SlideShare a Scribd company logo
1 of 26
Download to read offline
PT Medco Energi Mining Intl
www.medcoenergi.com
Energy Company of Choice
OPERATION EXCELLENCE
DURING THE TURNDOWN
MARKET ERA
A MARKETING PRESENTATION
JUNE 2016
9/1/2016 Page 2 of 25
A. Medco Energi at a Glance
PT Medco Energi Internasional Tbk : Our History
9/1/2016 Page 3 of 25
A. Medco Energi at a Glance
Domestic Oil and Gas Business
Medcoenergi Operates nine oil and gas blocks, maintain working interests in one block operated by partner and
hold an economic participating interest in one exploration field. MedcoEnergi also hold interest in three CBM
blocks.
Exploration Development Production Economic Interest Participation Service Contract CBM
Block A
South
Central
Sumatra
Rimau
Block
Bengara
Block
Nunukan
Block
Tarakan
Block
Seimengaris
Block
Sekayu
Block
Muralim
Block
Lematang
Block
Jeruk
Exploration
Well
Bawean
Block
Senoro-
Toili Block
9/1/2016 Page 4 of 25
A. Medco Energi at a Glance
International Oil and Gas Business
9/1/2016 Page 5 of 25
A. Medco Energi at a Glance
Coal Mining and Power Plant Business
9/1/2016 Page 6 of 25
Nov 2011 Infrastructure development : mess, office, port and crushing facility
Dec 2011 Heavy equipment purchasing
Jan 2012 •Heavy equipment mobilization
•Operator recruitment
Feb 2012 First OB removal and coal
getting
Apr 2012 First crushing activity
Sep 2012 First shipment
B. DTR Development Timeline
Total 48 Months (Permitting 32 months, Technical works 16 months)
•MEMI : Obtained PT. Duta
Tambang Rekayasa 1700 Ha,
Coal-Nunukan
•Medco Energi Mining
Internasional was established
in November
2008
•Drilling activity started and
Feasibility Study2009
•DTR : IUP Operation
•Environmental study (AMDAL)
•Applying for Borrow and Lend
Forestry Permit (IPP)
2010
•DTR : Borrow and Lend Forestry
Permit (IPP) in October2011
9/1/2016 Page 7 of 25
C. Why Challenging
Geological Complexity: 16 Major Structures
Structurecomplexitywithmultithinseams
Example of coal seam
displacement in DTR area
9/1/2016 Page 8 of 25
Multi thin coal seams
C. Why Challenging
Geological Complexity : Multi Thin Seams
±40 cm
±30 cm
±50 cm
Thickness 0.3
– 3.7 m
Layers :
up to 3
layers
9/1/2016 Page 9 of 25
C. Why Challenging
Geological Complexity : Multiple Coal Quality each Seams
Thickness
( Centimeter ) TM IM ASH VM FC TS CVAR
Pit Ganggoro North SE GU, GL, FU, FL
GU : 58, GL : 125, FU : 45, FL
: 43
3,005,016 174,660 17.20 6.52 2.74 11.43 44.22 41.61 4.79 6,441
Pit Arie North
CUU, CU, CUL,
CL, BU, BL
CUU : 35, CU : 81, CUL : 46,
CL : 34, BU : 48, BL : 58
2,586,400 171,150 15.11 6.71 2.86 10.88 43.05 44.21 3.55 6,542
Pit Elonita North E1 , E E1 : 43 , E : 102 4,351,393 289,657 15.02 6.13 2.81 6.12 45.27 45.79 3.41 6,985
Pit Ganggoro Lama
H, GU, G, GL,
FU, F, FL
H : 52, GU : 52, G : 132, GL :
0,93, FU : 43, F : 52, FL : 44
1,199,262 121,650 9.86 7.47 3.16 10.06 44.14 42.65 3.22 6,440
Pit Handayani H , I, G H : 108 , I : 70, G : 92 8,043,807 523,448 15.37 7.53 4.41 5.19 44.39 46.01 3.39 6,948
Pit Hamim GU, G, GL GU : 58, G : 53, GL : 125 1,443,430 92,970 15.53 8.56 3.46 17.72 40.54 38.30 3.84 5,679
Pit Elon Middle E1 , E E : 101 , E1: 37 1,247,770 75,270 16.58 6.13 2.81 6.12 45.27 45.79 3.41 6,985
Pit Erna Middle
E2L, E2U, E3L,
E3U
E2L : 39, E2U : 30, E3L : 74,
E3U : 44
459,940 32,820 14.01 7.25 3.20 6.03 44.66 44.46 1.21 6,853
Pit GG Middle
FL, FU, G, GL,
GU
FL : 55, FU : 38, G : 53, GL :
48, GU : 53
1,164,120 86,740 13.42 7.47 3.16 10.06 44.14 42.65 3.22 6,440
Total 23,501,138 1,568,365 14.98 7.07 3.49 8.17 44.11 44.36 3.61 6,710
* Middle Block data still need Re-Drill
PIT
Coal Quality
OB (Bcm)SEAM Coal (ton) SR
9/1/2016 Page 10 of 25
Chemical Properties Basis Unit Value Physical Properties Basis Unit Value
Total Moisture ARB % 10.0 Hard Grove Index 48.0
Specific Energy Fuel Ratio 1.1
Calorific Value GAD kcal/kg 6,800 Fusibility of Ash : Deformation Temparature Reducing 1250
Calorific Value GAR kcal/kg 6,500
Calorific Value NAR kcal/kg 6,200 Base % DB 26.4
Proximate Acid % DB 61.8
Inherent Moisture ADB % 6.0 Base / Acid ratio DB 0.4
Volatile Matter ADB % 43.0 Slagging index (B/A*%S dry in coal) DB 1.5
Fixed Carbon ADB % 44.0 Fouling index (B/A*%Na2O in ash) DB 0.5
Ash ADB % 10.0 Ash Analysis
Total Sulphur ADB % 3.5 SiO2 DB % 35.7
Ultimate Al2O3 DB % 25.1
Carbon DAF % 84.0 Fe2O3 DB % 12.6
Hydrogen DAF % 6.0 CaO DB % 5.9
Nitrogen DAF % 1.5 MgO DB % 5.8
Sulphur DAF % 4.2 Na2O DB % 1.2
Oxygen + Errors DAF % 4.8 K2O DB % 0.9
Trace Element TiO2 DB % 1.0
Chlorine ADB % 0.01 Mn3O4 DB % 0.1
Fluorine ADB ppm 80.0 P2O5 DB % 0.9
Phosporus in Coal adb % 0.04 SO3 DB % 10.6
Slag and Ash Deposit Characteristic
In accordance with current ASTM standards
C. Why Challenging
Geological Complexity : Typical of High Sulphur 3.5% and High CV 6500GAR
9/1/2016 Page 11 of 25
Total Drilling : 1224 holes (42,687 m)
Total Geophysical Logging : 467 holes (10,983 m)
Total Topographic Survey: 1.697 Ha Scale 1:1000
Batas
Konse
si AHL
Tanam
an
Akasia
AHL
Tana
man
Kelap
a
sawit
NJL
C. Why Challenging
Geological Complexity : Need Dense Drilling with Space 40m
9/1/2016 Page 12 of 25
Description Area DTR DTSA TOTAL
Coal Resources - Nunukan (Ton) All 8,900,000 2,170,000 11,070,000
(Ton) North 3,300,000
(Ton) North East 1,600,000
(Ton) Middle and South 4,000,000
Coal Reserve (SR = 15) (Ton) All 3,900,000 1,710,000 5,610,000
(Ton) Middle 600,000
(Ton) South 3,300,000
Mined Reserve as per Sep 2015 (Ton) All 1,686,000 0 1,686,000
Remaining Reserve (Ton) All 2,214,000 1,710,000 3,924,000
Note:
SR (stripping ratio) 1 : 15 means for every 1 ton of coal, we need to remove 15 meter cubic of soil (overburden)
C. Why Challenging
Small Resource and Reserve
9/1/2016 Page 13 of 25
Camp Site
Jetty PT.DTR
Jakarta
Balikpapan
Tarakan
Nunukan
C. Why Challenging
Remote Area and Near the Borderline
Routes :
1. Jakarta – Tarakan : 2.5 Hours
2. Tarakan – Nunukan : 30 Minutes
3. Nunukan – Jetty PT. DTR by Speedboat :
1 hours
4. Jetty PT. DTR – Camp Site by Car : 30
minutes
Nunukan
9/1/2016 Page 14 of 25
1. Top Soil Removal
2. Overburden Removal
3. Coal Getting
4. Overburden Dumping
5. Re Contouring
6. Top Soil Spreading
Mining Advancement Reclamation
Advancement
Page 14 of 29
D. Operation Excellence
Pushback Mining Method : Reduce Disturbance Area and Cost
9/1/2016 Page 15 of 25
D. Operation Excellence
Comprehensive Mine Plan : Opening Multiple Pit at the Single Mine
6 topsoil spreading
3 coal getting
1 topsoil removal
2 OB removal
4 OB dumping
5 re-contouring
PIT A
PIT B
9/1/2016 Page 16 of 25
We start the development when the coal price
started to fall, we don’t want to get stranded with
contractor at worst market condition
Cost of outsource was at least 10% higher than in-
house operation, currently our stripping ratio 1 : 15
Flexibility in operation mode adjusting to any
market condition
Seeing the future opportunity of being a service
company and develop our strength to be a mining
company as a strategic local partner
D. Operation Excellence
In-House Mining : 65 Unit (27HE+38DT)
9/1/2016 Page 17 of 25
D. Operation Excellence
Build up Team : Setup Organization Operation Base Company
DTR Organization : 335 person
Operator
63%
Engineer
8%
Mechanic
17%
Support
12%
9/1/2016 Page 18 of 25
ISO9001:2008 Quality Management Systems,
ISO14001:2004 Environment Management Systems,
OHSAS 18001:2007 Occupational Health and Safety
Medco Mining Management Systems
HRIS and
QHSE
Management
System
SOP
SAP and
GIS
D. Operation Excellence
Build up team : Develop Culture for Learning Development Base Company
9/1/2016 Page 19 of 25
D. Operation Excellence
Quality Management Pit to Port : Based on ISO 9001:2008
Borehole sampling Channel sampling BLC sampling
9/1/2016 Page 20 of 25
Port Load Out:
- Width River : 100 m
- Depth River (Mid) : 5.5 m
Anchorage Point:
- Max. Load Rate : 8,000 tpd
- Depth Anchorage : 16.0 m
D. Operation Excellence
Maximize the Logistic and Transport Advantage
9/1/2016 Page 21 of 25
Barge Loading
Plan
D. Operation Excellence
Maximize the Logistic and Transport Advantage : 6 Days to Complete a Supramax
Laycan Period : 06 - 15 Nov 2015
ETA Vessel : 09 November 2015
Vessel Name : MV Cheshire
ETA MV 9 Nov (AM) LAYTIME
Plan Actual
1 Aa 300 7,950
2 Bb 300 7,950
3 Cc 300 7,950
4 Dd 300 7,950
5 Aa 300 7,800
6 Bb 300 7,800
7 Cc 300 7,600
TOTAL 55,000
Laytime 6.88 days
Remarks :
Loading 24 Hours
Voyage (Full) 24 Hours
Discharge 18-24 Hours
Voyage (Empty) 18 Hours
Wait Loading
BARGING SCHEDULE - PT. Duta Tambang Rekayasa
No BARGE FEET
Tonnage
NOVEMBER 2015
1 2 3 4 5 6 7
5 6 7 8 9 10 17 111 12 13 14 15 16
Note:
Barge Loading at Jetty really affected by High Tide and Low Tide of River Sebakis which is twice a day that’s why it
takes almost 24 hours for 1 barge to completed and cast off to vessel
9/1/2016 Page 22 of 25
Barge Loading
PlanDetails Port :
 ROM Stockpile Cap : 60 kt
 Crushing Stockpile Cap : 60 kt
 Crushing Plan Cap : 300 tph
 Barge Loading Conveyor: 1,000 tph
D. Operation Excellence
Maximize the Logistic and Transport Advantage : 90% vessel in Dispatch Position
Average (Day)
Load Time Vessel Hour Vessel Hour
2012 7.2 1 1.2 2 -25.4
2013 5.84 8 199 2 -25
2014 5.39 7 174.83 2 -109
2015 7.96 6 100 1 -369
Target at Load Rate 8,000 mt per day for Supramax 55 kt is 6.9 days
DemmurageDispatch
Year
9/1/2016 Page 23 of 25
Copper smelter
80% of our end user are
cement and copper
smelter in India
Our high sulfur coal
compete with petcoke and
high sulfur coal from US
E. Marketing Effort
Coal End User: cement and smelter is our niche market
9/1/2016 Page 24 of 25
E. Marketing Effort
Selling at Premium Price
1. Deliverability
2. Quality assurance : giving forecast quality before shipment, variance 2-5% from forecast
3. In average we have been selling 10% above HPB (Government Price Index for MEDCO BARA)
4. We are delivering our company brand to end user
9/1/2016 Page 25 of 25
Zero Accident Award
1,291,017 man working hours
period Oct 1st 2012 – Oct 31st 2013
Nunukan CSR Award in Oct 2015: Penghargaan
Terbaik dalam Pemberdayaan Ekonomi
Proper BLUE
For Environmental year 2013 - 2015
F. Awards and Recognitions
Minister, Governor and Head of Regency
9/1/2016 Page 26 of 25
For further inquiry please contact :
FH. Kristiono
VP Corporate Strategic and Commerce
f.hary.kristiono@medcoenergi.com
Mobile +62 812 821 9517
PT Medco Energi Mining Internasional
Tel +62-21 2995 3279
Fax +62-21 821 1381
The Energy Building 51st floor SCBD Lot 11A
Jl. Jend Sudirman Kav. 52-53
Jakarta 12190, Indonesia
www.medcoenergi.com
MedcoMining
Medco Energi Mining Internasional
PT. Medco Energi Mining Internasional
End of Presentation
Many Thanks for Your Attention

More Related Content

Viewers also liked

Paul A Ostrenga -Resume 2015
Paul A  Ostrenga -Resume 2015Paul A  Ostrenga -Resume 2015
Paul A Ostrenga -Resume 2015Paul Ostrenga
 
Paul A Ostrenga -Resume 2017
Paul A  Ostrenga -Resume 2017Paul A  Ostrenga -Resume 2017
Paul A Ostrenga -Resume 2017Paul Ostrenga
 
Framgångsrika team
Framgångsrika teamFramgångsrika team
Framgångsrika team100-listan
 
Презентація вчителя
Презентація вчителяПрезентація вчителя
Презентація вчителяsunnyunited
 
översiktsplanen.rapport,ht11
översiktsplanen.rapport,ht11översiktsplanen.rapport,ht11
översiktsplanen.rapport,ht11100-listan
 
I spåren av pedagogerna
I spåren av pedagogernaI spåren av pedagogerna
I spåren av pedagogerna100-listan
 
Artigo legislação do ensino religioso-iv unidade (2)
Artigo  legislação do ensino religioso-iv unidade (2)Artigo  legislação do ensino religioso-iv unidade (2)
Artigo legislação do ensino religioso-iv unidade (2)Verônica Sylva
 
السيرة الذاتية عصام بوخشم
السيرة الذاتية عصام بوخشمالسيرة الذاتية عصام بوخشم
السيرة الذاتية عصام بوخشمAissam Boukhechem
 
Restaurant manager app
Restaurant manager appRestaurant manager app
Restaurant manager appNidhi Kumari
 

Viewers also liked (13)

Paul A Ostrenga -Resume 2015
Paul A  Ostrenga -Resume 2015Paul A  Ostrenga -Resume 2015
Paul A Ostrenga -Resume 2015
 
Paul A Ostrenga -Resume 2017
Paul A  Ostrenga -Resume 2017Paul A  Ostrenga -Resume 2017
Paul A Ostrenga -Resume 2017
 
Dynamic keypad
Dynamic keypadDynamic keypad
Dynamic keypad
 
Dynamic keypad
Dynamic keypadDynamic keypad
Dynamic keypad
 
Framgångsrika team
Framgångsrika teamFramgångsrika team
Framgångsrika team
 
WIS-PDS1020G2
WIS-PDS1020G2WIS-PDS1020G2
WIS-PDS1020G2
 
Презентація вчителя
Презентація вчителяПрезентація вчителя
Презентація вчителя
 
översiktsplanen.rapport,ht11
översiktsplanen.rapport,ht11översiktsplanen.rapport,ht11
översiktsplanen.rapport,ht11
 
I spåren av pedagogerna
I spåren av pedagogernaI spåren av pedagogerna
I spåren av pedagogerna
 
Artigo legislação do ensino religioso-iv unidade (2)
Artigo  legislação do ensino religioso-iv unidade (2)Artigo  legislação do ensino religioso-iv unidade (2)
Artigo legislação do ensino religioso-iv unidade (2)
 
السيرة الذاتية عصام بوخشم
السيرة الذاتية عصام بوخشمالسيرة الذاتية عصام بوخشم
السيرة الذاتية عصام بوخشم
 
Assam Curriculum vitae..
Assam Curriculum vitae..Assam Curriculum vitae..
Assam Curriculum vitae..
 
Restaurant manager app
Restaurant manager appRestaurant manager app
Restaurant manager app
 

Similar to 160901_MarketingPresent_Ver39

Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama MerahHami Asma'i
 
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIPanel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIGlobal CCS Institute
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfBlentBulut5
 
Combustion Turbine Efficiency Impact
Combustion Turbine Efficiency ImpactCombustion Turbine Efficiency Impact
Combustion Turbine Efficiency ImpactKatherine Corcoran
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxGholamRabbaniGhause
 
Indian experiences on Energye Efficiency in Steel Rolling Mills
Indian experiences on Energye Efficiency in Steel Rolling MillsIndian experiences on Energye Efficiency in Steel Rolling Mills
Indian experiences on Energye Efficiency in Steel Rolling Millseecfncci
 
Energy crisis of nepal and efficiency measures in industries
Energy crisis of nepal and efficiency measures in industriesEnergy crisis of nepal and efficiency measures in industries
Energy crisis of nepal and efficiency measures in industriesDr Ramhari Poudyal
 
Feasibility and Economic Design of Pumped Storage Hydropower Station
Feasibility and Economic Design of Pumped Storage Hydropower StationFeasibility and Economic Design of Pumped Storage Hydropower Station
Feasibility and Economic Design of Pumped Storage Hydropower StationAwais Marwat
 
Energy efficiency
Energy  efficiencyEnergy  efficiency
Energy efficiencygoogle
 
IRJET- Diesel Particulate Filter by using Copper Oxide as a Filter Medium
IRJET- Diesel Particulate Filter by using Copper Oxide as a Filter MediumIRJET- Diesel Particulate Filter by using Copper Oxide as a Filter Medium
IRJET- Diesel Particulate Filter by using Copper Oxide as a Filter MediumIRJET Journal
 
Ntpc information
Ntpc informationNtpc information
Ntpc informationNTPC
 
Eu India Grid Project Presentation Andy
Eu India Grid Project Presentation AndyEu India Grid Project Presentation Andy
Eu India Grid Project Presentation Andygoogle
 
BOILER FUEL conversion.pptx
BOILER FUEL conversion.pptxBOILER FUEL conversion.pptx
BOILER FUEL conversion.pptxArunNatarajan42
 
PCI update May 2012 Ross Stainlay
PCI update May 2012  Ross Stainlay PCI update May 2012  Ross Stainlay
PCI update May 2012 Ross Stainlay Ross Stainlay
 
Overview and introduction to Jwaneng
Overview and introduction to JwanengOverview and introduction to Jwaneng
Overview and introduction to JwanengAnglo American
 
Analysis of Investment of Deepwater Drilling Market
Analysis of Investment of Deepwater Drilling MarketAnalysis of Investment of Deepwater Drilling Market
Analysis of Investment of Deepwater Drilling MarketDr. Oliver Massmann
 

Similar to 160901_MarketingPresent_Ver39 (20)

Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
 
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRIPanel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
Panel 5. CCS projects in action - Dr Chong Kul Ryu, KEPRI
 
Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdf
 
Combustion Turbine Efficiency Impact
Combustion Turbine Efficiency ImpactCombustion Turbine Efficiency Impact
Combustion Turbine Efficiency Impact
 
SECL report.pptx
SECL report.pptxSECL report.pptx
SECL report.pptx
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptx
 
Presentation on steel
Presentation on steel Presentation on steel
Presentation on steel
 
Indian experiences on Energye Efficiency in Steel Rolling Mills
Indian experiences on Energye Efficiency in Steel Rolling MillsIndian experiences on Energye Efficiency in Steel Rolling Mills
Indian experiences on Energye Efficiency in Steel Rolling Mills
 
Energy crisis of nepal and efficiency measures in industries
Energy crisis of nepal and efficiency measures in industriesEnergy crisis of nepal and efficiency measures in industries
Energy crisis of nepal and efficiency measures in industries
 
Feasibility and Economic Design of Pumped Storage Hydropower Station
Feasibility and Economic Design of Pumped Storage Hydropower StationFeasibility and Economic Design of Pumped Storage Hydropower Station
Feasibility and Economic Design of Pumped Storage Hydropower Station
 
Energy efficiency
Energy  efficiencyEnergy  efficiency
Energy efficiency
 
IRJET- Diesel Particulate Filter by using Copper Oxide as a Filter Medium
IRJET- Diesel Particulate Filter by using Copper Oxide as a Filter MediumIRJET- Diesel Particulate Filter by using Copper Oxide as a Filter Medium
IRJET- Diesel Particulate Filter by using Copper Oxide as a Filter Medium
 
Ntpc information
Ntpc informationNtpc information
Ntpc information
 
Eu India Grid Project Presentation Andy
Eu India Grid Project Presentation AndyEu India Grid Project Presentation Andy
Eu India Grid Project Presentation Andy
 
July 15 present r 1
July 15 present r 1July 15 present r 1
July 15 present r 1
 
Group 3 Presentation
Group 3 PresentationGroup 3 Presentation
Group 3 Presentation
 
BOILER FUEL conversion.pptx
BOILER FUEL conversion.pptxBOILER FUEL conversion.pptx
BOILER FUEL conversion.pptx
 
PCI update May 2012 Ross Stainlay
PCI update May 2012  Ross Stainlay PCI update May 2012  Ross Stainlay
PCI update May 2012 Ross Stainlay
 
Overview and introduction to Jwaneng
Overview and introduction to JwanengOverview and introduction to Jwaneng
Overview and introduction to Jwaneng
 
Analysis of Investment of Deepwater Drilling Market
Analysis of Investment of Deepwater Drilling MarketAnalysis of Investment of Deepwater Drilling Market
Analysis of Investment of Deepwater Drilling Market
 

160901_MarketingPresent_Ver39

  • 1. PT Medco Energi Mining Intl www.medcoenergi.com Energy Company of Choice OPERATION EXCELLENCE DURING THE TURNDOWN MARKET ERA A MARKETING PRESENTATION JUNE 2016
  • 2. 9/1/2016 Page 2 of 25 A. Medco Energi at a Glance PT Medco Energi Internasional Tbk : Our History
  • 3. 9/1/2016 Page 3 of 25 A. Medco Energi at a Glance Domestic Oil and Gas Business Medcoenergi Operates nine oil and gas blocks, maintain working interests in one block operated by partner and hold an economic participating interest in one exploration field. MedcoEnergi also hold interest in three CBM blocks. Exploration Development Production Economic Interest Participation Service Contract CBM Block A South Central Sumatra Rimau Block Bengara Block Nunukan Block Tarakan Block Seimengaris Block Sekayu Block Muralim Block Lematang Block Jeruk Exploration Well Bawean Block Senoro- Toili Block
  • 4. 9/1/2016 Page 4 of 25 A. Medco Energi at a Glance International Oil and Gas Business
  • 5. 9/1/2016 Page 5 of 25 A. Medco Energi at a Glance Coal Mining and Power Plant Business
  • 6. 9/1/2016 Page 6 of 25 Nov 2011 Infrastructure development : mess, office, port and crushing facility Dec 2011 Heavy equipment purchasing Jan 2012 •Heavy equipment mobilization •Operator recruitment Feb 2012 First OB removal and coal getting Apr 2012 First crushing activity Sep 2012 First shipment B. DTR Development Timeline Total 48 Months (Permitting 32 months, Technical works 16 months) •MEMI : Obtained PT. Duta Tambang Rekayasa 1700 Ha, Coal-Nunukan •Medco Energi Mining Internasional was established in November 2008 •Drilling activity started and Feasibility Study2009 •DTR : IUP Operation •Environmental study (AMDAL) •Applying for Borrow and Lend Forestry Permit (IPP) 2010 •DTR : Borrow and Lend Forestry Permit (IPP) in October2011
  • 7. 9/1/2016 Page 7 of 25 C. Why Challenging Geological Complexity: 16 Major Structures Structurecomplexitywithmultithinseams Example of coal seam displacement in DTR area
  • 8. 9/1/2016 Page 8 of 25 Multi thin coal seams C. Why Challenging Geological Complexity : Multi Thin Seams ±40 cm ±30 cm ±50 cm Thickness 0.3 – 3.7 m Layers : up to 3 layers
  • 9. 9/1/2016 Page 9 of 25 C. Why Challenging Geological Complexity : Multiple Coal Quality each Seams Thickness ( Centimeter ) TM IM ASH VM FC TS CVAR Pit Ganggoro North SE GU, GL, FU, FL GU : 58, GL : 125, FU : 45, FL : 43 3,005,016 174,660 17.20 6.52 2.74 11.43 44.22 41.61 4.79 6,441 Pit Arie North CUU, CU, CUL, CL, BU, BL CUU : 35, CU : 81, CUL : 46, CL : 34, BU : 48, BL : 58 2,586,400 171,150 15.11 6.71 2.86 10.88 43.05 44.21 3.55 6,542 Pit Elonita North E1 , E E1 : 43 , E : 102 4,351,393 289,657 15.02 6.13 2.81 6.12 45.27 45.79 3.41 6,985 Pit Ganggoro Lama H, GU, G, GL, FU, F, FL H : 52, GU : 52, G : 132, GL : 0,93, FU : 43, F : 52, FL : 44 1,199,262 121,650 9.86 7.47 3.16 10.06 44.14 42.65 3.22 6,440 Pit Handayani H , I, G H : 108 , I : 70, G : 92 8,043,807 523,448 15.37 7.53 4.41 5.19 44.39 46.01 3.39 6,948 Pit Hamim GU, G, GL GU : 58, G : 53, GL : 125 1,443,430 92,970 15.53 8.56 3.46 17.72 40.54 38.30 3.84 5,679 Pit Elon Middle E1 , E E : 101 , E1: 37 1,247,770 75,270 16.58 6.13 2.81 6.12 45.27 45.79 3.41 6,985 Pit Erna Middle E2L, E2U, E3L, E3U E2L : 39, E2U : 30, E3L : 74, E3U : 44 459,940 32,820 14.01 7.25 3.20 6.03 44.66 44.46 1.21 6,853 Pit GG Middle FL, FU, G, GL, GU FL : 55, FU : 38, G : 53, GL : 48, GU : 53 1,164,120 86,740 13.42 7.47 3.16 10.06 44.14 42.65 3.22 6,440 Total 23,501,138 1,568,365 14.98 7.07 3.49 8.17 44.11 44.36 3.61 6,710 * Middle Block data still need Re-Drill PIT Coal Quality OB (Bcm)SEAM Coal (ton) SR
  • 10. 9/1/2016 Page 10 of 25 Chemical Properties Basis Unit Value Physical Properties Basis Unit Value Total Moisture ARB % 10.0 Hard Grove Index 48.0 Specific Energy Fuel Ratio 1.1 Calorific Value GAD kcal/kg 6,800 Fusibility of Ash : Deformation Temparature Reducing 1250 Calorific Value GAR kcal/kg 6,500 Calorific Value NAR kcal/kg 6,200 Base % DB 26.4 Proximate Acid % DB 61.8 Inherent Moisture ADB % 6.0 Base / Acid ratio DB 0.4 Volatile Matter ADB % 43.0 Slagging index (B/A*%S dry in coal) DB 1.5 Fixed Carbon ADB % 44.0 Fouling index (B/A*%Na2O in ash) DB 0.5 Ash ADB % 10.0 Ash Analysis Total Sulphur ADB % 3.5 SiO2 DB % 35.7 Ultimate Al2O3 DB % 25.1 Carbon DAF % 84.0 Fe2O3 DB % 12.6 Hydrogen DAF % 6.0 CaO DB % 5.9 Nitrogen DAF % 1.5 MgO DB % 5.8 Sulphur DAF % 4.2 Na2O DB % 1.2 Oxygen + Errors DAF % 4.8 K2O DB % 0.9 Trace Element TiO2 DB % 1.0 Chlorine ADB % 0.01 Mn3O4 DB % 0.1 Fluorine ADB ppm 80.0 P2O5 DB % 0.9 Phosporus in Coal adb % 0.04 SO3 DB % 10.6 Slag and Ash Deposit Characteristic In accordance with current ASTM standards C. Why Challenging Geological Complexity : Typical of High Sulphur 3.5% and High CV 6500GAR
  • 11. 9/1/2016 Page 11 of 25 Total Drilling : 1224 holes (42,687 m) Total Geophysical Logging : 467 holes (10,983 m) Total Topographic Survey: 1.697 Ha Scale 1:1000 Batas Konse si AHL Tanam an Akasia AHL Tana man Kelap a sawit NJL C. Why Challenging Geological Complexity : Need Dense Drilling with Space 40m
  • 12. 9/1/2016 Page 12 of 25 Description Area DTR DTSA TOTAL Coal Resources - Nunukan (Ton) All 8,900,000 2,170,000 11,070,000 (Ton) North 3,300,000 (Ton) North East 1,600,000 (Ton) Middle and South 4,000,000 Coal Reserve (SR = 15) (Ton) All 3,900,000 1,710,000 5,610,000 (Ton) Middle 600,000 (Ton) South 3,300,000 Mined Reserve as per Sep 2015 (Ton) All 1,686,000 0 1,686,000 Remaining Reserve (Ton) All 2,214,000 1,710,000 3,924,000 Note: SR (stripping ratio) 1 : 15 means for every 1 ton of coal, we need to remove 15 meter cubic of soil (overburden) C. Why Challenging Small Resource and Reserve
  • 13. 9/1/2016 Page 13 of 25 Camp Site Jetty PT.DTR Jakarta Balikpapan Tarakan Nunukan C. Why Challenging Remote Area and Near the Borderline Routes : 1. Jakarta – Tarakan : 2.5 Hours 2. Tarakan – Nunukan : 30 Minutes 3. Nunukan – Jetty PT. DTR by Speedboat : 1 hours 4. Jetty PT. DTR – Camp Site by Car : 30 minutes Nunukan
  • 14. 9/1/2016 Page 14 of 25 1. Top Soil Removal 2. Overburden Removal 3. Coal Getting 4. Overburden Dumping 5. Re Contouring 6. Top Soil Spreading Mining Advancement Reclamation Advancement Page 14 of 29 D. Operation Excellence Pushback Mining Method : Reduce Disturbance Area and Cost
  • 15. 9/1/2016 Page 15 of 25 D. Operation Excellence Comprehensive Mine Plan : Opening Multiple Pit at the Single Mine 6 topsoil spreading 3 coal getting 1 topsoil removal 2 OB removal 4 OB dumping 5 re-contouring PIT A PIT B
  • 16. 9/1/2016 Page 16 of 25 We start the development when the coal price started to fall, we don’t want to get stranded with contractor at worst market condition Cost of outsource was at least 10% higher than in- house operation, currently our stripping ratio 1 : 15 Flexibility in operation mode adjusting to any market condition Seeing the future opportunity of being a service company and develop our strength to be a mining company as a strategic local partner D. Operation Excellence In-House Mining : 65 Unit (27HE+38DT)
  • 17. 9/1/2016 Page 17 of 25 D. Operation Excellence Build up Team : Setup Organization Operation Base Company DTR Organization : 335 person Operator 63% Engineer 8% Mechanic 17% Support 12%
  • 18. 9/1/2016 Page 18 of 25 ISO9001:2008 Quality Management Systems, ISO14001:2004 Environment Management Systems, OHSAS 18001:2007 Occupational Health and Safety Medco Mining Management Systems HRIS and QHSE Management System SOP SAP and GIS D. Operation Excellence Build up team : Develop Culture for Learning Development Base Company
  • 19. 9/1/2016 Page 19 of 25 D. Operation Excellence Quality Management Pit to Port : Based on ISO 9001:2008 Borehole sampling Channel sampling BLC sampling
  • 20. 9/1/2016 Page 20 of 25 Port Load Out: - Width River : 100 m - Depth River (Mid) : 5.5 m Anchorage Point: - Max. Load Rate : 8,000 tpd - Depth Anchorage : 16.0 m D. Operation Excellence Maximize the Logistic and Transport Advantage
  • 21. 9/1/2016 Page 21 of 25 Barge Loading Plan D. Operation Excellence Maximize the Logistic and Transport Advantage : 6 Days to Complete a Supramax Laycan Period : 06 - 15 Nov 2015 ETA Vessel : 09 November 2015 Vessel Name : MV Cheshire ETA MV 9 Nov (AM) LAYTIME Plan Actual 1 Aa 300 7,950 2 Bb 300 7,950 3 Cc 300 7,950 4 Dd 300 7,950 5 Aa 300 7,800 6 Bb 300 7,800 7 Cc 300 7,600 TOTAL 55,000 Laytime 6.88 days Remarks : Loading 24 Hours Voyage (Full) 24 Hours Discharge 18-24 Hours Voyage (Empty) 18 Hours Wait Loading BARGING SCHEDULE - PT. Duta Tambang Rekayasa No BARGE FEET Tonnage NOVEMBER 2015 1 2 3 4 5 6 7 5 6 7 8 9 10 17 111 12 13 14 15 16 Note: Barge Loading at Jetty really affected by High Tide and Low Tide of River Sebakis which is twice a day that’s why it takes almost 24 hours for 1 barge to completed and cast off to vessel
  • 22. 9/1/2016 Page 22 of 25 Barge Loading PlanDetails Port :  ROM Stockpile Cap : 60 kt  Crushing Stockpile Cap : 60 kt  Crushing Plan Cap : 300 tph  Barge Loading Conveyor: 1,000 tph D. Operation Excellence Maximize the Logistic and Transport Advantage : 90% vessel in Dispatch Position Average (Day) Load Time Vessel Hour Vessel Hour 2012 7.2 1 1.2 2 -25.4 2013 5.84 8 199 2 -25 2014 5.39 7 174.83 2 -109 2015 7.96 6 100 1 -369 Target at Load Rate 8,000 mt per day for Supramax 55 kt is 6.9 days DemmurageDispatch Year
  • 23. 9/1/2016 Page 23 of 25 Copper smelter 80% of our end user are cement and copper smelter in India Our high sulfur coal compete with petcoke and high sulfur coal from US E. Marketing Effort Coal End User: cement and smelter is our niche market
  • 24. 9/1/2016 Page 24 of 25 E. Marketing Effort Selling at Premium Price 1. Deliverability 2. Quality assurance : giving forecast quality before shipment, variance 2-5% from forecast 3. In average we have been selling 10% above HPB (Government Price Index for MEDCO BARA) 4. We are delivering our company brand to end user
  • 25. 9/1/2016 Page 25 of 25 Zero Accident Award 1,291,017 man working hours period Oct 1st 2012 – Oct 31st 2013 Nunukan CSR Award in Oct 2015: Penghargaan Terbaik dalam Pemberdayaan Ekonomi Proper BLUE For Environmental year 2013 - 2015 F. Awards and Recognitions Minister, Governor and Head of Regency
  • 26. 9/1/2016 Page 26 of 25 For further inquiry please contact : FH. Kristiono VP Corporate Strategic and Commerce f.hary.kristiono@medcoenergi.com Mobile +62 812 821 9517 PT Medco Energi Mining Internasional Tel +62-21 2995 3279 Fax +62-21 821 1381 The Energy Building 51st floor SCBD Lot 11A Jl. Jend Sudirman Kav. 52-53 Jakarta 12190, Indonesia www.medcoenergi.com MedcoMining Medco Energi Mining Internasional PT. Medco Energi Mining Internasional End of Presentation Many Thanks for Your Attention