PROJECT BRIEF
The purpose of the project activity is to improve
the energy efficiency of the existing exhaust
fans, located at the fume treatment plants
of Dubai Aluminium (DUBAL), by installing
variable speed drives (VFD) for the existing
exhaust fans motors. This upgrade will result
in 40% electricity savings compared to the
existing situation without VFD. The resulting
reduction of electricity demand (approx. 56,000
MWh/year) will reduce the greenhouse gases
emission associated with the generation of
fossil fuel based electricity. Dubai Carbon is
supporting Dubal in registering the project with
UNFCCC for carbon credits under the CDM.
PROJECT STATUS
Project Type:
Carbon Advisory
Project Duration:
24 months (2014-2016)
Project Status:
Ongoing
Meet the Team:
CLIENT: EMIRATES GLOBAL
ALUMINIUM- JEBAL ALI (DUBAL)
3.3KV MAIN
EXHAUST FANS
ENERGY SAVING
PROJECT
Thomas
Bosse
Fazil Abdul
Rahiman
Wolfgang
Wetzer
AA040
PROJECT
NUMBER
EMISSION REDUCTION
POTENTIAL:
Approx. 25,000 tCO2
e
annually
CDM METHODOLOGY:
AMS-II.S. “Energy efficiency
in motor systems”
OUTCOMES/WORK PACKAGES:
• Developing and registering Dubal’s
energy efficiency project with
UNFCCC
• International recognition for Dubal’s
energy efficiency improvement
measures
PROJECT APPROACH:
• Prince 2 for Project Management
• UNFCCC methodologies, rules
and references
CLIENT:
Emirates Global Aluminium- Jebal Ali (Dubal)
Emirates Global Aluminium (EGA) is owned equally by Mubadala Development
Company of Abu Dhabi and Investment Corporation of Dubai. EGA is an aluminium
conglomerate with interests in bauxite/alumina and primary aluminium smelting; with
plans for significant local growth and international expansion.
EGA’s core operating assets are Dubai Aluminium (“DUBAL”) and Emirates Aluminium
(“EMAL”) – whose combined production is 2.4 million tonnes per annum (“tpa”), ranking
EGA among the five largest primary aluminium producers in the world. Both companies
are renowned for maximising the health and safety of people and the surrounding
community, reducing operational environmental impact and investing in social and
economic development. DUBAL’s Jebel Ali operation – comprising a 1 million tpa
smelter, a 2,350 MW power station and other facilities – is one of the world’s largest
single-site primary aluminium smelters. Commissioned in 1979, DUBAL celebrated its
35th anniversary in 2014.
http://www.ega.ae
CLIENT: EMIRATES GLOBAL
ALUMINIUM- JEBAL ALI (DUBAL)
3.3KV MAIN
EXHAUST FANS
ENERGY SAVING
PROJECT

More Related Content

What's hot

EG 1001 presentation (carbon filter)
EG 1001 presentation (carbon filter)EG 1001 presentation (carbon filter)
EG 1001 presentation (carbon filter)
Eric Chan
 

What's hot (16)

Imi remosa - Hydrogen for energy and business transition in industry (Alberto...
Imi remosa - Hydrogen for energy and business transition in industry (Alberto...Imi remosa - Hydrogen for energy and business transition in industry (Alberto...
Imi remosa - Hydrogen for energy and business transition in industry (Alberto...
 
Mark Lewis Tees Valley low carbon
Mark Lewis   Tees Valley low carbonMark Lewis   Tees Valley low carbon
Mark Lewis Tees Valley low carbon
 
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
 
Philips Lobbying Presentation
Philips Lobbying PresentationPhilips Lobbying Presentation
Philips Lobbying Presentation
 
ILP Scotland webinar: Luminaire Design for the Circular Economy
ILP Scotland webinar: Luminaire Design for the Circular EconomyILP Scotland webinar: Luminaire Design for the Circular Economy
ILP Scotland webinar: Luminaire Design for the Circular Economy
 
Solar Water Heaters
Solar Water HeatersSolar Water Heaters
Solar Water Heaters
 
Getting most out of bio-energy on industrial sites
Getting most out of bio-energy on industrial sitesGetting most out of bio-energy on industrial sites
Getting most out of bio-energy on industrial sites
 
EG 1001 presentation (carbon filter)
EG 1001 presentation (carbon filter)EG 1001 presentation (carbon filter)
EG 1001 presentation (carbon filter)
 
S Gulf and Pakistan Contact Issue 2/12
S Gulf and Pakistan Contact Issue 2/12S Gulf and Pakistan Contact Issue 2/12
S Gulf and Pakistan Contact Issue 2/12
 
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
SEDA Solar Energy Development in Egypt, Khaled Gasser 20130611
 
Khi Solar One, Abengoa in South Africa
Khi Solar One, Abengoa in South AfricaKhi Solar One, Abengoa in South Africa
Khi Solar One, Abengoa in South Africa
 
Total Nigeria Energy Solutions
Total Nigeria Energy SolutionsTotal Nigeria Energy Solutions
Total Nigeria Energy Solutions
 
Hydroge. What is needed. Anton Martinez _ Enagas
Hydroge. What is needed. Anton Martinez _ EnagasHydroge. What is needed. Anton Martinez _ Enagas
Hydroge. What is needed. Anton Martinez _ Enagas
 
H2 dev co ghes 2017 presentation
H2 dev co ghes 2017 presentationH2 dev co ghes 2017 presentation
H2 dev co ghes 2017 presentation
 
H2 Development Corp., LLC. MW Class Green H2 to HVAC and MW capable on-site ...
H2 Development Corp., LLC.  MW Class Green H2 to HVAC and MW capable on-site ...H2 Development Corp., LLC.  MW Class Green H2 to HVAC and MW capable on-site ...
H2 Development Corp., LLC. MW Class Green H2 to HVAC and MW capable on-site ...
 
West Normandy: A regional Hydrogen Economy Demonstrator
West Normandy: A regional Hydrogen Economy Demonstrator West Normandy: A regional Hydrogen Economy Demonstrator
West Normandy: A regional Hydrogen Economy Demonstrator
 

Viewers also liked

8 reasons not to do social media
8 reasons not to do social media8 reasons not to do social media
8 reasons not to do social media
Ken Green
 
Affordable Care Act Evaluative Paper
Affordable Care Act Evaluative PaperAffordable Care Act Evaluative Paper
Affordable Care Act Evaluative Paper
Kiarash P. Rahmanian
 
Garden city mi windows 888 778 0212
Garden city  mi windows 888 778 0212Garden city  mi windows 888 778 0212
Garden city mi windows 888 778 0212
hansons0588
 
8th pre alg -jan9
8th pre alg -jan98th pre alg -jan9
8th pre alg -jan9
jdurst65
 
Presentacion Casa de Cultura Puerto Escondido Antes y despues.compressed
Presentacion Casa de Cultura Puerto Escondido Antes y despues.compressedPresentacion Casa de Cultura Puerto Escondido Antes y despues.compressed
Presentacion Casa de Cultura Puerto Escondido Antes y despues.compressed
Desireé Hdz. Ibinarriaga
 

Viewers also liked (18)

8 reasons not to do social media
8 reasons not to do social media8 reasons not to do social media
8 reasons not to do social media
 
Affordable Care Act Evaluative Paper
Affordable Care Act Evaluative PaperAffordable Care Act Evaluative Paper
Affordable Care Act Evaluative Paper
 
Efficacy of scientific notation practice problems
Efficacy of scientific notation practice problemsEfficacy of scientific notation practice problems
Efficacy of scientific notation practice problems
 
casa Janine
casa Janinecasa Janine
casa Janine
 
Improving Constituent Engagement
Improving Constituent EngagementImproving Constituent Engagement
Improving Constituent Engagement
 
9.OPOWER
9.OPOWER9.OPOWER
9.OPOWER
 
The Dynamic Dozen (plus three) Strategic Tools (pdf version)
The Dynamic Dozen (plus three) Strategic Tools (pdf version)The Dynamic Dozen (plus three) Strategic Tools (pdf version)
The Dynamic Dozen (plus three) Strategic Tools (pdf version)
 
Garden city mi windows 888 778 0212
Garden city  mi windows 888 778 0212Garden city  mi windows 888 778 0212
Garden city mi windows 888 778 0212
 
8k5 nj3cdxy
8k5 nj3cdxy8k5 nj3cdxy
8k5 nj3cdxy
 
Invest In Kazakhstan Banking Overview P 78 81
Invest In Kazakhstan   Banking Overview P 78 81Invest In Kazakhstan   Banking Overview P 78 81
Invest In Kazakhstan Banking Overview P 78 81
 
17.Dubai200MW
17.Dubai200MW17.Dubai200MW
17.Dubai200MW
 
ONF and Sdx Central Webinar on Intent-Based Networking
ONF and Sdx Central Webinar on Intent-Based Networking ONF and Sdx Central Webinar on Intent-Based Networking
ONF and Sdx Central Webinar on Intent-Based Networking
 
8th pre alg -jan9
8th pre alg -jan98th pre alg -jan9
8th pre alg -jan9
 
The Dynamic Dozen (plus three) Strategic Tools
The Dynamic Dozen (plus three) Strategic ToolsThe Dynamic Dozen (plus three) Strategic Tools
The Dynamic Dozen (plus three) Strategic Tools
 
『ポケットスタディ 高度論文試験 午後Ⅰ・Ⅱ対応』発売のお知らせ
『ポケットスタディ 高度論文試験 午後Ⅰ・Ⅱ対応』発売のお知らせ『ポケットスタディ 高度論文試験 午後Ⅰ・Ⅱ対応』発売のお知らせ
『ポケットスタディ 高度論文試験 午後Ⅰ・Ⅱ対応』発売のお知らせ
 
Presentacion Casa de Cultura Puerto Escondido Antes y despues.compressed
Presentacion Casa de Cultura Puerto Escondido Antes y despues.compressedPresentacion Casa de Cultura Puerto Escondido Antes y despues.compressed
Presentacion Casa de Cultura Puerto Escondido Antes y despues.compressed
 
Рабочая программа по ОБЖ 8 класс
Рабочая программа по ОБЖ 8 классРабочая программа по ОБЖ 8 класс
Рабочая программа по ОБЖ 8 класс
 
Рабочая прграмма по географии 10 - 11 класс
Рабочая прграмма по географии 10 - 11 классРабочая прграмма по географии 10 - 11 класс
Рабочая прграмма по географии 10 - 11 класс
 

Similar to 12.EGA

New base energy news issue 944 dated 06 november 2016
New base energy news issue  944 dated 06 november 2016New base energy news issue  944 dated 06 november 2016
New base energy news issue 944 dated 06 november 2016
Khaled Al Awadi
 
Slotted anodes project
Slotted anodes projectSlotted anodes project
Slotted anodes project
srvrulz
 
fujairah-2-uae-ka26-cogeneration-advertorial
fujairah-2-uae-ka26-cogeneration-advertorialfujairah-2-uae-ka26-cogeneration-advertorial
fujairah-2-uae-ka26-cogeneration-advertorial
Daniel ANG
 

Similar to 12.EGA (20)

28.DSCE_ESCO
28.DSCE_ESCO28.DSCE_ESCO
28.DSCE_ESCO
 
Solar EOR: Myth and Reality in Solar Enhanced Oil Recovery
Solar EOR: Myth and Reality in Solar Enhanced Oil RecoverySolar EOR: Myth and Reality in Solar Enhanced Oil Recovery
Solar EOR: Myth and Reality in Solar Enhanced Oil Recovery
 
Mr.A.C.R.Das-Ministry-of-Steel.ppt
Mr.A.C.R.Das-Ministry-of-Steel.pptMr.A.C.R.Das-Ministry-of-Steel.ppt
Mr.A.C.R.Das-Ministry-of-Steel.ppt
 
New base energy news issue 944 dated 06 november 2016
New base energy news issue  944 dated 06 november 2016New base energy news issue  944 dated 06 november 2016
New base energy news issue 944 dated 06 november 2016
 
Power Gen ME presentation Harnessing Waste Energy
Power Gen ME presentation Harnessing Waste EnergyPower Gen ME presentation Harnessing Waste Energy
Power Gen ME presentation Harnessing Waste Energy
 
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
Emirates Steel Industry Carbon Capture Usage & Storage Project and ADNOC Ruma...
 
Adnoc and masdar project may 2013
Adnoc and masdar project   may 2013Adnoc and masdar project   may 2013
Adnoc and masdar project may 2013
 
Commercial IGCC Plants
Commercial IGCC PlantsCommercial IGCC Plants
Commercial IGCC Plants
 
Bob Alford - Perspectives on CO2-EOR
Bob Alford - Perspectives on CO2-EORBob Alford - Perspectives on CO2-EOR
Bob Alford - Perspectives on CO2-EOR
 
New base special 22 january 2014
New base special  22 january 2014New base special  22 january 2014
New base special 22 january 2014
 
New base special 22 january 2014 khaled alawadi
New base special  22 january 2014 khaled alawadiNew base special  22 january 2014 khaled alawadi
New base special 22 january 2014 khaled alawadi
 
New base special 23 january 2014 khaled al awadi
New base special  23 january 2014 khaled al awadiNew base special  23 january 2014 khaled al awadi
New base special 23 january 2014 khaled al awadi
 
Slotted anodes
Slotted anodesSlotted anodes
Slotted anodes
 
Slotted anodes project
Slotted anodes projectSlotted anodes project
Slotted anodes project
 
Response to Climate Change (incl. case of Carbon Capture)
Response to Climate Change (incl. case of Carbon Capture)Response to Climate Change (incl. case of Carbon Capture)
Response to Climate Change (incl. case of Carbon Capture)
 
29.DSCE_Lighting
29.DSCE_Lighting29.DSCE_Lighting
29.DSCE_Lighting
 
Aluminium World Journal 2022
Aluminium World Journal 2022Aluminium World Journal 2022
Aluminium World Journal 2022
 
Tata Steel presentation to CCC
Tata Steel presentation to CCCTata Steel presentation to CCC
Tata Steel presentation to CCC
 
Sapa 2015
Sapa 2015Sapa 2015
Sapa 2015
 
fujairah-2-uae-ka26-cogeneration-advertorial
fujairah-2-uae-ka26-cogeneration-advertorialfujairah-2-uae-ka26-cogeneration-advertorial
fujairah-2-uae-ka26-cogeneration-advertorial
 

More from Fazil Abdul Rahiman (16)

21.DU
21.DU21.DU
21.DU
 
25.AlGhurair
25.AlGhurair25.AlGhurair
25.AlGhurair
 
11.ET
11.ET11.ET
11.ET
 
8.ENOC
8.ENOC8.ENOC
8.ENOC
 
5.UAE_SmallScale_POA
5.UAE_SmallScale_POA5.UAE_SmallScale_POA
5.UAE_SmallScale_POA
 
2.Dubal
2.Dubal2.Dubal
2.Dubal
 
3.UAEGH_2013
3.UAEGH_20133.UAEGH_2013
3.UAEGH_2013
 
20.DEWA_ERP
20.DEWA_ERP20.DEWA_ERP
20.DEWA_ERP
 
7.FEWA
7.FEWA7.FEWA
7.FEWA
 
14.Zerocarbon_DubaiPolice
14.Zerocarbon_DubaiPolice14.Zerocarbon_DubaiPolice
14.Zerocarbon_DubaiPolice
 
18.CAS
18.CAS18.CAS
18.CAS
 
30.UNEP_Kuwait
30.UNEP_Kuwait30.UNEP_Kuwait
30.UNEP_Kuwait
 
31.UNEP_Oman
31.UNEP_Oman31.UNEP_Oman
31.UNEP_Oman
 
33.DSCE_2030
33.DSCE_203033.DSCE_2030
33.DSCE_2030
 
36.RTA
36.RTA36.RTA
36.RTA
 
6.UAEGH_2014
6.UAEGH_20146.UAEGH_2014
6.UAEGH_2014
 

12.EGA

  • 1. PROJECT BRIEF The purpose of the project activity is to improve the energy efficiency of the existing exhaust fans, located at the fume treatment plants of Dubai Aluminium (DUBAL), by installing variable speed drives (VFD) for the existing exhaust fans motors. This upgrade will result in 40% electricity savings compared to the existing situation without VFD. The resulting reduction of electricity demand (approx. 56,000 MWh/year) will reduce the greenhouse gases emission associated with the generation of fossil fuel based electricity. Dubai Carbon is supporting Dubal in registering the project with UNFCCC for carbon credits under the CDM. PROJECT STATUS Project Type: Carbon Advisory Project Duration: 24 months (2014-2016) Project Status: Ongoing Meet the Team: CLIENT: EMIRATES GLOBAL ALUMINIUM- JEBAL ALI (DUBAL) 3.3KV MAIN EXHAUST FANS ENERGY SAVING PROJECT Thomas Bosse Fazil Abdul Rahiman Wolfgang Wetzer AA040 PROJECT NUMBER
  • 2. EMISSION REDUCTION POTENTIAL: Approx. 25,000 tCO2 e annually CDM METHODOLOGY: AMS-II.S. “Energy efficiency in motor systems” OUTCOMES/WORK PACKAGES: • Developing and registering Dubal’s energy efficiency project with UNFCCC • International recognition for Dubal’s energy efficiency improvement measures PROJECT APPROACH: • Prince 2 for Project Management • UNFCCC methodologies, rules and references CLIENT: Emirates Global Aluminium- Jebal Ali (Dubal) Emirates Global Aluminium (EGA) is owned equally by Mubadala Development Company of Abu Dhabi and Investment Corporation of Dubai. EGA is an aluminium conglomerate with interests in bauxite/alumina and primary aluminium smelting; with plans for significant local growth and international expansion. EGA’s core operating assets are Dubai Aluminium (“DUBAL”) and Emirates Aluminium (“EMAL”) – whose combined production is 2.4 million tonnes per annum (“tpa”), ranking EGA among the five largest primary aluminium producers in the world. Both companies are renowned for maximising the health and safety of people and the surrounding community, reducing operational environmental impact and investing in social and economic development. DUBAL’s Jebel Ali operation – comprising a 1 million tpa smelter, a 2,350 MW power station and other facilities – is one of the world’s largest single-site primary aluminium smelters. Commissioned in 1979, DUBAL celebrated its 35th anniversary in 2014. http://www.ega.ae CLIENT: EMIRATES GLOBAL ALUMINIUM- JEBAL ALI (DUBAL) 3.3KV MAIN EXHAUST FANS ENERGY SAVING PROJECT