JOB NO: TAKER OFF:
JOB TITLE:
ELEMENT: Timber Roof Structure DATE:
Timber Roof Structure Hip
Wall Plates
2/ 13.50 27.00 75mm x 50mm hardwood timber Rafter = 4.90 , Width = 4.50
2/ 6.70 13.40 Grade B timber plates
40.40
Hip
Rafter
Ceiling Joists 4.500
No of Rafter & Ceiling Joists Hip^2 = (4.9)^2 + (4.5)^2
Width Hip^2 = 24.01 + 20.25
0.610 ) 15.50 Hip = 6.65
25
No of Ceiling Joists = 25 +1 = 26 Hip
4/ 6.65 26.60 100mm x 50mm hardwood timber
Grade B pitched roof members.
Ceiling Joists
26/ 6.70 174.20 50mm x 50mm hardwood timber
Grade B pitched roof members.
Rafters
26/2/ 4.90 254.80 100mm x 50mm hardwood timber
Grade B pitched roof members.
Ridges
1/ 6.85 6.85 100mm x 75mm hardwood timber
Grade B pitched roof members.
Struts
26/ 1.90 49.40 100mm x 50mm hardwood timber
26/2/ 1.30 67.60 Grade B pitched roof members.
26/2/ 0.60 31.20
26/2/ 1.55 80.60
26/2/ 1.20 62.40
291.20
page /
JOB NO: TAKER OFF:
JOB TITLE:
ELEMENT:Timber Roof Structure DATE:
Timber Roof Covering Fascia Boards
Roof Tiles
2/ 15.50 31.00 220mm x 20mm wide hardwood
2/ 4.90 420mm x 330mm concrete 2/ 8.60 17.20 Grade B timber fascia board
15.50 151.90 tiles to 100mm head lap laid at 30° 48.20 fixed to timber structure.
pitched, each tile nailed every
alternate course on 50 X30 mm
Grade B timber battens.
Painting for fascia boards
2/ 4.90 A layer of double sides aluminium Girth
15.50 151.90 foil insulation paper laid on straining 2/ 0.220 0.440
wires & lapped 150mm at joists. 0.020
0.460
48.20 Knotting, stopping, 1 coat primer
0.46 22.17 1 undercoat and 2 coat of gloss
Ridge Tiles paint finishes to general surface of
1/ 6.85 6.85 Extra Over concrete tiles timber over 300mm
for 250mm width ridge tiles bedded and
painted and pointed in cement and
sand (1:3) mortar.
Hip Tiles Timber Roof Drainage
4/ 6.65 26.60 Extra Over concrete tiles Gutter (Q.5.1)
for 250mm width hip tiles bedded and 2/ 16.20 32.40 100mm diameter half round u.p.v.c
painted and pointed in cement and 2/ 8.60 17.20 gutter fixed to timber fascia board
sand (1:3) mortar. 49.60 with brackets at 600mm centers.
Three Way Apex Gutter Fittings (Q.5.3))
2 2 Extra Over concrete tiles for 250mm 4 4 Extra Over 100mm diameter
width three way apex bedded and half round u.p.v.c gutter for 90 º bend
painted and pointed in cement and
sand (1:3) mortar. 4 4 Extra Over 100mm diameter
half round u.p.v.c gutter
outlet for water down pipe.
4 4 Approved u.p.v.c balloon grating
fixed to top of outlet
Rainwater Down pipe
Length
1.100
2.400
3.500
Rainwater Down pipe (Q.8.1)
4/ 3.50 14.00 100mm u.p.v.c. rainwater down pipe
including all fittings & bracket
fixed to brickwall
4/ 1.10 4.40 100mm u.p.v.c. rainwater down pipe
including all fittings bedded
under the concrete slab
Rainwater Down pipe fitting (Q.8.6)
4/ 4 16 Exra over 100mm u.p.v.c bends for
rain water down pipe
page /

More Related Content

What's hot

E Clemence Multi Family Residential
E Clemence Multi Family ResidentialE Clemence Multi Family Residential
E Clemence Multi Family Residential
Grant Hepburn
 

What's hot (20)

E Clemence Multi Family Residential
E Clemence Multi Family ResidentialE Clemence Multi Family Residential
E Clemence Multi Family Residential
 
BSR - 2020 With OH&P
BSR - 2020 With OH&PBSR - 2020 With OH&P
BSR - 2020 With OH&P
 
Remodel your kitchen with inox decor
Remodel your kitchen with inox decorRemodel your kitchen with inox decor
Remodel your kitchen with inox decor
 
Esite Norton Blue Fire
Esite Norton Blue FireEsite Norton Blue Fire
Esite Norton Blue Fire
 
Catalogue noi that phong khach hoa phat
Catalogue noi that phong khach hoa phatCatalogue noi that phong khach hoa phat
Catalogue noi that phong khach hoa phat
 
Hi-Impact Utility Duct Spacers - Cal Am Manufacturing
Hi-Impact Utility Duct Spacers - Cal Am ManufacturingHi-Impact Utility Duct Spacers - Cal Am Manufacturing
Hi-Impact Utility Duct Spacers - Cal Am Manufacturing
 
Faucets columns fonts catalogue
Faucets columns fonts catalogueFaucets columns fonts catalogue
Faucets columns fonts catalogue
 
BIMETECH PRESENTATION 2015
BIMETECH PRESENTATION 2015BIMETECH PRESENTATION 2015
BIMETECH PRESENTATION 2015
 
Replacing inner glass door Siemens microwave oven HB86K570B
Replacing inner glass door Siemens microwave oven HB86K570BReplacing inner glass door Siemens microwave oven HB86K570B
Replacing inner glass door Siemens microwave oven HB86K570B
 
Bed Frame Design
Bed Frame DesignBed Frame Design
Bed Frame Design
 
RSD Sample
RSD SampleRSD Sample
RSD Sample
 
Tech Dock Instruction Manual
Tech Dock Instruction ManualTech Dock Instruction Manual
Tech Dock Instruction Manual
 
Brochure May 15
Brochure May 15Brochure May 15
Brochure May 15
 
12777 coastal single pages part62
12777  coastal single pages part6212777  coastal single pages part62
12777 coastal single pages part62
 
1810 Kitchen Sink Catalogue 2015
1810 Kitchen Sink Catalogue 20151810 Kitchen Sink Catalogue 2015
1810 Kitchen Sink Catalogue 2015
 
IBS Score
IBS ScoreIBS Score
IBS Score
 
Panel fondo-lama-catalogo-2018
Panel fondo-lama-catalogo-2018Panel fondo-lama-catalogo-2018
Panel fondo-lama-catalogo-2018
 
12777 coastal single pages part67
12777  coastal single pages part6712777  coastal single pages part67
12777 coastal single pages part67
 
Sahara Int. Group Hardware 2017 Catalog
Sahara Int. Group Hardware 2017 CatalogSahara Int. Group Hardware 2017 Catalog
Sahara Int. Group Hardware 2017 Catalog
 
12777 coastal single pages part116
12777  coastal single pages part11612777  coastal single pages part116
12777 coastal single pages part116
 

Viewers also liked

M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specification
Est
 
M3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorM3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium door
Est
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
Est
 
M3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesM3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notes
Est
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred window
Est
 
Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1
Lin Hui
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windows
Est
 
M3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorM3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel door
Est
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
Est
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
Est
 

Viewers also liked (20)

M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specification
 
M3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorM3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium door
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster
 
Measurement Assignment 2
Measurement Assignment 2 Measurement Assignment 2
Measurement Assignment 2
 
Integrated project report
Integrated project reportIntegrated project report
Integrated project report
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 august
 
M3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesM3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notes
 
Design project one full
Design project one full   Design project one full
Design project one full
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred window
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2
 
Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windows
 
M3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorM3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel door
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Measurement4
Measurement4Measurement4
Measurement4
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
 
Bq floor
Bq floorBq floor
Bq floor
 

Similar to M3 Lecture 10 timber roof structure answer

Clt mtb seminar_presentation_five
Clt mtb seminar_presentation_fiveClt mtb seminar_presentation_five
Clt mtb seminar_presentation_five
FWPA
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
ssuserd43de8
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02
Trevain Bechan
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
ashleyyeap
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimation
imaduddin91
 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
imaduddin91
 

Similar to M3 Lecture 10 timber roof structure answer (20)

Catalogue LMSP
Catalogue LMSPCatalogue LMSP
Catalogue LMSP
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
213264208-forms-scaffolding-and-staging.ppsx
213264208-forms-scaffolding-and-staging.ppsx213264208-forms-scaffolding-and-staging.ppsx
213264208-forms-scaffolding-and-staging.ppsx
 
Clt mtb seminar_presentation_five
Clt mtb seminar_presentation_fiveClt mtb seminar_presentation_five
Clt mtb seminar_presentation_five
 
rahta.pdf
rahta.pdfrahta.pdf
rahta.pdf
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02
 
Hollow Block
Hollow Block Hollow Block
Hollow Block
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Week 7 - Woodworks.pdf
Week 7 - Woodworks.pdfWeek 7 - Woodworks.pdf
Week 7 - Woodworks.pdf
 
Week 7_estimation in construction works.pdf
Week 7_estimation in construction works.pdfWeek 7_estimation in construction works.pdf
Week 7_estimation in construction works.pdf
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
47093152 estimation
47093152 estimation47093152 estimation
47093152 estimation
 
Structural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptxStructural engineering and irrigation drawing.pptx
Structural engineering and irrigation drawing.pptx
 
McsfBudget
McsfBudgetMcsfBudget
McsfBudget
 
3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
 
Rab
RabRab
Rab
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
Elevations & sections
Elevations & sectionsElevations & sections
Elevations & sections
 
72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
Est
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
Est
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
Est
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
Est
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
Est
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
Est
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
Est
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
Est
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
Est
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
Est
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
Est
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
Est
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
Est
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 

Recently uploaded

obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
yulianti213969
 
Van Gogh Powerpoint for art lesson today
Van Gogh Powerpoint for art lesson todayVan Gogh Powerpoint for art lesson today
Van Gogh Powerpoint for art lesson today
lucygibson17
 
一比一原版美国西雅图大学毕业证(Seattle毕业证书)毕业证成绩单留信认证
一比一原版美国西雅图大学毕业证(Seattle毕业证书)毕业证成绩单留信认证一比一原版美国西雅图大学毕业证(Seattle毕业证书)毕业证成绩单留信认证
一比一原版美国西雅图大学毕业证(Seattle毕业证书)毕业证成绩单留信认证
khuurq8kz
 
如何办理澳洲迪肯大学毕业证(Deakin毕业证书)毕业证成绩单原版一比一
如何办理澳洲迪肯大学毕业证(Deakin毕业证书)毕业证成绩单原版一比一如何办理澳洲迪肯大学毕业证(Deakin毕业证书)毕业证成绩单原版一比一
如何办理澳洲迪肯大学毕业证(Deakin毕业证书)毕业证成绩单原版一比一
avy6anjnd
 
Riya Chand Birth Certificate.pdfsssssssssssssssss
Riya Chand Birth Certificate.pdfsssssssssssssssssRiya Chand Birth Certificate.pdfsssssssssssssssss
Riya Chand Birth Certificate.pdfsssssssssssssssss
prakash164267
 
OBAT ABORSI BANYUWANGI 087776558899 💊 OBAT PENGGUGUR KANDUNGAN BANYNYUWANGI
OBAT ABORSI BANYUWANGI 087776558899 💊 OBAT PENGGUGUR KANDUNGAN BANYNYUWANGIOBAT ABORSI BANYUWANGI 087776558899 💊 OBAT PENGGUGUR KANDUNGAN BANYNYUWANGI
OBAT ABORSI BANYUWANGI 087776558899 💊 OBAT PENGGUGUR KANDUNGAN BANYNYUWANGI
Obat Cytotec
 
Bhakti and Sufi Traditions from 8th to 18 th Century.pptx
Bhakti and Sufi Traditions from 8th to 18 th Century.pptxBhakti and Sufi Traditions from 8th to 18 th Century.pptx
Bhakti and Sufi Traditions from 8th to 18 th Century.pptx
kashvis
 
codes and conventions of film magazine and website.pptx
codes and conventions of film magazine and website.pptxcodes and conventions of film magazine and website.pptx
codes and conventions of film magazine and website.pptx
17duffyc
 
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
aqwaz
 
NON-COMMUNICABLE DISEASES.pptx...........
NON-COMMUNICABLE DISEASES.pptx...........NON-COMMUNICABLE DISEASES.pptx...........
NON-COMMUNICABLE DISEASES.pptx...........
CydeizelMercado1
 
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
yulianti213969
 

Recently uploaded (20)

Reading 8 Artworks about books and readers
Reading 8 Artworks about books and readersReading 8 Artworks about books and readers
Reading 8 Artworks about books and readers
 
How to order fake Worcester State University diploma?
How to order fake Worcester State University diploma?How to order fake Worcester State University diploma?
How to order fake Worcester State University diploma?
 
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
 
Sui Generis Magazine volume one Kristen Murillo.pdf
Sui Generis Magazine volume one Kristen Murillo.pdfSui Generis Magazine volume one Kristen Murillo.pdf
Sui Generis Magazine volume one Kristen Murillo.pdf
 
Van Gogh Powerpoint for art lesson today
Van Gogh Powerpoint for art lesson todayVan Gogh Powerpoint for art lesson today
Van Gogh Powerpoint for art lesson today
 
一比一原版美国西雅图大学毕业证(Seattle毕业证书)毕业证成绩单留信认证
一比一原版美国西雅图大学毕业证(Seattle毕业证书)毕业证成绩单留信认证一比一原版美国西雅图大学毕业证(Seattle毕业证书)毕业证成绩单留信认证
一比一原版美国西雅图大学毕业证(Seattle毕业证书)毕业证成绩单留信认证
 
VIP ℂall Girls Surat 8527049040 WhatsApp AnyTime Best Surat ℂall Girl Serviℂe...
VIP ℂall Girls Surat 8527049040 WhatsApp AnyTime Best Surat ℂall Girl Serviℂe...VIP ℂall Girls Surat 8527049040 WhatsApp AnyTime Best Surat ℂall Girl Serviℂe...
VIP ℂall Girls Surat 8527049040 WhatsApp AnyTime Best Surat ℂall Girl Serviℂe...
 
如何办理澳洲迪肯大学毕业证(Deakin毕业证书)毕业证成绩单原版一比一
如何办理澳洲迪肯大学毕业证(Deakin毕业证书)毕业证成绩单原版一比一如何办理澳洲迪肯大学毕业证(Deakin毕业证书)毕业证成绩单原版一比一
如何办理澳洲迪肯大学毕业证(Deakin毕业证书)毕业证成绩单原版一比一
 
DeFeliceKitley_Resume_BFAVCDGraduated2024
DeFeliceKitley_Resume_BFAVCDGraduated2024DeFeliceKitley_Resume_BFAVCDGraduated2024
DeFeliceKitley_Resume_BFAVCDGraduated2024
 
Riya Chand Birth Certificate.pdfsssssssssssssssss
Riya Chand Birth Certificate.pdfsssssssssssssssssRiya Chand Birth Certificate.pdfsssssssssssssssss
Riya Chand Birth Certificate.pdfsssssssssssssssss
 
Museum Quality__Published in PrintAction.pdf
Museum Quality__Published in PrintAction.pdfMuseum Quality__Published in PrintAction.pdf
Museum Quality__Published in PrintAction.pdf
 
OBAT ABORSI BANYUWANGI 087776558899 💊 OBAT PENGGUGUR KANDUNGAN BANYNYUWANGI
OBAT ABORSI BANYUWANGI 087776558899 💊 OBAT PENGGUGUR KANDUNGAN BANYNYUWANGIOBAT ABORSI BANYUWANGI 087776558899 💊 OBAT PENGGUGUR KANDUNGAN BANYNYUWANGI
OBAT ABORSI BANYUWANGI 087776558899 💊 OBAT PENGGUGUR KANDUNGAN BANYNYUWANGI
 
Bhakti and Sufi Traditions from 8th to 18 th Century.pptx
Bhakti and Sufi Traditions from 8th to 18 th Century.pptxBhakti and Sufi Traditions from 8th to 18 th Century.pptx
Bhakti and Sufi Traditions from 8th to 18 th Century.pptx
 
Green Lantern the Animated Series Practice Boards by Phoebe Holmes.pdf
Green Lantern the Animated Series Practice Boards by Phoebe Holmes.pdfGreen Lantern the Animated Series Practice Boards by Phoebe Holmes.pdf
Green Lantern the Animated Series Practice Boards by Phoebe Holmes.pdf
 
Turn Off The Air Con - The Singapore Punk Scene
Turn Off The Air Con - The Singapore Punk SceneTurn Off The Air Con - The Singapore Punk Scene
Turn Off The Air Con - The Singapore Punk Scene
 
codes and conventions of film magazine and website.pptx
codes and conventions of film magazine and website.pptxcodes and conventions of film magazine and website.pptx
codes and conventions of film magazine and website.pptx
 
Helen of Troy, Queen of Sparta.ppsx
Helen  of  Troy,  Queen  of  Sparta.ppsxHelen  of  Troy,  Queen  of  Sparta.ppsx
Helen of Troy, Queen of Sparta.ppsx
 
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
 
NON-COMMUNICABLE DISEASES.pptx...........
NON-COMMUNICABLE DISEASES.pptx...........NON-COMMUNICABLE DISEASES.pptx...........
NON-COMMUNICABLE DISEASES.pptx...........
 
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
 

M3 Lecture 10 timber roof structure answer

  • 1. JOB NO: TAKER OFF: JOB TITLE: ELEMENT: Timber Roof Structure DATE: Timber Roof Structure Hip Wall Plates 2/ 13.50 27.00 75mm x 50mm hardwood timber Rafter = 4.90 , Width = 4.50 2/ 6.70 13.40 Grade B timber plates 40.40 Hip Rafter Ceiling Joists 4.500 No of Rafter & Ceiling Joists Hip^2 = (4.9)^2 + (4.5)^2 Width Hip^2 = 24.01 + 20.25 0.610 ) 15.50 Hip = 6.65 25 No of Ceiling Joists = 25 +1 = 26 Hip 4/ 6.65 26.60 100mm x 50mm hardwood timber Grade B pitched roof members. Ceiling Joists 26/ 6.70 174.20 50mm x 50mm hardwood timber Grade B pitched roof members. Rafters 26/2/ 4.90 254.80 100mm x 50mm hardwood timber Grade B pitched roof members. Ridges 1/ 6.85 6.85 100mm x 75mm hardwood timber Grade B pitched roof members. Struts 26/ 1.90 49.40 100mm x 50mm hardwood timber 26/2/ 1.30 67.60 Grade B pitched roof members. 26/2/ 0.60 31.20 26/2/ 1.55 80.60 26/2/ 1.20 62.40 291.20 page /
  • 2. JOB NO: TAKER OFF: JOB TITLE: ELEMENT:Timber Roof Structure DATE: Timber Roof Covering Fascia Boards Roof Tiles 2/ 15.50 31.00 220mm x 20mm wide hardwood 2/ 4.90 420mm x 330mm concrete 2/ 8.60 17.20 Grade B timber fascia board 15.50 151.90 tiles to 100mm head lap laid at 30° 48.20 fixed to timber structure. pitched, each tile nailed every alternate course on 50 X30 mm Grade B timber battens. Painting for fascia boards 2/ 4.90 A layer of double sides aluminium Girth 15.50 151.90 foil insulation paper laid on straining 2/ 0.220 0.440 wires & lapped 150mm at joists. 0.020 0.460 48.20 Knotting, stopping, 1 coat primer 0.46 22.17 1 undercoat and 2 coat of gloss Ridge Tiles paint finishes to general surface of 1/ 6.85 6.85 Extra Over concrete tiles timber over 300mm for 250mm width ridge tiles bedded and painted and pointed in cement and sand (1:3) mortar. Hip Tiles Timber Roof Drainage 4/ 6.65 26.60 Extra Over concrete tiles Gutter (Q.5.1) for 250mm width hip tiles bedded and 2/ 16.20 32.40 100mm diameter half round u.p.v.c painted and pointed in cement and 2/ 8.60 17.20 gutter fixed to timber fascia board sand (1:3) mortar. 49.60 with brackets at 600mm centers. Three Way Apex Gutter Fittings (Q.5.3)) 2 2 Extra Over concrete tiles for 250mm 4 4 Extra Over 100mm diameter width three way apex bedded and half round u.p.v.c gutter for 90 º bend painted and pointed in cement and sand (1:3) mortar. 4 4 Extra Over 100mm diameter half round u.p.v.c gutter outlet for water down pipe. 4 4 Approved u.p.v.c balloon grating fixed to top of outlet Rainwater Down pipe Length 1.100 2.400 3.500 Rainwater Down pipe (Q.8.1) 4/ 3.50 14.00 100mm u.p.v.c. rainwater down pipe including all fittings & bracket fixed to brickwall 4/ 1.10 4.40 100mm u.p.v.c. rainwater down pipe including all fittings bedded under the concrete slab Rainwater Down pipe fitting (Q.8.6) 4/ 4 16 Exra over 100mm u.p.v.c bends for rain water down pipe page /