Lt Col (R) Ehsan-ul-Haq has over 32 years of experience in civil engineering. He has worked on a variety of projects for the Pakistani military, Frontier Works Organization, National Logistic Cell, and as a consultant. Some of his areas of expertise include buildings, roads, bridges, public works, housing developments, and overhead bridges. He has an engineering education including a BSc in civil engineering and additional diplomas and training courses. He is a professional engineer registered with the Pakistan Engineering Council and a member of the Institution of Engineers Pakistan.
1. CURRICULUM VITAE
PERSONAL DATA
Name : Lt Col (R) Ehsan-ul-Haq
Father’s Name : Allah Ditta Khokhar
Date of Birth : November 10, 1955
Profession / Specialization : Civil Engineering
Experience : 1979- to-date
Domicile : Gujrat - Punjab
Postal Address : House No. 35-F, Street # 2,
Allama Iqbal Town, Gujranwala Cantt
Permanent Address : House No. 35-F, Street # 2,
Allama Iqbal Town, Gujranwala Cantt
Email Address : sapper58lc@gmail.com
Telephone Contact : 0300- 6473347(Mobile)
055-3865524 (Line)
ACADEMIC QUALIFICATION & RECORD
Engineering Education
Year Name of Institution
B.Sc (Civil Engineering) 1984 Military College of Engineering,
Risalpur
B.Sc (Hon) 1990 University of Baluchistan Quetta
Electrical Engieering Diploma 1976 Govt. College of Technology
Rawalpindi
Civil Engineering Diploma 1980 Military College of Engineering,
(basic Course) Risalpur
2. Training Courses (Civil)
Pakistan Staff Course (PSC) 1990 Command & Staff College,
Quetta
Pakistan Technical Staff Course 1991 College of Electrical &
(PtSC) Mechanical Engineering,
Rawalpindi
Officer Leadership Course 1989 School of Infantry and Tactics,
Quetta
Field Engineering Course &
Bomb Disposal Course 1987 Military College of Engineering,
Risalpur
Advance Traffic ability 1985 Military College of Engineering,
Risalpur
Work Shops & Short Courses
Civil Engineer Project Management 1996 Military College of Engineering,
Risalpur
Advance Civil Engineering Designing 1992 NUST Risalpur
Watercourse Design & Water 2002 NIPA Lahore
Management
AFFILIATION WITH PROFESSIONAL INSTITUTIONS
Professional Engineer - Pakistan Engineering Council
Member - Institution of Engineers Pakistan
LANGUAGES WITH PROFICIENCY
English / Urdu / Punjabi Excellent in speaking, reading and writing
PROFESSIONAL EXPERIENCE
June 1979-Feb 1981
Project Engineer
Mangla Cantonment
Assignments
- Construction / Improvement of existing / old accommodation
- Planning, estimation, and supervision of construction of Barracks, Offices, Officer
Mess and storage accommodation
3. - Projects monitoring, approval of contact documents, approval of bills of quantities
and monitoring physical progress of the projects of the following departments of
District Jehlum and Mirpur (A.K):-
Public Health Engineering Department
Building Department
Highways Department
District Council
Mar 1981 - Feb 1982
Project Officer
FWO (Kohala-Kulyari Hilly Road) & Causeway on Ussar Nalha
at Ifthikhar Abad (Azad Kashmir)
Assignments
- Detailed survey, estimation, preparation of project document.
- Planning and supervision of base-overhauling of road construction machinery like
dozers, graders, compressors, road rollers etc.
- Preparation and implementation of method statements for road pilot cuts, road
widening and structures of Azad Pattan - Kulliari Road Project.
- Construction supervision of road, culverts, causeways and bridges.
- The massive project was executed round the clock and completed in record time.
- Command of huge engineering staff.
June 1984 -Feb 1987
Project Engineer
Peshawar Cantonment
Assignments
- Detailed planning/ study of Traffic ability, tracks, airstrips, wet/ dry bridges and
demolition projects.
- Estimation and supervision of construction of roads, rigid and flaxible pavements in
Northern sector of Cantonments.
- Re carpeting of air strip in Khaiber sector.
- Construction of Anti-aircraft Bunkers along Afghanistan Border at Zero Line
- Re activation of water supply Scheme constructed after 2nd World war.
- Construction of Army Stadium at Peshawar cantonment.
- Construction of residential and storage accommodation at Border Line
Apr 1987- Dec 1989
Deputy Project Director
Headquarters ISI Islamabad
Assignments
- Monitoring / supervision of civil engineering projects at all Pakistan ISI Detachments.
- Supervision /Construction of Hi-Tech Projects (Under Foreign / Local Companies) at
Ojari Camp and Secret Locations.
- Planning, estimation, and supervision of construction of ISI Complex at Islamabad
- Command of huge Military Engineering Technical Staff.
4. Mar 1990 - May 1994
Project Manager
Kharian Cantonment
Assignments
Carpeting of Army air strip.
Construction supervision of Ditch cum Bund along Anti-aircraft bunkers
Water divining and installation of deep tube wells giving 10 cusec discharge
Construction supervision of Salinity Control and Subsurface Water Drainage System
of Cantonment
Planning, estimating and construction of Single Men Barracks, Officer Mess and
Firing Ranges at Bridging Camp
Jun 1994 - Oct 1997
Senior Deputy Project Director
Headquarters ISI Islamabad
Assignments
- Monitoring / supervision of Safe Houses construction at all Pakistan ISI Detachments
- Evaluation and Checking of Contractor’s IPCs for civil works
- Analysis of all civil woks weekly, monthly and quarterly progress reports
- Liaising with the Detachment Commander as necessary to complete civil works in
time
- Preparation of presentation to brief DG ISI on fortnightly on all civil Works
Nov 1997 - Oct 1999
Commanding Officer
Project of Frontier Works Organization- (FWO)
Shehzad Kot Sindh (M-8) Motorway Project & Nusrat & Akil Loop/Mole Bund
at Sind River & Dadu SCARP Projects
A joint Venture of:
NESPAK Consultants, Pakistan
Ali Akbar Associate Consultant (AA&C) Karachi
Assignments
- Construction supervision of Rigid carpeting road and civil structure works,
culverts, causeways and bridges
- Supervision of laying base and Pre Mix Carpeting of 62 Km length along with
TST shoulders
- Planning & execution of water supply project (Rs.400Million) at Yazman Mandi
- Supervision of completion works of stone pitching of Spurs, Loop/Mole Bund and
aprons near Larkana city at River Sindh
- Command of a huge Engineering staff( Military and Civil)
- Quantitative Survey and Measurement of Work done at site and scrutiny of
payments bills to the contractors
5. - Construction supervision of Salinity Control and Subsurface Water Drainage
System at Dadu SCARP Project
- Preparation of water inundation scheme along Hakra Canal for Defense purpose
- Supervision of De silting project of old bed of River Bias
Nov 1999 - Jul 2001
Corps Monitoring Officer
Gujranwala Cantonment
A joint Venture of:
PIDA Pakistan
National Highway Authority Pakistan NHA
Monitoring Team of Irrigation Department
Assignments
- Planning, Estimating and suspension of De-silting project executed by Pak Army of
Ravi Chenab River Basin canals
- Monitoring of all annual maintenance works of Qadirabad Barrage and Khanki
Headwork
- Supervision of repair works project of Khanki Headwork foundations
July 2001 to May 2008
Regional Engineer
Gujranwala Division
A joint venture of :
US AID Program
National Rural Support Program (NRSP) Pakistan
Assignments
- Planning and execution of community civil works infrastructure projects of
Gujranwala division
- Technical capacity - Building Consultancies of various assignments
- Construction of Rural Area Development Communities Physical Infrastructure (CPI)
projects
- Preparation of monthly progress reports and made presentation to Chairman
- Conduct of Curriculum Development technical workshops
(June 08 –Feb 11)
Distt. Project Manger
National Logistic Cell(NLC)-Gujranwala Division
A joint venture of :
Asian Development Program
Punjab Health Department
Punjab Education Department
Assignments
6. - Planning, estimation and execution of following projects :-
Construction of 154 x Primary Schools (Rs 265.520 Million)
Repair / Renovation of 39 Rural Health Centers and Basic Health Units
(Rs 139 Million)
Construction and renovation of Colleges (Rs 100 Million)
- Monitoring and evaluation of allied contracts of sublet contractors
- Preparation of monthly and quarterly project progress reports.
- Presentation of all projects monthly to Project director and quarterly to DG NLC
(Mar 11 to June 13)
Resident Engineer
Master Consultants Engineering Private Limited
A project of Punjab Development Drainage and Sewerage Program
Assignments Supervision of the Mega Project of Water Supply and Sanitation
Schemes under Urban Sewerage/Drainage scheme, Wazirabad( Rs.250 Million)
(Aug 13 to May 14)
Resident Engineer
Engineer General Consultant (EGC) Pvt. Ltd Pakistan
A project of Pakistan Air Force Base, Rafiqui, Shourkote
Assignmen Supervision of Mega work of Re carpeting of complete Runway design by
DD & C E-in-C, having four links and re construction culvers, covering demolition of old
premix, laying and compaction of aggregate base course, laying of Asphalt course and
Asphalt wearing course of 1 KM length.
(Jun 2014 to Jul 15)
Resident Engineer (Civil)
SMEC International Pty Ltd, Cooma-Australia
Irrigation Department Government of The Punjab PROJECT
Consultant for Design and construction Supervision of
NEW KHANKI BARAGE ANDAUXILARY WORKS PROJECT, Pakistan
A joint Venture of:
WS Atkins International, UK
EGC (Pvt.) Ltd Pakistan
BARQAAB (Pvt.) Ltd Pakistan
Assignments
- Checking/approval of layouts for Barrage workshop, drainage, Roads,
lighting poles, Firefighting arrangements, 65 houses Colony and
administrative buildings etc.
- Witnessing laboratory tests and approval of construction materials/sources
7. and subsequent follow ups.
- Approval for concrete mix and Job Mix formulae for concrete and 27 KM
long road works.
- Super visioning of all types of Civil works.
- Checking of Contractor’s IPCs for civil works.
- Preparation of draft weekly, monthly and quarterly progress reports.
- Liaising with the CRE as necessary to collect relevant data for preparation
of monthly reports.
- Attend all meeting convened by the CRE, take notes and prepare minutes of
the meeting and circulate within the specified period.
(Aug 15 to Feb 16)
PROJECT ENGINEER
GEPCO Employees Housing Foundation Gujranwala
Assignments Responsible of development of road, water supply, sewerage system,
water drainage, ancillary works and entire works of project to develop the housing colony
along with co-ordination / dealing with various Govt. / Sami Govt. / Provincial / Federal
Departments / Authorities.
(Mar 2016 to date)
RESEDENT ENGINEER (NESPAK)
At Over Head Bridge (Aziz Cross) Gujranwala
Mega Project of C&W worth 4113 Millions
Assignments
Responsible to provide all type technical consultancy to contractor (NLC
Pakistan) and Clint C&W Punjab in the following salient fields:-
- Checking/approval of layouts of Bridge workshop drawings, Bar bending
Schedules, method statements of all works under execution.
- Witnessing laboratory tests and approval of construction materials/sources
and subsequent follow ups.
- Approval for concrete mix and Job Mix formulae for concrete.
- Super visioning/ checking of Piles, Piles Cap and Pier construction.
- Check/ verified all Form Works used for all types of Civil works.
- Evaluate/ verified of Contractor’s IPCs for civil works.
- Preparation of draft of Daily, Weekly and Monthly progress reports.
- Liaising with the Chief Designer / Project Manager NESPAK as necessary to
clear structure drawing anomalies and also collect relevant survey data for
field works conformation.
- Attend all meeting convened by the Chief Engineer (C&W) SE, Xen
Contractor and Consultant Managements, take notes and prepare minutes
of the meeting and circulate within the specified period.
EMPLOYMENT RECORD (AFTER PROFESSIONAL QUALIFICATION)
Military Engineering Service (MES)
8. Frontier Work Organization (FWO)
National Logistic Cell (NLC)
Master Consulting Engineers
Engineer General Consultant (EGC) Pvt. Ltd Pakistan
SMEC International Australia
GEPCO Employees Housing Foundation Gujranwala
Nation Engineer Services Pakistan (NESPAK) Pvt.
INCLUSIVE
DATE
FROM TO
1984 – 87
1987 – 90
1992 - 95
1996 – 00
2001 – 04
2005 – 08
2009 – 10
2011 –12
2012 - 13
NAME AND
ADDRESS OF
ORGANIZATION
MES - Pak Army
FWO – Pak Army
MES – Pak Army
FWO – Pak Army
NLC – Pak Army
PRSP – Punjab
NLC – Pak Army
Master
Consulting Engr.
Engineer General
Consultant (EGC)
TYPE OF
ORGANIZATION
Management /
Supervision
Management /
Supervision
Management /
Consultant
Management /
Supervision
Management /
Consultant
Management /
Consultant /
Supervision
Consultant
Consultant
Resident Engineer
Resident Engineer
DESIGNATION
OR
POSITION
Garrison
Engineers
Project Manager
Project Deputy
Director
Project Director
Project Director
Regional Project
Director
Director Works
Resident Engr.
LENGTH
OF
SERVICE
YR-MO
3 Years
2 Years
4 Years
5 Years
4 Years
4 years
3 years
2 years
1.5 years
2013 -14 SMEC International Resident Engineer. 1.5 Years
2015-16 GEPCO Project Engr. 6 Months
2016 – to date NESPAK Resident Engineer
Total length of Service: 32 Years
I certify that the above information is true to the best of my knowledge and belief and
that I have expert knowledge and specialization in the following types of projects. (List not
more than three).
Project code Project Profile
1. Buildings Single & Multistory, Warehouses, Industrial buildings, School &
Colleges and Defense purpose buildings.
2. Runways Demolition, Re carpeting establishing the ancillary works.
3. Roads & Road
9. Bridges Motor Way, SST/DST Roads, Bridges and Culverts Infrastructures.
4. Public Health Under water sewerage schemes, Road and Railway crossing
& Water Supply structures, Disposal stations and Urban Water Supply Schemes.
5. Housing Colony Development of housing colony infrastructure.
6. Over Head Bridge, of G.T Road Crossing.
Lt Col (R) Engr. Ehsan-ul-Haq,
Tel. 055-3865524
Cell. 0300-6473347