SlideShare a Scribd company logo
1 of 39
029
CAR PARKSCAR PARKS
(P1)
Dr f Dejahang (BSc CEng, BSc (Hons) Construction Mgmt, MSc, MCIOB, PhD)
http://www.cpi-team.com
CAR PARKSCAR PARKS
Parking Deck Expansion Joint Installation--SJS (Seismic ... - YouTube.htm
Science Art Religion Politics Scholarly Articles For Mathematics and
Productivity
http://www.twitlonger.com/show/n_1sp9pjo?new_post=true
MICROSOFT OneDrive PPT’s PDF’s BOOK LESSONS
Dr f Dejahang BSc CEng, BSc (Hons) Construction Mgmt, MSc, PhD
CAR PARKS
Multi-storey car park
(profitability)
 In the construction of
multi-storey car parks,
the idea of profitability is
very important to the
developer and covers a
number of aspects.
CAR PARKS
Steel construction makes it
possible-it can be achieved by:
reducing construction costs
optimising the occupation of the
car park
improve return on investment
This is achieved by gaining
floor area (in m2)
OPTIMISING THE OCCUPATION
Multi-storey car park-high
Occupation rate
This can only be achieved with high
quality building materials and:
1.Increased storey heights
2.Wide ramps
3.slim columns and high quality
fittings
4.increase the user’s comfort and
safety
CAR PARKS
All costs connected with the
construction and operation of the car
park until the end of its useful life
must be taken into account.
They include:
the building costs
the time of construction
the operating costs and the parking
fees
PROFITABILITY ANALYSIS
PROFITABILITY ANALYSIS
PROFITABILITY ANALYSIS
ADVANTAGES
OF STEEL STRUCTURES
ADVANTAGES
OF STEEL STRUCTURES
ADVANTAGES
OF STEEL STRUCTURES
CAR PARKS
When designing the facade of a multi-storey car
park, a major part of the outside walls should
remain open
Bad
desig
n
COLUMNS
COLUMNS
COLUMNS
COLUMNS
COLUMNS
In underground car parks, the position
of The columns normally depends on
the grid of the framework of the
building above.
In this case,
limit the cross-section of the columns
to the strict minimum
use hot-rolled sections or composite
columns
COLUMNS
steel grade save weight and
to reduce the size of the
columns
For multi-story car park use:
high-strength steel featuring
a 30% higher yield strength
than grade S355.
FLOOR BEAMS
The choice of the floor beams
depends on their span, the type of
concrete deck
the available construction height
Deck types
1.cast-in-place concrete,
2.composite or prefabricated
concrete slabs.
FLOOR BEAMS
FLOOR BEAMS
FLOOR BEAMS
FLOOR BEAMS
METAL STUDS WELDED ON THE
UPPER FLANGE OF THE H-SECTION
FLOOR BEAMS
Self-supporting metal decks
from ArcelorMittal
Construction in combination
with cast-in place concrete
avoid investing in the erection
of formwork supporting frames,
thereby shortening construction
time.
DEPENDING ON THE TYPE, THE
METAL DECKS ACT SOLELY AS
FORMWORK OR IN COMPOSITE
ACTION
Composite action by sealing the
joints with special mortar
COMPOSITE STEEL SECTIONS
WITH CAMBER BEFORE
PLACEMENT OF THE METAL
DECKS
STUDS WELDED THROUGH THE
METAL DECK ON SITE
CORROSION
 Corrosion protection of steel car park
structures is usually achieved by hot dip
galvanization.
 During this process, rust and mill scale are
removed from the surface of the beam in a
pickling bath.
 Then 5-10 minutes in the bath of liquid zinc
at 450 °C.
 Typically, a 150-250 μm thick zinc layer is
formed.
 This will protect the steel surface against
atmospheric corrosion.
CORROSION
In severe climatic conditions;
An additional paint can be
applied on top of the zinc layer.
This so-called DUPLEX system
It minimises maintenance costs
and substantially increases he
duration of protection against
corrosion’
CORROSION PROTECTION BY
PAINTS
 Corrosion protection by paints consists of cleaning
the surface of the steel section.
 Next applying several layers of compatible coats.
A typical surface treatment reads as
follows:
 shot blasting of the surface,
 degree of purity SA 2.5
 l primer – 15 to 25 μm
 one or two intermediary coat layers,
 (thickness – 2 x 40 or 1 x 80 μm)
 l two finishing coat layers
 (thickness – 2 x 60 μm)
FIRE PROTECTION
According to the
regulations of most
European countries, there
are no fire resistance
requirements for steel
structures of open multi-
storey car parks.
CAR PARKS
SUSTAINABLE DEVELOPMENT
Steel structures built with H
sections make it possible to:
reduce the quantity of construction
materials by using high-strength
steels,
limit transportation (the lower
weight of the structural elements)
save construction time by making
use of prefabrication,
SUSTAINABLE DEVELOPMENT
 reduce waste and other nuisances at the
job site by using dry assembly methods,
 design structures that can be dismantled
and reused for other purposes,
 increase the usable floor area by favouring
high strength S355 or S460 steels,
 meet environmental requirements by
using recyclable products made from
recycled scrap.
Car park 01
Car park 01
Car park 01

More Related Content

What's hot

Lift form slab construction
Lift form slab constructionLift form slab construction
Lift form slab constructiontivar rose
 
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITEDWater Birds (Ali)
 
Prefabrication : challenges and opportunities for the contractor
Prefabrication : challenges and opportunities for the contractorPrefabrication : challenges and opportunities for the contractor
Prefabrication : challenges and opportunities for the contractorBenoit Parmentier
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
Precast modular structures
Precast modular structuresPrecast modular structures
Precast modular structuresAnirudh Gupta
 
Mega prefab company profile
Mega prefab company profileMega prefab company profile
Mega prefab company profilebassamnakfour
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structuresjamali husain
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey buildingRahul
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost constructionManisha Singh
 
Slipform construction
Slipform constructionSlipform construction
Slipform constructiontivar rose
 
Precast Construction technology
Precast Construction technologyPrecast Construction technology
Precast Construction technologyGedalaJairam
 
Design Appraisal report
Design Appraisal reportDesign Appraisal report
Design Appraisal reportConor Meaney
 
Large span structures
Large span structuresLarge span structures
Large span structuresaduiti
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technologyAnjith Augustine
 

What's hot (20)

Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
Lift form slab construction
Lift form slab constructionLift form slab construction
Lift form slab construction
 
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
 
Prefabrication : challenges and opportunities for the contractor
Prefabrication : challenges and opportunities for the contractorPrefabrication : challenges and opportunities for the contractor
Prefabrication : challenges and opportunities for the contractor
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Precast modular structures
Precast modular structuresPrecast modular structures
Precast modular structures
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
Mega prefab company profile
Mega prefab company profileMega prefab company profile
Mega prefab company profile
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
Document
DocumentDocument
Document
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey building
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
 
Shard tower
Shard towerShard tower
Shard tower
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Chimney one go
Chimney one goChimney one go
Chimney one go
 
Precast Construction technology
Precast Construction technologyPrecast Construction technology
Precast Construction technology
 
Design Appraisal report
Design Appraisal reportDesign Appraisal report
Design Appraisal report
 
Large span structures
Large span structuresLarge span structures
Large span structures
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 

Viewers also liked

Next generation parking payments solution from A115
Next generation parking payments solution from A115Next generation parking payments solution from A115
Next generation parking payments solution from A115A115
 
JGT Auto Park Presentation (by Wong) (1)
JGT Auto Park Presentation (by Wong) (1)JGT Auto Park Presentation (by Wong) (1)
JGT Auto Park Presentation (by Wong) (1)Vin Lee
 
Cirpark Catalogue 2011-12 - Circontrol
Cirpark Catalogue 2011-12 - CircontrolCirpark Catalogue 2011-12 - Circontrol
Cirpark Catalogue 2011-12 - CircontrolMoises Barea
 
Efficiency solution for car park - CIRPARK
Efficiency solution for car park - CIRPARKEfficiency solution for car park - CIRPARK
Efficiency solution for car park - CIRPARKMoises Barea
 
Project Proposal Presentation-C.O.D.E-7 Solutions
Project Proposal Presentation-C.O.D.E-7 SolutionsProject Proposal Presentation-C.O.D.E-7 Solutions
Project Proposal Presentation-C.O.D.E-7 SolutionsDiren Dantanarayana
 
Dbms presentation of Automatic Car parking System
Dbms presentation of Automatic Car parking SystemDbms presentation of Automatic Car parking System
Dbms presentation of Automatic Car parking Systemsumi haque
 
CAR PARK VENTILATION CFD SERVICES - CAEDTECH
CAR PARK VENTILATION CFD SERVICES - CAEDTECHCAR PARK VENTILATION CFD SERVICES - CAEDTECH
CAR PARK VENTILATION CFD SERVICES - CAEDTECHrajarathnam
 
Software engineering rfid system
Software engineering rfid systemSoftware engineering rfid system
Software engineering rfid systemAli Haider
 
Smart Parking Solutions for Cities & Universities: 2016
Smart Parking Solutions for Cities & Universities: 2016Smart Parking Solutions for Cities & Universities: 2016
Smart Parking Solutions for Cities & Universities: 2016Mark Braibanti
 
Smart parking system pegasus 9 june2010
Smart parking system   pegasus 9 june2010Smart parking system   pegasus 9 june2010
Smart parking system pegasus 9 june2010walkthis
 
Automatic car parking system by Himanshu
Automatic car parking system by HimanshuAutomatic car parking system by Himanshu
Automatic car parking system by Himanshuhimanshu3070
 
RFID based car parking system-final ver
RFID based car parking system-final verRFID based car parking system-final ver
RFID based car parking system-final verDebasis Nayak
 
Integrated Transport Services - Cashless Transactions / Smart Card
Integrated Transport Services - Cashless Transactions / Smart CardIntegrated Transport Services - Cashless Transactions / Smart Card
Integrated Transport Services - Cashless Transactions / Smart CardValoriser Consultants
 
Automated parking systems
Automated parking systemsAutomated parking systems
Automated parking systemssowmya Sowmya
 
AUTOMATIC CAR PARKING SYSTEM
AUTOMATIC CAR PARKING SYSTEMAUTOMATIC CAR PARKING SYSTEM
AUTOMATIC CAR PARKING SYSTEMsowmya Sowmya
 

Viewers also liked (18)

Six steps to add value to your car park
Six steps to add value to your car parkSix steps to add value to your car park
Six steps to add value to your car park
 
Next generation parking payments solution from A115
Next generation parking payments solution from A115Next generation parking payments solution from A115
Next generation parking payments solution from A115
 
Comet_General
Comet_GeneralComet_General
Comet_General
 
JGT Auto Park Presentation (by Wong) (1)
JGT Auto Park Presentation (by Wong) (1)JGT Auto Park Presentation (by Wong) (1)
JGT Auto Park Presentation (by Wong) (1)
 
Cirpark Catalogue 2011-12 - Circontrol
Cirpark Catalogue 2011-12 - CircontrolCirpark Catalogue 2011-12 - Circontrol
Cirpark Catalogue 2011-12 - Circontrol
 
Efficiency solution for car park - CIRPARK
Efficiency solution for car park - CIRPARKEfficiency solution for car park - CIRPARK
Efficiency solution for car park - CIRPARK
 
Project Proposal Presentation-C.O.D.E-7 Solutions
Project Proposal Presentation-C.O.D.E-7 SolutionsProject Proposal Presentation-C.O.D.E-7 Solutions
Project Proposal Presentation-C.O.D.E-7 Solutions
 
Dbms presentation of Automatic Car parking System
Dbms presentation of Automatic Car parking SystemDbms presentation of Automatic Car parking System
Dbms presentation of Automatic Car parking System
 
CAR PARK VENTILATION CFD SERVICES - CAEDTECH
CAR PARK VENTILATION CFD SERVICES - CAEDTECHCAR PARK VENTILATION CFD SERVICES - CAEDTECH
CAR PARK VENTILATION CFD SERVICES - CAEDTECH
 
Software engineering rfid system
Software engineering rfid systemSoftware engineering rfid system
Software engineering rfid system
 
Smart Parking Solutions for Cities & Universities: 2016
Smart Parking Solutions for Cities & Universities: 2016Smart Parking Solutions for Cities & Universities: 2016
Smart Parking Solutions for Cities & Universities: 2016
 
Smart parking system pegasus 9 june2010
Smart parking system   pegasus 9 june2010Smart parking system   pegasus 9 june2010
Smart parking system pegasus 9 june2010
 
Automatic car parking system by Himanshu
Automatic car parking system by HimanshuAutomatic car parking system by Himanshu
Automatic car parking system by Himanshu
 
Smart parking
Smart parkingSmart parking
Smart parking
 
RFID based car parking system-final ver
RFID based car parking system-final verRFID based car parking system-final ver
RFID based car parking system-final ver
 
Integrated Transport Services - Cashless Transactions / Smart Card
Integrated Transport Services - Cashless Transactions / Smart CardIntegrated Transport Services - Cashless Transactions / Smart Card
Integrated Transport Services - Cashless Transactions / Smart Card
 
Automated parking systems
Automated parking systemsAutomated parking systems
Automated parking systems
 
AUTOMATIC CAR PARKING SYSTEM
AUTOMATIC CAR PARKING SYSTEMAUTOMATIC CAR PARKING SYSTEM
AUTOMATIC CAR PARKING SYSTEM
 

Similar to Car park 01

Eefect of Compressive Strength with and without Coarse Aggregate using Fly As...
Eefect of Compressive Strength with and without Coarse Aggregate using Fly As...Eefect of Compressive Strength with and without Coarse Aggregate using Fly As...
Eefect of Compressive Strength with and without Coarse Aggregate using Fly As...IRJET Journal
 
2015 03 23 SPS Floors - Generic Presentation
2015 03 23 SPS Floors - Generic Presentation2015 03 23 SPS Floors - Generic Presentation
2015 03 23 SPS Floors - Generic PresentationQipei Mei
 
fastrack technologies in bridges ppt
fastrack technologies in bridges pptfastrack technologies in bridges ppt
fastrack technologies in bridges pptSrinivasulu Srinu
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
IRJET- Glass Fiber Reinforced Gypsum
IRJET-  	  Glass Fiber Reinforced GypsumIRJET-  	  Glass Fiber Reinforced Gypsum
IRJET- Glass Fiber Reinforced GypsumIRJET Journal
 
IRJET - Review on Behavior of Composite Column and Post-Tension Flat Slab in ...
IRJET - Review on Behavior of Composite Column and Post-Tension Flat Slab in ...IRJET - Review on Behavior of Composite Column and Post-Tension Flat Slab in ...
IRJET - Review on Behavior of Composite Column and Post-Tension Flat Slab in ...IRJET Journal
 
IRJET - Sesismic Analysis of Multistorey Building using ETABS
IRJET -  	  Sesismic Analysis of Multistorey Building using ETABSIRJET -  	  Sesismic Analysis of Multistorey Building using ETABS
IRJET - Sesismic Analysis of Multistorey Building using ETABSIRJET Journal
 
Gubbi Civil Engineers, Leading Structural Repairs Company in Dubai.pdf
Gubbi Civil Engineers, Leading Structural Repairs Company in Dubai.pdfGubbi Civil Engineers, Leading Structural Repairs Company in Dubai.pdf
Gubbi Civil Engineers, Leading Structural Repairs Company in Dubai.pdfGubbi Civil Engineers
 
IRJET- Analytical Study of High Volume Fly Ash Concrete Bubble Deck Slab
IRJET- Analytical Study of High Volume Fly Ash Concrete Bubble Deck SlabIRJET- Analytical Study of High Volume Fly Ash Concrete Bubble Deck Slab
IRJET- Analytical Study of High Volume Fly Ash Concrete Bubble Deck SlabIRJET Journal
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structuresYogi Yogesh
 
SPC Brochure-E
SPC Brochure-ESPC Brochure-E
SPC Brochure-Edmtgms
 
IRJET- Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET-  	  Deisign and Analysis of Geodesic Tunnel Dome for an AuditoriumIRJET-  	  Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET- Deisign and Analysis of Geodesic Tunnel Dome for an AuditoriumIRJET Journal
 
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...IRJET Journal
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeIRJET Journal
 
LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quartersclicknow
 
White paper - Encapsulated Post Tensioned Concrete
White paper -  Encapsulated Post Tensioned ConcreteWhite paper -  Encapsulated Post Tensioned Concrete
White paper - Encapsulated Post Tensioned ConcreteAMSYSCO Inc.
 
IRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET Journal
 

Similar to Car park 01 (20)

Eefect of Compressive Strength with and without Coarse Aggregate using Fly As...
Eefect of Compressive Strength with and without Coarse Aggregate using Fly As...Eefect of Compressive Strength with and without Coarse Aggregate using Fly As...
Eefect of Compressive Strength with and without Coarse Aggregate using Fly As...
 
2015 03 23 SPS Floors - Generic Presentation
2015 03 23 SPS Floors - Generic Presentation2015 03 23 SPS Floors - Generic Presentation
2015 03 23 SPS Floors - Generic Presentation
 
Catlogue
CatlogueCatlogue
Catlogue
 
Groundworks and Civil Engineering Products
Groundworks and Civil Engineering ProductsGroundworks and Civil Engineering Products
Groundworks and Civil Engineering Products
 
fastrack technologies in bridges ppt
fastrack technologies in bridges pptfastrack technologies in bridges ppt
fastrack technologies in bridges ppt
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
IRJET- Glass Fiber Reinforced Gypsum
IRJET-  	  Glass Fiber Reinforced GypsumIRJET-  	  Glass Fiber Reinforced Gypsum
IRJET- Glass Fiber Reinforced Gypsum
 
IRJET - Review on Behavior of Composite Column and Post-Tension Flat Slab in ...
IRJET - Review on Behavior of Composite Column and Post-Tension Flat Slab in ...IRJET - Review on Behavior of Composite Column and Post-Tension Flat Slab in ...
IRJET - Review on Behavior of Composite Column and Post-Tension Flat Slab in ...
 
IRJET - Sesismic Analysis of Multistorey Building using ETABS
IRJET -  	  Sesismic Analysis of Multistorey Building using ETABSIRJET -  	  Sesismic Analysis of Multistorey Building using ETABS
IRJET - Sesismic Analysis of Multistorey Building using ETABS
 
Gubbi Civil Engineers, Leading Structural Repairs Company in Dubai.pdf
Gubbi Civil Engineers, Leading Structural Repairs Company in Dubai.pdfGubbi Civil Engineers, Leading Structural Repairs Company in Dubai.pdf
Gubbi Civil Engineers, Leading Structural Repairs Company in Dubai.pdf
 
IRJET- Analytical Study of High Volume Fly Ash Concrete Bubble Deck Slab
IRJET- Analytical Study of High Volume Fly Ash Concrete Bubble Deck SlabIRJET- Analytical Study of High Volume Fly Ash Concrete Bubble Deck Slab
IRJET- Analytical Study of High Volume Fly Ash Concrete Bubble Deck Slab
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structures
 
SPC Brochure-E
SPC Brochure-ESPC Brochure-E
SPC Brochure-E
 
IRJET- Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET-  	  Deisign and Analysis of Geodesic Tunnel Dome for an AuditoriumIRJET-  	  Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
IRJET- Deisign and Analysis of Geodesic Tunnel Dome for an Auditorium
 
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
Research Paper on Analysis and Design of Steel Truss by using Angle and Tube ...
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
 
LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quarters
 
White paper - Encapsulated Post Tensioned Concrete
White paper -  Encapsulated Post Tensioned ConcreteWhite paper -  Encapsulated Post Tensioned Concrete
White paper - Encapsulated Post Tensioned Concrete
 
composite structure.pptx
composite structure.pptxcomposite structure.pptx
composite structure.pptx
 
IRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for Bridges
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Recently uploaded

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 

Recently uploaded (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 

Car park 01

  • 1. 029 CAR PARKSCAR PARKS (P1) Dr f Dejahang (BSc CEng, BSc (Hons) Construction Mgmt, MSc, MCIOB, PhD) http://www.cpi-team.com
  • 2. CAR PARKSCAR PARKS Parking Deck Expansion Joint Installation--SJS (Seismic ... - YouTube.htm Science Art Religion Politics Scholarly Articles For Mathematics and Productivity http://www.twitlonger.com/show/n_1sp9pjo?new_post=true MICROSOFT OneDrive PPT’s PDF’s BOOK LESSONS Dr f Dejahang BSc CEng, BSc (Hons) Construction Mgmt, MSc, PhD
  • 3. CAR PARKS Multi-storey car park (profitability)  In the construction of multi-storey car parks, the idea of profitability is very important to the developer and covers a number of aspects.
  • 4. CAR PARKS Steel construction makes it possible-it can be achieved by: reducing construction costs optimising the occupation of the car park improve return on investment This is achieved by gaining floor area (in m2)
  • 5. OPTIMISING THE OCCUPATION Multi-storey car park-high Occupation rate This can only be achieved with high quality building materials and: 1.Increased storey heights 2.Wide ramps 3.slim columns and high quality fittings 4.increase the user’s comfort and safety
  • 6. CAR PARKS All costs connected with the construction and operation of the car park until the end of its useful life must be taken into account. They include: the building costs the time of construction the operating costs and the parking fees
  • 13. CAR PARKS When designing the facade of a multi-storey car park, a major part of the outside walls should remain open Bad desig n
  • 18. COLUMNS In underground car parks, the position of The columns normally depends on the grid of the framework of the building above. In this case, limit the cross-section of the columns to the strict minimum use hot-rolled sections or composite columns
  • 19. COLUMNS steel grade save weight and to reduce the size of the columns For multi-story car park use: high-strength steel featuring a 30% higher yield strength than grade S355.
  • 20. FLOOR BEAMS The choice of the floor beams depends on their span, the type of concrete deck the available construction height Deck types 1.cast-in-place concrete, 2.composite or prefabricated concrete slabs.
  • 25. METAL STUDS WELDED ON THE UPPER FLANGE OF THE H-SECTION
  • 26. FLOOR BEAMS Self-supporting metal decks from ArcelorMittal Construction in combination with cast-in place concrete avoid investing in the erection of formwork supporting frames, thereby shortening construction time.
  • 27. DEPENDING ON THE TYPE, THE METAL DECKS ACT SOLELY AS FORMWORK OR IN COMPOSITE ACTION Composite action by sealing the joints with special mortar
  • 28. COMPOSITE STEEL SECTIONS WITH CAMBER BEFORE PLACEMENT OF THE METAL DECKS
  • 29. STUDS WELDED THROUGH THE METAL DECK ON SITE
  • 30. CORROSION  Corrosion protection of steel car park structures is usually achieved by hot dip galvanization.  During this process, rust and mill scale are removed from the surface of the beam in a pickling bath.  Then 5-10 minutes in the bath of liquid zinc at 450 °C.  Typically, a 150-250 μm thick zinc layer is formed.  This will protect the steel surface against atmospheric corrosion.
  • 31. CORROSION In severe climatic conditions; An additional paint can be applied on top of the zinc layer. This so-called DUPLEX system It minimises maintenance costs and substantially increases he duration of protection against corrosion’
  • 32. CORROSION PROTECTION BY PAINTS  Corrosion protection by paints consists of cleaning the surface of the steel section.  Next applying several layers of compatible coats. A typical surface treatment reads as follows:  shot blasting of the surface,  degree of purity SA 2.5  l primer – 15 to 25 μm  one or two intermediary coat layers,  (thickness – 2 x 40 or 1 x 80 μm)  l two finishing coat layers  (thickness – 2 x 60 μm)
  • 33. FIRE PROTECTION According to the regulations of most European countries, there are no fire resistance requirements for steel structures of open multi- storey car parks.
  • 35. SUSTAINABLE DEVELOPMENT Steel structures built with H sections make it possible to: reduce the quantity of construction materials by using high-strength steels, limit transportation (the lower weight of the structural elements) save construction time by making use of prefabrication,
  • 36. SUSTAINABLE DEVELOPMENT  reduce waste and other nuisances at the job site by using dry assembly methods,  design structures that can be dismantled and reused for other purposes,  increase the usable floor area by favouring high strength S355 or S460 steels,  meet environmental requirements by using recyclable products made from recycled scrap.