SPRING CREEK TRANSMISSION
LINE RECONDUCTOR
Location
 Requesting Approval to cross Lick Creek Greenways Property
 Agenda Item 15-0562
 Environmental Constraint Study was performed
 (No constraints identified)
 Why are we reconductoring the transmission line?
 Why are we building the new section of transmission line?
TRANSMISSION SYSTEM SERVING THE
CITY OF COLLEGE STATION
8
Overloaded
Sections
New Transmission
line for reliability
PROPOSED ROUTE
Existing Transmission Lines
GREENWAY PROPERTY LOCATION
Greenway Crossing Area