Ajay Kumar Mourya is a project engineer with over 8 years of experience in PLCs, SCADA, drives, and industrial instrumentation. He has extensive experience in designing, developing, and commissioning SCADA and PLC systems for applications such as ash handling, water treatment plants, coal handling, and more. Some of the key projects he has worked on are located in Qatar, Rajasthan, Chhattisgarh, Bihar, and Himachal Pradesh. He is proficient in programming PLCs such as Allen Bradley PLCs as well as SCADA systems like Cimplicity and Intellution iFix. Ajay holds a diploma in electrical engineering and is pursuing
1. AJAY KUMAR MOURYA
Sect-37, Email: ajay.moray@gmail.com,
Noida Uttar Pradesh. Mob.+919015159211
Objective:
To establish myself in the arena I enter through continuous learning and development process and employing all my skills towards the growth of
organization I am associated with.
Professional Experience:
PERSONAL SYNOPSIS
• 8 years of experience in Various PLCs, SCADA, Drives.
• Working knowledge of various type of instrument like Flow transmitter, pressure transmitter, level transmitter
• Level switches Thermocouple, RTD, pH analyzer etc.
• Knowledge in industrial communications like MODBUS, SRTP, OPC, GENIUS, ETHERNET, RTU etc.
• Working knowledge of P&ID diagrams.
• Experience in development and commissioning of SCADA / HMI & PLC ladder and FBD logic in the following domains :
Ash Handling System/Coal Handling/Water Treatment Plant/Packing machine, DG Load sharing.
• Designing & Development of (Scripting, Animation, Database, Graphics) SCADA(Cimplicity & Intellution iFix)
• Knowledge of Proficy Historian.
• Configuration of Redundent PLC, IO Modules and RTUs.
• Preparation of Bill of Materials.
• Module Wiring / Wiring schedule diagram.
• Internal testing for Hardware panels and software functionality.
• System installation and commissioning experience.
• Strong verbal and written communication skills.
• Familiar with all versions of Microsoft Operating System and Microsoft Office.
• Working knowledge of Microsoft SQL server for recording Data, Events, Trends & Alarm Logging
.
Designation: Project Engineer
Duration: From June 2006 to present.
Company Name: RAS Automation and solution Pvt Ltd.
Office No.231, Udyog Kendra,, Knowledge Park 3, G.Noida, U.P-201301
Job responsibility:
• Panel power up on the site after complete power supply healthiness check in the power distribution panel (PDB).
• Executing Pre-Commissioning and Commissioning Task.
• Planning & scheduling assignments to achieve pre-set goals within time parameters. Formulating long term/short term strategic plans
to enhance operations.
• To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
• To check the entire work as according to approved drawings.
• To co-ordinate with Client/Consultants for all electrical approvals.
• Updating Information and Co-ordination to Senior and Client about the commissioning schedule.
• Erection of PCC/PLC/MCC Panel.
• Erection of field Instrument i.e. Level /Flow/Pressure transmitter, Switches, Analyser as Per P&ID.
• Hook-up of PLC Panel with MCC and PCC.
• Preparing Cable Schedule. Cable Lay-Out Drawing.
• Designing of PCC/MCC/PLC Panel.
Project Steered:
Project Name: HVAC.
Customer: Qatar Qool (Doha,Qatar).
End User: CDC
Project Site: West Bay Hotel, Doha, Qatar.
2. Project Name: Head Water Work Construction for Doha South RPS.
Customer: Roots Energy & Engineering Services.
End User: Kahra Maa
Project Site:, Doha, Qatar.
Project Name: Coal handling Plant.
Customer: Tapsi Engineering.
End User: Rajasthan Vidut Nigan
Project Site: Barmer (Rajasthan).
Project Name: Ash Handling System (Wet & Dry Ash)
Customer: Indure Pvt. Ltd.
End User: Jindal Power Limited. (4X250 Mw)
Project Site: Raigarh, (C.G)
Project Name: Ash Handling System (Wet & Dry Ash)
Customer: Indure Pvt. Ltd.
End User: NTPC. (3X500 Mw)
Project Site: Kahalgaon,Bhagalpur (Bihar)
Project Name: Bio Mass based Power Plant.
Customer: Suryachakra Power.
End User: Suryachakra Power.. (2X10 Mw)
Project Site: Champa,(C.G.)
Project Name: Water Treatment Plant.
Customer: Triveni Engineers Industries Ltd.
End User: GMR-EMCO Energy Limited (2X300 Mw)
Project Site: Warora (Chandra pur).
Project Name: Water Treatment Plant
Customer: Triveni Engineering Industries Ltd.
End User: Gujrat State Electricity Corporation Ltd. (Ukai, Gujrat)
Project Name: Hydro power Plant.
Customer: Energy Infra Tech..
End User: Himsakti Power (H.P.)
Academic Credentials:
• Pursuing BE in Electrical Engineering from KSOU.
• Diploma (Electrical Engineering Specialization with Industrial Control) from Government Polytechnic Deoria,U.P. in 2005..
• 10th from U.P. Board.
Technical Portfolio:
Tools (Engineering): PME 7.5-Ladder Programming for rx3i,Series 90-30,Versa max, Micro,& Durus Controller.
• Cimplicity SCADA,Intellution iFIX 5.5, ihistorian
• Programming of RX3I & SERIES 90-30 REDUNDANT SYSTEM.
• OPC connectivity between Cimplicity & Matricon OPC server
Personal Information:
Fathers Name Mr. Panchdeo Mourya
Languages Known Hindi, English
Date of Birth 01 March, 1987
Passport No. J1075862
Current consolidated
salary
Expected Salary Negotiable.
Declaration:
I hereby declare that the information furnished above is true to the best of my knowledge and belief.
Reference: Available on request. Ajay Mourya
Date:
Place: