1. CURRICULUM VITAE
1. Family name: DAKMAN
2. First names: HAMZA
3. Date of birth: 01.09.1969
4. Nationality: Turkish
5. Civil status: Married
6. Education:
Institution
[ Date from - Date to ]
Degree(s) or Diploma(s) obtained:
1984 - 1987 Yıldırım Beyazıt Lycee – Ankara – Turkey
1987 - 1993 BS Environmental Engineering Department
Middle East Technical University – Ankara - Turkey
7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic)
Language Reading Speaking Writing
Turkish (Mother Tongue) 1 1 1
English 1 1 1
Russian - 5 -
French 3 5 5
Arabic - 5 -
8. Membership of professional bodies:
Chamber of Environmental Engineers, Alumni Society of METU
9. Other skills:
Ms Office Programs (Word, Excel, Powerpoint, MsProject etc.) Autocad 2010, Intellicad2000,
Adobeacrobat
ATV131 and Hydromantis Package Programs For Water & WW Treatment Systems, Noise & Air
Pollution Modelling Programs etc.
10. Present position: Environmental Projects Group Manager
11. Years within the firm: 9 months
12. Key qualifications :
Management of Site Activities and Technical Office (Design Works, Work Shedule and
Contract) :
Management of the projects from the tender stage to the execution stage. Preparation of all
financial and technical studies of the tender files.
Detailed design of both drinking water, wastewater treatment plants, hydraulic structures, pumping
stations, water transmission lines. Hydraulic Calculations of Water and Wastewater Treatment
Plants (technical office management).
Page 1 of 6
2. The preparation of execution plans and drawings of the treatment plants for both civil and electro-
mechanical works of treatment plants, hydraulic structures, pumping stations, water networks
(technical
The financial and contractual follow up of the projects according to the FIDIC Red and Yellow
Books.
Preparation and controlling of tender specification files of the international projects. Preparation of
preliminary, execution and as-built drawings. Follow up and implementation of document control
system.
Preparation (financial offers by making analysis, unit price analysis) and coordination of
international projects ranging from construction (infrastructure projects) to consultancy-controlling.
Cost control calculation, quantity survey and preparation and follow up of monthly interim payment
certificates.
Preparation, follow up and built up of the works schedule, claims and site activities as per the
contract in accordance with FIDIC.
Design and construction of Sanitary Landfill Projects According to the Solid Waste Disposal
Specifications and Legislations, Preparation of EIA Reports.
Design of Water - Sewer Networks, Pumping Stations, Hydraulic Strcutures Projects by using
packing programs.
Coordination and management of relations between the Contractor, Engineer and the Client
Management of multinational (in multinational groups) water, wastewater treatment plants, water
transmission lines and hydraulic structures in Algeria, Egypt and Turkey starting from stages of
tender, design, execution and to final acceptance stages of the projects.
Direction and coordination of Solid Waste Projects such as Bilecik Integrated Solid Waste Project,
Söke Integrated Solid Waste Project. Selection of the processes and technologies for handling of
packing material and organic waste digesters (energy production and composting).
13. Specific experience in the region:
Country Date from – Date to
Russia 1993 – 1994
Algeria 2004 - to 2008
Egypt 2008 - to 2011
Turkey 2011 – to date
Libya 2014 – 2015
Pakistan 2016 – to date
Page 2 of 6
3. 14. Professional experience:
Date from -
Date to
Location Company Position Description
May 2015 – to
date
Ankara –
Turkey
Koltek
Consultancy
Co.
Environmental
Projects Group
Manager
- Project Coordinator – The Master Plan, The Construction Projects and The
Tender File Preparation of Flood Protection in Nilüfer Creek and Sub
Creeks Residential Areas, Koltek – Yaşlıoğlu Consortium, (L= 270 km total
length), BUSKI
- Project Manager – Adapazarı (Ballıkaya) Drinking Water Treatment Plant
Executions Design Project (540 000 m3/day) , DSI
- Project Manager – Water Supply and Transmission Lines Project in
Aydın – Nazilli and Surroundings Residential Areas , DSI,
- Water Supply Expert (Iraq – World Bank)
Project Name : AL-Naser-Emergency Water Supply Project
Project No: P 094650-C11
Cilent : Ministry of Municipalities and Public Works / Bagdad / Iraq
Invoice No: 2015/03
Date of Invoice: 9.5.2015
- Water Supply and Treatment Expert (Lahor – Pakistan)
Client : Punjub Saaf Pani Company
Project Name : Contract For Engineering Management Consultancy
Services : Package – 6 Multan, Pakpattan, Khanewal, Vehari and Jhang
JV of NDC(National Development Consultant (Pvt) Ltd.) - Quality
Engineering & Consultancy Services(QECS) - KOL TEK Consulting
Engineers, Turkey
January 2014 –
May 2015
Ankara –
Turkey
Libya
Algeria
Dakman
Construction
and
Engineering
Managing
Director
Construction Consultancy and Design Works :
-Tosya WWTP – 15000 m3/day (İlbank) – Construction, Erection and
Operation Works,
- Pazarcık – Narlı WWTP – 15 000 m3/day (İlbank) – Design, Construction,
Erection Works,
- Al Qwasam – Libya Infrastructure Desgin Works (Roads, Sewer Network,
Storm Water Network, Drinking Water Network) as per AECOM Standards
- Consultancy for Infrastructure Projects (Algeria)
2012 October -
2013 December
Ankara –
Erzurum -
Turkey
HGG İnşaat
Sanayi ve Ltd.
Şti.
Project
Coordinator – Site
Manager
Construction of WWTP and Wastewater Collectors Including Creek
Rehabilitation Project
Erzurum 54 000 m3/day HOCHTIEF – HGG JV FIDIC Red Book Contract
Management, Site Management, Cost Control, Design Applications, Work
Schedule, Preparation of Variation Orders, Claims
Relations between Partner (Hochtief, Engineer (MWH – Yüksel JV), Sub-
Contractors, Municipality, Ministry of Environment and Housing (IPA)
2012 January –
2012 October
İstanbul -
Turkey
Hexagon
Solid
Waste
Project
Development
Director
Bilecik Integrated Solid Waste Management Plants Technical Design and
Construction Director,
Söke Integrated Solid Waste Management Plants Technical Design and
Construction Director
4. 2008 June -2011
October 2008
Alexandria -
Egypt
Degremont SA. Project Manager
(Civil and Electro-
Mech.
Works)
Alexandria East WWTP Rehabilitation and Secondary Treatment Extension
Project (2008) with DEGREMONT SA – ARAB CONTRACTORS –
120 000 000 Euro (1 000 000 m3/day - max) - Alexandria - EGYPT
March 2007 -
June 2008
Algeria MAPA
Construction
and Trade Inc.
Project Manager
(Civil Works)
Lot3.1 Sidi Lahjel Water Treatment Plant Construction (2006 – 80 000 000
Euro) MAPA -DEGREMONT SA Consortium
(560 000 m3/day) Mostaganem-Algeria
January 2006 -
March 2007
Ankara -
Turkey
Mostaganem
- Algeria
MAPA
Construction
and Trade Inc.
Project
Coordinator
MAO Water Treatment Constr. (2006 – 80 000 000 Euro) MAPA -
DEGREMONT SA Consortium
(560 000 m3/day)- Mostaganem-Alger; Coordination of all Technical,
Administrative and Civil Works of MAPA.
Page 1 of 6
5. June 2004 -
March 2006
Ankara –
Tukey
Algeria
MAPA
Construction and
Trade Inc.
Bussiness
Development -
Tender Prep.
1-Tichi-Haf Water Treatment Plant Construction Tender File and Concept
Design (120 000 m3/day)-Algeria ;
2-MAO Water Treatment Construction Tender and Concept Desing
(2006)(560 000 m3/day)- Algeria;
3-ORAN Wastewater Treatment Plant Project Tender and Concept Design
(270 000 m3/day)-Algeria;
4- Souf Valley LOT 1-Wastewater Collection Network and WWTP Project
Tender-Algeria
5- KOUDIAT ACERDOUNE Water Supply and Water Treatment Plant
Tender (207 000 m3/day)-Algeria
May 2001 -
June 2004
Ankara -
Turkey
SIMAS Ltd. Co. Project Manager –
Tender Prep.
1-Malatya Waste Water TP Tender Drawings and Tender File Prep. ;
2-Erzurum(940 000 PE) Water TP BOT Concept Design;
3-Upgrading of Chirita-Romania Water TP Tender File and Financial
Proposal;
4- Eskişehir Potable Water Project Tender File and Financial Proposal;
5- Rehabilitation and Extension of Water Distribution and Sewerage Networks
in the Cluj-Napoca Conurbation – Romania Proposal;
6-Ceylanpınar (44 000 PE) Waste Water TP Design;
7- Konya WW Treatment Plant Projects Tender File and Financial Proposal ;
8- Mersin Waste Water Project (Treatment Plant and Sea Outfall) Tender File
and Financial Proposal;
9- SE / 67 Expansion , Upgrade, Operation and Maintenance of Jahra STP –
Kuwait Financial Proposal;
10- SE / 63 Kuwait Sewerage Improvements Proposal;
11 - Sewerage Extension and Completion of Rosiori Main Sewer in Braila
Tender File and Financial Proposal;
12-International Tender Preparations: According to FIDIC, ISPA, EBRD,
WORLD BANK and KFW Norms : Russia, Romania, Bulgaria, Poland, Syria,
Iraq, Saudi Arabia, Kuwait, Gulf Region, Pakistan,
1997 - 2001 Ankara -
Turkey
EKOTEK
Construction,
Industry Ltd.
Design Engineer 1-WW Package Treatment Plants (Seaside Region- Turkey);
2- Drinking Water Treatment Plants Detailed Design: Tonya (28 000 PE)
Türkelli (29 000 PE);
3- WW TPs Detailed Design; Çınarcık (22 000 PE), Esenköy (12 500 PE)
4- Waste Water TP Detailed Design Akköy (3 000 PE);
5- WWTP Detailed Design Göcek (80 000 PE),
6-Treatment Plant Mechanical Equipment Design
1996-1997 Ankara TEMPO
Infrastructure Ltd.
Design Engineer 1-Water and Sewer Network Design,
2-Solid Waste Disposal Plant Detailed Design (Didim 37500 PE),
3- Environmental Impact Assessment Reports Preparation (Petrochemical
Complex in Yumurtalık-Turkey, Marina-Holiday Villages, Quarries and
Cement Industries)
Page 2 of 6
6. 1994-1996 İstanbul -
Turkey
Reserve Officer Military Service
1993-1994
Samara-
Russia
TEKFEN
Construction Co.
Site Engineer
Site Engineer - Treatment Plant & Sewer System Construction in Military
Residence Complex
Page 3 of 6
7. 15. Other relevant information (eg, Publications)
16. Contact information
Address (Turkey) :
Yaşamkent Mahallesi 3151 Sok. No:10A / 18
Yenimahalle -Ankara
TURKEY
Mobile : 0090 533 638 7348
e-mail : hamzadakman@yahoo.com
References :
1 - Hassan Ghazanfari (Suez Environment – Degremont Director Project Execution
International)
e-mail : abolhassan.ghazanfari@degremont.com
mobile : + 33 6 80 34 63 91
2- Saim Güriş (MNG Holding - Vice President)
e-mal : saimguris@mng.com.tr
mobile : +90 612 1452
3- Nicola Collela (Salini – Impregilo - Business Development Turkey)
e-mail : nicola.colella@impregilo.com.tr
mobile : +90 530 613 0067