SlideShare a Scribd company logo
Craig Sparks Page 1
CRAIG SPARKS
Electrician/Project
Manager/Superintendent/Foreman
Mobile # (506) 343-6799
Home # (506) 849-3891
Email: dcraigsparks@hotmail.com
EXPERIENCE
2003 –2015
Position: PROJECT MANAGER/CONSTRUCTION
MANAGER/SUPERINTENDENT
 Managing/Supervising of construction crews.
 Managing/Supervising of all office/administration staff that supports the project
and the construction crews. QA/QC, Foreman, General Foreman, Site Safety Manager,
document controller.
 Analyzing and planning of job requirements
 Staffing of personnel. Direct and In-direct Labor
 Procurement
 Deliverables
 Logistics
 Preparing job tracking and progress reports
 Coordinating job safety meetings
 Preparing of work order summaries for billings
 Progress meetings with clients
 Progress Billings
 Installation and commissioning of equipment
 Payroll
EXPERIENCE CONTINUED
1994 –2016
Position: ELECTRICIAN
 Installation/Maintenance/replacement of electrical systems.
 Cable trays, inclusive of 4” tray to 36” tray.
 Conduits inclusive ½” to 6”.
 Cabling installations, including terminating, testing, meggaring, continuity. Ranges
from single and multi-conductor #18 AWG to 750 mcm AWG. Teck 90, RW90, flexible
cables, Cat 3, 5, 6, and fiber optic.
 Installation of lighting and lighting equipment. Interior, exterior, high-bay. All
voltages.
Craig Sparks Page 2
 Installation of High Voltage Stress Cones, meggaring, assisting with High Pot testing
 Preforming electrical maintenance on Generators during scheduled and un-
scheduled shut downs at Bayside Power (Emera) and N.B. Power Courtney Bay.
 Preforming electrical maintenance on Gas Turbines during scheduled and un-
scheduled shut downs at Bayside Power (Emera).
 Preforming electrical maintenance on Steam Turbines during scheduled and un-
scheduled shut downs at Bayside Power (Emera) and N.B. Power Courtney Bay.
 Installation, maintenance, troubleshooting, commissioning, start-up of: 4-20 milli-
amp, and 0-10Vdc signals for DCS systems. Including RTD, transducers,
level/flow/pressure/temperature/vibration sensors and transmitters on Rosemount, ABB,
Siemens, Rockwell, Schneider Electric, Emerson, Mitsubishi, G.E., Honeywell, Omron,
Phoenix Contact, etc….
 Installation, maintenance, troubleshooting, commissioning, start-up of: Electrical
distribution systems. MCC (Motor Control Centers), distribution centers, etc… Allen
Bradley, ABB, Siemens, Cutler Hammer, GE. Performed tasks on their control/signal,
and power circuits. Voltages of 120, 208, 347, 480, 600, 4160, 13.8k, etc…
 Installation, troubleshooting, commissioning, start-up of transformers. Many types,
lighting, power distribution, step-up, step-down, isolating, grounding, dry-type, liquid-
filled, explosion proof, control transformers. Voltage ranges from 12 Vdc to 13.8Kv
inclusive.
 Installation, maintenance, troubleshooting, commissioning, start-up of: Fire Alarm
systems. Notifier, Edwards, Honeywell, Simplex Grinnell.
 Installation, maintenance, troubleshooting, commissioning, start-up of Bayside
Power’s (Emera) complete Freeze Protection/ Heat Tracing Systems. Raychem, Pentair,
Thermon, Pyrotenax.
 Installation, maintenance of battery banks for DCS, UPS, back-up diesel generators,
fire alarm systems.
 Installation, troubleshooting, commissioning, start-up of: Data/Communication
systems industrial and commercial. Copper installations of telephone Cat 3, data/comms,
cat 5, 5e, 6 shielded and non-shielded cabling. Fiber optics, 1330nm, 1550nm
termination, testing, troubleshooting. Panduit, Corning, Belden, Tyco, Amp.
 Installation of VFDs (Variable Frequency Drives), and VFD cabling.
January 2016 – March 2016
Company: Black and McDonald, NB
Project: Point Lepreau Generation Station Public Address System
Position: Electrician
Install additional electrical components to new and existing Public Address System
December 2014 – August 2015
Company: Dawcolectric, Fredericton, NB
Project: Irving Shipbuilding Inc. Facility Modernization Project
Position: Superintendent
Install all electrical systems including distribution, fire alarm, lighting, lighting automated controls,
etc….
October 2013 – December 2014
Company: Dawcolectric, Fredericton, NB
Project: Renous Atlantic Institution New Maximum Security Housing Unit
Position: Superintendent
Install all Instrumentation, mechanical and electrical, as well as all Telecomm and Security devices
and systems upgrades.
Craig Sparks Page 3
January 2013 – October 2013
Company: Dawcolectric, Fredericton, NB
Project: Canaport LNG Booster Compressor Upgrade
Position: Construction Manager/Superintendent
Install all Instrumentation, mechanical and electrical, as well as all Telecomm and Security devices
and systems upgrades.
September 2012 – January 2013
Company: The State Group Inc., Saint John, NB
Project: Nova Scotia Power Biomass Steam Turbine Project
Position: PROJECT MANAGER
Sent to assist Project Manager of the ongoing contract
May 2012- September 2012
Company: The State Group Inc., Saint John, NB
Project: N.B. Power Maintenance Province Wide
Position: PROJECT MANAGER
Daily maintenance and scheduled shut downs of all power plants province wide.
Supplying manpower, tooling, clerical and management.
December 2011 – April 2012
Company: The State Group Inc., Saint John, NB
Project: Dr. Everett Chalmers Hospital Chiller Upgrade
Position: PROJECT MANAGER
Install new 15KV switches, transformer, MCC, VFDs, Power control wiring for all associated
Systems.
September 2011 – December 2011
Company: The State Group Inc., Saint John, NB
Project: Dorchester Penitentiary Enlarge sally Port
Position: PROJECT MANAGER
Install new gate power & controls, motor Starter, distribution, fence detection & camera systems.
July 2011- April 2012
Company: The State Group Inc., Saint John, NB
Project: Renous Fence Containment
Position: PROJECT MANAGER
Power supply & distribution to containment area, lighting, camera, fence detection,
microwave detection, installation
June 2011 – September 2011
Company: The State Group Inc., Saint John, NB
Project: Phase II Security Fence Canister Site
Position: QUALITY ASSURANCE
Ensure materials, installations, and all documentation is up to all applicable codes,
standards and contract specifications.
June 2011- August 2011
Company: The State Group Inc., Saint John, NB
Project: Pine Grove Nursing Home
Position: PROJECT MANAGER
Replace Diesel Generator, feeders, Automatic Transfer Switch, and controls.
Craig Sparks Page 4
March 2011- June 2011
Company: The State Group Inc., Saint John, NB
Project: Renous Atlantic Institution
Position: PROJECT MANAGER
Replace emergency diesel generators (2), automatic transfer switches (3) & controls.
September 2010 – December 2010
Company: The State Group Inc., Saint John, NB
Project: CBC Radio Canada
Position: SUPERINTENDENT/ELECTRICIAN
Replace diesel generator & install automatic transfer switch.
January 2010 – December 2010
Company: The State Group Inc., Saint John, NB
Project: St. Joseph Hospital Saint John
Position: SUPERINTENDENT/ELECTRICIAN
Upgrade fire alarm system
December 2009 – October 2010
Company: The State Group Inc., Saint John, NB
Project: Lancaster Waste Water Treatment Plant
Position: SUPERINTENDENT
Install standby Diesel Generator/Variable Frequency Drives Upgrade
September 2009 – November 2009
Company: The State Group Inc., Saint John, NB
Project: Lawton’s Drugs and Empire Theater
Position: FORMAN/ELECTRICIAN
Upgrading and additions to telephone/data systems
June 2009 – August 2009
Company: The State Group Inc.,
Saint John, NB
Project: NB Power Coleson Cove
Position: FORMAN/ELECTRICIAN
Tank Farm
Installation of new level transmitters and wiring
June 2009 – July 2009
Company: The State Group Inc., Saint John, NB
Project: NB Power Coleson Cove
Position: SUPERINTENDENT
Water Treatment Plant Lime and Acid Pump Installation
Installation motor feeds and controls/heat tracing
January 2008 – May 2009
Company: The State Group Inc., Saint John, NB
Project: Canaport LNG
Position: PROJECT MANAGER
Manager for Non-Process buildings, Structured Cabling, and PA/GA Contracts
Craig Sparks Page 5
Aug 2007 – December 2007
Company: The State Group Inc., Saint John, NB
Project: BAYSIDE POWER, Saint John, New Brunswick
Position: MAINTENANCE
Care and maintenance of electrical equipment
May 2007
Company: The State Group Inc., Saint John, NB
Project: Saint John Port Authority
Position: FORMAN/ELECTRICIAN
Replace distribution Transformers and replaces feeders
January 2007 – April 2007
Company: The State Group Inc., Saint John, NB
Project: NS Power Tufts Cove
Position: SUPERINTENDENT /ELECTRICIAN
Install Emergency backup generator
Commissioning
July 2005 – Dec 2006
Company: The State Group Inc., Saint
John, NB
Project: Service Contracts (Sobeys/HSBC)
Position: FOREMAN/ELECTRICIAN
Electrician/Data Installer
March 2005 – June 2005
Company: The State Group Inc., Saint John, NB
Project: Irving Oil Refinery Hydrogen Recovery Unit
Saint John, New Brunswick
Position: FOREMAN
Install all electrical and Instrumentation for new onsite Hydrogen unit
October 2004 – December 2004
Company: The State Group Inc., Saint John, NB
Project: BAYSIDE POWER, Saint John, New Brunswick
Position: MAINTENANCE
Care and maintenance of electrical equipment
October 2003 – October 2004
Company: The State Group Inc., Saint John, NB
Project: NB POWER COLESON COVE
Variable Frequency Drive Building/Limestone Receiving Bldg
Position: SUPERINTENDENT
May 2000-Oct 2003
Company: The State Group Inc., Saint John, NB
Project: Bayside Power Cogeneration Project & Maintenance
Position: FOREMAN
Construction of gas turbine and recovery boiler
Refit existing steam turbine
Craig Sparks Page 6
September 1999 – May 2000
Project: Gardner Electric at Irving Oil Refinery Expansion
Position: CONSTRUCTION ELECTRICIAN
Perform daily electrical installations
August 1998 – July 1999
Project: O’Brien Electric at Irving Tissue, Irving Pulp and Paper and Irving Paper, Saint
John, New Brunswick
Position: APPRENTICE ELECTRICIAN
Perform daily electrical installations
1994 - 1998
Project: ICS – State at Irving Paper, Saint John, New Brunswick
Position: APPRENTICE ELECTRICIAN
Perform daily electrical installations
Craig Sparks Page 7
Education and Professional Development
2013 Gold Seal Certification - Project Management
Canadian Construction Association
2012 St. John Ambulance First Aid and CPR training
2012 Cumulative Impact of Change Orders by Awad S. Hanna, Ph.D., P.E.
Hanna Consulting Group Inc.
2009 Tyco Electronics Training- Certifying and Troubleshooting Premises Cabling
Systems
2009 Gold Seal Internship Certification
Canadian Construction Association
2009 Tyco Electronics Training- Convergence Makes Cabling an Asset
-Saving Energy with Smart Cabling
- Myth busting takes on Shielded Cabling
- Intelligent Infrastructure Management
-Is Pre-Terminated Prudent for your Projects
-What’s New in LAN Cabling Standards
2008 AMP Ampact Training- Registered Installer and Certifier
2008 Panduit Network Cabling Systems – Certified Technician
Level I & II
2008 Project Management Course
Project Management Institute
2007 Arc Flash/Electrical Safety - Panduit
2007 Arc Flash and Safety Seminar
2007 Blueprint Reading – The Basics
Construction Association of Nova Scotia
2007 Construction Planning & Scheduling
Construction Association of Nova Scotia
2006 AMP ACT I – Installing and Connecting LAN Cabling Systems
AMP ACT II- Certifying and Troubleshooting LAN Cabling Systems
IBDN-700- Belden IBDN Installation
2005 Certificate of Qualification – INDUSTRIAL ELECTRICIAN
New Brunswick Community College - Saint John, NB
Craig Sparks Page 8
2003 Block Release Apprenticeship Program – Industrial Instrumentation
New Brunswick College - Saint John, NB
Block Two completion
2001 Block Release Apprenticeship Program – Industrial Instrumentation
New Brunswick College - Saint John, NB
Block One completion
2000 Certificate of Qualification – CONSTRUCTION ELECTRICIAN
New Brunswick Community College - Saint John, NB
1994 One Year Electrical Program – 1995 Certificate Received
New Brunswick College – Saint John, NB
1994 Block Release Apprenticeship Program
Construction Electrician
Craig Sparks Page 9
New Brunswick Construction Safety Association Training:
1. Principles of loss control
2. Principles of loss control audit
3. Safety orientation
4. Confined space awareness
5. Fall protection
6. WHIMIS
7. Scheduling 101
8. Scheduling 102
9. Blueprint Reading
10. Accident/Investigation
11. Hazard Control & Identification
12. Lock Out Tag Out
Safety Orientation/Workplace Standard First Aid with CPR”C”
C.P.R. Training, Heart and Stroke Foundation
New Brunswick Occupational Health and Safety Training
Aerial Platform Training
Zoom Boom Lift Training

More Related Content

What's hot

Mohamed hamdy cv
Mohamed hamdy cvMohamed hamdy cv
Mohamed hamdy cv
mohamed hamdy
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016Terry Evans
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
Dhiraj kumar Nishad
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Cover letter
Cover letterCover letter
Vipin Resume
Vipin ResumeVipin Resume
Vipin ResumeVipin Das
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDarius Angeles
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copyarmando doria
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJames Stults
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
PETER MAIDENS
 
Dale Bietendorf's rev. resume
Dale Bietendorf's rev. resumeDale Bietendorf's rev. resume
Dale Bietendorf's rev. resumeDALE BIETENDORF
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
Kiran Y V N Rao
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
KumaresanT7
 

What's hot (20)

Mohamed hamdy cv
Mohamed hamdy cvMohamed hamdy cv
Mohamed hamdy cv
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
 
Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Cover letter
Cover letterCover letter
Cover letter
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin Resume
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resume
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
Dale Bietendorf's rev. resume
Dale Bietendorf's rev. resumeDale Bietendorf's rev. resume
Dale Bietendorf's rev. resume
 
RA CV Current
RA CV CurrentRA CV Current
RA CV Current
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
Mohamed ElGazzar Egypt
Mohamed ElGazzar EgyptMohamed ElGazzar Egypt
Mohamed ElGazzar Egypt
 

Viewers also liked

CV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFCV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFShajeer A.S
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
darshankumartrivedi
 
Cv resume sample for fresh graduate of office administration
Cv resume sample for fresh graduate of office administrationCv resume sample for fresh graduate of office administration
Cv resume sample for fresh graduate of office administrationHọc Huỳnh Bá
 

Viewers also liked (6)

CV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFCV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDF
 
cv boda dec15
cv boda dec15cv boda dec15
cv boda dec15
 
Adam Podgorski Resume
Adam Podgorski ResumeAdam Podgorski Resume
Adam Podgorski Resume
 
Ernesto C. Perez
Ernesto C. PerezErnesto C. Perez
Ernesto C. Perez
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
 
Cv resume sample for fresh graduate of office administration
Cv resume sample for fresh graduate of office administrationCv resume sample for fresh graduate of office administration
Cv resume sample for fresh graduate of office administration
 

Similar to Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager

Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks
 
Frank randazzo resume
Frank randazzo resumeFrank randazzo resume
Frank randazzo resume
Frank Randazzo
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith
 
CURRICULUM__VITAE_NOEL27_08_15
CURRICULUM__VITAE_NOEL27_08_15CURRICULUM__VITAE_NOEL27_08_15
CURRICULUM__VITAE_NOEL27_08_15Noel Owens
 
Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Holland Kendall
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons
 
2019 robert bertranb
2019 robert bertranb 2019 robert bertranb
2019 robert bertranb
Robert Bertrand
 
Glen Mayes resume 2016
Glen Mayes resume 2016Glen Mayes resume 2016
Glen Mayes resume 2016Glen Mayes
 
Robert Resume 8-26-15
Robert Resume 8-26-15Robert Resume 8-26-15
Robert Resume 8-26-15Robert Thomas
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Hitt
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
Ed's Resume June 2016
Ed's Resume June 2016Ed's Resume June 2016
Ed's Resume June 2016Ed Mierzwa
 
Duane Slaney Resume Word Format
Duane Slaney Resume Word FormatDuane Slaney Resume Word Format
Duane Slaney Resume Word FormatDuane Slaney
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resume
Abbas Fadhil
 

Similar to Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager (20)

Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Frank randazzo resume
Frank randazzo resumeFrank randazzo resume
Frank randazzo resume
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))
 
CURRICULUM__VITAE_NOEL27_08_15
CURRICULUM__VITAE_NOEL27_08_15CURRICULUM__VITAE_NOEL27_08_15
CURRICULUM__VITAE_NOEL27_08_15
 
Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
2019 robert bertranb
2019 robert bertranb 2019 robert bertranb
2019 robert bertranb
 
Glen Mayes resume 2016
Glen Mayes resume 2016Glen Mayes resume 2016
Glen Mayes resume 2016
 
Robert Resume 8-26-15
Robert Resume 8-26-15Robert Resume 8-26-15
Robert Resume 8-26-15
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
PJMcManus
PJMcManusPJMcManus
PJMcManus
 
RICHARD HEATH-CV3a
RICHARD HEATH-CV3aRICHARD HEATH-CV3a
RICHARD HEATH-CV3a
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
Stephen_LeeAlmond
Stephen_LeeAlmondStephen_LeeAlmond
Stephen_LeeAlmond
 
Ed's Resume June 2016
Ed's Resume June 2016Ed's Resume June 2016
Ed's Resume June 2016
 
Duane Slaney Resume Word Format
Duane Slaney Resume Word FormatDuane Slaney Resume Word Format
Duane Slaney Resume Word Format
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resume
 

Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager

  • 1. Craig Sparks Page 1 CRAIG SPARKS Electrician/Project Manager/Superintendent/Foreman Mobile # (506) 343-6799 Home # (506) 849-3891 Email: dcraigsparks@hotmail.com EXPERIENCE 2003 –2015 Position: PROJECT MANAGER/CONSTRUCTION MANAGER/SUPERINTENDENT  Managing/Supervising of construction crews.  Managing/Supervising of all office/administration staff that supports the project and the construction crews. QA/QC, Foreman, General Foreman, Site Safety Manager, document controller.  Analyzing and planning of job requirements  Staffing of personnel. Direct and In-direct Labor  Procurement  Deliverables  Logistics  Preparing job tracking and progress reports  Coordinating job safety meetings  Preparing of work order summaries for billings  Progress meetings with clients  Progress Billings  Installation and commissioning of equipment  Payroll EXPERIENCE CONTINUED 1994 –2016 Position: ELECTRICIAN  Installation/Maintenance/replacement of electrical systems.  Cable trays, inclusive of 4” tray to 36” tray.  Conduits inclusive ½” to 6”.  Cabling installations, including terminating, testing, meggaring, continuity. Ranges from single and multi-conductor #18 AWG to 750 mcm AWG. Teck 90, RW90, flexible cables, Cat 3, 5, 6, and fiber optic.  Installation of lighting and lighting equipment. Interior, exterior, high-bay. All voltages.
  • 2. Craig Sparks Page 2  Installation of High Voltage Stress Cones, meggaring, assisting with High Pot testing  Preforming electrical maintenance on Generators during scheduled and un- scheduled shut downs at Bayside Power (Emera) and N.B. Power Courtney Bay.  Preforming electrical maintenance on Gas Turbines during scheduled and un- scheduled shut downs at Bayside Power (Emera).  Preforming electrical maintenance on Steam Turbines during scheduled and un- scheduled shut downs at Bayside Power (Emera) and N.B. Power Courtney Bay.  Installation, maintenance, troubleshooting, commissioning, start-up of: 4-20 milli- amp, and 0-10Vdc signals for DCS systems. Including RTD, transducers, level/flow/pressure/temperature/vibration sensors and transmitters on Rosemount, ABB, Siemens, Rockwell, Schneider Electric, Emerson, Mitsubishi, G.E., Honeywell, Omron, Phoenix Contact, etc….  Installation, maintenance, troubleshooting, commissioning, start-up of: Electrical distribution systems. MCC (Motor Control Centers), distribution centers, etc… Allen Bradley, ABB, Siemens, Cutler Hammer, GE. Performed tasks on their control/signal, and power circuits. Voltages of 120, 208, 347, 480, 600, 4160, 13.8k, etc…  Installation, troubleshooting, commissioning, start-up of transformers. Many types, lighting, power distribution, step-up, step-down, isolating, grounding, dry-type, liquid- filled, explosion proof, control transformers. Voltage ranges from 12 Vdc to 13.8Kv inclusive.  Installation, maintenance, troubleshooting, commissioning, start-up of: Fire Alarm systems. Notifier, Edwards, Honeywell, Simplex Grinnell.  Installation, maintenance, troubleshooting, commissioning, start-up of Bayside Power’s (Emera) complete Freeze Protection/ Heat Tracing Systems. Raychem, Pentair, Thermon, Pyrotenax.  Installation, maintenance of battery banks for DCS, UPS, back-up diesel generators, fire alarm systems.  Installation, troubleshooting, commissioning, start-up of: Data/Communication systems industrial and commercial. Copper installations of telephone Cat 3, data/comms, cat 5, 5e, 6 shielded and non-shielded cabling. Fiber optics, 1330nm, 1550nm termination, testing, troubleshooting. Panduit, Corning, Belden, Tyco, Amp.  Installation of VFDs (Variable Frequency Drives), and VFD cabling. January 2016 – March 2016 Company: Black and McDonald, NB Project: Point Lepreau Generation Station Public Address System Position: Electrician Install additional electrical components to new and existing Public Address System December 2014 – August 2015 Company: Dawcolectric, Fredericton, NB Project: Irving Shipbuilding Inc. Facility Modernization Project Position: Superintendent Install all electrical systems including distribution, fire alarm, lighting, lighting automated controls, etc…. October 2013 – December 2014 Company: Dawcolectric, Fredericton, NB Project: Renous Atlantic Institution New Maximum Security Housing Unit Position: Superintendent Install all Instrumentation, mechanical and electrical, as well as all Telecomm and Security devices and systems upgrades.
  • 3. Craig Sparks Page 3 January 2013 – October 2013 Company: Dawcolectric, Fredericton, NB Project: Canaport LNG Booster Compressor Upgrade Position: Construction Manager/Superintendent Install all Instrumentation, mechanical and electrical, as well as all Telecomm and Security devices and systems upgrades. September 2012 – January 2013 Company: The State Group Inc., Saint John, NB Project: Nova Scotia Power Biomass Steam Turbine Project Position: PROJECT MANAGER Sent to assist Project Manager of the ongoing contract May 2012- September 2012 Company: The State Group Inc., Saint John, NB Project: N.B. Power Maintenance Province Wide Position: PROJECT MANAGER Daily maintenance and scheduled shut downs of all power plants province wide. Supplying manpower, tooling, clerical and management. December 2011 – April 2012 Company: The State Group Inc., Saint John, NB Project: Dr. Everett Chalmers Hospital Chiller Upgrade Position: PROJECT MANAGER Install new 15KV switches, transformer, MCC, VFDs, Power control wiring for all associated Systems. September 2011 – December 2011 Company: The State Group Inc., Saint John, NB Project: Dorchester Penitentiary Enlarge sally Port Position: PROJECT MANAGER Install new gate power & controls, motor Starter, distribution, fence detection & camera systems. July 2011- April 2012 Company: The State Group Inc., Saint John, NB Project: Renous Fence Containment Position: PROJECT MANAGER Power supply & distribution to containment area, lighting, camera, fence detection, microwave detection, installation June 2011 – September 2011 Company: The State Group Inc., Saint John, NB Project: Phase II Security Fence Canister Site Position: QUALITY ASSURANCE Ensure materials, installations, and all documentation is up to all applicable codes, standards and contract specifications. June 2011- August 2011 Company: The State Group Inc., Saint John, NB Project: Pine Grove Nursing Home Position: PROJECT MANAGER Replace Diesel Generator, feeders, Automatic Transfer Switch, and controls.
  • 4. Craig Sparks Page 4 March 2011- June 2011 Company: The State Group Inc., Saint John, NB Project: Renous Atlantic Institution Position: PROJECT MANAGER Replace emergency diesel generators (2), automatic transfer switches (3) & controls. September 2010 – December 2010 Company: The State Group Inc., Saint John, NB Project: CBC Radio Canada Position: SUPERINTENDENT/ELECTRICIAN Replace diesel generator & install automatic transfer switch. January 2010 – December 2010 Company: The State Group Inc., Saint John, NB Project: St. Joseph Hospital Saint John Position: SUPERINTENDENT/ELECTRICIAN Upgrade fire alarm system December 2009 – October 2010 Company: The State Group Inc., Saint John, NB Project: Lancaster Waste Water Treatment Plant Position: SUPERINTENDENT Install standby Diesel Generator/Variable Frequency Drives Upgrade September 2009 – November 2009 Company: The State Group Inc., Saint John, NB Project: Lawton’s Drugs and Empire Theater Position: FORMAN/ELECTRICIAN Upgrading and additions to telephone/data systems June 2009 – August 2009 Company: The State Group Inc., Saint John, NB Project: NB Power Coleson Cove Position: FORMAN/ELECTRICIAN Tank Farm Installation of new level transmitters and wiring June 2009 – July 2009 Company: The State Group Inc., Saint John, NB Project: NB Power Coleson Cove Position: SUPERINTENDENT Water Treatment Plant Lime and Acid Pump Installation Installation motor feeds and controls/heat tracing January 2008 – May 2009 Company: The State Group Inc., Saint John, NB Project: Canaport LNG Position: PROJECT MANAGER Manager for Non-Process buildings, Structured Cabling, and PA/GA Contracts
  • 5. Craig Sparks Page 5 Aug 2007 – December 2007 Company: The State Group Inc., Saint John, NB Project: BAYSIDE POWER, Saint John, New Brunswick Position: MAINTENANCE Care and maintenance of electrical equipment May 2007 Company: The State Group Inc., Saint John, NB Project: Saint John Port Authority Position: FORMAN/ELECTRICIAN Replace distribution Transformers and replaces feeders January 2007 – April 2007 Company: The State Group Inc., Saint John, NB Project: NS Power Tufts Cove Position: SUPERINTENDENT /ELECTRICIAN Install Emergency backup generator Commissioning July 2005 – Dec 2006 Company: The State Group Inc., Saint John, NB Project: Service Contracts (Sobeys/HSBC) Position: FOREMAN/ELECTRICIAN Electrician/Data Installer March 2005 – June 2005 Company: The State Group Inc., Saint John, NB Project: Irving Oil Refinery Hydrogen Recovery Unit Saint John, New Brunswick Position: FOREMAN Install all electrical and Instrumentation for new onsite Hydrogen unit October 2004 – December 2004 Company: The State Group Inc., Saint John, NB Project: BAYSIDE POWER, Saint John, New Brunswick Position: MAINTENANCE Care and maintenance of electrical equipment October 2003 – October 2004 Company: The State Group Inc., Saint John, NB Project: NB POWER COLESON COVE Variable Frequency Drive Building/Limestone Receiving Bldg Position: SUPERINTENDENT May 2000-Oct 2003 Company: The State Group Inc., Saint John, NB Project: Bayside Power Cogeneration Project & Maintenance Position: FOREMAN Construction of gas turbine and recovery boiler Refit existing steam turbine
  • 6. Craig Sparks Page 6 September 1999 – May 2000 Project: Gardner Electric at Irving Oil Refinery Expansion Position: CONSTRUCTION ELECTRICIAN Perform daily electrical installations August 1998 – July 1999 Project: O’Brien Electric at Irving Tissue, Irving Pulp and Paper and Irving Paper, Saint John, New Brunswick Position: APPRENTICE ELECTRICIAN Perform daily electrical installations 1994 - 1998 Project: ICS – State at Irving Paper, Saint John, New Brunswick Position: APPRENTICE ELECTRICIAN Perform daily electrical installations
  • 7. Craig Sparks Page 7 Education and Professional Development 2013 Gold Seal Certification - Project Management Canadian Construction Association 2012 St. John Ambulance First Aid and CPR training 2012 Cumulative Impact of Change Orders by Awad S. Hanna, Ph.D., P.E. Hanna Consulting Group Inc. 2009 Tyco Electronics Training- Certifying and Troubleshooting Premises Cabling Systems 2009 Gold Seal Internship Certification Canadian Construction Association 2009 Tyco Electronics Training- Convergence Makes Cabling an Asset -Saving Energy with Smart Cabling - Myth busting takes on Shielded Cabling - Intelligent Infrastructure Management -Is Pre-Terminated Prudent for your Projects -What’s New in LAN Cabling Standards 2008 AMP Ampact Training- Registered Installer and Certifier 2008 Panduit Network Cabling Systems – Certified Technician Level I & II 2008 Project Management Course Project Management Institute 2007 Arc Flash/Electrical Safety - Panduit 2007 Arc Flash and Safety Seminar 2007 Blueprint Reading – The Basics Construction Association of Nova Scotia 2007 Construction Planning & Scheduling Construction Association of Nova Scotia 2006 AMP ACT I – Installing and Connecting LAN Cabling Systems AMP ACT II- Certifying and Troubleshooting LAN Cabling Systems IBDN-700- Belden IBDN Installation 2005 Certificate of Qualification – INDUSTRIAL ELECTRICIAN New Brunswick Community College - Saint John, NB
  • 8. Craig Sparks Page 8 2003 Block Release Apprenticeship Program – Industrial Instrumentation New Brunswick College - Saint John, NB Block Two completion 2001 Block Release Apprenticeship Program – Industrial Instrumentation New Brunswick College - Saint John, NB Block One completion 2000 Certificate of Qualification – CONSTRUCTION ELECTRICIAN New Brunswick Community College - Saint John, NB 1994 One Year Electrical Program – 1995 Certificate Received New Brunswick College – Saint John, NB 1994 Block Release Apprenticeship Program Construction Electrician
  • 9. Craig Sparks Page 9 New Brunswick Construction Safety Association Training: 1. Principles of loss control 2. Principles of loss control audit 3. Safety orientation 4. Confined space awareness 5. Fall protection 6. WHIMIS 7. Scheduling 101 8. Scheduling 102 9. Blueprint Reading 10. Accident/Investigation 11. Hazard Control & Identification 12. Lock Out Tag Out Safety Orientation/Workplace Standard First Aid with CPR”C” C.P.R. Training, Heart and Stroke Foundation New Brunswick Occupational Health and Safety Training Aerial Platform Training Zoom Boom Lift Training