SlideShare a Scribd company logo
1 of 3
Yvan Dufresne
411 Queensland Circle S.E.  Calgary AB T2J 4P5
yvan2@hotmail.ca  403.888.7925
ELECTRICAL SUPERVISOR
High degree of skills, knowledge and major projects experience within Oil/Gas, Commercial Construction and Health
Services environments. Supervise the work of others with integrity, reliability, professionalism and accountability.
Effective communicator and collaborator with extreme focus on safety and quality. Technical expertise with proven
strengths in analyzing, planning, troubleshooting, working to timelines and implementing optimal solutions. Ability to
lead, train and mentor. Experience includes:
 Electrical Systems and Controls
 Installations and Commissioning
 Safety and Industry Compliance
 Quality Assurance / Quality Control
 Transformers, Pumps, Motors, Generators
 Blueprint Interpretation / Schematics
 Electrical Code / Wiring Diagrams
 Security & Evacuation Systems
 Communication Systems
 Gear and Cable Runs
 Fire Alarm Systems
 Diagnostics / Repairs
KEY PROJECT EXPERIENCE
ABB RAFFIN (Shell Scotford Debottlenecking Skid) Foreman
• Managed and lead construction of 120’ x 25’ (skid) Electrical building.
• Installation and testing of 4160V switchgear and 600V mcc’s.
• Installation of VFD.
• Installation and testing of UPS, DC systems.
• Layout and installation of internal lighting and miscellaneous receptacles.
• Layout and installation of fire alarm and HVAC power and controls.
Powell (Enbridge) Edmonton Access Expansion Senior Management
• Managed and lead construction of 3 powerhouses controlling 3 separate manifolds pumping oil and other
products to various locations in Alberta.
• Rigged and pulled 5KV cable throughout cable rack to all 3 powerhouse from a remote transformer.
• 600v layout/installation of gear, valves and associated cable runs.
• Grounding/bonding including the grid. 347v / 120-208v / UPS / Lighting - including low-voltage switching.
Fire Alarm / Security / HVAC / Instrumentation / Heat Trace (SR). All cable pulls and conduit runs in both
rigid and EMT. Ladder and instrumentation tray.
• Energizing and testing of all equipment.
FLUOR (Syncrude’s Mildred Lake Mine Project): As Fibre Optic/Communications and High Voltage Superintendent
collaborated on the infrastructure for new $18M fiber optic system.
4 Managed several companies including Midlite Powerline Construction, PCS, Kentz Construction, Jacobs,
Kiewit for the install of all 72Kv power lines and fiber optic cabling and associated communication cables to
the MLMR replacement Project.
• Held progress meetings and reported to Imperial Oil.
• Built completion packages.
• Energized and tested various equipment.
Yvan Dufresne -2-
URS Corporation (Fort McMurray Water Treatment Plant): As Senior Electrical Supervisor - with Lock Out Tag
Authority) completed effective planning, layout, installation, safety, start-up, testing and commissioning and ensured
QA/QC documentation for the following:
4 4160v gear and associated cable runs to MCC’s, DCC, Transformers, Pumps, Motors and Generator,
terminations of cables at both ends and test of gear/cables.
4 600v layout/installation of gear, valves and associated cable runs.
4 Communications: all associated components including fiber optic cable, single and multi mode pull, and
termination. Cat5E / Cat6 cable pull, termination.
4 Grounding/bonding including the grid. 347v / 120-208v / UPS / Lighting - including low-voltage switching.
Fire Alarm / Security / HVAC / Instrumentation / Heat Trace (SR). All cable pulls and conduit runs in both
rigid and EMT. Ladder and instrumentation tray.
IES (Industrial Electrical Services) for Syncrude: As Senior Electrical Supervisor oversaw effective planning, layout,
installation, safety, QA/QC documentation, start-up, testing of systems including:
4 Grounding/bonding including the grid. Incoming 600v feed from SERP Distribution Control Centre. 600v
distribution throughout facility. 120-208v distribution. Lighting. Communication. Fire Alarm, HVAC and all
cable pulls. Conduit runs in both rigid and EMT. Ladder and instrumentation tray. Heat Trace (MI).
Bantrel Constructors Ltd. (Shell Scottford Upgrader Expansion): As Senior Electrical Supervisor collaborated on the
planning and implementation the heat trace and evacuation system.
4 All heat trace SR (self regulated) and MI (mineral insulated) install power boxes, RTD’s, controller cabinets,
tray and pull cables to various locations throughout the plant.
Installed sirens and horns along with associated controller cabinets for the evacuation system.
Western Electric (Foothills Hospital). As Foreman supervising 24-man crew directed the planning, installation and
testing of electrical and communication system throughout interstitial and operation room floors involving:
4 600v distribution, 347v distribution, 120-208v distribution in both regular and emergency power. UPS.
Grounding/bonding, Lighting including low voltage switching.
4 Communications, Fire Alarm, Security and Paging.
4 EMT conduit and basket tray installation.
Trotter & Morton Ltd. (Pengrowth Towers Childrens Hospital Projects): As journeyman electrician
4 600v distribution, 347v distribution, 120-208v distribution in both regular and emergency power. UPS.
Grounding/bonding, Lighting including low voltage switching.
4 Communications, Fire Alarm, Security and Paging.
4 EMT conduit and basket tray installation.
Yvan Dufresne -3-
LEADERSHIP & TEAM PLAYER STRENGTHS
 Successfully collaborate with industry professionals to create plans, schedules and targets to ensure successful
timelines, workflow patterns for the implementation involved in large/complex projects and when addressing
unique problems and challenges.
 Keen awareness with strong communication skills in the identification of specific issues; able to clarify and resolve
issues effectively.
 Reputation for communicating technical information into understandable terms for training purposes.
 Consistently commended for ensuring safety adherence, quality workmanship and compliance by team members.
 Enthusiastic motivator; consistently maintain a positive attitude and sense of humour to promote a well-balanced
work environment; resulting in higher productivity and employee morale.
EMPLOYMENT HISTORY
Foreman for 120” x 25” skid for debottleneck project Shell Scottford (ABB Raffin) Sep 2015 – Dec 2015
General foreman for EAE project Enbridge (east Edmonton tank farm) Powell Nov 2014 – July 2015
Superintendent Fiber Optics/Communications & high voltage, Syncrude MLMR Project, FLUOR Apr 2014 - Oct 2014
Sr. Electrical Supervisor - URS Corporation (Fort Mcmurray Water Treatment Plant) Oct 2011 - Apr 2014
Sr. Electrical Supervisor - Industrial Electrical Services (Syncrude) Sep 2010 - Sep 2011
Supervisor - Shell Scottford Upgrader Expansion, Bantrel Constructors Apr 2009 - Jul 2010
Foreman - Western Electric (Foothills Hospital) May 2007 - Apr 2009
Trotter & Morton Ltd. (Pengrowth Towers & Calgary Children’s Hospital) 2004 - 2007
KDL Electric Ltd. (Apprenticeship on Commercial & Residential sites) 2000 - 2004
Owner, Dufresne Developments - Retail construction projects 1990 - 2000
EDUCATION / SPECIALIZED TRAINING
Journeyman Electrician – Red Seal Certified, Southern Alberta Institute of Technology (SAIT) 2007
LSE (Leadership for Safety Excellence), Alberta Construction Safety Association 2012
CSTS and First Aid Certifications (current)
Additional languages: French and Spanish
References Provided Upon Request

More Related Content

What's hot

Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copyarmando doria
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071Nithy Anantham
 
Rev02 Resume of James Macauley Nov'16 (3)
Rev02 Resume of James Macauley Nov'16 (3)Rev02 Resume of James Macauley Nov'16 (3)
Rev02 Resume of James Macauley Nov'16 (3)James Macauley
 
SAMUEL OZONO RESUME 03.20.16
SAMUEL OZONO RESUME 03.20.16SAMUEL OZONO RESUME 03.20.16
SAMUEL OZONO RESUME 03.20.16Sam Ozono
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companiesbala madhu
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resumenoli donez
 
Mahmood Hasan Resume 2
Mahmood Hasan Resume 2Mahmood Hasan Resume 2
Mahmood Hasan Resume 2Mahmood Hasan
 
Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif KhanLatif Khan
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15Mahboob Iqbal
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDarius Angeles
 

What's hot (20)

Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 
Mukesh_Kumar_(1)
Mukesh_Kumar_(1)Mukesh_Kumar_(1)
Mukesh_Kumar_(1)
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
Rev02 Resume of James Macauley Nov'16 (3)
Rev02 Resume of James Macauley Nov'16 (3)Rev02 Resume of James Macauley Nov'16 (3)
Rev02 Resume of James Macauley Nov'16 (3)
 
Jeevan1
Jeevan1Jeevan1
Jeevan1
 
SAMUEL OZONO RESUME 03.20.16
SAMUEL OZONO RESUME 03.20.16SAMUEL OZONO RESUME 03.20.16
SAMUEL OZONO RESUME 03.20.16
 
Ahmed Raslan_CV
Ahmed Raslan_CVAhmed Raslan_CV
Ahmed Raslan_CV
 
Engr uzair khan
Engr uzair khanEngr uzair khan
Engr uzair khan
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
Mahmood Hasan Resume 2
Mahmood Hasan Resume 2Mahmood Hasan Resume 2
Mahmood Hasan Resume 2
 
Resume_Latif Khan
Resume_Latif KhanResume_Latif Khan
Resume_Latif Khan
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
JKY CV.
JKY CV.JKY CV.
JKY CV.
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resume
 

Viewers also liked

Nuestro cuadro "Emperadores de Roma y su Imperio"
Nuestro cuadro "Emperadores de Roma y su Imperio"Nuestro cuadro "Emperadores de Roma y su Imperio"
Nuestro cuadro "Emperadores de Roma y su Imperio"CEDEC
 
Golden road sr revalidatie amc 30 mei 2011
Golden road sr revalidatie amc 30 mei 2011Golden road sr revalidatie amc 30 mei 2011
Golden road sr revalidatie amc 30 mei 2011jgdaams
 
Plantilla ejercicio "La magia". REA “Yincana de los seres de ficción”.
Plantilla ejercicio "La magia". REA “Yincana de los seres de ficción”.Plantilla ejercicio "La magia". REA “Yincana de los seres de ficción”.
Plantilla ejercicio "La magia". REA “Yincana de los seres de ficción”.CEDEC
 
Ten Simple Rules for Building and Maintaining a Scientific Reputation
Ten Simple Rules for Building and Maintaining a Scientific ReputationTen Simple Rules for Building and Maintaining a Scientific Reputation
Ten Simple Rules for Building and Maintaining a Scientific ReputationPhilip Bourne
 
Making it Happen - How L&D Can Influence Lasting Change - Laura Overton - Tow...
Making it Happen - How L&D Can Influence Lasting Change - Laura Overton - Tow...Making it Happen - How L&D Can Influence Lasting Change - Laura Overton - Tow...
Making it Happen - How L&D Can Influence Lasting Change - Laura Overton - Tow...Learning Pool Ltd
 
Mapa mental y conceptual
Mapa mental y conceptualMapa mental y conceptual
Mapa mental y conceptualXajaira Ortiz
 
Cuadro doble entrada
Cuadro doble entradaCuadro doble entrada
Cuadro doble entradaXajaira Ortiz
 
One LMS; four on-brand portals with glh Hotels and Totara LMS
One LMS; four on-brand portals with glh Hotels and Totara LMSOne LMS; four on-brand portals with glh Hotels and Totara LMS
One LMS; four on-brand portals with glh Hotels and Totara LMSLitmos Heroes
 
Rúbrica de la tarea de creación en equipo de un itinerario con Google maps
Rúbrica de la tarea de creación en equipo de un itinerario con Google mapsRúbrica de la tarea de creación en equipo de un itinerario con Google maps
Rúbrica de la tarea de creación en equipo de un itinerario con Google mapsCEDEC
 
Rubrica para evaluar una fotografia
Rubrica para evaluar una fotografiaRubrica para evaluar una fotografia
Rubrica para evaluar una fotografiaCEDEC
 
Rubrica para evaluar un crucigrama
Rubrica para evaluar un crucigramaRubrica para evaluar un crucigrama
Rubrica para evaluar un crucigramaCEDEC
 

Viewers also liked (15)

S5 tarea5 boman
S5 tarea5 bomanS5 tarea5 boman
S5 tarea5 boman
 
Nuestro cuadro "Emperadores de Roma y su Imperio"
Nuestro cuadro "Emperadores de Roma y su Imperio"Nuestro cuadro "Emperadores de Roma y su Imperio"
Nuestro cuadro "Emperadores de Roma y su Imperio"
 
Nerses Gevorkian CBS BA1
Nerses Gevorkian CBS BA1Nerses Gevorkian CBS BA1
Nerses Gevorkian CBS BA1
 
Golden road sr revalidatie amc 30 mei 2011
Golden road sr revalidatie amc 30 mei 2011Golden road sr revalidatie amc 30 mei 2011
Golden road sr revalidatie amc 30 mei 2011
 
Plantilla ejercicio "La magia". REA “Yincana de los seres de ficción”.
Plantilla ejercicio "La magia". REA “Yincana de los seres de ficción”.Plantilla ejercicio "La magia". REA “Yincana de los seres de ficción”.
Plantilla ejercicio "La magia". REA “Yincana de los seres de ficción”.
 
The State of Social Media Curriculum: Exploring Professional Expectations of ...
The State of Social Media Curriculum: Exploring Professional Expectations of ...The State of Social Media Curriculum: Exploring Professional Expectations of ...
The State of Social Media Curriculum: Exploring Professional Expectations of ...
 
Ten Simple Rules for Building and Maintaining a Scientific Reputation
Ten Simple Rules for Building and Maintaining a Scientific ReputationTen Simple Rules for Building and Maintaining a Scientific Reputation
Ten Simple Rules for Building and Maintaining a Scientific Reputation
 
Making it Happen - How L&D Can Influence Lasting Change - Laura Overton - Tow...
Making it Happen - How L&D Can Influence Lasting Change - Laura Overton - Tow...Making it Happen - How L&D Can Influence Lasting Change - Laura Overton - Tow...
Making it Happen - How L&D Can Influence Lasting Change - Laura Overton - Tow...
 
Mapa mental y conceptual
Mapa mental y conceptualMapa mental y conceptual
Mapa mental y conceptual
 
Cuadro doble entrada
Cuadro doble entradaCuadro doble entrada
Cuadro doble entrada
 
One LMS; four on-brand portals with glh Hotels and Totara LMS
One LMS; four on-brand portals with glh Hotels and Totara LMSOne LMS; four on-brand portals with glh Hotels and Totara LMS
One LMS; four on-brand portals with glh Hotels and Totara LMS
 
Rúbrica de la tarea de creación en equipo de un itinerario con Google maps
Rúbrica de la tarea de creación en equipo de un itinerario con Google mapsRúbrica de la tarea de creación en equipo de un itinerario con Google maps
Rúbrica de la tarea de creación en equipo de un itinerario con Google maps
 
Rubrica para evaluar una fotografia
Rubrica para evaluar una fotografiaRubrica para evaluar una fotografia
Rubrica para evaluar una fotografia
 
Rubrica para evaluar un crucigrama
Rubrica para evaluar un crucigramaRubrica para evaluar un crucigrama
Rubrica para evaluar un crucigrama
 
Neurotransmisores
NeurotransmisoresNeurotransmisores
Neurotransmisores
 

Similar to Electrical Supervisor With Extensive Oil & Gas Experience

JaxSmith Resume
JaxSmith  ResumeJaxSmith  Resume
JaxSmith ResumeJack Smith
 
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon MacInnis
 
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood ResumeJohn Hopwood
 
ATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresumeATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresumeLeroy Douglas
 
John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner
 
Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid
 
Jahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - RJahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - RIan Jahn
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016Khadar Ali Shaik,P.Eng
 
(A)markwatsonresume315.docx1 (2)
(A)markwatsonresume315.docx1 (2)(A)markwatsonresume315.docx1 (2)
(A)markwatsonresume315.docx1 (2)Mark Watson
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)Irfan Vali
 

Similar to Electrical Supervisor With Extensive Oil & Gas Experience (20)

Rick resume 2016
Rick resume 2016Rick resume 2016
Rick resume 2016
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Abrego, Francisco Javier - CV - 2016
Abrego, Francisco Javier - CV -  2016Abrego, Francisco Javier - CV -  2016
Abrego, Francisco Javier - CV - 2016
 
JaxSmith Resume
JaxSmith  ResumeJaxSmith  Resume
JaxSmith Resume
 
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_Electrical
 
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
ATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresumeATT_1419883665642_leroydouglasresume
ATT_1419883665642_leroydouglasresume
 
Davie h cv
Davie h  cvDavie h  cv
Davie h cv
 
Commission resume
Commission resumeCommission resume
Commission resume
 
John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016John Turner Resume Nov 6, 2016
John Turner Resume Nov 6, 2016
 
Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)
 
Jahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - RJahn Ian - Electrical Superintendent - R
Jahn Ian - Electrical Superintendent - R
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
 
LGResume2015
LGResume2015LGResume2015
LGResume2015
 
FPL RESUME1115
FPL RESUME1115FPL RESUME1115
FPL RESUME1115
 
Electrical17OCT
Electrical17OCTElectrical17OCT
Electrical17OCT
 
(A)markwatsonresume315.docx1 (2)
(A)markwatsonresume315.docx1 (2)(A)markwatsonresume315.docx1 (2)
(A)markwatsonresume315.docx1 (2)
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
Ricky. Harley. cv
Ricky. Harley. cvRicky. Harley. cv
Ricky. Harley. cv
 

Electrical Supervisor With Extensive Oil & Gas Experience

  • 1. Yvan Dufresne 411 Queensland Circle S.E.  Calgary AB T2J 4P5 yvan2@hotmail.ca  403.888.7925 ELECTRICAL SUPERVISOR High degree of skills, knowledge and major projects experience within Oil/Gas, Commercial Construction and Health Services environments. Supervise the work of others with integrity, reliability, professionalism and accountability. Effective communicator and collaborator with extreme focus on safety and quality. Technical expertise with proven strengths in analyzing, planning, troubleshooting, working to timelines and implementing optimal solutions. Ability to lead, train and mentor. Experience includes:  Electrical Systems and Controls  Installations and Commissioning  Safety and Industry Compliance  Quality Assurance / Quality Control  Transformers, Pumps, Motors, Generators  Blueprint Interpretation / Schematics  Electrical Code / Wiring Diagrams  Security & Evacuation Systems  Communication Systems  Gear and Cable Runs  Fire Alarm Systems  Diagnostics / Repairs KEY PROJECT EXPERIENCE ABB RAFFIN (Shell Scotford Debottlenecking Skid) Foreman • Managed and lead construction of 120’ x 25’ (skid) Electrical building. • Installation and testing of 4160V switchgear and 600V mcc’s. • Installation of VFD. • Installation and testing of UPS, DC systems. • Layout and installation of internal lighting and miscellaneous receptacles. • Layout and installation of fire alarm and HVAC power and controls. Powell (Enbridge) Edmonton Access Expansion Senior Management • Managed and lead construction of 3 powerhouses controlling 3 separate manifolds pumping oil and other products to various locations in Alberta. • Rigged and pulled 5KV cable throughout cable rack to all 3 powerhouse from a remote transformer. • 600v layout/installation of gear, valves and associated cable runs. • Grounding/bonding including the grid. 347v / 120-208v / UPS / Lighting - including low-voltage switching. Fire Alarm / Security / HVAC / Instrumentation / Heat Trace (SR). All cable pulls and conduit runs in both rigid and EMT. Ladder and instrumentation tray. • Energizing and testing of all equipment. FLUOR (Syncrude’s Mildred Lake Mine Project): As Fibre Optic/Communications and High Voltage Superintendent collaborated on the infrastructure for new $18M fiber optic system. 4 Managed several companies including Midlite Powerline Construction, PCS, Kentz Construction, Jacobs, Kiewit for the install of all 72Kv power lines and fiber optic cabling and associated communication cables to the MLMR replacement Project. • Held progress meetings and reported to Imperial Oil. • Built completion packages. • Energized and tested various equipment.
  • 2. Yvan Dufresne -2- URS Corporation (Fort McMurray Water Treatment Plant): As Senior Electrical Supervisor - with Lock Out Tag Authority) completed effective planning, layout, installation, safety, start-up, testing and commissioning and ensured QA/QC documentation for the following: 4 4160v gear and associated cable runs to MCC’s, DCC, Transformers, Pumps, Motors and Generator, terminations of cables at both ends and test of gear/cables. 4 600v layout/installation of gear, valves and associated cable runs. 4 Communications: all associated components including fiber optic cable, single and multi mode pull, and termination. Cat5E / Cat6 cable pull, termination. 4 Grounding/bonding including the grid. 347v / 120-208v / UPS / Lighting - including low-voltage switching. Fire Alarm / Security / HVAC / Instrumentation / Heat Trace (SR). All cable pulls and conduit runs in both rigid and EMT. Ladder and instrumentation tray. IES (Industrial Electrical Services) for Syncrude: As Senior Electrical Supervisor oversaw effective planning, layout, installation, safety, QA/QC documentation, start-up, testing of systems including: 4 Grounding/bonding including the grid. Incoming 600v feed from SERP Distribution Control Centre. 600v distribution throughout facility. 120-208v distribution. Lighting. Communication. Fire Alarm, HVAC and all cable pulls. Conduit runs in both rigid and EMT. Ladder and instrumentation tray. Heat Trace (MI). Bantrel Constructors Ltd. (Shell Scottford Upgrader Expansion): As Senior Electrical Supervisor collaborated on the planning and implementation the heat trace and evacuation system. 4 All heat trace SR (self regulated) and MI (mineral insulated) install power boxes, RTD’s, controller cabinets, tray and pull cables to various locations throughout the plant. Installed sirens and horns along with associated controller cabinets for the evacuation system. Western Electric (Foothills Hospital). As Foreman supervising 24-man crew directed the planning, installation and testing of electrical and communication system throughout interstitial and operation room floors involving: 4 600v distribution, 347v distribution, 120-208v distribution in both regular and emergency power. UPS. Grounding/bonding, Lighting including low voltage switching. 4 Communications, Fire Alarm, Security and Paging. 4 EMT conduit and basket tray installation. Trotter & Morton Ltd. (Pengrowth Towers Childrens Hospital Projects): As journeyman electrician 4 600v distribution, 347v distribution, 120-208v distribution in both regular and emergency power. UPS. Grounding/bonding, Lighting including low voltage switching. 4 Communications, Fire Alarm, Security and Paging. 4 EMT conduit and basket tray installation.
  • 3. Yvan Dufresne -3- LEADERSHIP & TEAM PLAYER STRENGTHS  Successfully collaborate with industry professionals to create plans, schedules and targets to ensure successful timelines, workflow patterns for the implementation involved in large/complex projects and when addressing unique problems and challenges.  Keen awareness with strong communication skills in the identification of specific issues; able to clarify and resolve issues effectively.  Reputation for communicating technical information into understandable terms for training purposes.  Consistently commended for ensuring safety adherence, quality workmanship and compliance by team members.  Enthusiastic motivator; consistently maintain a positive attitude and sense of humour to promote a well-balanced work environment; resulting in higher productivity and employee morale. EMPLOYMENT HISTORY Foreman for 120” x 25” skid for debottleneck project Shell Scottford (ABB Raffin) Sep 2015 – Dec 2015 General foreman for EAE project Enbridge (east Edmonton tank farm) Powell Nov 2014 – July 2015 Superintendent Fiber Optics/Communications & high voltage, Syncrude MLMR Project, FLUOR Apr 2014 - Oct 2014 Sr. Electrical Supervisor - URS Corporation (Fort Mcmurray Water Treatment Plant) Oct 2011 - Apr 2014 Sr. Electrical Supervisor - Industrial Electrical Services (Syncrude) Sep 2010 - Sep 2011 Supervisor - Shell Scottford Upgrader Expansion, Bantrel Constructors Apr 2009 - Jul 2010 Foreman - Western Electric (Foothills Hospital) May 2007 - Apr 2009 Trotter & Morton Ltd. (Pengrowth Towers & Calgary Children’s Hospital) 2004 - 2007 KDL Electric Ltd. (Apprenticeship on Commercial & Residential sites) 2000 - 2004 Owner, Dufresne Developments - Retail construction projects 1990 - 2000 EDUCATION / SPECIALIZED TRAINING Journeyman Electrician – Red Seal Certified, Southern Alberta Institute of Technology (SAIT) 2007 LSE (Leadership for Safety Excellence), Alberta Construction Safety Association 2012 CSTS and First Aid Certifications (current) Additional languages: French and Spanish References Provided Upon Request