SlideShare a Scribd company logo
Muhammad Shahzad Akbar
PEC # ELECT/40142
E&I Engineer
Contact No.:+92346-7113140/ +92333-0453553
E-Mail: shahzad.akbar87@gmail.com
PROFILE SUMMARY
 Graduate of Bachelor of Science in Electrical Engineering with more than 3.5 years of Experience in:
Operation& Maintenance, Electrical, Electronics, Automation & Instrumentation, Project Management &
Execution.
 Installation, Commissioning , Operation & Maintenance of TWO Coal Fired Boilers each 55 ton/hr, 5.3MPa,
490°c.
 Installation, Commissioning, Operation & Maintenance of Steam Turbine 12MW, 3000rpm, 4.9MPa, Double
Extraction & Condensate Mode.
 Installation, Commissioning, Operation & Maintenance of Alternator 15MW, 3000rpm, DVR Excitation System,
NARI Synchronization & Protection System.
 Operation and Maintenance of 3x1.5MW CAT 3516 Industrial Gensets. with 3x1875kVA, 50Hz, 1500RPM,
400V Alternator with Brushless excitation and Digital Automatic Voltage Regulator. .
 Installation, Commissioning, Operation and Maintenance of 2 x 1.6 MW CAT 3517B Diesel Gensets with
2x2000KVA, 50Hz, 1500RPM, 400V Synchronous Generators with Brushless excitation and Digital Automatic
Voltage Regulator.
 Installation, Commissioning and Troubleshooting of NARI NSC200NT SCADA Electrical Control & Protections
Monitoring system)
 Installation, Commissioning, Operation & Maintenance of DCS (SIEMENS PCS7, NT6000 DEH+ETS, PLC
(Siemens), BENTLEY NEVADA Turbine Protection System.
 Installation, Commissioning, Operation & Maintenance of Instruments (Temperature, Flow, Level and Pressure
Gauges/Transmitters, control valves, Analyzers) etc.
 Manages the plant’s operations, projects, and maintenance.
 Control on inventory, budget and compliance with safety regulations.
 Training of staff including Trainee Engineers, Supervisors, & trade workers.
 Development of Sequence of Procedures (SOP) for maintenance of E&I equipment’s according to ISO Standards.
 E&I BOQ's, study of P&ID, Installation, Commissioning and MBO’s (Management by Objectives).
 Well aware of Electrical Engineering Methodologies as well as the corresponding Equipments, materials,
consumables, tools and Manpower Allocations related to (HT & LT) Electrical Operation, Maintenance and
Installation Works.
 A keen planner, strategist & implementer with demonstrated abilities in Managing entire E&I (Electrical, Automation
and Instrumentation).
EMPLOYMENT DETAILS
Since October 2015 till date. Ingredion, Rafhan Maize Product. Co. LTD
Pakistan as E&I Engineer.
Working as E&I Engineer on coal fired power plant having capacity of 15MW Electricity Generation.
RESPONSIBILITIES:
ELECTRICAL:
 Scheduling, planning & executing jobs during the shift including Procurement, Contract Management &
Work order Generation.
 Preventive maintenance of E & I installations including Generators, Transformers, DCS system, VFDs, E
& I Control and Protection Cabinets, Motors, Instruments including control valves, transmitter, analyzers,
level transmitters and control system.
 In the main control room, monitor Power, Automation and Control System equipment for challenges to
integrity issues using Supervisory Control systems (SCADA) and Distributed Control System (DCS).
 Coordinate and supervise planned and emergent maintenance items, while ensuring timely completion and
adherence to industrial and electrical safety standards.
 Installation, Commissioning, Operation and Maintenance of 1 x 15 MW Synchronous Generator with
Brushless excitation and Digital Automatic Voltage Regulator.
 Operation and Maintenance of 3x1.5MW CAT 3516 Industrial Gensets. with 3x1875kVA, 50Hz,
1500RPM, 400V Alternator with Brushless excitation and Digital Automatic Voltage Regulator. .
 Installation, Testing, Commissioning, Operation and Maintenance of electrical equipments like
Transformers, Generator, LV / MV Switchgear Breakers, NGR panel, Protection Relays, Batteries, Motors,
Control and Protections etc.
 Hi-pot test of MV cables, Transformers and Generator, Meggar test of LV cables, LV panels and motors.
 Installation, Testing, Commissioning, Operation and Maintenance of Generator Protection & Synchronization
panels.
 Installation, Operation and Maintenance of VFD Panels of 2.2 to 315 KW
 Installation, Commissioning, Operation and Maintenance of Coal Handling, Coal Crushing & Conveying System,
Limestone Powder preparation.
 Installation, Commissioning, Operation and Maintenance of Boiler makeup water treatment plant, Cooling tower
& Circulating water system, electrostatic Precipitators with 72KV Rectifying Transformers.
 Installation, Commissioning and Maintenance of Siemens Power Transformers having rating of 10-13MVA, 20-
26MVA which includes: IR (Insulation test), No load test, Full load test, Impedance measurement test of power
transformer, Safeties testing of power transformer, Dielectric Insulation test of transformer oil.
 Thermo-graphy of whole plant electric joints.
 Installation, Testing, Commissioning, Operation and Maintenance of Public Address system, Fire Alarm and Fire
Protection system and CCTV Cameras system.
 Installation, testing and Maintenance of Earthing, Structural Grounding & Lightning Arrester system of whole
plant.
 Erection and commissioning of area lighting, equipment lighting and street light poles up to 500W.
INSTRUMENT & CONTROL:
 Installation, Operation and Maintenance of SIEMENS PCS-7 DCS of 2676 I/O’s at coal fired Power Plant w.r.t
hardware, software, logical working and communication.
 Installation, Operation and Maintenance of SCIYON NT6000 DCS for Turbine Safeties of 300 I/O’s like (Thermal
Expansions, Axial Displacements, Condenser Vacuum, Lube Oil Pressure and Temperatures, Thrust Pad and
Radial Tile Temperatures interlocks) at coal fired Power Plant w.r.t hardware, software, logical working and
communication.
 Installation, Operation and Maintenance of TSI (Turbine Supervisory Instrument System make Bently Nevada) like
(Tile Vibrations, Rotations, Turbine Over-speed) for Turbine Internal Safeties at coal fired Power Plant w.r.t
hardware and communication.
 Working on calibration, Installation and loop testing (regarding DCS) of all types of Field instruments (Pneumatic
and Motorized Control valves, Shut-off valves, Transmitters (level, flow, pressure, temperature), Switches
(pressure, level, position, vibration), Analyzers (P.H, Conductivity, Oxygen), Coal flow rate & totalizer system.
 Installation, Operation and Maintenance of Ignition Diesel Burner for Coal Fired Boiler startup.
UTILITIES:
Air Compressors (0.8MPa, 60 tons/hr), Cooling Towers (4800m3), Water Treatment Plant (60m3/hr), Coal
Crusher 100 tons/hr, ESP 110 tons/hr 3-Electric Fields 72KV, Ash Silo 40 tons/hr, Slag Disposal System 10 tons/hr,
Lime Stone Powder System 30 tons/hr in coal fired power plant.
Since July, 2013 to October, 2015 International Airport, Multan, Pakistan.
as Electrical Engineer.
RESPOSIBILITIES:
ELECTRICAL:
 Installation, Testing, Commissioning, Operation and Maintenance of 2 x 1.6 MW Caterpillar 3517B Diesel Gensets
with 2x2000KVA, 50Hz, 1500RPM, 400V Synchronous Generators with Brushless excitation and Digital
Automatic Voltage Regulator.
 Installation, Testing, Commissioning, Operation and Maintenance of electrical equipments like Transformers,
Generator, LV / MV Switchgear Breakers, NGR panel, Protection Relays, Batteries, Motors, Control and
Protections etc.
 Hi-pot test of MV cables, Transformers and Generator, Meggar test of LV cables, LV panels and motors.
 Installation, Testing, Commissioning, Operation and Maintenance of Generator Protection & Synchronization
panels.
 3x2.5MVA Power Transformers, (2x100KVA,2x300KVA,4x400KVA) Distribution Transformers, Power Factor
Improvement Pannels
 Installation, Testing, Commissioning, Operation and Maintenance of Public Address system, Fire Alarm and Fire
Protection system and CCTV Cameras system, FIDs (Flight Information Displays), Aeroplane Parking System
 Installation, testing and Maintenance of Earthing, Structural Grounding & Lightning Arrester system of whole
plant.
 Erection and commissioning of area lighting, equipment lighting and road light poles up to 500W.
UTILITIES:
Utility Building (2x1.6MW Diesel Generators), Passengers Terminal Buildings, Offices Blocks, Officers and Staff
Mess & Resendencies, Cargo Building, Passengers Car Parking & Aeroplanes Runway & Parking
EDUCATION
2013 B.Sc.(Electrical Engineering) (3.52/4.0 CGPA) University of Management and Technology (UMT), Lahore.
TRAININGS
 Six Sigma white belt & KAIZEN trained
 2 days training on Safety measures at Plant and Offices
 3 days training on Process Hazard Analysis and Risk Assessment
PERSONAL DETAILS
Date of Birth: 16th
April, 1987
Languages Known: English, Urdu
Nationality: Pakistani
Marital Status: Single

More Related Content

What's hot

Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
Sanad Samir
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
VEERABHARATHI MUNI
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
Abdul Hakkim
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CVTods Almeron
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
Abdullah Almutairi
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
saryhasabadly
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
vineeth ravi
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
Abdul Hakkim
 

What's hot (20)

Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CV
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
QAQC E&I
QAQC E&IQAQC E&I
QAQC E&I
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 

Viewers also liked

Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard
 
aaronparkerresume (5)
aaronparkerresume (5)aaronparkerresume (5)
aaronparkerresume (5)Aaron Parker
 
03_August_2016_Richard_Bailey_Resume[1]
03_August_2016_Richard_Bailey_Resume[1]03_August_2016_Richard_Bailey_Resume[1]
03_August_2016_Richard_Bailey_Resume[1]Richard Bailey
 
1ResumeDEC2016Phillip Lopez
1ResumeDEC2016Phillip Lopez1ResumeDEC2016Phillip Lopez
1ResumeDEC2016Phillip Lopezphillip Lopez
 
Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015Peter Gervais
 
Updated resume 1 (1) (1)
Updated resume 1 (1) (1)Updated resume 1 (1) (1)
Updated resume 1 (1) (1)
Paul Clay
 
Simon Chen Resume 07252016
Simon Chen Resume 07252016Simon Chen Resume 07252016
Simon Chen Resume 07252016Simon Chen
 
Chirko, Kenneth Resume - long
Chirko, Kenneth Resume - longChirko, Kenneth Resume - long
Chirko, Kenneth Resume - longKenneth Chirko
 
Katia frye resume 2016 no address
Katia frye resume 2016   no addressKatia frye resume 2016   no address
Katia frye resume 2016 no address
Katia Frye
 
Full resume dr_russell_john_childs_2016
Full resume dr_russell_john_childs_2016Full resume dr_russell_john_childs_2016
Full resume dr_russell_john_childs_2016
Russell Childs
 
RICHARD FINN RESUME - Jun2016
RICHARD FINN RESUME - Jun2016RICHARD FINN RESUME - Jun2016
RICHARD FINN RESUME - Jun2016Richard R Finn
 
Ken_Wu_Resume_2017N
Ken_Wu_Resume_2017NKen_Wu_Resume_2017N
Ken_Wu_Resume_2017NKen Wu
 

Viewers also liked (14)

General Resume
General ResumeGeneral Resume
General Resume
 
2017 RESUME
2017 RESUME2017 RESUME
2017 RESUME
 
Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2
 
aaronparkerresume (5)
aaronparkerresume (5)aaronparkerresume (5)
aaronparkerresume (5)
 
03_August_2016_Richard_Bailey_Resume[1]
03_August_2016_Richard_Bailey_Resume[1]03_August_2016_Richard_Bailey_Resume[1]
03_August_2016_Richard_Bailey_Resume[1]
 
1ResumeDEC2016Phillip Lopez
1ResumeDEC2016Phillip Lopez1ResumeDEC2016Phillip Lopez
1ResumeDEC2016Phillip Lopez
 
Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015Gervais Peter Resume Oct :2015
Gervais Peter Resume Oct :2015
 
Updated resume 1 (1) (1)
Updated resume 1 (1) (1)Updated resume 1 (1) (1)
Updated resume 1 (1) (1)
 
Simon Chen Resume 07252016
Simon Chen Resume 07252016Simon Chen Resume 07252016
Simon Chen Resume 07252016
 
Chirko, Kenneth Resume - long
Chirko, Kenneth Resume - longChirko, Kenneth Resume - long
Chirko, Kenneth Resume - long
 
Katia frye resume 2016 no address
Katia frye resume 2016   no addressKatia frye resume 2016   no address
Katia frye resume 2016 no address
 
Full resume dr_russell_john_childs_2016
Full resume dr_russell_john_childs_2016Full resume dr_russell_john_childs_2016
Full resume dr_russell_john_childs_2016
 
RICHARD FINN RESUME - Jun2016
RICHARD FINN RESUME - Jun2016RICHARD FINN RESUME - Jun2016
RICHARD FINN RESUME - Jun2016
 
Ken_Wu_Resume_2017N
Ken_Wu_Resume_2017NKen_Wu_Resume_2017N
Ken_Wu_Resume_2017N
 

Similar to Resume E&I Engineer

SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MIrfan Vali
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622MOHAMMAD KHALID MUSTAFA
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsIrfan Vali
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)Irfan Vali
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
BYJUL RAHMAN
 
Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood ButtTahir Butt
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companiesbala madhu
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc techEDWIN S
 
Techno Quest - Profile
Techno Quest -  ProfileTechno Quest -  Profile
Techno Quest - Profilekrunaldesai20
 

Similar to Resume E&I Engineer (20)

SHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&MSHAIK IRFAN VALI .... resume O&M
SHAIK IRFAN VALI .... resume O&M
 
Resume
ResumeResume
Resume
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
SHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume ProjectsSHAIK IRFAN VALI ...resume Projects
SHAIK IRFAN VALI ...resume Projects
 
bala.1
bala.1bala.1
bala.1
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
bala.1
bala.1bala.1
bala.1
 
Byjul rahman cv (updated)
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
 
electrician
electricianelectrician
electrician
 
RamCV1
RamCV1RamCV1
RamCV1
 
Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood Butt
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc tech
 
Resume Francis
Resume FrancisResume Francis
Resume Francis
 
muhammad Usman CV
muhammad Usman CVmuhammad Usman CV
muhammad Usman CV
 
Techno Quest - Profile
Techno Quest -  ProfileTechno Quest -  Profile
Techno Quest - Profile
 
Resume_Akhilesh
Resume_AkhileshResume_Akhilesh
Resume_Akhilesh
 

Resume E&I Engineer

  • 1. Muhammad Shahzad Akbar PEC # ELECT/40142 E&I Engineer Contact No.:+92346-7113140/ +92333-0453553 E-Mail: shahzad.akbar87@gmail.com PROFILE SUMMARY  Graduate of Bachelor of Science in Electrical Engineering with more than 3.5 years of Experience in: Operation& Maintenance, Electrical, Electronics, Automation & Instrumentation, Project Management & Execution.  Installation, Commissioning , Operation & Maintenance of TWO Coal Fired Boilers each 55 ton/hr, 5.3MPa, 490°c.  Installation, Commissioning, Operation & Maintenance of Steam Turbine 12MW, 3000rpm, 4.9MPa, Double Extraction & Condensate Mode.  Installation, Commissioning, Operation & Maintenance of Alternator 15MW, 3000rpm, DVR Excitation System, NARI Synchronization & Protection System.  Operation and Maintenance of 3x1.5MW CAT 3516 Industrial Gensets. with 3x1875kVA, 50Hz, 1500RPM, 400V Alternator with Brushless excitation and Digital Automatic Voltage Regulator. .  Installation, Commissioning, Operation and Maintenance of 2 x 1.6 MW CAT 3517B Diesel Gensets with 2x2000KVA, 50Hz, 1500RPM, 400V Synchronous Generators with Brushless excitation and Digital Automatic Voltage Regulator.  Installation, Commissioning and Troubleshooting of NARI NSC200NT SCADA Electrical Control & Protections Monitoring system)  Installation, Commissioning, Operation & Maintenance of DCS (SIEMENS PCS7, NT6000 DEH+ETS, PLC (Siemens), BENTLEY NEVADA Turbine Protection System.  Installation, Commissioning, Operation & Maintenance of Instruments (Temperature, Flow, Level and Pressure Gauges/Transmitters, control valves, Analyzers) etc.  Manages the plant’s operations, projects, and maintenance.  Control on inventory, budget and compliance with safety regulations.  Training of staff including Trainee Engineers, Supervisors, & trade workers.  Development of Sequence of Procedures (SOP) for maintenance of E&I equipment’s according to ISO Standards.  E&I BOQ's, study of P&ID, Installation, Commissioning and MBO’s (Management by Objectives).  Well aware of Electrical Engineering Methodologies as well as the corresponding Equipments, materials, consumables, tools and Manpower Allocations related to (HT & LT) Electrical Operation, Maintenance and Installation Works.  A keen planner, strategist & implementer with demonstrated abilities in Managing entire E&I (Electrical, Automation and Instrumentation). EMPLOYMENT DETAILS Since October 2015 till date. Ingredion, Rafhan Maize Product. Co. LTD Pakistan as E&I Engineer. Working as E&I Engineer on coal fired power plant having capacity of 15MW Electricity Generation. RESPONSIBILITIES: ELECTRICAL:  Scheduling, planning & executing jobs during the shift including Procurement, Contract Management & Work order Generation.
  • 2.  Preventive maintenance of E & I installations including Generators, Transformers, DCS system, VFDs, E & I Control and Protection Cabinets, Motors, Instruments including control valves, transmitter, analyzers, level transmitters and control system.  In the main control room, monitor Power, Automation and Control System equipment for challenges to integrity issues using Supervisory Control systems (SCADA) and Distributed Control System (DCS).  Coordinate and supervise planned and emergent maintenance items, while ensuring timely completion and adherence to industrial and electrical safety standards.  Installation, Commissioning, Operation and Maintenance of 1 x 15 MW Synchronous Generator with Brushless excitation and Digital Automatic Voltage Regulator.  Operation and Maintenance of 3x1.5MW CAT 3516 Industrial Gensets. with 3x1875kVA, 50Hz, 1500RPM, 400V Alternator with Brushless excitation and Digital Automatic Voltage Regulator. .  Installation, Testing, Commissioning, Operation and Maintenance of electrical equipments like Transformers, Generator, LV / MV Switchgear Breakers, NGR panel, Protection Relays, Batteries, Motors, Control and Protections etc.  Hi-pot test of MV cables, Transformers and Generator, Meggar test of LV cables, LV panels and motors.  Installation, Testing, Commissioning, Operation and Maintenance of Generator Protection & Synchronization panels.  Installation, Operation and Maintenance of VFD Panels of 2.2 to 315 KW  Installation, Commissioning, Operation and Maintenance of Coal Handling, Coal Crushing & Conveying System, Limestone Powder preparation.  Installation, Commissioning, Operation and Maintenance of Boiler makeup water treatment plant, Cooling tower & Circulating water system, electrostatic Precipitators with 72KV Rectifying Transformers.  Installation, Commissioning and Maintenance of Siemens Power Transformers having rating of 10-13MVA, 20- 26MVA which includes: IR (Insulation test), No load test, Full load test, Impedance measurement test of power transformer, Safeties testing of power transformer, Dielectric Insulation test of transformer oil.  Thermo-graphy of whole plant electric joints.  Installation, Testing, Commissioning, Operation and Maintenance of Public Address system, Fire Alarm and Fire Protection system and CCTV Cameras system.  Installation, testing and Maintenance of Earthing, Structural Grounding & Lightning Arrester system of whole plant.  Erection and commissioning of area lighting, equipment lighting and street light poles up to 500W. INSTRUMENT & CONTROL:  Installation, Operation and Maintenance of SIEMENS PCS-7 DCS of 2676 I/O’s at coal fired Power Plant w.r.t hardware, software, logical working and communication.  Installation, Operation and Maintenance of SCIYON NT6000 DCS for Turbine Safeties of 300 I/O’s like (Thermal Expansions, Axial Displacements, Condenser Vacuum, Lube Oil Pressure and Temperatures, Thrust Pad and Radial Tile Temperatures interlocks) at coal fired Power Plant w.r.t hardware, software, logical working and communication.  Installation, Operation and Maintenance of TSI (Turbine Supervisory Instrument System make Bently Nevada) like (Tile Vibrations, Rotations, Turbine Over-speed) for Turbine Internal Safeties at coal fired Power Plant w.r.t hardware and communication.  Working on calibration, Installation and loop testing (regarding DCS) of all types of Field instruments (Pneumatic and Motorized Control valves, Shut-off valves, Transmitters (level, flow, pressure, temperature), Switches (pressure, level, position, vibration), Analyzers (P.H, Conductivity, Oxygen), Coal flow rate & totalizer system.  Installation, Operation and Maintenance of Ignition Diesel Burner for Coal Fired Boiler startup. UTILITIES: Air Compressors (0.8MPa, 60 tons/hr), Cooling Towers (4800m3), Water Treatment Plant (60m3/hr), Coal Crusher 100 tons/hr, ESP 110 tons/hr 3-Electric Fields 72KV, Ash Silo 40 tons/hr, Slag Disposal System 10 tons/hr, Lime Stone Powder System 30 tons/hr in coal fired power plant.
  • 3. Since July, 2013 to October, 2015 International Airport, Multan, Pakistan. as Electrical Engineer. RESPOSIBILITIES: ELECTRICAL:  Installation, Testing, Commissioning, Operation and Maintenance of 2 x 1.6 MW Caterpillar 3517B Diesel Gensets with 2x2000KVA, 50Hz, 1500RPM, 400V Synchronous Generators with Brushless excitation and Digital Automatic Voltage Regulator.  Installation, Testing, Commissioning, Operation and Maintenance of electrical equipments like Transformers, Generator, LV / MV Switchgear Breakers, NGR panel, Protection Relays, Batteries, Motors, Control and Protections etc.  Hi-pot test of MV cables, Transformers and Generator, Meggar test of LV cables, LV panels and motors.  Installation, Testing, Commissioning, Operation and Maintenance of Generator Protection & Synchronization panels.  3x2.5MVA Power Transformers, (2x100KVA,2x300KVA,4x400KVA) Distribution Transformers, Power Factor Improvement Pannels  Installation, Testing, Commissioning, Operation and Maintenance of Public Address system, Fire Alarm and Fire Protection system and CCTV Cameras system, FIDs (Flight Information Displays), Aeroplane Parking System  Installation, testing and Maintenance of Earthing, Structural Grounding & Lightning Arrester system of whole plant.  Erection and commissioning of area lighting, equipment lighting and road light poles up to 500W. UTILITIES: Utility Building (2x1.6MW Diesel Generators), Passengers Terminal Buildings, Offices Blocks, Officers and Staff Mess & Resendencies, Cargo Building, Passengers Car Parking & Aeroplanes Runway & Parking EDUCATION 2013 B.Sc.(Electrical Engineering) (3.52/4.0 CGPA) University of Management and Technology (UMT), Lahore. TRAININGS  Six Sigma white belt & KAIZEN trained  2 days training on Safety measures at Plant and Offices  3 days training on Process Hazard Analysis and Risk Assessment PERSONAL DETAILS Date of Birth: 16th April, 1987 Languages Known: English, Urdu Nationality: Pakistani Marital Status: Single