SlideShare a Scribd company logo
1 of 4
Download to read offline
CV Page 1 of 4
CV
Personal Data:
Name: Mohammed Habiballah Mustafa Mudowi
Occupation: Civil Engineer
Date & Place of
Birth:
10-Feb-1973 / Omdurman – Sudan
Nationality: Sudanese
Marital Status: Married
Address: Riyadh – Kingdom of Saudi Arabia
Mob. No.: +966502527382 (Saudi Arabia) +249122271691 (Sudan)
Email: «mom.habib@gmail.com»
«momhabib131@yahoo.com»
Engineering Sr.: No. ‫هـ‬ ‫م‬/‫م‬ ‫س‬/‫خ‬ ‫م‬/7538 (Sudan) / No. 259040 (Saudi Arabia)
Transferable IQAMA is available + Saudi Driven License
Educational Qualifications:
Degree Awarded: B.Sc of Civil Engineering (honors).
Date of Graduate: July 1998
University: Sudan University of Science & Technology –
Faculty of Engineering.
Skills & Capabilities:
 Proficiency in dealing with computer, Windows operating system and Microsoft Office
package (Word, Excel, Powerpoint ...) and the Internet.
 Proficiency in some of software applications work-related to Civil Engineering:
(AutoCAD, WaterCAD, Primavera Project Planner, Map Source, Google Earth, etc).
CV Page 2 of 4
 Proficiency in use of some Survey devices (Level, GPS).
 Fluency in English both spoken and written.
 Good communication and adaptation to the group work and to any/all conditions of the
various forms, situations and places of work.
Professional Qualifications:
N0. Training & Courses Period Institution
1 Field training period before graduate May 1995
to July1995
Hamdy Consultant & Dan Fowdeo
Company
2 Water Resources Management,
Purification and Distribution Network
System
17/7 
2/8/2004
Khartoum University- Faculty of
Engineering & Arch.
3 Introduction in GIS (Geographic
Information System)
4/5 
10/5/2005
GIS Institute with collaboration of
UNESCO chair in water, Khartoum
4 Training workshop of Environmental
Health, Water Quality Guidelines,
Chlorination and Monitoring
9/10 –
11/10/2005
Nyala (WES, WHO, and SMOH
facilitators)
5 Computer Application Diploma 20/6 –
20/7/2006
Sudan National Federation of UNESCO
Clubs, Khartoum
6 Computer Basic Applications Course 24/2 –
29/3/2007
National Information Center - Sudan
7 Technical Report Writing Training
Course
26/4 –
30/4/2009
Competencies Training & Studies Center,
Khartoum
8 HDPE pipes tests & inspection,
Delegation to China
30/7 –
8/8/2009
Boshan Machinery In. & Ex. Co. –
Jing Dao, Beijing – China
9 Management of Rural Drinking
Water & Sanitation Projects
23/9 –
22/10/2009
National Institute of Rural Development
(NIRD) – Hyderabad – India
10 Training course on Rainwater
Harvesting and Utilization for
Developing Countries
2/7 –
12/8/2013
Gansu Research Institute for Water
Conservancy, Lanzhou, China
11 Training Course on Management
Skills & Projects Planning1st
23/2 –
27/2/2014
Drinking Water & Sanitation Unit Training
Center (DWST), Khartoum
12 Training Course on Pipe Network
Management and Design 1st
3/3 –
13/3/2014
Drinking Water & Sanitation Unit Training
Center (DWST), Khartoum
13 Training Course on Projects Planning
& Management using Primavera
Project Planner
16/3 –
20/3/2014
Drinking Water & Sanitation Unit Training
Center (DWST), Khartoum
14 Training Course on Pipe Network
Design and Management
3/3 – 13/3
& 8/6 –
12/6/2014
Drinking Water & Sanitation Unit Training
Center (DWST), Khartoum
CV Page 3 of 4
Experience:
Work in Public Water Corporation (PWC), now Drinking Water & Sanitation Unit
(DWSU) / Ministry of Water Resources and Electricity – Khartoum – Sudan in General
Directorate of Projects Execution (from Nov 1999 up to Oct 2015) as consultant
supervisor of water & sanitation projects implementation.
Engineering Experience:
 Supervision the implementation of engineering and construction works of water and
sanitation projects these are: water treatment plants, desalination plants, boreholes
(ground & surface), transmission pipelines and water distribution systems (various type
and size).
 Supervision the implementation of Rainwater harvesting projects and techniques such
as dams (embankment, masonry and concrete), haffirs, bonds, reservoirs, dykes,
terraces, conduits, canals, etc for various purposes of collection, distribution,
conveyance, flood control and others.
 Review and study design documents for various water projects and implementation
plans, as well as engineering and construction basic and detailed drawings.
 Participate and assist in the design of water distribution networks, water treatment
plants and dams beside soil investigation and feasibility studies.
 Quantity survey, calculation and estimation (BOQs) with connection to the drawings
and contracts beside assistance in the preparation and development of technical and
engineering contracts.
 Follow-up inspection and preparation of documents, letters and certificates related to
project such as investigation, permissions, achievement, receipts, handover and others.
 Preparation of progress reports as required (daily, weekly, monthly ...... etc) and
meeting reports.
 Writing and preparation of engineering technical reports.
 Good knowledge of project planning and management of the site and development and
follow up the implementation time schedules.
 Implementation and supervision of construction works such as reinforced concrete,
brick, timber, and steel structures, etc in terms of inspection and quality assurance.
 Supervision the implementation of earthworks (excavation, embankment and
compaction).
 Supervision, implementation and management of projects and programs of
humanitarian emergencies and natural disasters.
 Check and approve the quality of the materials used in construction, erection and
installation (cement, aggregates, concrete, steel, rebar, soil, pipes, accessories ....)
 Technical and field work using GPS by surveying the target area and record the
reference points and coordinates to be linked with Geographic Information Systems
(GIS programs) such as (Map source, Google Earth, etc).
 Identification of work goals, undertaking field survey and analyzing collected data to be
used in the development and preparation of the partial and strategic plans of integrated
water resources development.
CV Page 4 of 4
 Sort the bids and select the appropriate bidder in terms of prequalification and technical
condition (experience, technical ability, equipments, manpower, timetable, speed of
completion of work ...) and financial condition (appropriate economic cost, financial
viability, letters of guarantee ...).
 Preparation, check and approval of payment documents with accordance to the
achievement.
 Insurance Quality Control as per requirements, standards and specifications.
 Undertaking Testing, Commissioning, Initial and Final Handover of the project.
Practical Experience:
Work as Resident Engineer and Site Manager in many projects at different areas in
Sudan for the detailed following projects beside participation in many programs and
studies as mentioned below:
Duration Project
March 2000
to April 2001
Construction of Kuijera Dam at West Kordufan State beside participation on construction
of Siesaban Dam at South Kordufan State and Shikhaib Dam at North Kurdofan State.
May 2001 to
March 2002.
Construction of Haffirs and Abu Ragala Dam at West Kordufan state
June 2002. Construction of Haffirs and Boreholes Drilling at El Gezira State
From Oct.
2002 to Feb.
2004
Construction of Arbaat Upper Gate Dam and Arbaat U/S Upper Gate Dam at Red Sea
State. In addition of participation with supervision team of construction of Port Sudan
Water Desalination Plants (A: 7500 mᶟ/d & B: 2500 mᶟ/d).
Aug. 2004 up
to Dec. 2005
Work in Emergency Response Program (Darfur region disaster situation) with WES
(Water & Environmental Sanitation Project) in South Darfur State since Aug. 2004 up to
Dec. 2005 at Nyala, Kass and El Daien IDPs Camps as Water Engineer and Manager for
Kass town water treatment plant.
April 2006 to
July 2006
Consult Assistant in preparing and developing of the Manuals & Guidelines for 14 Water
Sources & Sanitation Facilities which implemented by PWC and UNICEF.
Feb. 2007 to
July 2007
Work as a Team Leader for Data collection & Field Survey of drinking water sources to
set and develop The Future Development Plans & Quarter Century Strategy in eastern
region states (Red sea, Kassala and Gedarif).
Oct. 2008 to
Dec. 2009
Co-operation Supervisor for Water Harvesting Projects (Agricultural Revolution Program
2008) in Kassala and Gedarif states beside the other states of the northern Sudan.
Jan. 2010 to
Dec. 2012
Site Manager for Atbara and Eldamar Water Supply Project which consist of water
treatment plant (50,000 m³/d capacity), pump station and 20 Km transmission pipelines
Feb. 2013 to
Jun. 2013
Work with (The Funder) Dams Implementation Unit (DIU) as resident engineer
supervisor and consultant for execution of Tendelti Town Water Network Project which
executed by Czech Productions International Company (The Contractor).
Feb. 2014 up
to Oct. 2015
Site Manager Supervisor of Um Maghat Water Treatment Plant (75,000 m³/d Capacity),
which currently executed by the Contractor Omrab Engineering Co.

More Related Content

Similar to C.V - Copy (20)

AMIR' s CV
AMIR' s CVAMIR' s CV
AMIR' s CV
 
Goutam-update
Goutam-updateGoutam-update
Goutam-update
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Cv govind acharya for senior engineer
Cv  govind acharya for senior engineerCv  govind acharya for senior engineer
Cv govind acharya for senior engineer
 
Cv govind acharya
Cv  govind acharyaCv  govind acharya
Cv govind acharya
 
CV Govind Acharya
CV  Govind AcharyaCV  Govind Acharya
CV Govind Acharya
 
Thomas Mensah - CV GE
Thomas Mensah - CV  GEThomas Mensah - CV  GE
Thomas Mensah - CV GE
 
CV of KRM QA & QC 1
CV of KRM QA & QC 1CV of KRM QA & QC 1
CV of KRM QA & QC 1
 
CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016CV Osama Hamad_Aug 2016
CV Osama Hamad_Aug 2016
 
HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016HDakman-CV-eng-07-06-2016
HDakman-CV-eng-07-06-2016
 
Naveed Ullah-Civil Engineer
Naveed Ullah-Civil EngineerNaveed Ullah-Civil Engineer
Naveed Ullah-Civil Engineer
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
CV_AbdullaProectManager10th Ramadan
CV_AbdullaProectManager10th RamadanCV_AbdullaProectManager10th Ramadan
CV_AbdullaProectManager10th Ramadan
 
CV (2)
CV (2)CV (2)
CV (2)
 
CV-Rabiul Islam-2016
CV-Rabiul Islam-2016CV-Rabiul Islam-2016
CV-Rabiul Islam-2016
 
Nady Boktor Resume
Nady Boktor ResumeNady Boktor Resume
Nady Boktor Resume
 
Abdel Hamied Lotfy cv
Abdel Hamied Lotfy cvAbdel Hamied Lotfy cv
Abdel Hamied Lotfy cv
 
MORSIMOHAMEDSherif_en_02-2016
MORSIMOHAMEDSherif_en_02-2016MORSIMOHAMEDSherif_en_02-2016
MORSIMOHAMEDSherif_en_02-2016
 
CV Darlington
CV DarlingtonCV Darlington
CV Darlington
 

C.V - Copy

  • 1. CV Page 1 of 4 CV Personal Data: Name: Mohammed Habiballah Mustafa Mudowi Occupation: Civil Engineer Date & Place of Birth: 10-Feb-1973 / Omdurman – Sudan Nationality: Sudanese Marital Status: Married Address: Riyadh – Kingdom of Saudi Arabia Mob. No.: +966502527382 (Saudi Arabia) +249122271691 (Sudan) Email: «mom.habib@gmail.com» «momhabib131@yahoo.com» Engineering Sr.: No. ‫هـ‬ ‫م‬/‫م‬ ‫س‬/‫خ‬ ‫م‬/7538 (Sudan) / No. 259040 (Saudi Arabia) Transferable IQAMA is available + Saudi Driven License Educational Qualifications: Degree Awarded: B.Sc of Civil Engineering (honors). Date of Graduate: July 1998 University: Sudan University of Science & Technology – Faculty of Engineering. Skills & Capabilities:  Proficiency in dealing with computer, Windows operating system and Microsoft Office package (Word, Excel, Powerpoint ...) and the Internet.  Proficiency in some of software applications work-related to Civil Engineering: (AutoCAD, WaterCAD, Primavera Project Planner, Map Source, Google Earth, etc).
  • 2. CV Page 2 of 4  Proficiency in use of some Survey devices (Level, GPS).  Fluency in English both spoken and written.  Good communication and adaptation to the group work and to any/all conditions of the various forms, situations and places of work. Professional Qualifications: N0. Training & Courses Period Institution 1 Field training period before graduate May 1995 to July1995 Hamdy Consultant & Dan Fowdeo Company 2 Water Resources Management, Purification and Distribution Network System 17/7  2/8/2004 Khartoum University- Faculty of Engineering & Arch. 3 Introduction in GIS (Geographic Information System) 4/5  10/5/2005 GIS Institute with collaboration of UNESCO chair in water, Khartoum 4 Training workshop of Environmental Health, Water Quality Guidelines, Chlorination and Monitoring 9/10 – 11/10/2005 Nyala (WES, WHO, and SMOH facilitators) 5 Computer Application Diploma 20/6 – 20/7/2006 Sudan National Federation of UNESCO Clubs, Khartoum 6 Computer Basic Applications Course 24/2 – 29/3/2007 National Information Center - Sudan 7 Technical Report Writing Training Course 26/4 – 30/4/2009 Competencies Training & Studies Center, Khartoum 8 HDPE pipes tests & inspection, Delegation to China 30/7 – 8/8/2009 Boshan Machinery In. & Ex. Co. – Jing Dao, Beijing – China 9 Management of Rural Drinking Water & Sanitation Projects 23/9 – 22/10/2009 National Institute of Rural Development (NIRD) – Hyderabad – India 10 Training course on Rainwater Harvesting and Utilization for Developing Countries 2/7 – 12/8/2013 Gansu Research Institute for Water Conservancy, Lanzhou, China 11 Training Course on Management Skills & Projects Planning1st 23/2 – 27/2/2014 Drinking Water & Sanitation Unit Training Center (DWST), Khartoum 12 Training Course on Pipe Network Management and Design 1st 3/3 – 13/3/2014 Drinking Water & Sanitation Unit Training Center (DWST), Khartoum 13 Training Course on Projects Planning & Management using Primavera Project Planner 16/3 – 20/3/2014 Drinking Water & Sanitation Unit Training Center (DWST), Khartoum 14 Training Course on Pipe Network Design and Management 3/3 – 13/3 & 8/6 – 12/6/2014 Drinking Water & Sanitation Unit Training Center (DWST), Khartoum
  • 3. CV Page 3 of 4 Experience: Work in Public Water Corporation (PWC), now Drinking Water & Sanitation Unit (DWSU) / Ministry of Water Resources and Electricity – Khartoum – Sudan in General Directorate of Projects Execution (from Nov 1999 up to Oct 2015) as consultant supervisor of water & sanitation projects implementation. Engineering Experience:  Supervision the implementation of engineering and construction works of water and sanitation projects these are: water treatment plants, desalination plants, boreholes (ground & surface), transmission pipelines and water distribution systems (various type and size).  Supervision the implementation of Rainwater harvesting projects and techniques such as dams (embankment, masonry and concrete), haffirs, bonds, reservoirs, dykes, terraces, conduits, canals, etc for various purposes of collection, distribution, conveyance, flood control and others.  Review and study design documents for various water projects and implementation plans, as well as engineering and construction basic and detailed drawings.  Participate and assist in the design of water distribution networks, water treatment plants and dams beside soil investigation and feasibility studies.  Quantity survey, calculation and estimation (BOQs) with connection to the drawings and contracts beside assistance in the preparation and development of technical and engineering contracts.  Follow-up inspection and preparation of documents, letters and certificates related to project such as investigation, permissions, achievement, receipts, handover and others.  Preparation of progress reports as required (daily, weekly, monthly ...... etc) and meeting reports.  Writing and preparation of engineering technical reports.  Good knowledge of project planning and management of the site and development and follow up the implementation time schedules.  Implementation and supervision of construction works such as reinforced concrete, brick, timber, and steel structures, etc in terms of inspection and quality assurance.  Supervision the implementation of earthworks (excavation, embankment and compaction).  Supervision, implementation and management of projects and programs of humanitarian emergencies and natural disasters.  Check and approve the quality of the materials used in construction, erection and installation (cement, aggregates, concrete, steel, rebar, soil, pipes, accessories ....)  Technical and field work using GPS by surveying the target area and record the reference points and coordinates to be linked with Geographic Information Systems (GIS programs) such as (Map source, Google Earth, etc).  Identification of work goals, undertaking field survey and analyzing collected data to be used in the development and preparation of the partial and strategic plans of integrated water resources development.
  • 4. CV Page 4 of 4  Sort the bids and select the appropriate bidder in terms of prequalification and technical condition (experience, technical ability, equipments, manpower, timetable, speed of completion of work ...) and financial condition (appropriate economic cost, financial viability, letters of guarantee ...).  Preparation, check and approval of payment documents with accordance to the achievement.  Insurance Quality Control as per requirements, standards and specifications.  Undertaking Testing, Commissioning, Initial and Final Handover of the project. Practical Experience: Work as Resident Engineer and Site Manager in many projects at different areas in Sudan for the detailed following projects beside participation in many programs and studies as mentioned below: Duration Project March 2000 to April 2001 Construction of Kuijera Dam at West Kordufan State beside participation on construction of Siesaban Dam at South Kordufan State and Shikhaib Dam at North Kurdofan State. May 2001 to March 2002. Construction of Haffirs and Abu Ragala Dam at West Kordufan state June 2002. Construction of Haffirs and Boreholes Drilling at El Gezira State From Oct. 2002 to Feb. 2004 Construction of Arbaat Upper Gate Dam and Arbaat U/S Upper Gate Dam at Red Sea State. In addition of participation with supervision team of construction of Port Sudan Water Desalination Plants (A: 7500 mᶟ/d & B: 2500 mᶟ/d). Aug. 2004 up to Dec. 2005 Work in Emergency Response Program (Darfur region disaster situation) with WES (Water & Environmental Sanitation Project) in South Darfur State since Aug. 2004 up to Dec. 2005 at Nyala, Kass and El Daien IDPs Camps as Water Engineer and Manager for Kass town water treatment plant. April 2006 to July 2006 Consult Assistant in preparing and developing of the Manuals & Guidelines for 14 Water Sources & Sanitation Facilities which implemented by PWC and UNICEF. Feb. 2007 to July 2007 Work as a Team Leader for Data collection & Field Survey of drinking water sources to set and develop The Future Development Plans & Quarter Century Strategy in eastern region states (Red sea, Kassala and Gedarif). Oct. 2008 to Dec. 2009 Co-operation Supervisor for Water Harvesting Projects (Agricultural Revolution Program 2008) in Kassala and Gedarif states beside the other states of the northern Sudan. Jan. 2010 to Dec. 2012 Site Manager for Atbara and Eldamar Water Supply Project which consist of water treatment plant (50,000 m³/d capacity), pump station and 20 Km transmission pipelines Feb. 2013 to Jun. 2013 Work with (The Funder) Dams Implementation Unit (DIU) as resident engineer supervisor and consultant for execution of Tendelti Town Water Network Project which executed by Czech Productions International Company (The Contractor). Feb. 2014 up to Oct. 2015 Site Manager Supervisor of Um Maghat Water Treatment Plant (75,000 m³/d Capacity), which currently executed by the Contractor Omrab Engineering Co.