1. CURRICULUM VITAE OF PHILIP KEELEY
Nationality: Australian, Canadian Citizen
Mailing Address: 11 Shawbrooke Cir SW, Calgary, Alberta, Canada T2Y 2Y4
Qualifications: Certificate in Mechanical/ Structural Engineering Drafting- W. A.
Contact No.: Home: (403)212-0736 Mobile (587)893-3888
Email Address: p_keeley@yahoo.ca
OCT’13-NOV’14 AMEC – Calgary, Alberta, Canada
Position: Senior Structural Checker
Project: CNRL Froth Treatment Plant Train 2
Duties:Responsibilities checking and assist with mentoring junior designers on PDS Framewoks,
Microstation and Autocad..
JUN’11-OCT’13 AMEC – Calgary, Alberta, Canada
Position: Senior Structural Checker
Project: Syncrude Plant 122-MFT Centrifuging Full Scale Plant
Duties: Responsibilities include piling and foundation modeling and drawing extraction, pile reporting
and checking, steelwork modeling and drawing extraction, mto reporting and checking. Assist
with mentoring junior designers on PDS Framewoks, Microstation and Autocad.
FEB’10-MAY’11 AMEC/SHINKI – Seoul, Korea
Position: Structural Coordinator/Planning and Scheduling
Project: Kearl Oilsands Initial Phase
Duties: Site Assignment to Seoul, Korea for the Kearl Oilsands Project for ‘Gap Emgineering’
deliverables out of local EPC design office. This gap engineering includes connection detail
design and calculations for module fabrication out of Ulsan, Korea. The role includes but not
limited to review of connection sketches and calculations, making sure deliverables are meeting
schedule, answering EPC generated RFI’s, IFC drawing review and clarifications, squad
checking and review of PDS 3D models for consistency with IFC drawings. Answering
fabrication questions and clarifications. Coordinating and addressing issues raised between
Korean fabrication and North American fabrication. Involved with planning and scheduling to
ensure contractor is meeting project milestones and deliverables.
JUL’09 – JAN’10 AMEC – Calgary, Alberta, Canada
Position: Senior Designer/Checker
Project: Kearl Oilsands Project Phase 1
Duties: Site Wide Area designer looking after standards and also checking in the froth treatment area
MAY’08 – MAR’09 FLUOR CANADA – Calgary, Alberta, Canada
Position: Senior Coordinator/Planning and Scheduling
Project: KNPC New Refinery Project – Al Zour, Kuwait
Duties: To help our GEC office get setup and become familiar with the project standards and document
specifications for their scope of works, together with a review of their manhour estimate and
schedule to ensure that the deliverables meet the project standards and specifications.
1
2. APR’ 07- APRIL’08 FLUOR CANADA – Calgary, Alberta, Canada
Position: Lead Civil/Structural Design Supervisor
Project: Total E&P Canada Ltd. Athabasca Upgrader Project
Duties: Responsible for the preparation of standard drawings and eventually the man-hour summaries,
development and monitoring of schedules, effort-hours and staffing together with the material
quantity take-off(architectural, civil, concrete, fireproofing and structural steel) to plus or minus
30% and then 15% for the Feed phase 2 and 3 of this project.
FEB’ 06- APR’07 FLUOR CANADA – Calgary, Alberta, Canada
Position: Civil/Structural PDS Lead Design Supervisor
Project: Saudi International Petro-Chemicals (Sipchem) Jubail Acetyls Complex (JAC) Project
Duties: Responsible for the preparation of standard drawings and man-hour summaries, development
and monitoring of schedules, effort-hours and staffing together with the material quantity take-
off(architectural, civil, concrete, fireproofing and structural steel) for the Acetic Acid (AA) plant
which is one of three units of the Sipchem project. To encourage designers to become familiar
with and to use CSA KOL as much as possible.
JULY’ 05- FEB’ 06 BANTREL – Calgary, Alberta, Canada
Position: Senior Civil/Structural Autoplant/Rebis Specialist
Project: Petro Canada RCP 1.1 Expansion Project
Duties: Responsible for the Main East/West piperack, including 3D steel modeling and drawing
extraction. Playing a lead role for other designers on the project.
JUNE’ 04- JUNE’ 05 FLUOR CANADA – Calgary, Alberta, Canada
Position: Senior Civil/Structural PDS Design/Checker Specialist
Project: Opti Canada Long Lake Upgrader Project
Duties: Responsibilities include but not limited to piling and foundation modeling and drawing
extraction, pile reporting and checking, steelwork modeling and drawing extraction, mto
reporting and checking in the utilities and offsite area. Playing a lead supervising role of
other designers in their work execution.
DEC’ 03- MAY’ 04 JACOBS ENGINEERING INC – Calgary, Alberta, Canada
Position: Senior Civil/Structural PDS Designer/Checker Specialist
Project: Saudi Aramco Ju’aymah NGL Fractionation Gas Plant Capacity Increase Project
Duties: To provide an estimate of tonnage of steel and volume of concrete for the bid phase of this
expansion project along with paving and undergrounds. Debottlenecking of existing modules to
also increase capacity.
2
3. NOV’ 01- SEPT’ 03 FLUOR/SNC LAVALIN – Calgary, Alberta, Canada
Position: Senior Lead Civil/Structural PDS Designer Specialist
Project: Syncrude Upgrading Expansion Syncrude Canada Ltd.
(UE-1) Project - EPC Phase Mildred Lake Site
Plant Expansion to 350K BPD Fort McMurray, Alberta
of Syncrude Sweet Blend(SSB)
(Nov. 2000 – Dec 2004)
This is a project valued in excess of $3 billion Cdn. that will increase the capacity of Syncrude’s
existing oil sands extraction and upgrader by 30%. Multi-company integrated task force
responsible for the project definition and associated cost and scheduling required to obtain
project sanction from the owners.
Duties: Responsible for the East/West and North/South piperacks in area 18-2 of the SSB
plant(Syncrude Sweet Blend). Responsibilties include piling and foundation modeling and
drawing extraction, pile reporting and checking, steelwork modeling and drawing extraction, mto
reporting and checking. Supervising other designers in their work execution and acting
as a lead supervisor. Ref: J. Burton (403)537-5303, K. McLean (403)294-2538.
JUNE’01-NOV’01 TIGA JOINT VENTURE(FLUOR DANIEL/WORLEY) – Perth, Australia
Position: Senior Structural PDS Designer
Project: Bayu Undan Gas Recycle Development Project
Duties: Structural frameworks PDS modeling and drawing extraction of secondary and tertiary steelwork
on the cellar and mezzanine decks for the CUQ platform and pipe supports for all of the DPP
platform. Also involved with checking.
JAN’ 01-MAY’01 AUSENCO – Perth, Australia
Position: Structural Design Draftsman
Projects: Chatree Gold Project
Duties: Civil and Structural design drawings using Autocad 2000
AUG’ 00-DEC’00 MINPROC – Perth, Australia
Position: Structural Design Draftsman
Projects: Murrin Murrin, MesaJ
Duties: Complete structural packages for the above projects using Autocad R14.
APR’ 99- JAN' 2000 FLUOR DANIEL- Manila, Philippines
Position: PDS(Plant Design System) Structural Site Construction Support.
Projects: P&G Cabuyao Granules Project.
Duties: To manage the civil/structural task of completing all outstanding PDS modeling on the
Cabuyao Granules Project and to give support and guidance to construction personnel at
the jobsite. To assist in checking fabrication drawings and to implement any design changes
and/or corrections to engineering details where it deemed necessary. To assist the
construction supervisors on the civil and structural content of the project.
3
4. AUG’ 98- APR’ 99 OVE ARUP –Manila, Philippines
Position: PDS Coordinator and Project Coordinator.
Projects: P&G Cabuyao Granules Project, Shell Malampaya CGS Offshore Oil Project.
Duties: To access the PDS setup as it was and to put forward any recommendations that might
enhance the future use of PDS within the office. In particular interest was the setup and
modeling technique of the users in Frameworks on the Cabuyao Granules Project.
Lead Civil/Structural design supervisor and coordinator on the Cabuyao Granules
Project responsible for supervising a number of engineers and PDS designers in
the execution of the structural content of the project. Liaisoning with construction, fabrication
and other outside consultants on the project. Troubleshooting any problems designers have
with regards to Frameworks and implementing any new enhancements to better
execute future projects using Frameworks. Preliminary layout and design of the concrete gravity
structure and top side
platform for the Shell Malampaya pil project in the Philippines.
JUN’ 96- AUG’98 FLUOR DANIEL- Manila, Philippines
Position: PDS Coordinator, Civil/ Structural DAS(Discipline Application Specialist). Intergraph PDS
System using Equipment Modeling, Frameworks, Microstation Modeler and Design Review,
Autocad
Projects: Air Products Air Separation Plant (Thailand), Batu Hijau Project (Indonesia), Oil Project
(Houston).
Duties: PDS Coordinator for the air Products Air Separation Project. Coordinating a team of piping
and structural designers using Intergraph PDS System. Civil/ Structural DAS on the Batu
Hijau project, conducting Frameworks training courses for those new hires who
were about to joint the batu Hijau project. Troubleshooting any problems designers have with
regards to Frameworks and to implement a set of standard modeling procedures and
practices that became the office standard for any future projects. Conducted in-house
Frameworks training courses for all new employees. Liaison with other Fluor Daniel Office
with regards to Frameworks and any new developments that would enhance our
Frameworks capabilities.
APR’ 93- JUN ’96 FLUOR DANIEL- Perth, Australia
Position: Civil/ Structural/ Mechanical CAD system on Microstation and Autocad, Intergraph PDS System
using Equipment Modeling, Modeldraft, Frameworks and Design Review. Inroads Civil Design
Software Packages. Xsteel Packages. Xsteel Shop detailing package.
Project: Yarrie Iron Ore Mine, Marandoo JV, Paraburdoo Fines Processing Plant, Yandi Rail Design,
Raub Gold Feasibility Study, Lurgi Mineral Sands Project, BHPDRI Project.
Duties: Producing structural steelwork and concrete drawings together with 3D-model layout of
various mine sites. Civil layouts for roads and railway work for Yarrie, Marandoo and
Yandi Iron Ore Mines with earthwork quantities using Inroads. Plant conceptual layout work on
feasibility studies. Past 18 months involved with PDS (plant design system) using
Piping Design, Equipment Modeling, Modeldraft, Frameworks and Design Review.
Spent from November ’95 to February ’96 in Fluor Daniel office Manila job sharing
on a project for BHPDRI. Position was a CAD design coordinator and drafting
supervisor for the local draftsmen to a standard acceptable to our client (BHP).
JULY ‘92- MAR ’93 MINENCO- Perth, Australia
Position: Design draftsman on Microstation and Autocad
Project: Low grade tip head modifications for Hamersley Iron.
Duties: Mechanical design modifications to various areas of the plant.
4
5. AUG ‘91- MAR ’92 WOOD & GRIEVE- Perth, Australia
Position: Senior Design draftsman on Microstation and Autocad.
Project: St. George Medical complex- Sydney.
Duties: Concrete drawings of prestessed beams, concrete columns, slabs, lift cores, edge beams
typical of high rise structures. Structural steelwork design drawings.
OCT ‘ 90- JUL ’91 SIGNET ENGINEERING- Perth, Australia
Position: Senior Mechanical Design draftsman on Microstation and Autocad.
Project: Gunung Ponkgor Project, Argyle Alluvial HMS Replacement.
Duties: Mechanical general arrangement drawings, structural and civil design engineering drawings
for mine crushing station.
APR ‘90- SEPT ’90 DAVY/ MINENCO JOINT VENTURE- Perth, Australia
Position: Senior Plant layout coordinating draftsmen on Microstation and Autocad.
Project: Hismelt Project
Duties: Layout of plant and equipment in all areas of the plant for conceptual design before final design.
3D plant design layout.
JAN ‘90- APR ’90 MINPROC- Perth, Australia
Position: Civil/ Structural Design Draftsman
Project: Agip Nickel Project
Duties: Preparation of structural drawings in liaison with mechanical draftsmen on the Smelting and
Precipitation facility of the project.
OCT ‘89- JAN ’90 C&C DRAFTING- Perth, Australia
Position: Structural Draftsman
Duties: Preparation of shop detail drawings and checking.
MAR ‘87- OCT ’89 EXEARNE PTY LTD- Perth, Australia
Position: Civil/ Structural/ Mechanical design draftsman on Microstation and Autocad.
Project: Ranger, Mt. Morgans, Haveluck, Mt. Fisher, Labourchere, Matilda GP’s, Mt. Gibson 1.1
MTPA, Cork Tree Well, Telfer Fine Ore Bin Upgrade, Waroona Wet Plant Design,
Dralot Crusher Design, Lawlers Crushing Plant, Atlas Milling foundations, GPM shop detailing.
Duties: Section leader on the above mentioned project together with checking. Shop detailing of chutes
and steelwork. Some site supervision of concrete pours and steelwork erection on some of the
above projects.
MAR ‘86- MAR ’87 LYCOPODIUM PTY LTD- Perth, Australia
Position: Civil/ Structural design draftsman
Project: TC8, Youanmi, Mt. Wilkinson, Andacollo, Pine Creek GP’s
Duties: Prepare civil and structural design drawings on the above projects. Checking of shop drawings
associated with these projects and liaisons with shop fabricators for preparation of packages.
Some site steelwork erection supervision.
JULY ‘85- MAR’ 86 GRAPHICS TECHNOLOGY PTY LTD- Perth, Australia
Position: Design draftsman- Intergraph PDP11 CAD System
Projects: Westonia, Cork Tree Well GP’s.
5
6. Duties: Primary crushing chamber, fine ore bin concrete and steelwork layout and details. Shop detail
drawings for Woodside project. Various commercial projects. Some site steelwork
supervision.
MAY ‘84- JULY ’85 LYCOPODIUM PTY LTD- Perth, Australia
Position: Design draftsman.
Projects: Nevoria, Kia- Ora, Great Vistoria GP’s, cork Tree Well and Meekatharra GP Upgrades
Duties: Responsible for all concrete and steelwork layouts and details and all civil earthworks for
above projects. Checking of design drawings. Conveyor arrangement and detail design
drawings. Some site steelwork erection supervision.
NOV ‘83- MAY ’84 MINENCO- Perth, Australia
Position: Design draftsman
Projects: Argyle Diamond Mine
Duties: Substations, secondary crushing concrete layout. Conveyor arrangement and detail design
drawings. Concrete detail design drawings.
AUG ‘83- OCT’ 83 GUTTERIDGE HASKINS AND DAVEY- Darwin, Australia
Position: Senior design draftsman
Duties: Subdivisions, roads, drainage, sewerage and water services layout.
APR ‘82- APR ’83 CMPS PTY LTD- Brisbane, Australia
Position: Senior Design Draftsman
Projects: Blair Athol Coal Project
Duties: Concrete and steelwork layout and detail drawings of secondary crushing station. Checking of
concrete and steelwork drawings for mine facilities area.
AUG ‘81- APR ’82 KINHILL PTY LTD- Brisbane, Australia
Position: Senior Design draftsman
Project: Newlands Coal Project
Duties: Mine infrastructure layout and drainage. Office equipment and layout in mine building. Road
and drainage layout intersections and longitudinal cross sections. Concrete foundation
layout and reinforcement. Steel structures associated with mine facilities including transfer
stations, stack –out gantries and conveyor trusses.
JULY ‘81- AUG ’81 BORNHORST AND WARD- Brisbane, Australia
Position: Design Draftsman
Duties: Reinforced high rise concrete structures including prestressed floor slabs. Commercial buildings
such as units and townhouses.
APR ‘81- JUNE ’81 McDONALD WAGNER AND PRIDDLE- Brisbane, Australia
Position: Design draftsman
Duties: Reinforced concrete bridge diaphragms, bridge segments and heavy concrete foundations.
Bridge piping work. Architectural drafting of mine buildings.
FEB ‘81- MAR ’81 BHP- Brisbane, Australia
Position: Design draftsman.
Duties: Reinforced concrete culverts for mine area. Chute layouts and detail drawings for Groote
Eylandt Manganese Plant and associated pipework.
6
7. MAR ‘80- JAN ’81 KINNAIRD HILL deROHAN AND YOUNG- Perth, Australia
Position: Design draftsman
Projects: Alcoa Wagerup Alumina, Alcoa Kwinana
Duties: Overland conveyor layouts and support structures and details. Heavy reinforced concrete
foundations and slabs. Grain silo bins and associated piping and drainage layout and foundations.
Piping layout and steel supporting structures. Checking of shop drawings. Piping supporting
structures and piping into bauxite mill.
NOV ‘79- FEB ’80 CROOKS MICHELLE PEACOCK STEWART PTY LTD- Perth, Australia
Position: Design draftsman.
Duties: Conveyor layouts and take- up tower foundations and structures for Mt. Newman mining.
Timber conveyors and supports for Dampier Salt.
JAN ‘ 73- OCT ’79 PUBLIC WORKS DEPT. OF W.A.- Perth, Australia
Position: Design draftsman.
Duties: Engineering drawings of a multitude of concrete and steel structures. Heavy mining to light
commercial steel structures. Architectural drafting of steel structures.
FEB ‘72- DEC ’72 COMPLETE DRAFTING AND DESIGN SERVICES- Perth, Australia
Position: Detail Draftsman
Project: Shop detail drawings of heavy mining plants and material quantities. Small commercial
structures including schools and warehouses.
JUNE ‘71- JAN ’72 BOILER MANURFACTURERS- Perth, Australia
Position: Draftsman.
Duties: Shop detail drawings of various types of boilers such as steam and supersaturated steam
boilers.
7