SlideShare a Scribd company logo
1 of 14
2015 - GIRISH RAVIKUMAR PORTFOLIO
RESUME – GIRISH RAVIKUMAR
QUALIFICATION : Masters of Architecture, UNIVERSITY OF ADELAIDE
: Bachelor of Architecture, THIAGARAJAR COLLEGE OF ENGINEERING, MADURAI KAMARAJ UNIVERSITY
AFFILIATIONS :
• REGISTERED ARCHITECT, 4328
• CERTIFIED PROJECT MANAGEMENT PROFESSIONAL
EMPLOYMENT :
• PRESENT , PROJECT ARCHITECT, MODE DESIGN PTY LTD, BRISBANE
• 2013 -PRESENT , PRINCIPAL ARCHITECT, DESIGN SHASTHRAARCHITECTS
• 2008-2013 , SENIOR DESIGN ARCHITECT, GHD PTY LTD
• 2007 – 2008, MIRVAC DESIGN
• 2006 – 2007, PDT ARCHITECTS
• 2004 – 2006, JOHN ADAM ARCHITECT
• 2002 – 2004, K JOSEPH PETER ASSOCIATES
ACHIEVEMENTS :
• 2012 – 2011 INTERNATIONAL BIKE DESIGN MERIT AWARD
• 2010 – BRISBANE LORD MAYOR’S AWARD FOR OUTSTANDING ACHIEVEMENT IN
THE CATEGORY OF ENVIRONMENTAL FOR BRISBANE CITY COUNCIL’S 3
CITYCAT TERMINAL PROJECTS
• 2002 – FIRST PLACE FOR BARRIER FREE DESIGN FOR PEOPLE WITH
DISABILITY IN RECREATION PARKS
CERTFICATES:
MANAGEMENT LEVEL COURSE CERTFICATES
RESUME – GIRISH RAVIKUMAR
CERTFICATES:
OTHER RELEVANT CERTFICATES
MANAGEMENT LEVEL COURSE CERTFICATES
WESTSIDE DEVELOPMENTS QUEENSLAND, AUSTRALIA
HOSPITAL INTERIOR FIT OUT PROJECTS, AUSTRALIA
KEY PROJECTS – RETAIL & COMMERCIAL
WESTSIDE DEVELOPMENTS
YEAR : 2015
COST : $85M AUD
Westside developments comprised of multi storied apartments,
hotels, day surgery hospital and car parks.
A residential and commercial development comprising of high
quality residential accommodation, affordable housing, retail,
commercial, leisure and entertainment outlets, public and
community development.
My role was to design, document and manage construction for
the day surgery hospital interior fit out.
Project ongoing for MODE DESIGN PTY LTD
HOSPITAL INTERIOR FIT OUT
YEAR : 2015
COST : $5M AUD
Ramsay Pharmacy a leading medical services provider in
Australia commissioned MODE to undertake design and
documentation of their new pharmacy interior fit out all over
Australia.
My role was to design and undertake documentation for all
these pharmacies. I also prepared tender documentation and
provided tender assessment service for Ramsay pharmacy.
Once the construction tender was awarded by the client I
managed onsite construction
Project completed for MODE DESIGN PTY LTD
OMAN BEACH RESORT
KEY PROJECTS – PUBLIC & RECREATION BUILDINGS
HEALTH RESORT KOTTARAKARA, KERALA
ZAMORINS CONVENTION CENTRE
YEAR : 2015
COST : 50C INR
The project is currently ongoing with an aim to be operational by
2018. Following this Sanction drawings are being prepared
currently. The project was undertaken in collaboration with
MODE Design in Australia
My role in the project was to lead the architectural team,
coordinate with consultants & administer the contract during
construction. The project was designed and in REVIT. The
construction of these projects has been anticipated to
commence mid 2017.
Project ongoing for Design Shasthra
ZAMORINS CONVENTION CENTRE, CALICUT, KERALA
OMAN BEACH RESORT
YEAR : 2015
COST : 50M USD
A project design report was completed for this project and
submitted to the Oman Tourism department and awaiting further
response. The project was undertaken in collaboration with
MODE Design in Australia
My role in the project was to lead the architectural team, in
undertaking the design. Coming up with a concept and
implementing it. I also developed the preliminary BOQ for the
project.
Project ongoing for Design Shasthra
HEALTH RESORT KOTTARAKARA, KERALA
YEAR : 2016
COST : 35C INR
Concept design has been completed for this project and the
project is currently ongoing discussion with the local planning
authority for approval
My role in the project was to lead the architectural team,
coordinate with consultants & administer the contract during
construction.
Project ongoing for Design Shasthra
TENNYSON REACH MASTERPLAN QUEENSLAND, AUSTRALIA
FLINDERS STREET TOWNSVILE, MASTERPLAN QUEENSLAND, AUSTRALIA
KEY PROJECTS – MASTERPLANNING & COMMERCIAL
TENNYSON REACH MASTERPLAN
YEAR : 2005
COST : $85M AUD
Tennyson reach is MIRVAC’s prestigious development in
conjunction with Tennis Queensland. The project consists of
multi storied apartments, hotels and public parks. MIRVAC after
the development in Tennyson put forward a bid for the animal
research institute site near Tennyson. It was designed as the
phase II of the Tennyson development. The key Project
components are as follows;
A residential and commercial development comprising of high
quality residential accommodation, affordable housing, retail,
commercial, leisure and entertainment outlets, public and
community development.
My role was to design the Hotel building as a start for exploring
the design language. The idea was to create building fabrics
with high end finishes. The language was to use pre-cast walls
to wrap up the buildings thereby providing sun protection for the
façade. Then the same language was used to design the
residential apartments and the sports and recreation building.
Project completed for MIRVAC
FLINDERS STREET TOWNSVILLE
YEAR : 2006
COST : $50M AUD
MIRVAC after its residential development in Mariners peninsula,
Townsville came up with a commercial and mixed use
development and a plaza space.
My role was to design and undertake DA documentation for a
17 storied office building with retail at ground floor and 5 levels
of open deck car park and offices above. The idea was to
symbolize tropical architecture using concrete ledges and
creating thick shadow lines. I did a form study to understand
how folded panels created movement along the building façade
to activate the walk along the boardwalk.
MIXED USE DEVELOPMENT
My role was to Design and document the 17 storied mixed use
building with restaurant and retail at ground floor, 5 levels of
open deck car park, 3 levels of hotel and 6 typical apartment
levels and 2 typical penthouse levels. The hotel level comprises
a recreation deck which has a suspended swimming pool which
overlooks into the tropical plaza in between the two buildings.
Project completed for MIRVAC
NORTHSHORE MASTERPLAN QUEENSLAND, AUSTRALIA
KEY PROJECTS – MASTERPLANNING & COMMERCIAL
MENDS STREET SHORE REDEVELOPMENT PERTH, AUSTRALIA
NORTHSHORE MASTERPLAN
YEAR : 2009
COST : $47M AUD
This is a regional center of 270,000 people. A key feature of this
project was the application of City Information Modeling to
indicatively predict the development yields and infrastructure
imposts of a range of options and link these to growth
projections to enable an evidence based recommendation to be
made to Brisbane City Council for the future structure of the
CBD.
At its heart, Northshore will include 2.5 kilometers of dedicated
riverfront, with a mix of parkland and community space. These
spaces will complement the combination of residential, retail
and commercial opportunities on site.
Over the next 20 years, approximately 15,000 residents are set
to call Northshore home. The precinct will also be the
employment location for around 15,000 in retail precincts and
office parks.
Development within Northshore Hamilton will be based on
principles of excellence in urban design and architecture, best-
practice environmentally-sustainable design and transit-oriented
development.
Project completed for GHD
REDLANDS COLLEGE MASTERPLAN QUEENSLAND, AUSTRALIA
KEY PROJECTS – INSTITUTION & EDUCATION
REDLANDS COLLEGE QUEENSLAND, AUSTRALIA
REDLANDS COLLEGE MASTERPLAN
YEAR : 2011
COST : $15M AUD
Redlands College commissioned to design, document and
administer the contract for a multipurpose hall, an addition to
existing science block.
My role in the project was to lead the architectural team,
coordinate with consultants & administer the contract during
construction. The project was designed and in REVIT. The
construction of these projects has been completed.
Project completed for GHD
KEY PROJECTS – INSTITUTION & EDUCATION
BRIBIE ISLAND AQUATIC CENTRE & U3A EDUCATION CENTRE QUEENSLAND, AUSTRALIA
GIN GIN STATE HIGH SCHOOL QUEENSLAND, AUSTRALIA
GIN GIN STATE HIGH SCHOOL
YEAR : 2014
COST : $2M AUD
As part of the DETE - Project Services, Queensland Year 7
Flying Start Program, we were commissioned to undertake
design and delivery of their Year 7 building. My role involved
client liaison, design management and project delivery. Running
this project our team developed a very good understanding of
the Department of Education Guidelines. This project provided
us good connections within both organizations to help project
requirements.
My role in the project was to lead the architectural team,
coordinate with consultants & administer the contract during
construction. The project was designed and in REVIT. The
construction of these projects has been completed.
Project completed for GHD
OATS ST STATION PERTH AUSTRALIA
TENERIFFE CITYCAT TERMINAL QUEENSLAND, AUSTRALIA
OATS STREET STATION PERTH
YEAR : 2012
COST : $87M AUD
Our team at GHD was invited to undertake a feasibility design
for Oats street railway station in Perth. The project was an
outcome of a study undertaken by Perth Transport Authority on
the complexity of a level crossing adjacent to the station. The
options proposed to PTA were a elevated platform and a
Underground platform. The options were well received by PTA
and GHD provided the cost analysis for both options. The
project is currently undergoing financial approval.
Project completed for GHD
TENERIFFE FERRY STATION
YEAR : 2010
COST : $4M AUD
BCC commissioned our team at GHD to design and document
for tendering for 3 CityCat terminals in Teneriffe, Hawthorne and
Bretts Wharf and a terminal in Hamilton for ULDA. Our team
designed and documented the project in REVIT and worked
alongside the marine engineers, who played a key role in the
design of the gangway and pontoon. The design components
include a visually interesting, barrier free congregational space
in the form of a passenger waiting area. A gangway easy
enough to maneuver for patrons on wheel chair at different tidal
levels. In order to achieve efficient ferry operations the floating
pontoon was designed to allow uninterrupted through fare for
passengers embarking and disembarking the vessel.
My role in the project is to lead the architectural team,
coordinate with consultants. Out of the 4 terminals, Teneriffe
and Hamilton are currently being built.
Project completed for GHD
KEY PROJECTS – INFRASTRUCTURE AND TRANSPORT
KEY PROJECTS – INFRASTRUCTURE AND TRANSPORT
NORTHSHORE CITYCAT TERMINAL QUEENSLAND, AUSTRALIA
FERNY GORVE RAILWAY STATION QUEENSLAND, AUSTRALIA
FERNY GORVE RAILWAY STATION
YEAR : 2011
COST : $30M AUD
Our team at GHD won the design, document and construction
support for both train stations where, I lead the proposals team
as a bid manager, providing multi-disciplinary fee proposal,
intended project program and compiling submission documents.
The ferny grove station is complete and have won great
appreciation from Queensland Rail for its innovative design and
open space planning.
Project completed for GHD
NORTHSHORE FERRY TERMINAL
YEAR : 2011
COST : $5M AUD
Located on MacArthur Avenue, the state-of-the-art terminal will
provide local commuters with the benefit of express travel to the
CBD taking only 28 minutes via
Apollo Road
The new terminal and services to ensure Northshore will be a
vibrant, well-connected transit-oriented community.
Features of the new Northshore Hamilton ferry terminal include:
• A dual-berth pontoon allowing two vessels to stop at the
terminal simultaneously
• Easy access and approximately 24 seats in the onshore
waiting area
• A sheltered ramp, waiting area and gangway
• go card and pay-per-trip facilities.
Project completed for GHD
KEY PROJECTS – COMMERCIAL & RESIDENTIAL
MINA RASHID SWIRLING TOWER, DUBAI
MINA RASHID, DUBAI
YEAR : 2008
COST : $70M AUD
NAKHEEL after the merger with MIRVAC commissioned
MIRVAC to design 4 high rise buildings in its new project Mina
Rashid (Port Rashid).
Our team was involved in rewriting the Design control
regulations for some of the key sites of the master plan
Designing and Documenting 2 waterfront residential buildings,
the promenade, Hotel and commercial Building
Contemporary Arabic architecture, Sustainable Architecture
Using Recycled timber and the activation of the waterfront with
wide boardwalks and promenade and colonnades recessed in
the building to sustain the heat. Arabic motifs were used in
providing screens for sun protection. The usage of glass was
minimized. With Arup on board testing the sustainability we
could get feedbacks about the sustainability issues in the
building.
Project completed for MIRVAC
KEY PROJECTS – COMMERCIAL & RESIDENTIAL
MARINERS PENINSULA TOWNSVILLE, AUSTRALIA
MINA RASHID CULTURAL CENTRE AND RESIDENTIAL TOWER, DUBAI
MARINERS PENINSULA, TOWNSVILLE
YEAR : 2006
COST : $20M AUD
Mariner’s Peninsula is MIRVAC’s prestigious development in
conjunction in Townsville. The project consists of multi storied
apartments, flanked by public parks. The key Project
components are as follows;
A residential and commercial development comprising of high
quality residential accommodation, luxury villas with yatch jetties
and landscaped open spaces and recreation areas
Our role was to design the oval shaped high rise residential
building. The idea was to create building fabrics with high end
finishes. The language was to use pre-cast walls to wrap up the
buildings thereby providing sun protection for the façade.
Project completed for MIRVAC
skype : girish ravikumar
In: : au.linkedin.com/in/girishravikumar
6/508Oxley Rd, Sherwood, QLD, AU
P 61 434 035 396

More Related Content

What's hot

Steve Marsden 2015 CV & Portfolio
Steve Marsden 2015 CV & PortfolioSteve Marsden 2015 CV & Portfolio
Steve Marsden 2015 CV & Portfolio
Steve Marsden
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
Ahmed Mishrif
 
designage - Profile-1
designage - Profile-1designage - Profile-1
designage - Profile-1
Tushar Patil
 
Resume & Profile
Resume & ProfileResume & Profile
Resume & Profile
Roger Pass
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.P
Madhava Kulal
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
Ahmed Sakr
 
CV_GFlanagan current 2016
CV_GFlanagan current 2016CV_GFlanagan current 2016
CV_GFlanagan current 2016
Gareth Flanagan
 
12-15-2015
12-15-201512-15-2015
12-15-2015
Pr Group
 
MRM in the community - proposal revised 4 June 2014 - thumbnail version
MRM in the community - proposal revised 4 June 2014 - thumbnail versionMRM in the community - proposal revised 4 June 2014 - thumbnail version
MRM in the community - proposal revised 4 June 2014 - thumbnail version
michael matthews
 

What's hot (20)

Steve Marsden 2015 CV & Portfolio
Steve Marsden 2015 CV & PortfolioSteve Marsden 2015 CV & Portfolio
Steve Marsden 2015 CV & Portfolio
 
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
 
Crispan Falcao-2017
Crispan Falcao-2017Crispan Falcao-2017
Crispan Falcao-2017
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
designage - Profile-1
designage - Profile-1designage - Profile-1
designage - Profile-1
 
CV-2016
CV-2016CV-2016
CV-2016
 
Mohamed Hassan CV ..
Mohamed Hassan CV ..Mohamed Hassan CV ..
Mohamed Hassan CV ..
 
Flacq Profile
Flacq ProfileFlacq Profile
Flacq Profile
 
Mohammed Al Naggar Resume
Mohammed Al Naggar ResumeMohammed Al Naggar Resume
Mohammed Al Naggar Resume
 
Resume & Profile
Resume & ProfileResume & Profile
Resume & Profile
 
lal
lallal
lal
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.P
 
Mountford Pigott LLP Masterplanning Portfolio 2013
Mountford Pigott LLP Masterplanning Portfolio 2013Mountford Pigott LLP Masterplanning Portfolio 2013
Mountford Pigott LLP Masterplanning Portfolio 2013
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
Health care and research company brochure BeglinWoods Architects
Health care and research company brochure BeglinWoods ArchitectsHealth care and research company brochure BeglinWoods Architects
Health care and research company brochure BeglinWoods Architects
 
CV_GFlanagan current 2016
CV_GFlanagan current 2016CV_GFlanagan current 2016
CV_GFlanagan current 2016
 
12-15-2015
12-15-201512-15-2015
12-15-2015
 
MRM in the community - proposal revised 4 June 2014 - thumbnail version
MRM in the community - proposal revised 4 June 2014 - thumbnail versionMRM in the community - proposal revised 4 June 2014 - thumbnail version
MRM in the community - proposal revised 4 June 2014 - thumbnail version
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
 
EPJ -profile 2016e
EPJ -profile 2016eEPJ -profile 2016e
EPJ -profile 2016e
 

Similar to Portfolio Girish Ravikumar

MODE_Sector-Brochure_Landscape_V2_LQ
MODE_Sector-Brochure_Landscape_V2_LQMODE_Sector-Brochure_Landscape_V2_LQ
MODE_Sector-Brochure_Landscape_V2_LQ
Rhonan OBrien
 
Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016
Jon Rose
 
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_EmailMODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
Rhonan OBrien
 
smc Profilejune 2014 large-file
smc Profilejune 2014 large-filesmc Profilejune 2014 large-file
smc Profilejune 2014 large-file
Zaki Salleh
 
MODE_Sector-Brochure_Commercial_V1_LQ
MODE_Sector-Brochure_Commercial_V1_LQMODE_Sector-Brochure_Commercial_V1_LQ
MODE_Sector-Brochure_Commercial_V1_LQ
Rhonan OBrien
 
Peter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally Aquenta CV
Peter Dally Aquenta CV
Peter Dally
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016
Kim Barry
 
Darragh Bellew Portfolio (Reduced)
Darragh Bellew Portfolio (Reduced)Darragh Bellew Portfolio (Reduced)
Darragh Bellew Portfolio (Reduced)
Darragh Bellew
 
Company Profile_Hydro-Utilities
Company Profile_Hydro-UtilitiesCompany Profile_Hydro-Utilities
Company Profile_Hydro-Utilities
Thami Mpala
 
161121 Katie Devitt Portfolio_email_wo cv
161121 Katie Devitt Portfolio_email_wo cv161121 Katie Devitt Portfolio_email_wo cv
161121 Katie Devitt Portfolio_email_wo cv
Katie Devitt
 

Similar to Portfolio Girish Ravikumar (20)

151105_SJW Graphic CV
151105_SJW Graphic CV151105_SJW Graphic CV
151105_SJW Graphic CV
 
MODE_Sector-Brochure_Landscape_V2_LQ
MODE_Sector-Brochure_Landscape_V2_LQMODE_Sector-Brochure_Landscape_V2_LQ
MODE_Sector-Brochure_Landscape_V2_LQ
 
Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016
 
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_EmailMODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj Iyengar
 
smc Profilejune 2014 large-file
smc Profilejune 2014 large-filesmc Profilejune 2014 large-file
smc Profilejune 2014 large-file
 
smcdesigninc - the landscape studio
smcdesigninc - the landscape studiosmcdesigninc - the landscape studio
smcdesigninc - the landscape studio
 
KGDMT-UK
KGDMT-UKKGDMT-UK
KGDMT-UK
 
Selected Projects 10 02
Selected Projects 10 02Selected Projects 10 02
Selected Projects 10 02
 
Luca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdf
 
MODE_Sector-Brochure_Commercial_V1_LQ
MODE_Sector-Brochure_Commercial_V1_LQMODE_Sector-Brochure_Commercial_V1_LQ
MODE_Sector-Brochure_Commercial_V1_LQ
 
Bharath Chellayya_Portfolio
Bharath Chellayya_PortfolioBharath Chellayya_Portfolio
Bharath Chellayya_Portfolio
 
Peter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally Aquenta CV
Peter Dally Aquenta CV
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016
 
Portfolio
PortfolioPortfolio
Portfolio
 
Darragh Bellew Portfolio (Reduced)
Darragh Bellew Portfolio (Reduced)Darragh Bellew Portfolio (Reduced)
Darragh Bellew Portfolio (Reduced)
 
Portfolio 2016 - Nakorn
Portfolio 2016 - NakornPortfolio 2016 - Nakorn
Portfolio 2016 - Nakorn
 
Kunz Raubenheimer Architects - Portfolio - 2021
Kunz Raubenheimer Architects - Portfolio - 2021Kunz Raubenheimer Architects - Portfolio - 2021
Kunz Raubenheimer Architects - Portfolio - 2021
 
Company Profile_Hydro-Utilities
Company Profile_Hydro-UtilitiesCompany Profile_Hydro-Utilities
Company Profile_Hydro-Utilities
 
161121 Katie Devitt Portfolio_email_wo cv
161121 Katie Devitt Portfolio_email_wo cv161121 Katie Devitt Portfolio_email_wo cv
161121 Katie Devitt Portfolio_email_wo cv
 

Recently uploaded

Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
awasv46j
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
nirzagarg
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
mark11275
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
instagramfab782445
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
yhavx
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
HyderabadDolls
 

Recently uploaded (20)

Dahisar Comfortable Call Girls ,09167354423,Mira Road Model Call Girls
Dahisar Comfortable Call Girls ,09167354423,Mira Road Model Call GirlsDahisar Comfortable Call Girls ,09167354423,Mira Road Model Call Girls
Dahisar Comfortable Call Girls ,09167354423,Mira Road Model Call Girls
 
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
Branding in the Psychedelic Landscape Report.pdf
Branding in the Psychedelic Landscape Report.pdfBranding in the Psychedelic Landscape Report.pdf
Branding in the Psychedelic Landscape Report.pdf
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 

Portfolio Girish Ravikumar

  • 1. 2015 - GIRISH RAVIKUMAR PORTFOLIO
  • 2. RESUME – GIRISH RAVIKUMAR QUALIFICATION : Masters of Architecture, UNIVERSITY OF ADELAIDE : Bachelor of Architecture, THIAGARAJAR COLLEGE OF ENGINEERING, MADURAI KAMARAJ UNIVERSITY AFFILIATIONS : • REGISTERED ARCHITECT, 4328 • CERTIFIED PROJECT MANAGEMENT PROFESSIONAL EMPLOYMENT : • PRESENT , PROJECT ARCHITECT, MODE DESIGN PTY LTD, BRISBANE • 2013 -PRESENT , PRINCIPAL ARCHITECT, DESIGN SHASTHRAARCHITECTS • 2008-2013 , SENIOR DESIGN ARCHITECT, GHD PTY LTD • 2007 – 2008, MIRVAC DESIGN • 2006 – 2007, PDT ARCHITECTS • 2004 – 2006, JOHN ADAM ARCHITECT • 2002 – 2004, K JOSEPH PETER ASSOCIATES ACHIEVEMENTS : • 2012 – 2011 INTERNATIONAL BIKE DESIGN MERIT AWARD • 2010 – BRISBANE LORD MAYOR’S AWARD FOR OUTSTANDING ACHIEVEMENT IN THE CATEGORY OF ENVIRONMENTAL FOR BRISBANE CITY COUNCIL’S 3 CITYCAT TERMINAL PROJECTS • 2002 – FIRST PLACE FOR BARRIER FREE DESIGN FOR PEOPLE WITH DISABILITY IN RECREATION PARKS CERTFICATES: MANAGEMENT LEVEL COURSE CERTFICATES
  • 3. RESUME – GIRISH RAVIKUMAR CERTFICATES: OTHER RELEVANT CERTFICATES MANAGEMENT LEVEL COURSE CERTFICATES
  • 4. WESTSIDE DEVELOPMENTS QUEENSLAND, AUSTRALIA HOSPITAL INTERIOR FIT OUT PROJECTS, AUSTRALIA KEY PROJECTS – RETAIL & COMMERCIAL WESTSIDE DEVELOPMENTS YEAR : 2015 COST : $85M AUD Westside developments comprised of multi storied apartments, hotels, day surgery hospital and car parks. A residential and commercial development comprising of high quality residential accommodation, affordable housing, retail, commercial, leisure and entertainment outlets, public and community development. My role was to design, document and manage construction for the day surgery hospital interior fit out. Project ongoing for MODE DESIGN PTY LTD HOSPITAL INTERIOR FIT OUT YEAR : 2015 COST : $5M AUD Ramsay Pharmacy a leading medical services provider in Australia commissioned MODE to undertake design and documentation of their new pharmacy interior fit out all over Australia. My role was to design and undertake documentation for all these pharmacies. I also prepared tender documentation and provided tender assessment service for Ramsay pharmacy. Once the construction tender was awarded by the client I managed onsite construction Project completed for MODE DESIGN PTY LTD
  • 5. OMAN BEACH RESORT KEY PROJECTS – PUBLIC & RECREATION BUILDINGS HEALTH RESORT KOTTARAKARA, KERALA ZAMORINS CONVENTION CENTRE YEAR : 2015 COST : 50C INR The project is currently ongoing with an aim to be operational by 2018. Following this Sanction drawings are being prepared currently. The project was undertaken in collaboration with MODE Design in Australia My role in the project was to lead the architectural team, coordinate with consultants & administer the contract during construction. The project was designed and in REVIT. The construction of these projects has been anticipated to commence mid 2017. Project ongoing for Design Shasthra ZAMORINS CONVENTION CENTRE, CALICUT, KERALA OMAN BEACH RESORT YEAR : 2015 COST : 50M USD A project design report was completed for this project and submitted to the Oman Tourism department and awaiting further response. The project was undertaken in collaboration with MODE Design in Australia My role in the project was to lead the architectural team, in undertaking the design. Coming up with a concept and implementing it. I also developed the preliminary BOQ for the project. Project ongoing for Design Shasthra HEALTH RESORT KOTTARAKARA, KERALA YEAR : 2016 COST : 35C INR Concept design has been completed for this project and the project is currently ongoing discussion with the local planning authority for approval My role in the project was to lead the architectural team, coordinate with consultants & administer the contract during construction. Project ongoing for Design Shasthra
  • 6. TENNYSON REACH MASTERPLAN QUEENSLAND, AUSTRALIA FLINDERS STREET TOWNSVILE, MASTERPLAN QUEENSLAND, AUSTRALIA KEY PROJECTS – MASTERPLANNING & COMMERCIAL TENNYSON REACH MASTERPLAN YEAR : 2005 COST : $85M AUD Tennyson reach is MIRVAC’s prestigious development in conjunction with Tennis Queensland. The project consists of multi storied apartments, hotels and public parks. MIRVAC after the development in Tennyson put forward a bid for the animal research institute site near Tennyson. It was designed as the phase II of the Tennyson development. The key Project components are as follows; A residential and commercial development comprising of high quality residential accommodation, affordable housing, retail, commercial, leisure and entertainment outlets, public and community development. My role was to design the Hotel building as a start for exploring the design language. The idea was to create building fabrics with high end finishes. The language was to use pre-cast walls to wrap up the buildings thereby providing sun protection for the façade. Then the same language was used to design the residential apartments and the sports and recreation building. Project completed for MIRVAC FLINDERS STREET TOWNSVILLE YEAR : 2006 COST : $50M AUD MIRVAC after its residential development in Mariners peninsula, Townsville came up with a commercial and mixed use development and a plaza space. My role was to design and undertake DA documentation for a 17 storied office building with retail at ground floor and 5 levels of open deck car park and offices above. The idea was to symbolize tropical architecture using concrete ledges and creating thick shadow lines. I did a form study to understand how folded panels created movement along the building façade to activate the walk along the boardwalk. MIXED USE DEVELOPMENT My role was to Design and document the 17 storied mixed use building with restaurant and retail at ground floor, 5 levels of open deck car park, 3 levels of hotel and 6 typical apartment levels and 2 typical penthouse levels. The hotel level comprises a recreation deck which has a suspended swimming pool which overlooks into the tropical plaza in between the two buildings. Project completed for MIRVAC
  • 7. NORTHSHORE MASTERPLAN QUEENSLAND, AUSTRALIA KEY PROJECTS – MASTERPLANNING & COMMERCIAL MENDS STREET SHORE REDEVELOPMENT PERTH, AUSTRALIA NORTHSHORE MASTERPLAN YEAR : 2009 COST : $47M AUD This is a regional center of 270,000 people. A key feature of this project was the application of City Information Modeling to indicatively predict the development yields and infrastructure imposts of a range of options and link these to growth projections to enable an evidence based recommendation to be made to Brisbane City Council for the future structure of the CBD. At its heart, Northshore will include 2.5 kilometers of dedicated riverfront, with a mix of parkland and community space. These spaces will complement the combination of residential, retail and commercial opportunities on site. Over the next 20 years, approximately 15,000 residents are set to call Northshore home. The precinct will also be the employment location for around 15,000 in retail precincts and office parks. Development within Northshore Hamilton will be based on principles of excellence in urban design and architecture, best- practice environmentally-sustainable design and transit-oriented development. Project completed for GHD
  • 8. REDLANDS COLLEGE MASTERPLAN QUEENSLAND, AUSTRALIA KEY PROJECTS – INSTITUTION & EDUCATION REDLANDS COLLEGE QUEENSLAND, AUSTRALIA REDLANDS COLLEGE MASTERPLAN YEAR : 2011 COST : $15M AUD Redlands College commissioned to design, document and administer the contract for a multipurpose hall, an addition to existing science block. My role in the project was to lead the architectural team, coordinate with consultants & administer the contract during construction. The project was designed and in REVIT. The construction of these projects has been completed. Project completed for GHD
  • 9. KEY PROJECTS – INSTITUTION & EDUCATION BRIBIE ISLAND AQUATIC CENTRE & U3A EDUCATION CENTRE QUEENSLAND, AUSTRALIA GIN GIN STATE HIGH SCHOOL QUEENSLAND, AUSTRALIA GIN GIN STATE HIGH SCHOOL YEAR : 2014 COST : $2M AUD As part of the DETE - Project Services, Queensland Year 7 Flying Start Program, we were commissioned to undertake design and delivery of their Year 7 building. My role involved client liaison, design management and project delivery. Running this project our team developed a very good understanding of the Department of Education Guidelines. This project provided us good connections within both organizations to help project requirements. My role in the project was to lead the architectural team, coordinate with consultants & administer the contract during construction. The project was designed and in REVIT. The construction of these projects has been completed. Project completed for GHD
  • 10. OATS ST STATION PERTH AUSTRALIA TENERIFFE CITYCAT TERMINAL QUEENSLAND, AUSTRALIA OATS STREET STATION PERTH YEAR : 2012 COST : $87M AUD Our team at GHD was invited to undertake a feasibility design for Oats street railway station in Perth. The project was an outcome of a study undertaken by Perth Transport Authority on the complexity of a level crossing adjacent to the station. The options proposed to PTA were a elevated platform and a Underground platform. The options were well received by PTA and GHD provided the cost analysis for both options. The project is currently undergoing financial approval. Project completed for GHD TENERIFFE FERRY STATION YEAR : 2010 COST : $4M AUD BCC commissioned our team at GHD to design and document for tendering for 3 CityCat terminals in Teneriffe, Hawthorne and Bretts Wharf and a terminal in Hamilton for ULDA. Our team designed and documented the project in REVIT and worked alongside the marine engineers, who played a key role in the design of the gangway and pontoon. The design components include a visually interesting, barrier free congregational space in the form of a passenger waiting area. A gangway easy enough to maneuver for patrons on wheel chair at different tidal levels. In order to achieve efficient ferry operations the floating pontoon was designed to allow uninterrupted through fare for passengers embarking and disembarking the vessel. My role in the project is to lead the architectural team, coordinate with consultants. Out of the 4 terminals, Teneriffe and Hamilton are currently being built. Project completed for GHD KEY PROJECTS – INFRASTRUCTURE AND TRANSPORT
  • 11. KEY PROJECTS – INFRASTRUCTURE AND TRANSPORT NORTHSHORE CITYCAT TERMINAL QUEENSLAND, AUSTRALIA FERNY GORVE RAILWAY STATION QUEENSLAND, AUSTRALIA FERNY GORVE RAILWAY STATION YEAR : 2011 COST : $30M AUD Our team at GHD won the design, document and construction support for both train stations where, I lead the proposals team as a bid manager, providing multi-disciplinary fee proposal, intended project program and compiling submission documents. The ferny grove station is complete and have won great appreciation from Queensland Rail for its innovative design and open space planning. Project completed for GHD NORTHSHORE FERRY TERMINAL YEAR : 2011 COST : $5M AUD Located on MacArthur Avenue, the state-of-the-art terminal will provide local commuters with the benefit of express travel to the CBD taking only 28 minutes via Apollo Road The new terminal and services to ensure Northshore will be a vibrant, well-connected transit-oriented community. Features of the new Northshore Hamilton ferry terminal include: • A dual-berth pontoon allowing two vessels to stop at the terminal simultaneously • Easy access and approximately 24 seats in the onshore waiting area • A sheltered ramp, waiting area and gangway • go card and pay-per-trip facilities. Project completed for GHD
  • 12. KEY PROJECTS – COMMERCIAL & RESIDENTIAL MINA RASHID SWIRLING TOWER, DUBAI MINA RASHID, DUBAI YEAR : 2008 COST : $70M AUD NAKHEEL after the merger with MIRVAC commissioned MIRVAC to design 4 high rise buildings in its new project Mina Rashid (Port Rashid). Our team was involved in rewriting the Design control regulations for some of the key sites of the master plan Designing and Documenting 2 waterfront residential buildings, the promenade, Hotel and commercial Building Contemporary Arabic architecture, Sustainable Architecture Using Recycled timber and the activation of the waterfront with wide boardwalks and promenade and colonnades recessed in the building to sustain the heat. Arabic motifs were used in providing screens for sun protection. The usage of glass was minimized. With Arup on board testing the sustainability we could get feedbacks about the sustainability issues in the building. Project completed for MIRVAC
  • 13. KEY PROJECTS – COMMERCIAL & RESIDENTIAL MARINERS PENINSULA TOWNSVILLE, AUSTRALIA MINA RASHID CULTURAL CENTRE AND RESIDENTIAL TOWER, DUBAI MARINERS PENINSULA, TOWNSVILLE YEAR : 2006 COST : $20M AUD Mariner’s Peninsula is MIRVAC’s prestigious development in conjunction in Townsville. The project consists of multi storied apartments, flanked by public parks. The key Project components are as follows; A residential and commercial development comprising of high quality residential accommodation, luxury villas with yatch jetties and landscaped open spaces and recreation areas Our role was to design the oval shaped high rise residential building. The idea was to create building fabrics with high end finishes. The language was to use pre-cast walls to wrap up the buildings thereby providing sun protection for the façade. Project completed for MIRVAC
  • 14. skype : girish ravikumar In: : au.linkedin.com/in/girishravikumar 6/508Oxley Rd, Sherwood, QLD, AU P 61 434 035 396