Presentation made at 3rd Northeast Connectivity Summit,2016 on Way forward for oil and gas exploration in Tripura by Mr. S. C.Soni, Asset Manager, ONGC Tripura Asset
6. Fields of Tripura
Manikyanagar
Tichna
Agartala Dome
Konaban
Kunjaban
Sonamura
Sundalbari
Fields Discovered 11
On Production 7
Yet to be put on Production 4
1975… Baramura 31
1982… Gojalia 15
1983… Manikyanagar 30
1986… Konaban 36
1987… Agartala Dome 49
2000… Tichna 09
2004… Sonamura 03
2007…Sundulbari & Kunjaban 10+7
2008… Tulamura 01
2009…Khubal 11
Others 10
TotalWells 212
7. Operational Areas for E&P Activities
7
Particular
Area
(Km2)
Remarks
Granted PML 3075
17 granted PML areas in
10 discovered fields
Gas production from 13
granted PML
AA-ONN-2001/1
(NELP Block)
960
Operational w.e.f. May’
2003.
DOC submitted in
Feb’2016
Total 4035 Km2
11. Status of Wells (As on 01.09.2016)
11
Total Wells Drilled 212
Gas Wells 95
On Production 70
Sick 4
Unconnected for want of surface facilities 21
Abandoned / To be abandoned 95
Utility Wells 05
Inconclusive Tested / Re-testing required 17
13. Block: Tripura AA-ONN-2002/1
PSC Details
Effective
Date
7th April, 2004
Participation JOGPL 20%, GAIL 80%
Block Area 1,260 Sq. Km.
Post Relinquishment
Phases
Completed
Exploration Phases I & II
Current
Phase
Appraisal/Development
of two discoveries
14. Phase-1
Exploration Wells (3)
Jailangpara-1, Kathalchari-1*, North-Ambassa
AppraisalWells (2)
Srikantabari-1, Kathalchari-NE
Seismic Area ~ 310 LKM of 2D API
Phase-2
Exploration Wells (2)
Matabari-1, North Atharamura-1*
Seismic Area ~ 310 LKM of 2D API
Current Activities
Kathalchari
FDP approved by MC on 5th August
2015.
North
Atharamura
Appraisal plan reviewed by MC on
30th June 2015.
Investment
$136 MM (INR 695 Cr)
till end 31st August 2016
Work Programme Carried Out
14
15. Field Habiganj
Disc. Year/Prod. Year 1963/1968
GIIP (BCF) 3684
2P (BCF) 2633 (RF:71%)
Average Single Well Productivity 25.11 MMSCFD
Source: Petrobangla Annual Report, 2013
Field Bibiyana
Disc. Year/Prod. Year 1998/2007
GIIP (BCF) 7427
2P (BCF) 5754 (RF:77%)
Average Single Well Productivity 59.57 MMSCFD
Source: Petrobangla Annual Report, 2013
Field Moulavi Bazar
Disc. Year/Prod. Year 1997/2005
GIIP (BCF) 1053
2P (BCF) 428 (RF: 41%)
Average Single Well Productivity 12.17 MMSCFD
Source: Petrobangla Annual Report, 2013
Existing /Producing Fields of Bangladesh
Existing /Producing Fields of Tripura (India)
New Fields of Tripura (India)
Field Rashidpur
Disc. Year/Prod. Year 1960/1993
GIIP (BCF) 3650
2P (BCF) 2433 (RF:67%)
Average Single Well Productivity 11.75 MMSCFD
Source: Petrobangla Annual Report, 2013
Field Baramura
Disc. Year/Prod. Year 1975/1986
GIIP (BCF) 302.3 196
2P (BCF) 122.3 (RF:40%) 98.3 (RF:50.2%)
Average Single Well Productivity 5.3 MMSCFD
Source: IHS,2011
Field Agartala Dome
Disc. Year/Prod. Year 1987/1998
GIIP (BCF) 578.2 553.8
2P (BCF) 369.5 (RF:64%) 385 (RF:67.3%)
Average Single Well Productivity 7.1 MMSCFD
Source: IHS, 2011
Block
surrounded by
prolific Gas
fields of India
and Bangladesh
Bangladesh Fields Source: Petrobangla Annual Report
2013
Indian Fields Source*: www.infraline.com(2008-2009),
IHS 2011
16. 1616
1C 2C 3C
GIIP 125 341 1860
Recoverable 75 239 1395
Kathalchari - Middle Bhuban; 1st phase FDP approved
1C 2C 3C
GIIP 354 1078 3401
Recoverable 58 348 923
North Atharamura - Middle Bhuban; To be appraised
Resource estimates as per GCA report as of September
2013
DGH has approved GIIP of 1.2 TCF (36 BCM)
and recoverable of 65 BCF (2P) (1.95 BCM)
Large GIIP Resource Base : ~500-5000 BCF Range
Units in BCF
Units in BCF
17. Appraisal Period Appraisal period till 31st May 2016,
requested DGH for extension.
Work Program 2 Firm Wells & 140 LKM 2D Seismic
completed
3 ContingentWells + 50 LKM 2D
Seismic
Static & Dynamic Modeling and DOC
preparation.
Appraisal of North-Atharamura Discovery
17
18. FDP
Approved by MC on 5th Aug’15 for 249
Sq KM of development area
Reserves
GIIP: 1212 BCF (36 BCM)
Recov. Reserves: 64.54 BCF (1.95 BCM)
from 4 wells as Phase-1.
Development
Work
Program
• 3D Seismic 70 Sq. Km
• (02) Re-Entry and completion of KL
& MatabariWell
• Drilling and completion of 02 new
wells, basis 3D Seismic
• Facility installation and
commissioning
• Gas Production , Evacuation and
Monetization.
• First Gas expected by May 2020.
Development of Kathalchari Discovery
18
33. Project Scheme for production enhancement
34
For Gas production of 5.1 MMSCMD, a project scheme
was approved by ONGC Board in Feb’2016
Total Investment : Rs 5050. 13 Cr
Drilling (153 wells) : Rs 4116.37 Cr
Surface Facilities & pipeline : Rs 933.76 Cr
Reserve Accretion : 40 BCM
Gas Production envisaged : 49.37 BCM till 2035-36
Investment has been approved for the activities to be carried out between 2005-06 to 2021-22
34. Major Milestones for Sustenance of Gas Supply
35
Components
(West Tripura)
Activities
Completed
during 2005-16
Balance
Activities to be
completed by
2021-22
Total Plan
Drilling of Wells 81 72 153
Exploratory Wells 48 33 81
Development Wells 33 39 72
Planned Accretion*, BCM ~18 ~22 40
Surface Facilities, MMSCMD 4.95 1.4 6.35
Capacity to be Added : 1.40 MMSCMD
Creation of Sonamura GCS : 0.80 MMSCMD (EDC: Dec 2016)
Creation of Gojalia GCS : 0.50 MMSCMD (EDC: Mar 2019)
Production profile considered up to 2035-36
35. Drilling Program for next 5 years
36
6
13
15
13
7
9 9
7 7 7
15
22 22
20
14
0
5
10
15
20
25
2016-17 2017-18 2018-19 2019-20 2020-21
Exp Dev Total
NELP 2 6 1* 4* 5*
36. 37
Hydrocarbon Vision 2030 for North-East India was
released by MOPNG – GOI on 9th Feb 2016 at
Guwahati for developing North-East region as a
dominant Hydrocarbon Hub at the forefront of India’s
energy economy.
Hydrocarbon Vision 2030 for NER
37. 38
5 Pillars of North East Hydrocarbon Vision 2030
Production
Production enhancement contracts, technology
deployment and fast track clearances
•Develop service provider hubs
Projects
LPG, NG, POL Pipelines
•Refineries, Import links
•CNG Highways & 13 new CGD networks
Policy Moderate PSC, review resource pricing
•FacilitateVGF (Viability Gap Funding)
People
Clean fuel access for households
•Skill development
•Local community involvement
State government involvement in planning and
implementation
•Trade with SAARC countries
Partnership
38. 39
Developing North East Region as a dominant hub at forefront of India energy map
Hydrocarbon Vision 2030 for NER
1. Double the the production of Oil and Natural Gas (O + OEG in MMTOE)
2. Access of clean fuel (LPG/PNG) to 100% households in the region.
3. Bolster development through creation of service provider hubs.
4. Ensure availability to support growth in per capita Petroleum product consumption.
5. Provide pipe line connectivity by installing new POL & LPG pipe line.
6. Develop natural gas grid, CGD networks & CNG Highways.
7. Generate employment opportunities through industrial & skill development.
8. Promote manufacturing industry related to Oil & Gas in the region.
9. Incentivize production of Bio fuel in the region for providing access to clean fuels and
to boost rural economy.
10.Promote trade between North East Region of India & Neighbouring SAARC
countries.
39. Natural Gas – Demand Supply scenario
40
Present Status Future Projections
40. 41
Key initiatives planned for the Tripura state
Production of Oil &
Gas
Oil & Gas production
estimated
approximately to be
3.5 MMTOE in 2030
LPG Access
Increasing LPG
consumption from
32TMTPA in 2014-15
84TMTPA in 2029-30
Revenue
Estimated revenue of Rs.
410 Crore from
royalty in 2030
Planned projects
Oil & Gas
• Natural gas pipeline:Agartala-Silchar-Shillong-Guwahati-Bongaigaon
• LPG pipeline: Chittagong-sabrum-Agartala (Further to Aizawl/Silchar)
• POL Pipeline: Guwahati-Lumding-Silchar-Agartala
• Service provider hub at Agartala
• Expansion of CGD network byTNGCL
• Developing Agartala as nodal LPG despatch point
(for Silchar, Manipur, Mizoram)
Other Infrastructure
projects
Black top surface and
double lane laying of
NH 44
POL product supply
Increasing POL availability
from
190TMTPA in 2014-15
408TMTPA in 2029-30
45. 726 MW Mega Power Plant project was conceptualized :
to monetize the already established idle gas reserves
to improve the power scenario of the North-East states.
OTPC – ONGC Tripura Power Company Ltd
46
One of the biggest Clean Development Mechanism (CDM) projects of the world.
46. Hon’ble President of India Sri. Pranab Mukherjee inaugurated the first unit 363.3 MW
on 21.06.2013.
President inaugurates 1st unit, Jun’ 2013
47
47. Honourable Prime Minister Mr. Narendra Modi dedicated Unit II (363.3 mw) to the Nation
on December 1, 2014.
48
Prime Minister inaugurates 2nd unit, Dec’ 2014
49. 50
Natural gas utilisation – Industry development
Natural Gas as aVehicle Fuel
PNG for Domestic Use (Piped Natural Gas) & CGD (City Gas
Distribution) network
For production of Fertilizers.
For heating in the leaching process for drying and curing processes
in Rubber Industry.
For uniform heating during drying process of tea leaves in tea
processing industry .
Natural gas can be used for powder drying, tiles drying and final
heat treatment.