(6600), Rs31400/- • Division in which presently working : USBRL Project J&K-Konkan Railway 3.3 ADDITIONAL QUALIFICATION & (Professional Membership) • Life Member of Institution of Permanent Way Engineers (India)-IPWE • Life Member of Indian Institution of Bridge Engineers-IIBE • Certified Welding Inspector course for welding at welding research institute BHEL Trichy (Tamil Nadu) • Level II Certification in Non Destructing Testing for DPT, MPT & UT as per SNT TC IA-2006. • Familiar with IS, IRS and BS Codes, which are relevant for the steel and concrete works. • Also has experience of working in hilly terrains in the Himalayan Ranges with critical environmental conditions. 4. KEY QUALIFICATION : Having 33years of rich & extensive experience in Steel Bridge works. 4.1 National Deputation: ( 2006 –till date ) • On Deputation to Konkan Railway Corporation Ltd for National Project of Udhampur Srinagar Baramulla Rail Link Project in J&K for Construction of Special Bridges at Anji Khad River, Chenab bridge at Chenab River and Tunnel (T3). • Presently also looking after the duty of DyCE/Bridges/Reasi for the works of Major Bridges from km 30.0 to 50.40 of USBRLP. 4.2 Foreign Deputation: ( 1999 -2003 ) • On Deputation to IRCON INTERNATIONAL PVT LTD for three years from DEC.- 1999 to DEC.-2003 in Bangladesh for Rehabilitation of Track and Bridges on Jamuna Bridge Railway link Project Contract No.2, for Bangladesh Rly for Dual Gauge track (247 km). • On Short Term Deputation to IRCON INTERNATIONAL PVT LTD in LIBERIA ( West Africa) (09.03.06 to 20.03.06) for Survey and Inspection of Bridges, Culverts & Armco Pipes for the Rehabilitation of Track and Bridges for 267 km length. Page 2 of 12
  • 3. 4.3 Northern Railway: ( 1981 -2006 ) • Having rich experience in Project Planning and Management, site construction management of civil works in the field of bridges. • Inspection, Maintenance, Regirdering, Strengthening, Fabrication & Erection and Launching of Major bridges, ROBs, RUBs, FOBs, Microwave Tower, etc. • Visiting Bridge Safety Training School at Tugalkabad New Delhi for delivering lectures. 5. POST HELD AND PROMOTIONS:- 6. EXPERIENCE: 6.1. ON National Project: (2006 –till date) A) On Deputation to Konkan Railway Corporation Ltd for National Project of Udhampur Srinagar Baramulla Rail Link Project in J &K for Construction of Special Bridge at Anji Khad River, Chenab Bridge, Tunnel and major bridges from km 30-50.4. S. No. Designation Period 1 SENIOR ENGINEER/FAB/CHENAB/KRCL/REASI 18.04.2011 to present 2 SENIOR ENGINEER/ANJI/KRCL/REASI 18.04.2011 to present 3 ASSISTANT ENGINEER/Anji/KRCL/Reasi 06.11.06 to 17.04.2011 4 SSE/BRIDGES/M/Pathankot 1.11.05 to 05.11.06 5 SSE/BRIDGES/M/ Jalandhar city 1.11.03 to 31.10.05 6 S.E/.BRIDGE/M/ Jalandhar city 03-01-2003 to 31.10.03 7 S.E/.BRIDGE/IRCON/BANGLADESH 15-12-1999 to 02.01.03 8 S.E./BRIDGE/M/ Jalandhar city 1995-99 9 S.E/.BRIDGE/M/Pathankot 1995 10 BRI-Gd-II/M/Pathankot 1989-95 11 BRI-Gd-III/ Jalandhar city 1984-89 12 BRI-Gd-III/NDLS 1982-84 APPRENTICE-BRI N. Rly. 1981-82 Page 3 of 12
  • 4. i) Construction of Special Bridge across the river Anji Khad at Km. 38/670 on the Katra – Dharam section of the USBRL project in J&K.  Scope of Works (Works Handled):- • Involved in QA and QC of civil and fabrication work with detailed survey work, Plate Load Test, Implementation of construction activities as per approved methodology and quality assurance plan (as per IS and IRS standards), • Supervising const. activities like foundation excavation, Concreting of Foundations, Piers (Slip form & Conventional method) and Pier caps as per approved methodology. • Execution of Works as per approved GAD and approved Drawing. • Checking and approval of BBS as per approved drawings . • Reviewing and Approval of methodology for different activities regarding concreting of foundations, piers, pier caps and excavation of foundations. • Preparation of testing procedure. • To check physical tests done at site lab as per codal requirement on Cement, coarse& fine aggregates, fresh and hardened concrete and admixture. • Review and approval of Mix design and trial mix. • Survey work of site by grid survey, contour survey and 3D laser Scanning survey of area. • QA/QC for foundation, footing, Piers and Pier Cap. • Preparation and Finalization of WPS/WPQR for welding. • Geo-Tech investigation of Bridge: o Bore Hole Investigation by Double and triple Barrel method. o Making Drifts at P-1 & P-10 Location and preparations of Testing Blocks. o Conducting In Situ Shear Test and Cyclic Plate Load Test By M/s CSMRS- NDLS o Conducting MASW Test By M/s NGRI -Hyderabad • Liasoning with forest department for land acquisition. • Reply of Arbitration case of M/s GAJV for Anji Bridge. o Study of Statements of Claims by Claimant. o Reply of SOC by Respondent i.e. CSOC. o Presenting the arbitration case as Presenting Officer (PO) o Reply of rejoinder Page 4 of 12
  • 5. o Attending hearing and arguing the claims during Arbitration hearings o Submission of Final written statements of oral arguments during hearings • Measurement and processing of RA Bills • Preparation and processing of NS-Items. • Preparation of Final Bill. • Preparation of Fresh Tender for Balance work of Anji Bridge including BOQ. ii) Supervision for Construction of Tunnel T-3.  Scope of Works (Works Handled):- • Dewatering work inside the Tunnel. • Monitoring Instrumentation of Tunnel. • Final Survey work for Approach road. • Measurement and processing of RA Bills and NS-Items • Preparation of Final Bill. • Survey for Escape Adit and approach road. • Preparation of Tender documents for T3 iii) Construction of special bridge across the river Chenab on Katra – Dharam section of the USBRL project in J&K. (Additional charge of Fabrication work)  Scope of Works (Works Handled):- • Supervision of Steel Fabrication work of Chenab Bridge. • Preparation/Scrutiny of WPS/WPQR and witnessing of Weld Sample for WPS/WPQR. • Also involved in supervision of Fabrication work and NDT testing of Viaduct Super Structure as per WPS, WPQR, QAP and Approved Methodology. • Fit up check (Before welding), Inspection during welding, Visual inspection after welding and NDT testing of Steel work. • Inspection of Steel Plants for Vendors approval at manufacturer’s premises for supplying of structural steel plates as per IS 2062 2011. • Inspection of Steel plates at manufacturer’s premises for witnessing of rolling process as per ITP & TDC which includes: o Review of Laddle Analysis of slabs for each Heat. o Witnessing of rolling Page 5 of 12
  • 6. o Online UT of plates o Sampling and Stamping o Witnessing of Tests such as Tensile, Bend, Micro, Chemical and Charpy Impact tests at manufacturer’s lab as well as in NABL accredited lab. o Dimensional checks of plates. o Visual inspections of plates from top & bottom for surface defects. o Review of MTCs and issue of release note for accepted plates. • Inspection of Paints at manufacturer’s premises for witnessing of testing process as per ITP & TDC which includes: o Review of o Witnessing of Tests o Sampling and Stamping o Review of Test results o Review of MTCs and issue of release note for accepted paints. iv) Construction of civil works of Major bridges, Earth work in Embankment and Cutting, Feeder Roads, Protection and allied works between km30.0 t0 50.40of Single BG line on Katra – Dharam section of the USBRL project in J&K.  Scope of Works (Works Handled):- • Study of Tender documents/contract Agreement. • Study of all the drawings for all works. • Execution of Works as per approved GAD and approved Drawing. • Approval of Method Statements for various activities • Checking and approval of BBS. • Preparation, Finalisation and approval of testing procedure. • Excavation of Foundations. i. Constructions of Foundations and Pedestals. ii. Construction of Piers by Slip Form. iii. Constrictions of Pier cap. • Ensure that the quality, QA/QC policies are effectively implemented in the project. • QA/QC as per Methodology and QAP-Civil of Civil works related to this bridge for foundation, footing, Piers and Pier Cap. • Reply of Arbitration case of M/s GAJV for Anji Bridge. o Study of Statements of Claims by Claimant. o Reply of SOC by Respondent i.e. CSOC. o Presenting the arbitration case as Presenting Officer (PO) Page 6 of 12
  • 7. o Reply of rejoinder o Attending hearing and arguing the claims during Arbitration hearings o Making written final submission to Arbitral Tribunal V) Work of New Anji Bridge in c/w Review of Alignment of Katra- Qazigund Section.  Scope of Works (Works Handled):- • Preliminary Abstract Estimate of new Anji Bridge Location. o Marking on the ground of proposed alignment of Anji Bridge. o Coordination of geological survey of the India who have been engaged by NR for carrying out detailed mapping of revised T-2 and T-3 along with bridge abutment and portal location. o Carrying out Bore holes at new location site as per advice of GSI. • Preparation of cost estimate of new alignment 6.2 ON NORTHERN RAILWAY:-  Scope of Works (Works Handled):-  Inspection & Maintenance i.e. (Detail Technical Inspection, Oiling & Greasing, Painting) of Major bridges, ROBs, FOBs, T/Tables and EOT-Gantries.  Repair & Strengthening of bridges special repair, replacing loose rivets, Erection of Bridges, FOBs, ROBs, PF.Shelter, and Goods sheds Microwave tower, Flood light tower, etc.  Erection & Launching of CH Span, Service spans during breaches at various sites manually/by cranes.  Strengthening of existing steel structures under traffic. (Addition & alteration).  Launching of girders on new construction line as well as on running lines, Regirdering on existing running lines under traffic block.  Reconstruction of 1 x 450’ span at Akhnoor Bridge over river Chenab in J&K for Ministry of Defence.  Raising of existing girders of Road Over Bridges/ Foot Over Bridges for Railway Electrification from Ludhiana to Amritsar for vertical clearance.  Maintaining & keeping Stores in neat, clean & working condition and also up keeping machinery with least break down and maintained ledgers & Records. Page 7 of 12
  • 8.  Up keeping & Maintaining of Service records and other files of establishment of staff & welfare of staff.  Attending Inspection of higher officer such as GM, PCE & CBE’s Inspection, with full record. 6.2 ON DEPUTATION 6.2.1 ON FOREIGN PROJECT: a) On Deputation to IRCON INTERNATIONAL PVT LTD in Bangladesh from DEC.99 to DEC.03. Worked on Jamuna Bridge Railway link Project Contract No.2 , Bangladesh Railway for Dual Gauge and Rehabilitation of Track and Bridges on Ishurdi-Jamtoil and Ishurdi- Parbatipur - Section. (247KM) for three years.  Scope of Works (Works Handled):-  Survey and Inspection of bridges and preparing reports, & Making working drawings for the works to be done preparation of method statements and got approved from Consultants.  Replacement of existing wooden sleepers of all the girder bridges with new rolled H Beam sleepers and laying of third rail for conversion to dual gauge.  Installation of H-Beam Sleeper on Bridges including fixing Track & Guard rails.  Repair, replacement of corroded steel in girders, pointing, repair & rebuilding of Brick work.  Replacement of Span, bearings, bed plates, Anchor Bolts & nuts.  Replacement of corroded, loose & defective rivets with bolts,  Shot blast & painting of corroded area of the girder, bearing and bed plates.  Removing ballast of trough girder , clean and painting the steel and reinstall ballast  Repair concrete bridge seats and deteriorated bricks  Levelling & Resetting of Spans, Bearings, Bed plates, Epoxy Resin Injection in bed blocks.  Preparation of Final Drawings. b) On Short Term Deputation to LIBERIA in West Africa for Survey and Inspection of Bridges, Culverts &Armco Pipes for the Rehabilitation of Track and Bridges on Buchanan-- Nimba --Section, 267 KM in 10 days with GM /Bridges of IRCON (09.03.06 to 20.03.06)  Scope of Works (Works Handled):-  Inspected all the Major Steel Bridges : 8 Nos. Bridges. (Span up to 42mtr).  Inspection of RCC Box Culverts : 12 Nos. Bridges (Span 11to 14mtr.)  Inspection of Armco CG metal pipes : 698 Nos. bridges (1.05m to 3.05m dia.)  Digitalization : Taken Photographs of all the bridges with Digital camera for record. Page 8 of 12
  • 9.  Submission of Report : Prepare the Survey report showing quantum of work to be done, including rough estimate and submitted in Corporate Office 7. MAJOR CONSTRUCTION WORKS HANDLED AND ACHIEVEMENTS.  Constructions of Piers which includes Foundations and Sub structures of Anji Khad Bridge on Reasi side. o Excavation of Foundations. o Constructions of Foundations and Pedestals. o Construction of Piers by Slip Form. o Constrictions of Pier cap.  Finalisation of QAPs for Civil and Fabrication work of Anji Bridge.  Preparation of WPS and WPQR which includes Testing of Welders and witnessing of Test Samples at Approved Lab.  Making Drifts of 45m and 80 m (Size 2x2m) at P-1 and P-10 locations of Anji Bridge for conducting Tests.  Preparations of Tests Blocks & Conducting Tests In- Situ Shear and Cyclic Plate Load Tests in Drifts.  Conducting MASW Test in drifts  Contour Survey with L. Section and Cross sections of Anji Bridge site for Slope Stability  3D Laser Scanning Survey for slope Stability of Anji Bridge and Chenab Bridge which includes L-Sections and Cross Sections of whole area.  Rehabilitation of Bridges and Track in Bangladesh Railway in 247KM during deputation in IRCON.  Survey and Inspection of Bridges, Culverts & Armco Pipes for the Rehabilitation of Track and Bridges on Buchanan-Nimba-Section in Liberia, 267 KM in 10 days with GM /Bridges of IRCON (09.03.06 to 20.03.06).  Fabrication & Erection of 1x450’ long span of Akhnoor bridge (Single largest span) Border Road Organization on Jammu-Poonch Highway in J&K state.  Deck modification of 14x150; spans in Br.No.188 Mirthal; on JUC-PTK Sec. Page 9 of 12
  • 10.  Erection of 2x100; Plate Girder at Br.no. 128-A on Mukerian Hydel Channel on JUC- PTK Sec.  Erection of 1x 150’ through & 2x40`, 60’Pl.Gr. on BEAS –GOINDWAL Sec.  Erection of PF Shelters in Delhi during Asaid 82 on Ring railway.  Dismantling and erection of FOBs on Ring railway during Asaid 82  Erection of Foot Over Bridges, PF shelter on Ferozepur division.  Rebuilding of bridges with the help of Temp. S/Spans, during breaches on FZR Division.  Erection of Microwave Towers at Jammu Tawi and Bari Brahmans on FZR Division  Raising of all existing girders of Road Over Bridges/ Foot Over Bridges for Railway Electrification from Ludhiana to Amritsar for vertical clearance.  Regirdering of Br. No.55 (7x45’) spans on Up & Down line JUC-ASR SEC. With the help of 140T ART crane and road cranes. Regirdering of Br. No.70 (12x45’) spans on JUC-HSX SEC.  Unloading of 60`Girder from BOM and Erection at Br.no.2 RUB on BHR- JAT SEC. with the help of road cranes.  Regirdering of Br. No.280 (3x60’) spans (early steel) on ASR-PTK SEC. With the help of 140T ART crane.  Installation of Innovative Inspection Trolley on Br.No.5A for Inspection of Bottom flooring members of Triangulated Girders.  Erection of 1x60’ span with the help of 140 ton ART Crane at RUB 224-A on JUC–PTK- SEC. in c/w doubling of line.  Dismantling and Erection of FOB/BEAS (375MT) on JUC-ASR Section before target. Page 10 of 12
  • 11. 8. Awards and Commendations: S.No. Year Awards/ Commendation Certificates 1. 2009 Director(W&W)’s Foundation Day Award Certificate of Merit for Meritorious service on 20th Foundation Day of Konkan Railway Corporation Ltd. on 15/10/2009. 2 2008 ED (P) Foundation Day Award Certificate of Merit for Meritorious service on 19th Foundation Day of Konkan Railway Corporation Ltd. on 15/10/2008. 3. 2006 CBE’s Award Commendation Certificate & cash award of Rs 350/- in connection with inspection of CBE’s N.R during the year 2006. 4. 2005 Pr. CE Award Commendation Certificate & cash award of Rs 1000/- for meritorious services for the year 2004-05. 5. 2005 GM/ N. Rly. Group Award Commendation Certificate & cash award of Rs 600/- for Installation of Innovative Inspection Trolley during the year 2004-05 6. 2003 Dy. CBE/JRC Award Commendation Certificate & cash award of Rs 200/- for doing Hindi work during the year 2003-04 8, 1997 Dy.CBE/ JRC Commendation Certificate by Dy.CBE/JRC for Raising of FOB/LDH1997 9. 1996 Dy.CBE/JRC Commendation Certificate by Dy.CBE/JRC in c/w Training to TA Personnel. 1996 10. 1996 CE’s Award Certificate of Merits & Cash award of Rs 350/-for exceptional services rendered during floods and Breaches in 1995-96 11. 1994 GM’s Award Cash award Rs 750/- for the excellent work done for reconstruction of Akhnoor bridge in J&K State for BRO1994 12. 1994 CE/Bridge/NR Commendation Certificate in connection with reconstruction of Akhnoor Bridge in J&K Dt: 01/05/93. 13. 1993 CE/Bridge/NR Commendation Certificate in connection with reconstruction of Akhnoor Bridge in J&K Dt: 12/08/93. 14. 1993 CE/Bridge/NR Commendation Certificate in connection with reconstruction of Akhnoor Bridge in J&K Dt: 13/10/93. 15. 1992 CE’s Award Certificate of Merits & Cash award of Rs 400/- for Meritorious services done during 91-92 16. 1992 GM/NR Group Award Group award in connection with Deck Modification of Major Bridge no. 188 on JUC-PTK Section. 17. 1992 Appreciation letter by Dy CBE/JRC for Meritorious work of erection done for Deck modification of Br.No.188 (14x150’) 1992 Page 11 of 12
  • 12. 9. SPECIAL TRAININGS:- S.No. Year Training 1 2014 Skill Upgradation Training Programs on "Leadership and Communication Skills Development “by ISDA at India habitat Center Lodhi Road, New Delhi on 04.01. 14 2 2013 NDT & DT Training Programme by WRI at Chenab site . 3 2013 Training on Surface Preparation and Painting at ED/P/KRCL office at Reasi By TATA Project Ltd (Quality Services) from 06.05.2013 to 07-05-2013 4 2011 Training on Welding and fabrication Inspection Workshop at GM/P/KRCL office at Reasi By TATA Project Ltd (Quality Services) from 30-01-11 to 02-02-2011 5 2010 Training on PIMS from 03-03-10 to 05-03-10 at ED (P) office Reasi. 6 2010 Seminar on Primavera (PMIS) from 22-02-10 to 24-02-10 at ED (P) office Reasi. 7 2009 Seminar on Tunnelling on 27-08-09 at Katra Organised by Constructions Org. of NR 8 2009 Training on Indian Contract Management 17-07-09 to 19-07-09 at ED (P) office Reasi by Prof.ML Jand. 9 2007 Training on Arbitration from 22/10/07 to 25/10/07 at ED (P) office Reasi by Prof.ML Jand. 10 2007 Training course on welding for Certified Welding Inspector from 18/06/07 to 28/06/07 at WRI Tiruchirappalli. 11 2003 Attended National Technical Seminar on “Design, Construction, Inspection, Rehabilitation and Maintenance of Rly. Bridges at Chennai Organized by IPWE” 12 2005 Undergone one week “Special course on Management Development” at Safety Camp/ Dharmpur/ Himachal from 08/08/05 to 12/08/05. 13 2003 Attended seminar cum workshop “Working on girder bridges in electrified section” at CAMTECH Gwalior. 14 1996 Undergone one week special course on MDP course at Jharipani/ Massoori from 03/06/96 to 07/06/96. 15 1988 Undergone one week Training at BST/TKD Welding Course. 16 1987 Undergone one week Training at BST/TKD Bridge Safety Course. 17 1986 Undergone one week Training at BST/TKD Riveting Course. 18 1981 Undergone 1 year Training course in Bridge works as Apprentice BRI in N. Rly from 07/01/81 to 12/01/82. L.S.Khalsa SEN/Fabrication/Chenab KRCL/Reasi Emp. No 5151 USBRL Project Page 12 of 12