2. Requesting Approval to cross Lick Creek Greenways Property
Agenda Item 15-0562
Environmental Constraint Study was performed
(No constraints identified)
Why are we reconductoring the transmission line?
Why are we building the new section of transmission line?
3. TRANSMISSION SYSTEM SERVING THE
CITY OF COLLEGE STATION
8
Overloaded
Sections
New Transmission
line for reliability