SlideShare a Scribd company logo
1 of 6
uzairaamirkhan UZAIR AAMIR
Mobile: 0300-9099998 * E-Mail: uzairaamirkhan@yahoo.com
OBJECTIVE
To pursue a professionalcareer in a dynamic and creative environment in a well-reputed
organization and excel in the field of Electrical Engineering by utilizing and expanding my
technical, communication, managerial skills and analytical capabilities
Location Prefered:
SUMMARY
Technically Sophistiicated Professional with over one year of experience in the area of
Electrical Engineeringin the field of Construction and Transmission & Distribution .
Cureently associated with WAPDA, TSK Internatinal Pvt, PDA, and PESCO.
Proficient in Site Supervision, Wiring, Design Calculation (Estimation), Testing & Analysis,
Planning & Project Cordination according to the drawings.
Led Site work upgrade project for loading T/F and Generators, Load Banks, Main Distribution
Boards, Primary underground distribution (Conduits and cabling), Branch Distribution Boards,
Grounding (for electrical room and MDB, BDB or BCB and Load Bank).
Installations of Poles for 11 KVA Three Phase/440 voltage Three Phase Transmission Lines.
Installations Transformers.
Installations of Electric Meters & Three Phase Induction Motors
Ability to analyze, troubleshoot and determine technical problems.
Maintained Excellent academic record.
Rapid learner with the strong grasping approach.
Excellent communication, analy.tical & presentation skills.
Better analytical and problem resolving ability to go to the core of the problem for enhancing
operations.
PROFESSIONAL EXPERIENCE
hitech networks limited (hnl) on Telenor project: march 2016 till dated.
Network operating center (NOC ) trainee engineer
 Operate the Innexiv remote monitoring system (rms).
 Operate ZTE remote monitoring system .
 On /off the generator by remote monitoring system .
 On/off 3g by network elocation center(NEC) software.
 Check the voltages and take action.
 Escalation for down sites and lsv;s (low voltages) sites.
 Check and send the updatesabout the sites.
Development Management Consultants ( DMC ): august , 2015 to february , 2016.
Electrical Engineer
Major project.
 Construction and supervision at rural health center district bannu
 Feasibility study
 Design apply
Frontier Foundry Steel ( FF Steel ): may 8 , 2015 to july 6 , 2015.
Internee engineer
Major Projects
 AC/DC Motors.
 Installations of 20, 15, 10,25, 30, 150, 100, 7.5, 5, 2 , 1000 HP motors.
 Installations of Star and delta connection.
 Interlocking for star and delta connection.
 Interlocking for forward and reserve direction.
 Uses of contactors.
 CKT Breaker 1500 Amps.
 SF6 CKT Breaker.
 Fly Wheel.
 Earthing and grounding for Motors and transformers.
 DC Pannel.
 AC Speeder.
 Installations of timer.
 Over Load Relay.
Maintenance.
 Armature Winding.
 Steel Cutter.
 Gear.
 Cranp.
 Thyrister.
132 KV Hydro Power Generation Station , Warsak Dam, Peshawar, KPK,Pakistan
december, 2014 to april, 2015.
Internee Engineer
MAJOR PROJECTS
 132 KV Hydro Power Generation Station , Warsak Dam, Peshawar,
 KPK, Pakistan
At TSK EngineeringInternational PvtPeshawar, KPK, March 2014 to november2014
Electrical Engineer
MAJOR PROJECTS
 Tarru Wapda Housing Society Peshawar, KPK, Pakistan.
Errection of HT and LT poles, Installtions of HT & LT conductors, 25 KVA, 50KVA,
100 KVA & 200 KVA transformers and Single & Three Phase Electric Meters and Street
Lights.
 Reggi Lalma Housing Society Peshawar, KPK, Pakistan.
Errection of HT and LT poles, Installtions of HT & LT conductors, 25 KVA, 50KVA,
100 KVA & 200 KVA transformers and Single & Three Phase Electric Meters and Street
Lights.
 Bagh-e-naran Road Hayatabad Peshawar, KPK, Pakistan.
Installation of Street Lights with Solar Pannel.
 AzaKhail Matanai Housing society Peshawar, KPK, Pakistan.
Errection of HT and LT poles, Installtions of HT & LT conductors, 50 & 100 KVA
transformers and Single & Three Phase Electric Meters.
 Phase V Hayatabad Peshawar, KPK, Pakistan.
maintenance and installations, Wiring, Lt Panel, Cable Trays, lights, fans and switches in
Officers Houses PDA Peshawar .
 D-4, Phase VI Hayatabad Peshawar, KPK, Pakistan
Errection of HT and LT poles, Installtions of HT & LT conductors, 100 & 200 KVA
transformers and Single & Three Phase Electric Meters.
 Installations of 25 KVA Tranformers for U.fone, Telenor,Zong & Mobilink Towers in
Peshawar, KPK, Pakistan.
 Installations of 400 KVA & 500 KVA Transformers for USAWA pharmaceutical and
Papular Group of Juice, Resalpor Nawshehra, KPK, Pakistan
 Installation of 630KVA Transformer for ARY Steel Manufacturing Industry, Industrial
Zone, Hayatabad Peshawar, KPK, Pakistan
At TSK Engineering International Pvt Peshawar, KPK, Pakistan August 2013 to till January 2014
Assistant Electrical Engineer
MAJOR PROJECTS
 Hamza town Peshawar, KPK, Pakistan.
Installation of Street Lights and Elecrical meters for consumers Supply
 Khyber Bazar, KPK, Pakistan.
Installation HT & LT Poles, Conductors, transformers and consumers connections.
 Ring Road, Peshawar, KPK, Pakistan.
Installation of Street Lights, Transformers, conductors, Ht & LT Poles and consumers
supply.
JOB RESPONSIBILITIES
Construction:
Installed various electrical engineering and communication systemcomponents.
Prepared a project baseline and ensured that projects were carried in accordance to the same.
Scheduled the electrical work in coordination with the electrical engineers, contractors and
clients.
Installed under ground Conduits (PVC & X-PLE).
Wiring according to the drawings/ Site Supervision.
Ensured that all electrical tools were in accordance to the specifications.
Checked the installed electrical systems on a regular basis and ensured its smooth functioning.
Ensured that all safety regulations were followed in the facility and protective equipment’s
were given to workers.
Performed regular inspections on the electrical work carried in the facility.
Documented all client and vendor tests on the installed electrical equipment and conducted
tests.
Organized the inspection on site materials and ensured that they meet the required standards.
Assisted Reading of Drawings.
Weekly and monthly making Reports and send to Higher Authorities.
Daily making Reports and send to Higher Authorities.
Interfacing of different media devices.
Wiring and panel boards operations.
Transmission & Distribution:
Installations of HT poles (PC & Structure of 36, 45 ft Height) with 11 KVA Three Phase
Transmission lines (ACSR OSPREY, ACSR DOG & ACSR RABBIT Transmission power conductors)
Installations of LT Poles (PC & Structure of 30 ft Height) with 440 voltage Three Phase
Transmission Lines (AAC WASP & AAC ANT Transmission power conductors).
Installations of PIN insulators for HT transmission lines.
Installations of STRAIN Insulators for LT transmission lines.
Installations of DEAD END CLAMP for OSPERY, DOG & RABBIT Transmission power conductors.
Installations of SHACKLE Insulators for LT transmission lines.
Installations of D-SHACKLE ASSEMBALY for LT transmission lines.
Installations of ANCHOR Shackles.
Installations of PLATE FORM for Transformer (Single & Double Structure Pole/ H pole).
Installations of 12 Transformers (10 KVA, 15 KVA, 25 KVA, 50 KVA, 100 KVA & 200 KVA).
Installations of EARTH UNITES with THIMBLE.
Installations of STAY ROD with ELBOW & THIMBLE.
Installations of GALVANISED STEEL WIRE 10 mm.
Installations of GALVANISED STEEL & WIRE 6mm.
Installtions of DROP OUT CUT OUT for 11 KVA Transmission lines & Transformers.
Installations of SINGLE & THREE PHASE ELECTRIC METERS.
Installation of PVC 37/0.83 4/CORE & PVC 19/0.83 4/CORE connection between Transformer
and E-Meter.
Installations of Street lights.
Installations of THREE PHASE, 40 HP, 380-420 V, 58 A, 0.8 P.F, 1470 RPM MOTER for Tube Well.
Installations of Switch Gears for Three PHASE INDUCTION MOTOR.
Installations of 50 KVA Transformers for Tube Wells.
Maintinanace & Generation:
Worked on maintanace of Generation Generators (Generated voltage 11KV).
Worked on Step Up T/F (Step up from 11 KV to 132 KV )
Using Step Up T/F rating 40 MVA, SF 6 circuit bracker.
TECHNICAL SKILL
Site Engineer (Construction) : Installations of Generatr, Undewr Ground
Distribution,
Building Wiring according to Drawings.
Transmission & Distribution : Installation of Electrical HT & LT Cnductors,
T/F, E-Meters
AutoCAD Drafting, Designing & Techniques : Electrical Design Calculation
ECDAIL : Single Line Diagram
PLC/ MATLAB / C++ : programmable subjects
MS Office : Windows / (Word, Excel, Power Point.
Miantinanace & Generation : 132 KV Generation
ACADEMIC CREDENTIALS
2011 Bachelors in Electrical Engineering from Sarhad University of Science & Information
Technology, Peshawar, KPK, Pakistan.
ACHIEVEMENTS
Mini project
 Toggling of LED’s screen on a bread board using Microprocessor8051.
Final Year Project & thesis.
 Design of Electronic Circuit Breaker.
PERSONAL DOSSIER
Date of Birth: July 06, 1989
Residential Address Pakistan: House: 583, Street:30, Sector: D-4, Phase: 1. Hayatabad,
Peshawar.
REFERENCE
Will be furnishe on Demand

More Related Content

What's hot

What's hot (20)

Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Gabriel Gichinga Gen tech
Gabriel Gichinga Gen techGabriel Gichinga Gen tech
Gabriel Gichinga Gen tech
 
electrician
electricianelectrician
electrician
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) new
 
Yvan Dufresne resume - Nov 2014
Yvan Dufresne resume - Nov 2014Yvan Dufresne resume - Nov 2014
Yvan Dufresne resume - Nov 2014
 
Cover letter
Cover letterCover letter
Cover letter
 
ELEC.ENG CV
ELEC.ENG CVELEC.ENG CV
ELEC.ENG CV
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
 
Ahmed Raslan_CV
Ahmed Raslan_CVAhmed Raslan_CV
Ahmed Raslan_CV
 
Commission resume
Commission resumeCommission resume
Commission resume
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Ashok Resume-2015
Ashok Resume-2015Ashok Resume-2015
Ashok Resume-2015
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
Curriculam vitae
Curriculam vitaeCurriculam vitae
Curriculam vitae
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
roldan_resume_updated_23 Oct 2015
roldan_resume_updated_23 Oct 2015roldan_resume_updated_23 Oct 2015
roldan_resume_updated_23 Oct 2015
 
greenid cv
greenid cvgreenid cv
greenid cv
 

Viewers also liked

TDC POA - Especificação Por Exemplo como ferramenta de negócios
TDC POA - Especificação Por Exemplo como ferramenta de negóciosTDC POA - Especificação Por Exemplo como ferramenta de negócios
TDC POA - Especificação Por Exemplo como ferramenta de negóciosSamanta Cicilia
 
2 instr. princ. y valores éticos
2 instr. princ. y valores éticos2 instr. princ. y valores éticos
2 instr. princ. y valores éticosfamiliar
 
3D дизайн для магазинов и офисов
3D дизайн для магазинов и офисов3D дизайн для магазинов и офисов
3D дизайн для магазинов и офисовАРТ РПК
 
Testes Exploratórios não são sinônimo de bagunça! (TDC 2016 POA)
Testes Exploratórios não são sinônimo de bagunça! (TDC 2016 POA)Testes Exploratórios não são sinônimo de bagunça! (TDC 2016 POA)
Testes Exploratórios não são sinônimo de bagunça! (TDC 2016 POA)Igor Abade
 
Tecnologia Móvel no Contexto Escolar: um estudo com os professores de Cabo Verde
Tecnologia Móvel no Contexto Escolar: um estudo com os professores de Cabo VerdeTecnologia Móvel no Contexto Escolar: um estudo com os professores de Cabo Verde
Tecnologia Móvel no Contexto Escolar: um estudo com os professores de Cabo VerdeNeuza Pedro
 

Viewers also liked (14)

Diseño y evaluacion de un proyecto
Diseño y evaluacion de un proyectoDiseño y evaluacion de un proyecto
Diseño y evaluacion de un proyecto
 
TDC POA - Especificação Por Exemplo como ferramenta de negócios
TDC POA - Especificação Por Exemplo como ferramenta de negóciosTDC POA - Especificação Por Exemplo como ferramenta de negócios
TDC POA - Especificação Por Exemplo como ferramenta de negócios
 
Aula 3º semana
Aula 3º semanaAula 3º semana
Aula 3º semana
 
2 instr. princ. y valores éticos
2 instr. princ. y valores éticos2 instr. princ. y valores éticos
2 instr. princ. y valores éticos
 
3D дизайн для магазинов и офисов
3D дизайн для магазинов и офисов3D дизайн для магазинов и офисов
3D дизайн для магазинов и офисов
 
Testes Exploratórios não são sinônimo de bagunça! (TDC 2016 POA)
Testes Exploratórios não são sinônimo de bagunça! (TDC 2016 POA)Testes Exploratórios não são sinônimo de bagunça! (TDC 2016 POA)
Testes Exploratórios não são sinônimo de bagunça! (TDC 2016 POA)
 
Produção textual 1
Produção textual 1Produção textual 1
Produção textual 1
 
Texto2
Texto2Texto2
Texto2
 
Produção textual 4
Produção textual 4Produção textual 4
Produção textual 4
 
Cultivating great transit related communities final
Cultivating great transit related communities finalCultivating great transit related communities final
Cultivating great transit related communities final
 
Green and healthy planning
Green and healthy planningGreen and healthy planning
Green and healthy planning
 
Agile Testing - Vamos quebrar esse paradigma?
Agile Testing - Vamos quebrar esse paradigma?Agile Testing - Vamos quebrar esse paradigma?
Agile Testing - Vamos quebrar esse paradigma?
 
Normas padrao portugues
Normas padrao portuguesNormas padrao portugues
Normas padrao portugues
 
Tecnologia Móvel no Contexto Escolar: um estudo com os professores de Cabo Verde
Tecnologia Móvel no Contexto Escolar: um estudo com os professores de Cabo VerdeTecnologia Móvel no Contexto Escolar: um estudo com os professores de Cabo Verde
Tecnologia Móvel no Contexto Escolar: um estudo com os professores de Cabo Verde
 

Similar to Engr uzair khan (20)

P S electricals
P S electricalsP S electricals
P S electricals
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
Resume_Gopala
Resume_GopalaResume_Gopala
Resume_Gopala
 
New cv jithesh
New cv jitheshNew cv jithesh
New cv jithesh
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
Resume E&I Engineer
Resume E&I EngineerResume E&I Engineer
Resume E&I Engineer
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substation
 
CV_Susovan
CV_SusovanCV_Susovan
CV_Susovan
 
CV_ susovan
CV_ susovanCV_ susovan
CV_ susovan
 
Stalin_resumedoc1
Stalin_resumedoc1Stalin_resumedoc1
Stalin_resumedoc1
 
JKY CV.
JKY CV.JKY CV.
JKY CV.
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
JAWED ALI
JAWED ALIJAWED ALI
JAWED ALI
 
JAWED ALI
JAWED ALIJAWED ALI
JAWED ALI
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
supervisor
supervisorsupervisor
supervisor
 

Recently uploaded

Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...ssuserdfc773
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257subhasishdas79
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 

Recently uploaded (20)

Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 

Engr uzair khan

  • 1. uzairaamirkhan UZAIR AAMIR Mobile: 0300-9099998 * E-Mail: uzairaamirkhan@yahoo.com OBJECTIVE To pursue a professionalcareer in a dynamic and creative environment in a well-reputed organization and excel in the field of Electrical Engineering by utilizing and expanding my technical, communication, managerial skills and analytical capabilities Location Prefered: SUMMARY Technically Sophistiicated Professional with over one year of experience in the area of Electrical Engineeringin the field of Construction and Transmission & Distribution . Cureently associated with WAPDA, TSK Internatinal Pvt, PDA, and PESCO. Proficient in Site Supervision, Wiring, Design Calculation (Estimation), Testing & Analysis, Planning & Project Cordination according to the drawings. Led Site work upgrade project for loading T/F and Generators, Load Banks, Main Distribution Boards, Primary underground distribution (Conduits and cabling), Branch Distribution Boards, Grounding (for electrical room and MDB, BDB or BCB and Load Bank). Installations of Poles for 11 KVA Three Phase/440 voltage Three Phase Transmission Lines. Installations Transformers. Installations of Electric Meters & Three Phase Induction Motors Ability to analyze, troubleshoot and determine technical problems. Maintained Excellent academic record. Rapid learner with the strong grasping approach. Excellent communication, analy.tical & presentation skills. Better analytical and problem resolving ability to go to the core of the problem for enhancing operations. PROFESSIONAL EXPERIENCE hitech networks limited (hnl) on Telenor project: march 2016 till dated. Network operating center (NOC ) trainee engineer  Operate the Innexiv remote monitoring system (rms).
  • 2.  Operate ZTE remote monitoring system .  On /off the generator by remote monitoring system .  On/off 3g by network elocation center(NEC) software.  Check the voltages and take action.  Escalation for down sites and lsv;s (low voltages) sites.  Check and send the updatesabout the sites. Development Management Consultants ( DMC ): august , 2015 to february , 2016. Electrical Engineer Major project.  Construction and supervision at rural health center district bannu  Feasibility study  Design apply Frontier Foundry Steel ( FF Steel ): may 8 , 2015 to july 6 , 2015. Internee engineer Major Projects  AC/DC Motors.  Installations of 20, 15, 10,25, 30, 150, 100, 7.5, 5, 2 , 1000 HP motors.  Installations of Star and delta connection.  Interlocking for star and delta connection.  Interlocking for forward and reserve direction.  Uses of contactors.  CKT Breaker 1500 Amps.  SF6 CKT Breaker.  Fly Wheel.  Earthing and grounding for Motors and transformers.  DC Pannel.  AC Speeder.  Installations of timer.  Over Load Relay. Maintenance.  Armature Winding.  Steel Cutter.  Gear.  Cranp.  Thyrister.
  • 3. 132 KV Hydro Power Generation Station , Warsak Dam, Peshawar, KPK,Pakistan december, 2014 to april, 2015. Internee Engineer MAJOR PROJECTS  132 KV Hydro Power Generation Station , Warsak Dam, Peshawar,  KPK, Pakistan At TSK EngineeringInternational PvtPeshawar, KPK, March 2014 to november2014 Electrical Engineer MAJOR PROJECTS  Tarru Wapda Housing Society Peshawar, KPK, Pakistan. Errection of HT and LT poles, Installtions of HT & LT conductors, 25 KVA, 50KVA, 100 KVA & 200 KVA transformers and Single & Three Phase Electric Meters and Street Lights.  Reggi Lalma Housing Society Peshawar, KPK, Pakistan. Errection of HT and LT poles, Installtions of HT & LT conductors, 25 KVA, 50KVA, 100 KVA & 200 KVA transformers and Single & Three Phase Electric Meters and Street Lights.  Bagh-e-naran Road Hayatabad Peshawar, KPK, Pakistan. Installation of Street Lights with Solar Pannel.  AzaKhail Matanai Housing society Peshawar, KPK, Pakistan. Errection of HT and LT poles, Installtions of HT & LT conductors, 50 & 100 KVA transformers and Single & Three Phase Electric Meters.  Phase V Hayatabad Peshawar, KPK, Pakistan. maintenance and installations, Wiring, Lt Panel, Cable Trays, lights, fans and switches in Officers Houses PDA Peshawar .  D-4, Phase VI Hayatabad Peshawar, KPK, Pakistan Errection of HT and LT poles, Installtions of HT & LT conductors, 100 & 200 KVA transformers and Single & Three Phase Electric Meters.  Installations of 25 KVA Tranformers for U.fone, Telenor,Zong & Mobilink Towers in Peshawar, KPK, Pakistan.  Installations of 400 KVA & 500 KVA Transformers for USAWA pharmaceutical and Papular Group of Juice, Resalpor Nawshehra, KPK, Pakistan  Installation of 630KVA Transformer for ARY Steel Manufacturing Industry, Industrial Zone, Hayatabad Peshawar, KPK, Pakistan
  • 4. At TSK Engineering International Pvt Peshawar, KPK, Pakistan August 2013 to till January 2014 Assistant Electrical Engineer MAJOR PROJECTS  Hamza town Peshawar, KPK, Pakistan. Installation of Street Lights and Elecrical meters for consumers Supply  Khyber Bazar, KPK, Pakistan. Installation HT & LT Poles, Conductors, transformers and consumers connections.  Ring Road, Peshawar, KPK, Pakistan. Installation of Street Lights, Transformers, conductors, Ht & LT Poles and consumers supply. JOB RESPONSIBILITIES Construction: Installed various electrical engineering and communication systemcomponents. Prepared a project baseline and ensured that projects were carried in accordance to the same. Scheduled the electrical work in coordination with the electrical engineers, contractors and clients. Installed under ground Conduits (PVC & X-PLE). Wiring according to the drawings/ Site Supervision. Ensured that all electrical tools were in accordance to the specifications. Checked the installed electrical systems on a regular basis and ensured its smooth functioning. Ensured that all safety regulations were followed in the facility and protective equipment’s were given to workers. Performed regular inspections on the electrical work carried in the facility. Documented all client and vendor tests on the installed electrical equipment and conducted tests. Organized the inspection on site materials and ensured that they meet the required standards. Assisted Reading of Drawings. Weekly and monthly making Reports and send to Higher Authorities. Daily making Reports and send to Higher Authorities. Interfacing of different media devices. Wiring and panel boards operations. Transmission & Distribution: Installations of HT poles (PC & Structure of 36, 45 ft Height) with 11 KVA Three Phase Transmission lines (ACSR OSPREY, ACSR DOG & ACSR RABBIT Transmission power conductors)
  • 5. Installations of LT Poles (PC & Structure of 30 ft Height) with 440 voltage Three Phase Transmission Lines (AAC WASP & AAC ANT Transmission power conductors). Installations of PIN insulators for HT transmission lines. Installations of STRAIN Insulators for LT transmission lines. Installations of DEAD END CLAMP for OSPERY, DOG & RABBIT Transmission power conductors. Installations of SHACKLE Insulators for LT transmission lines. Installations of D-SHACKLE ASSEMBALY for LT transmission lines. Installations of ANCHOR Shackles. Installations of PLATE FORM for Transformer (Single & Double Structure Pole/ H pole). Installations of 12 Transformers (10 KVA, 15 KVA, 25 KVA, 50 KVA, 100 KVA & 200 KVA). Installations of EARTH UNITES with THIMBLE. Installations of STAY ROD with ELBOW & THIMBLE. Installations of GALVANISED STEEL WIRE 10 mm. Installations of GALVANISED STEEL & WIRE 6mm. Installtions of DROP OUT CUT OUT for 11 KVA Transmission lines & Transformers. Installations of SINGLE & THREE PHASE ELECTRIC METERS. Installation of PVC 37/0.83 4/CORE & PVC 19/0.83 4/CORE connection between Transformer and E-Meter. Installations of Street lights. Installations of THREE PHASE, 40 HP, 380-420 V, 58 A, 0.8 P.F, 1470 RPM MOTER for Tube Well. Installations of Switch Gears for Three PHASE INDUCTION MOTOR. Installations of 50 KVA Transformers for Tube Wells. Maintinanace & Generation: Worked on maintanace of Generation Generators (Generated voltage 11KV). Worked on Step Up T/F (Step up from 11 KV to 132 KV ) Using Step Up T/F rating 40 MVA, SF 6 circuit bracker. TECHNICAL SKILL Site Engineer (Construction) : Installations of Generatr, Undewr Ground Distribution, Building Wiring according to Drawings. Transmission & Distribution : Installation of Electrical HT & LT Cnductors, T/F, E-Meters AutoCAD Drafting, Designing & Techniques : Electrical Design Calculation ECDAIL : Single Line Diagram PLC/ MATLAB / C++ : programmable subjects MS Office : Windows / (Word, Excel, Power Point. Miantinanace & Generation : 132 KV Generation
  • 6. ACADEMIC CREDENTIALS 2011 Bachelors in Electrical Engineering from Sarhad University of Science & Information Technology, Peshawar, KPK, Pakistan. ACHIEVEMENTS Mini project  Toggling of LED’s screen on a bread board using Microprocessor8051. Final Year Project & thesis.  Design of Electronic Circuit Breaker. PERSONAL DOSSIER Date of Birth: July 06, 1989 Residential Address Pakistan: House: 583, Street:30, Sector: D-4, Phase: 1. Hayatabad, Peshawar. REFERENCE Will be furnishe on Demand