ALAA ELDIEN MOTAWE SOLIMAN
MADINATY Group 61, Bl. 3, Ap. 31, Cairo, Egypt
+20112339558  alaamotawea1976@gmail.com
ENGINEERING, OPERATION TEAM LEADER
16+ years’ success leading engineering innovation for high-growth organizations
Results oriented Instrumentation and Control Assistant Manager with over 16 years of experience
directing pre-commissioning, commissioning and startup of the instrumentation and control systems to
gas reducing and metering stations in Egypt and Jordan. Skilled professional in coordinating maintenance
operations, calibrating instruments and performing quality control inspections. Solid expertise in
engineering design, quality planning, safety planning, reporting and budget management. Ability to
develop and implement feasible timelines and budgets, and effectively lead cross-functional teams through
strategic leadership and outstanding problem solving skills. Excellent business communication,
organisational and interpersonal skills, with the capacity to increase productivity and profit margins in a
fast paced, dynamic environment.
HIGHLIGHTS OF EXPERTISE
⦁ Strategic Planning & Execution
⦁ Instrumentation & Control
Engineering
⦁ Construction Management
⦁ Project Management
⦁ Operations Management
⦁ Risk Identification & Mitigation
⦁ Process Improvements
⦁ Strategic Leadership
⦁ Ability to Influence
⦁ Staff Management & Training
⦁ Client & Vendor Management
⦁ Contract Management
⦁ Business Development
⦁ HSE & QC Planning
⦁ Budget Management
⦁ Advanced Problem
Solving
⦁ Relationship Building
⦁ AutoCAD
⦁ MS Office & MS Project
CAREER EXPERIENCE
GASCO (EGYPTIAN NATURAL GAS CO.), Cairo, Egypt March 2001 - Present
INSTRUMENTATION & CONTROL ASSISTANT GENERAL MANAGER (June 2012 – Present)
 Oversee pre-commissioning, commissioning and start-up of the instrumentation and control
equipment related to gas reducing and metering stations in numerous GASCO projects from budget
estimation to service entry.
 Spearhead the commissioning & start-up of DOMIAT powerstation & KORIMAT solar power station
gas reducing and metering stations, as well as the engineering and commissioning & start-up of
ETHYDICO factory reducing& metering station to ensure completion within established timeline,
budget and quality standards.
 Initiate the upgrade the gas measurement systems to 9 power stations by adding complete gas quality
systems to each gas metering system.
 Key contributor to the engineering and construction of Reverse flow project between Jordan and
Egypt.
 Direct the preparation and revision of the material requisition specifications and detailed technical
studies for Instrumentation and control equipment.
 Key contributor to the endorsement of the Factory Acceptance Test (F.A.T.) and Site Acceptance Test
(S.A.T.), and continuously achieve all ISO 9001 Quality standards.
 Strategic stakeholder actively involved in the preparation of the country-wide Gas Networks code
(related to gas measurements, gas quality and gas quantities balance).
 Revise and update company-wide general specifications for gas chromatograph, Uninterruptable
Power Supply units and Gas over oil actuators.
 Assess the fuel supply contract and operation / maintenance contract for DAIROUT power station to
ensure cost effectiveness and compliance with contractual agreements.
 Assigned to supply 3 gas reducing & metering stations to New Capital, BANISWEIF &
ELBURULLUS power stations (the biggest reducing / metering station in the world)
ALAA SOLIMAN Page 2
JORDANIAN EGYPTIAN FAJR, AMMAN, JORDAN (LOANED FROM GASCO)April 2005 – June 2012
INSTRUMENTATION & CONTROL DEPARTMENT MANAGER(April 2005-June 2012)
 Directed pre-commissioning, commissioning and start-up of complex gas metering stations, such as:
AQABA, SAMRA I &REHAB Power Stations, RASHADIA Cement Factory &AQABA City Gate gas
metering stations, Jordanian Syrian border temporary & permanent gas metering station, SAMRA II &
East Amman Power Stations & AQABA Power Station reduction / heating gas station.
 Key contributor to the instrumentation / control and project management from budget estimation,
preparing tender documents, reviewing vendor prints, technical evaluation phase for suppliers,
F.A.T., supervision on erection and mechanical completion phase then S.A.T. and service entry.
OPERATION DEPARTMENTMANAGER (Jan. 2010-June 2012)
 Spearheaded the pre-commissioning, commissioning, start-up and the Third Party Certification for the
natural gas measurement system to ensure compliance with company’s standards, HSE regulations,
design specifications and international quality standards.
 Initiated and developed tendering documents, including specifications and designs of natural gas
measurement systems to the gas metering stations.
 Coordinated all tasks related to gas measurement devices, gas regulator sizing, and instrumentation /
control process to ensure effective completion and within established standards.
 Forged solid relationships with vendors and clients to assure cost effectiveness and timely delivery
while reducing costs.
 Key contributor to the pre-commissioning, commissioning & Start-up of the Arab Gas Pipeline project
36" supplying natural gas to Jordan & its facilities (valve rooms, pig traps, metering stations & SCADA
systems).
 Instrumental leader in coordinating the ARAB GAS P/L extension to SYRIA (30 km 36" Pipeline) to
efficiently supply Egyptian natural gas to Syria.
 Championed the implementation and connection of the flow control units to FAJR customers in Jordan
by using SCADA.
 Directed the pre-commissioning, commissioning and start-up of the SAMRA III & QATRANH Power
Stations gas metering stations.
 Initiated the upgrade of all the PLC processors (MODICON) in the gas compressor station in AQABA,
valve rooms & gas metering stations retested (38 PLC processors).
 Monitored equipment performance by introducing checklists for gas metering stations, valve rooms
and SCADA system related to FAJR facilities.
 Acted as the FAJR operation and maintenance contractor to assure supply of agreed gas quantities to
FAJR customers.
 Played a key role in the preparation of yearly balance quantities & settlements forms for the gas
supplier and FAJR clients.
SENIOR INSTRUMENTATION & CONTROL ENGINEER, (March 2001-April 2005)
 Spearheaded the upgrade of 22 gas stations & 64 Valve Rooms to replace old equipment and to
streamline operational efficiency of the gas power stations.
Earlier Career:
Design Engineer, City Gas Company, Cairo, Egypt, April 2000 – March 2001
EDUCATION &CREDENTIALS
BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING, Ain Shams University, Cairo, Egypt, May 1999
Natural Gas Flow Metrology, VSL / NMI, Metrology Institute in Holland, Cairo
MANTURBO Gas Turbines (THM 1304-10), MANTURBO – AQABA JORDAN, 2008
Ultrasonic gas meter, flow computers, gas chromatograph, ELSTER-INSTROMET, 2008
OMNI flow computer& Allen Bradley PLC, PETROGAS Holland, 2003
AutoCAD 2000, American university in Cairo, 2001

More Related Content

What's hot

Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017martin fuentes
 
Intergrated Rice Plant Progress 2013
Intergrated Rice Plant Progress 2013 Intergrated Rice Plant Progress 2013
Intergrated Rice Plant Progress 2013 M Abid Latif
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCkhursheed aiam
 
Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Brandon Rhodes
 
Resume dennis r. barrick 3-18-2018
Resume   dennis r. barrick 3-18-2018Resume   dennis r. barrick 3-18-2018
Resume dennis r. barrick 3-18-2018Dennis Barrick
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBabu K
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio datakalathil716
 
Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resumeUmang Tailor
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resumeArun Goyle
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 

What's hot (19)

Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017Martin fuentes .doc Jan 2017
Martin fuentes .doc Jan 2017
 
Intergrated Rice Plant Progress 2013
Intergrated Rice Plant Progress 2013 Intergrated Rice Plant Progress 2013
Intergrated Rice Plant Progress 2013
 
Gopa 16 Aug 2016
Gopa 16 Aug 2016Gopa 16 Aug 2016
Gopa 16 Aug 2016
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015
 
CV.SMK
CV.SMKCV.SMK
CV.SMK
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
Kailash cv
Kailash cvKailash cv
Kailash cv
 
Resume dennis r. barrick 3-18-2018
Resume   dennis r. barrick 3-18-2018Resume   dennis r. barrick 3-18-2018
Resume dennis r. barrick 3-18-2018
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
 
Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resume
 
Tabrez
TabrezTabrez
Tabrez
 
CV
CVCV
CV
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 

Similar to alaa soliman cv

Similar to alaa soliman cv (20)

Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resume
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resume
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
adrian cv
adrian cvadrian cv
adrian cv
 
Haitham Sayed C.V
Haitham Sayed C.VHaitham Sayed C.V
Haitham Sayed C.V
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
EHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEHAB GAMEEL LAMEE
EHAB GAMEEL LAMEE
 
Senior Process Engineer, Sep
Senior Process  Engineer, SepSenior Process  Engineer, Sep
Senior Process Engineer, Sep
 
Instrument & Control Engineer
Instrument & Control Engineer Instrument & Control Engineer
Instrument & Control Engineer
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 
Resume Shahid
Resume ShahidResume Shahid
Resume Shahid
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 

alaa soliman cv

  • 1. ALAA ELDIEN MOTAWE SOLIMAN MADINATY Group 61, Bl. 3, Ap. 31, Cairo, Egypt +20112339558  alaamotawea1976@gmail.com ENGINEERING, OPERATION TEAM LEADER 16+ years’ success leading engineering innovation for high-growth organizations Results oriented Instrumentation and Control Assistant Manager with over 16 years of experience directing pre-commissioning, commissioning and startup of the instrumentation and control systems to gas reducing and metering stations in Egypt and Jordan. Skilled professional in coordinating maintenance operations, calibrating instruments and performing quality control inspections. Solid expertise in engineering design, quality planning, safety planning, reporting and budget management. Ability to develop and implement feasible timelines and budgets, and effectively lead cross-functional teams through strategic leadership and outstanding problem solving skills. Excellent business communication, organisational and interpersonal skills, with the capacity to increase productivity and profit margins in a fast paced, dynamic environment. HIGHLIGHTS OF EXPERTISE ⦁ Strategic Planning & Execution ⦁ Instrumentation & Control Engineering ⦁ Construction Management ⦁ Project Management ⦁ Operations Management ⦁ Risk Identification & Mitigation ⦁ Process Improvements ⦁ Strategic Leadership ⦁ Ability to Influence ⦁ Staff Management & Training ⦁ Client & Vendor Management ⦁ Contract Management ⦁ Business Development ⦁ HSE & QC Planning ⦁ Budget Management ⦁ Advanced Problem Solving ⦁ Relationship Building ⦁ AutoCAD ⦁ MS Office & MS Project CAREER EXPERIENCE GASCO (EGYPTIAN NATURAL GAS CO.), Cairo, Egypt March 2001 - Present INSTRUMENTATION & CONTROL ASSISTANT GENERAL MANAGER (June 2012 – Present)  Oversee pre-commissioning, commissioning and start-up of the instrumentation and control equipment related to gas reducing and metering stations in numerous GASCO projects from budget estimation to service entry.  Spearhead the commissioning & start-up of DOMIAT powerstation & KORIMAT solar power station gas reducing and metering stations, as well as the engineering and commissioning & start-up of ETHYDICO factory reducing& metering station to ensure completion within established timeline, budget and quality standards.  Initiate the upgrade the gas measurement systems to 9 power stations by adding complete gas quality systems to each gas metering system.  Key contributor to the engineering and construction of Reverse flow project between Jordan and Egypt.  Direct the preparation and revision of the material requisition specifications and detailed technical studies for Instrumentation and control equipment.  Key contributor to the endorsement of the Factory Acceptance Test (F.A.T.) and Site Acceptance Test (S.A.T.), and continuously achieve all ISO 9001 Quality standards.  Strategic stakeholder actively involved in the preparation of the country-wide Gas Networks code (related to gas measurements, gas quality and gas quantities balance).  Revise and update company-wide general specifications for gas chromatograph, Uninterruptable Power Supply units and Gas over oil actuators.  Assess the fuel supply contract and operation / maintenance contract for DAIROUT power station to ensure cost effectiveness and compliance with contractual agreements.  Assigned to supply 3 gas reducing & metering stations to New Capital, BANISWEIF & ELBURULLUS power stations (the biggest reducing / metering station in the world)
  • 2. ALAA SOLIMAN Page 2 JORDANIAN EGYPTIAN FAJR, AMMAN, JORDAN (LOANED FROM GASCO)April 2005 – June 2012 INSTRUMENTATION & CONTROL DEPARTMENT MANAGER(April 2005-June 2012)  Directed pre-commissioning, commissioning and start-up of complex gas metering stations, such as: AQABA, SAMRA I &REHAB Power Stations, RASHADIA Cement Factory &AQABA City Gate gas metering stations, Jordanian Syrian border temporary & permanent gas metering station, SAMRA II & East Amman Power Stations & AQABA Power Station reduction / heating gas station.  Key contributor to the instrumentation / control and project management from budget estimation, preparing tender documents, reviewing vendor prints, technical evaluation phase for suppliers, F.A.T., supervision on erection and mechanical completion phase then S.A.T. and service entry. OPERATION DEPARTMENTMANAGER (Jan. 2010-June 2012)  Spearheaded the pre-commissioning, commissioning, start-up and the Third Party Certification for the natural gas measurement system to ensure compliance with company’s standards, HSE regulations, design specifications and international quality standards.  Initiated and developed tendering documents, including specifications and designs of natural gas measurement systems to the gas metering stations.  Coordinated all tasks related to gas measurement devices, gas regulator sizing, and instrumentation / control process to ensure effective completion and within established standards.  Forged solid relationships with vendors and clients to assure cost effectiveness and timely delivery while reducing costs.  Key contributor to the pre-commissioning, commissioning & Start-up of the Arab Gas Pipeline project 36" supplying natural gas to Jordan & its facilities (valve rooms, pig traps, metering stations & SCADA systems).  Instrumental leader in coordinating the ARAB GAS P/L extension to SYRIA (30 km 36" Pipeline) to efficiently supply Egyptian natural gas to Syria.  Championed the implementation and connection of the flow control units to FAJR customers in Jordan by using SCADA.  Directed the pre-commissioning, commissioning and start-up of the SAMRA III & QATRANH Power Stations gas metering stations.  Initiated the upgrade of all the PLC processors (MODICON) in the gas compressor station in AQABA, valve rooms & gas metering stations retested (38 PLC processors).  Monitored equipment performance by introducing checklists for gas metering stations, valve rooms and SCADA system related to FAJR facilities.  Acted as the FAJR operation and maintenance contractor to assure supply of agreed gas quantities to FAJR customers.  Played a key role in the preparation of yearly balance quantities & settlements forms for the gas supplier and FAJR clients. SENIOR INSTRUMENTATION & CONTROL ENGINEER, (March 2001-April 2005)  Spearheaded the upgrade of 22 gas stations & 64 Valve Rooms to replace old equipment and to streamline operational efficiency of the gas power stations. Earlier Career: Design Engineer, City Gas Company, Cairo, Egypt, April 2000 – March 2001 EDUCATION &CREDENTIALS BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING, Ain Shams University, Cairo, Egypt, May 1999 Natural Gas Flow Metrology, VSL / NMI, Metrology Institute in Holland, Cairo MANTURBO Gas Turbines (THM 1304-10), MANTURBO – AQABA JORDAN, 2008 Ultrasonic gas meter, flow computers, gas chromatograph, ELSTER-INSTROMET, 2008 OMNI flow computer& Allen Bradley PLC, PETROGAS Holland, 2003 AutoCAD 2000, American university in Cairo, 2001