SlideShare a Scribd company logo
1 of 2
Download to read offline
PROJECT BRIEF
In line with the strategy of Supreme Council
of Energy, District Cooling is a viable tool
to reduce energy consumption of the built
environment and target a 40% penetration in
the Emirate of Dubai. EMPOWER is world’s
leading entity when it comes to development
and provision of efficient district cooling
services. EMPOWER’s energy efficient and
thereby emission reduction measures will be
made eligible under the UNFCCC by Dubai
Carbon, to generate carbon credits. For this a
new and unique CDM Methodology specific to
district cooling is being developed.
PROJECT STATUS
Project Type:
Carbon Advisory
Project Duration:
30 months
Project Status:
Ongoing
Meet the Team:
CLIENT: EMIRATES CENTRAL COOLING
SYSTEMS CORPORATION (EMPOWER)
DISTRICT COOLING
PROGRAMME OF
ACTIVITIES (POA)
Thomas
Bosse
Fazil Abdul
Rahiman
Suraiya
Tasnim
Pablo
Izquierdo
AA170
PROJECT
NUMBER
EMISSION REDUCTION
POTENTIAL:
Unlimited as unlimited
projects can be included
in the PoA over a span of
28 years. The maximum
emission reduction potential
of the individual project
should be less than 60,000
tCO2
e annually.
CDM METHODOLOGY:
Under development
OUTCOMES/WORK PACKAGES:
• EMPOWER to be the first entity in the
world to develop a CDM Methodology
under UNFCCC for energy efficient
district cooling
• EMPOWER to be the first entity in the
world to develop a PoA for efficient
district cooing services
• Potential to include all high efficient
district cooling projects in the country
under the PoA
CLIENT: EMIRATES CENTRAL COOLING
SYSTEMS CORPORATION (EMPOWER)
DISTRICT COOLING
PROGRAMME OF
ACTIVITIES (POA)
PROJECT APPROACH:
• Prince 2 for Project Management
• UNFCCC methodologies, rules
and references
CLIENT:
Emirates Central Cooling Systems Corporation (EMPOWER) was
established in 2003 with an objective to enable the real estate sector to efficiently
utilize energy resources through District Cooling Services (DCS). Empower
was set up as a joint venture between Dubai Electricity and Water Authority
(DEWA) and TECOM Investments a member of Dubai Holding through a Royal
Decree issued by the Ruler of Dubai. Over the last decade, Empower has seen
a consistent level of growth. It recently acquired Palm Utilities and Palm District
Cooling, considered as one of the largest ever acquisition in the district cooling
industry, transforming Empower into the world’s largest district cooling services
provider in terms of capacity. From a modest beginning in 2004 with a single
temporary plant serving DIFC (the financial district of Dubai), Empower has grown
exponentially and the numbers are quite remarkable – we serve more than 45,000
customers, have over 70% market share in the UAE, nearly 700 employees, and a
district cooling capacity of approximately 1 million Refrigeration Tons (RT).
http://www.empower.ae

More Related Content

What's hot

Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectPaul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectGlobal CCS Institute
 
C4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from airC4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from airIceland Geothermal
 
Joint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in IndonesiaJoint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in IndonesiaDicky Edwin Hindarto
 
Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...
Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...
Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...Fundación Renovables
 
Ecoterrace Design Quality Presentation
Ecoterrace Design Quality PresentationEcoterrace Design Quality Presentation
Ecoterrace Design Quality Presentationeversion
 
Farm Renewables Overview: the political and environmental picture - Oliver Ha...
Farm Renewables Overview: the political and environmental picture - Oliver Ha...Farm Renewables Overview: the political and environmental picture - Oliver Ha...
Farm Renewables Overview: the political and environmental picture - Oliver Ha...Farming Futures
 
Company Update February 2017
Company Update February 2017Company Update February 2017
Company Update February 2017Rebecca Markillie
 

What's hot (8)

Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectPaul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
 
UFI Operations Award 2010 - Direct Energy Center
UFI Operations Award 2010 - Direct Energy CenterUFI Operations Award 2010 - Direct Energy Center
UFI Operations Award 2010 - Direct Energy Center
 
C4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from airC4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from air
 
Joint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in IndonesiaJoint Crediting Mechanism Development in Indonesia
Joint Crediting Mechanism Development in Indonesia
 
Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...
Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...
Presentación de Jørgen Abildgaard en la Jornada "Barcelona hacia la transició...
 
Ecoterrace Design Quality Presentation
Ecoterrace Design Quality PresentationEcoterrace Design Quality Presentation
Ecoterrace Design Quality Presentation
 
Farm Renewables Overview: the political and environmental picture - Oliver Ha...
Farm Renewables Overview: the political and environmental picture - Oliver Ha...Farm Renewables Overview: the political and environmental picture - Oliver Ha...
Farm Renewables Overview: the political and environmental picture - Oliver Ha...
 
Company Update February 2017
Company Update February 2017Company Update February 2017
Company Update February 2017
 

Similar to 16.Empower

The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case StudyThe Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case StudyDicky Edwin Hindarto
 
CDM clean development mechanism
CDM clean development mechanismCDM clean development mechanism
CDM clean development mechanismavanidedhia2
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects Avanceon
 
2 co making the business case for ccs
2 co   making the business case for ccs2 co   making the business case for ccs
2 co making the business case for ccsGlobal CCS Institute
 
ITM Power Results Presentation
ITM Power Results PresentationITM Power Results Presentation
ITM Power Results PresentationITM Power
 
Solutions in Industry: Carbon Capture Utilisation and Storage (CCS) and circu...
Solutions in Industry: Carbon Capture Utilisation and Storage (CCS) and circu...Solutions in Industry: Carbon Capture Utilisation and Storage (CCS) and circu...
Solutions in Industry: Carbon Capture Utilisation and Storage (CCS) and circu...ipcc-media
 
NEWE REAL ESTATE & ENERGY HOLDING, LLC
NEWE REAL ESTATE & ENERGY HOLDING, LLCNEWE REAL ESTATE & ENERGY HOLDING, LLC
NEWE REAL ESTATE & ENERGY HOLDING, LLChundkrealestate
 
The Cotocon Group Case Studies
The Cotocon Group Case Studies The Cotocon Group Case Studies
The Cotocon Group Case Studies Jimmy Carchietta
 
company_profile_BioEnergy_AlternativeFuels
company_profile_BioEnergy_AlternativeFuelscompany_profile_BioEnergy_AlternativeFuels
company_profile_BioEnergy_AlternativeFuelsMahmoud Mostafa
 
Beyond profit sig carbon finance
Beyond profit sig carbon financeBeyond profit sig carbon finance
Beyond profit sig carbon financeElaine Chow
 
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureBusiness case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureGlobal CCS Institute
 
Green Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset ProgramGreen Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset ProgramDicky Edwin Hindarto
 
White Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectWhite Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectGlobal CCS Institute
 

Similar to 16.Empower (20)

29.DSCE_Lighting
29.DSCE_Lighting29.DSCE_Lighting
29.DSCE_Lighting
 
28.DSCE_ESCO
28.DSCE_ESCO28.DSCE_ESCO
28.DSCE_ESCO
 
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case StudyThe Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
The Implementation of the Market Based Mechanism in Indonesia, a JCM Case Study
 
Commercial Case Studies
Commercial Case StudiesCommercial Case Studies
Commercial Case Studies
 
CDM clean development mechanism
CDM clean development mechanismCDM clean development mechanism
CDM clean development mechanism
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
 
5.UAE_SmallScale_POA
5.UAE_SmallScale_POA5.UAE_SmallScale_POA
5.UAE_SmallScale_POA
 
2 co making the business case for ccs
2 co   making the business case for ccs2 co   making the business case for ccs
2 co making the business case for ccs
 
ITM Power Results Presentation
ITM Power Results PresentationITM Power Results Presentation
ITM Power Results Presentation
 
Solutions in Industry: Carbon Capture Utilisation and Storage (CCS) and circu...
Solutions in Industry: Carbon Capture Utilisation and Storage (CCS) and circu...Solutions in Industry: Carbon Capture Utilisation and Storage (CCS) and circu...
Solutions in Industry: Carbon Capture Utilisation and Storage (CCS) and circu...
 
Thermax presentation
Thermax presentationThermax presentation
Thermax presentation
 
NEWE REAL ESTATE & ENERGY HOLDING, LLC
NEWE REAL ESTATE & ENERGY HOLDING, LLCNEWE REAL ESTATE & ENERGY HOLDING, LLC
NEWE REAL ESTATE & ENERGY HOLDING, LLC
 
The Cotocon Group Case Studies
The Cotocon Group Case Studies The Cotocon Group Case Studies
The Cotocon Group Case Studies
 
company_profile_BioEnergy_AlternativeFuels
company_profile_BioEnergy_AlternativeFuelscompany_profile_BioEnergy_AlternativeFuels
company_profile_BioEnergy_AlternativeFuels
 
Beyond profit sig carbon finance
Beyond profit sig carbon financeBeyond profit sig carbon finance
Beyond profit sig carbon finance
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureBusiness case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
 
Contact Solar
Contact SolarContact Solar
Contact Solar
 
Green Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset ProgramGreen Aviation Through Carbon Offset Program
Green Aviation Through Carbon Offset Program
 
White Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage ProjectWhite Rose Carbon Capture and Storage Project
White Rose Carbon Capture and Storage Project
 

More from Fazil Abdul Rahiman (17)

21.DU
21.DU21.DU
21.DU
 
25.AlGhurair
25.AlGhurair25.AlGhurair
25.AlGhurair
 
11.ET
11.ET11.ET
11.ET
 
9.OPOWER
9.OPOWER9.OPOWER
9.OPOWER
 
8.ENOC
8.ENOC8.ENOC
8.ENOC
 
2.Dubal
2.Dubal2.Dubal
2.Dubal
 
3.UAEGH_2013
3.UAEGH_20133.UAEGH_2013
3.UAEGH_2013
 
17.Dubai200MW
17.Dubai200MW17.Dubai200MW
17.Dubai200MW
 
20.DEWA_ERP
20.DEWA_ERP20.DEWA_ERP
20.DEWA_ERP
 
7.FEWA
7.FEWA7.FEWA
7.FEWA
 
14.Zerocarbon_DubaiPolice
14.Zerocarbon_DubaiPolice14.Zerocarbon_DubaiPolice
14.Zerocarbon_DubaiPolice
 
18.CAS
18.CAS18.CAS
18.CAS
 
30.UNEP_Kuwait
30.UNEP_Kuwait30.UNEP_Kuwait
30.UNEP_Kuwait
 
31.UNEP_Oman
31.UNEP_Oman31.UNEP_Oman
31.UNEP_Oman
 
33.DSCE_2030
33.DSCE_203033.DSCE_2030
33.DSCE_2030
 
36.RTA
36.RTA36.RTA
36.RTA
 
6.UAEGH_2014
6.UAEGH_20146.UAEGH_2014
6.UAEGH_2014
 

16.Empower

  • 1. PROJECT BRIEF In line with the strategy of Supreme Council of Energy, District Cooling is a viable tool to reduce energy consumption of the built environment and target a 40% penetration in the Emirate of Dubai. EMPOWER is world’s leading entity when it comes to development and provision of efficient district cooling services. EMPOWER’s energy efficient and thereby emission reduction measures will be made eligible under the UNFCCC by Dubai Carbon, to generate carbon credits. For this a new and unique CDM Methodology specific to district cooling is being developed. PROJECT STATUS Project Type: Carbon Advisory Project Duration: 30 months Project Status: Ongoing Meet the Team: CLIENT: EMIRATES CENTRAL COOLING SYSTEMS CORPORATION (EMPOWER) DISTRICT COOLING PROGRAMME OF ACTIVITIES (POA) Thomas Bosse Fazil Abdul Rahiman Suraiya Tasnim Pablo Izquierdo AA170 PROJECT NUMBER
  • 2. EMISSION REDUCTION POTENTIAL: Unlimited as unlimited projects can be included in the PoA over a span of 28 years. The maximum emission reduction potential of the individual project should be less than 60,000 tCO2 e annually. CDM METHODOLOGY: Under development OUTCOMES/WORK PACKAGES: • EMPOWER to be the first entity in the world to develop a CDM Methodology under UNFCCC for energy efficient district cooling • EMPOWER to be the first entity in the world to develop a PoA for efficient district cooing services • Potential to include all high efficient district cooling projects in the country under the PoA CLIENT: EMIRATES CENTRAL COOLING SYSTEMS CORPORATION (EMPOWER) DISTRICT COOLING PROGRAMME OF ACTIVITIES (POA) PROJECT APPROACH: • Prince 2 for Project Management • UNFCCC methodologies, rules and references CLIENT: Emirates Central Cooling Systems Corporation (EMPOWER) was established in 2003 with an objective to enable the real estate sector to efficiently utilize energy resources through District Cooling Services (DCS). Empower was set up as a joint venture between Dubai Electricity and Water Authority (DEWA) and TECOM Investments a member of Dubai Holding through a Royal Decree issued by the Ruler of Dubai. Over the last decade, Empower has seen a consistent level of growth. It recently acquired Palm Utilities and Palm District Cooling, considered as one of the largest ever acquisition in the district cooling industry, transforming Empower into the world’s largest district cooling services provider in terms of capacity. From a modest beginning in 2004 with a single temporary plant serving DIFC (the financial district of Dubai), Empower has grown exponentially and the numbers are quite remarkable – we serve more than 45,000 customers, have over 70% market share in the UAE, nearly 700 employees, and a district cooling capacity of approximately 1 million Refrigeration Tons (RT). http://www.empower.ae