MATERIAL
MANAGEMENT
MATERIAL MANAGEMENT
 Materials management is an important
process.
 It is about how to reduce waste
 Improve productivity
 Follow a Sustainable development
 It is about how a building is designed and
how materials are estimated?
 It is about how materials are acquired and
how the packaging is specified.
MATERIAL MANAGEMENT
 It is about how the delivery schedule is
designed.
 It is about how contractors plan materials
use and how they manage previously
used materials and cuts.
 It is about how waste is managed for use
elsewhere or recycling rather than being
discarded in a landfill.
MATERIAL MANAGEMENT
 Often on site usable or reusable pieces of
material can be seen in a construction site.
-Examples
 lighting ballasts,
 electrical switches
 plasterboards damaged under the rain/bad
handling/storage etc.
 Torn bags of cement,
 Broken tiles, bricks, blocks,
 various lengths of piping and conduit.
 And many more.
MATERIAL MANAGEMENT
Cost of Waste
 The cost of waste is more than simply the cost of
getting it to a landfill and dumping it.
The cost of waste is:
 Original cost of material
 Delivery cost
 Handling cost
 Management cost
 Cleanup cost
 Waste hauling cost
 Tipping fee
=Total cost of construction waste
MATERIAL MANAGEMENT
Materials use
 materials reuse,
 reduction and recycling
 begins in the planning stages of a project.
1. It starts with the architect,
2. proceeds through the engineer, the estimator,
the purchaser,
3. The construction manager
4. finally the contractors.
MATERIAL MANAGEMENT
 Materials cost control often starts with a
plan.
 Once the material is on site and especially
once its been cut, it is too late to plan.
 With carefully well planned operational
procedures and construction practices, a
plan can be developed and implemented
to save significant costs in materials.
MATERIAL MANAGEMENT
 Researchers in the past have tried to
quantify the potential benefits of applying
effective material management practice on
commercial building practice.
 Overall, they found that 25 site factors and
conditions potentially affect productivity.
 One of which is material management, this
is shown diagrammatically in figure below.
MATERIAL MANAGEMENT
 Ineffective material management reduces
labour productivity.
 Material handling could be improved by
simple measures such a:
 organizing the delivering and storage of
materials in a sequential manner,
 the end result will improve productivity.
MATERIAL MANAGEMENT
 Researchers have tried to quantify the potential
benefits of applying material management
practices on construction sites.
 They carried out material management on a
number of selected sites.
 The projects were all constructed under similar
conditions.
 Only one project used material management
technique.
 All material related problems were identified,
quantified, and linked to site material practice.
MATERIAL MANAGEMENT
 The number of work hours wasted was
calculated.
 The result of their study concluded that
work hour losses resulting from poor
material management caused cost
overrun of 18%.
MATERIAL MANAGEMENT
 The case study also showed that an
investment of £1100.00 in the field of
material management would have saved
£6300.00 in quantified disruption, a
benefit/cost ratio of 5.7.
 Material management involves organizing
the storage area, delivery of materials,
material handling and distribution.
MATERIAL MANAGEMENT
 The construction industry has a major
impact on the environment, both in terms
of the resources it consumes and the
waste it produces.
 The construction industry is responsible
for producing all kinds of wastes.
 The amount and type of which depends
on factors such as:
 the stage of construction,
 type of construction work and practices on
site.
MATERIAL MANAGEMENT
 Over 90% of non -energy minerals
extracted in Great Britain are used to
supply the construction industry with
materials.
 Every year more than 70 million tones of
construction and demolition waste has
been produced in England and Wales
MATERIAL MANAGEMENT-POLICY
 Reduce > Reuse > Recycle
 The construction industry is the UK’s
largest user of natural resources, and
produces a large amounts of waste.
 Everyone in the construction industry can
contribute to tackling waste-by.
 It is by reducing waste, using materials in
a better way, with care.
 Collecting waste for recycling.
MATERIAL MANAGEMENT
1. 400 MILLION TONNES of material is
used
2. 100 MILLION TONNES of waste is
produced – more than one-third of the
UK’s annual waste
3. 25 MILLION TONNES of construction
waste is disposed to landfill
MATERIAL MANAGEMENT
Waste hierarchy
1. Reuse
2. Recycle
3. Dispose
 Firstly, aim to reduce the amount of waste you
create.
 If waste is created, identify ways you can reuse
the materials.
 Finally, if materials cannot be reused then
collect them to recycle.
 Only dispose of waste as a last resort.
MATERIAL MANAGEMENT
 Try to be involved early in a project to
encourage designs that cause less waste
to be created.
 Use standard sizes and quantities of
materials, and plan ahead to reduce off
cuts.
 Avoid over-ordering.
MATERIAL MANAGEMENT
 arrange deliveries to match work stages,
 avoid materials being stored on site longer
than necessary,
 ensure storage areas are safe, secure and
weatherproof,
 Minimise rework from errors and poor
workmanship.
MATERIAL MANAGEMENT
 Refuse poor quality or damaged deliveries.
 Don’t remove protective packaging from
materials before they are needed.
RECOMMENDATIONS
 The site induction and toolbox talks are
opportunities to raise awareness of good waste
management.
 Having one person responsible for ordering
materials helps avoid surplus being purchased.
MATERIAL MANAGEMENT
 Buying sand and gravel in bulk bags
rather than loose helps reduce wastage.
 Computer software is available to estimate
required quantities accurately.
Your duty of care
 All businesses have a duty to ensure that
waste they produce is handled safely and
within the law.
 This is a duty of care we are all part of the
process.
MATERIAL MANAGEMENT
 check that any company removing waste
from your site is a registered waste carrier,
 make sure that they take the waste to a
registered waste management site,
 If you do not check and it is illegally
disposed of, you could be held
responsible.
MATERIAL MANAGEMENT
 Every load of waste that leaves your site
must be accompanied by a Waste
Transfer Note.
 This provides an accurate description of
the waste to enable it to be treated safely.
 Keep copies of all waste transfer notes for
at least two years
MATERIAL MANAGEMENT
Site Waste Management Plans
 A Site Waste Management Plan (SWMP)
is a legal requirement in England for
projects over £300,000.
 It requires you to forecast and record
waste and how it is managed.
MATERIAL MANAGEMENT
 Using the SWMP as a waste management
tool can help the company to:
1. increase profit margins;
2. reduce waste management costs;
3. demonstrate compliance with your legal
obligations; and decrease the amount of
waste you dispose of to landfill.
MATERIAL MANAGEMENT
 The true cost of waste is not just the cost
of hiring a skip.
 It also includes:
1. the cost of the materials that end up as
waste;
2. the labour cost to handle the waste on
site; and the cost of waste storage,
3. transport, treatment and disposal.
MATERIAL MANAGEMENT
1. Most of waste arises on the structure
and fitting stages of construction.
2. BENCHMARK DATA
There are no agreed bench mark data
available.
3. On going study at Centre for Research in
the Built Environment is looking at the
bench marking for waste minimisation.
MATERIAL MANAGEMENT-WASTE CONTROL
Environmentally friendly policy
 Step1-Sustainable development
 Step2-On site Material Management
Policy
 Step3-On site prevention policy
 Step4-On site reduction
 Step5-On site reuse Policy
 Step6-On site recovery Policy
MATERIAL MANAGEMENT
Not recommended policy
 Off site reuse
 Off site recovery
 Wastes disposal to Landfill
MATERIAL MANAGEMENT
MATERIAL MANAGEMENT
RECORD KEEPING
 Complete documentation of all contract
activities is an important part of material
management.
 These records provide an accurate record of:
1. material testing,
2. Inspections
3. work performed.
 They also provide proof of and support for the
decisions and actions taken.
 These records show that the contractual
obligations of the contractor have been fulfilled
and the public’s funds have been properly
spent.
MATERIAL MANAGEMENT
 These records show how the material
was used, what was the level of
material wastage on site.
 I twill provide valuable information on
how to reduce waste and have a tight
control on material management.
MATERIAL MANAGEMENT
Good Recordkeeping Practices
 Keep records up-to-date, accurate, and
complete.
 This will save time throughout the process.
-To achieve this:
 enter records on the day of the event,
 enter information in a manner so another person
could easily complete the entry,
 when needed, without additional instructions.
MATERIAL MANAGEMENT
 If % waste allowed is =5% a good record
keeping will show the level of waste for each
activities.
 If the waste for let us say activity 100-120 is
6.65% the good record keeping will
demonstrate why waste was high for that
activity.
 Lesson can be learnt from waste increase.
 Waste and material management have strong
correlation.
MATERIAL MANAGEMENT
Recordkeeping Policies and Procedures
Resources
 Record the date first.
 Record verbal instructions and minor conditions.
 Weather conditions.
 Work in progress, including temporary erosion
control methods employed.
 Location of work (activity 1-2, 2-3,…)
 Contractors and subcontractor’s work force
 Arrival and departure of equipment
MATERIAL MANAGEMENT
♦ Quantity of equipment and its usage at the
project for each activity.
♦ Important instructions to the contractor.
♦ Names of official visitors and a summary
of any discussions with the visitors
♦ Unusual construction or work conditions
♦ Decision making discussions with the
contractor
♦ Disagreements with the contract
MATERIAL MANAGEMENT
 Detailed information that may have a connection
with a probable dispute or claim against the
department
 Project completion and final inspection
 Other important features of the project, such as
discussions concerning Disadvantaged
 Business Enterprise (DBE) and Equal
Opportunity (EEO)
 Record time suspension and reason
 Record resumption of work
MATERIAL MANAGEMENT
 Record all materials brought onto the project
even if they are material-on-hand and the date
 that the material arrived
 Record the date that Storm Water Inspections
were performed and any violation by the
 contractor of Project Specific Locations (PSLs)
in the ROW or within one mile of the
 project
 Record traffic control being used
MATERIAL MANAGEMENT
 Time inspector is on the project
 Credit Days – Enter reason for credit day
in Site Manager Daily Work Report (DWR)
and Diary. (Exception for Saturday &
Sunday – unless the contractor is
working.)
MATERIAL MANAGEMENT
 NOTE: The Site Manager DWR contains 10
different categories on the first tab under
‘Remarks’
 to record information. These categories are:
 • Accident
 • Contractor Work Hours
 • Dispute/Claim
 • EEO Issues
 • GENERAL
MATERIAL MANAGEMENT
 • General
 • Other
 • Safety Violations
 • Traffic and
 • Visitors.
 Records Management Resources from GSD
 Keeping good records does not mean keeping
all records indefinitely. The Records
Management
 Section of the General Services Division (GSD)
provides guidance on general records
MATERIAL MANAGEMENT
 management issues on their website.
Information on the Records Retention Schedule
is also
 available. Specific information on District
Construction Records can be accessed online.
The
 link to Division/Office Schedules of Unique
Records include records maintained by the
 Construction Division and other Divisions. To
establish record retention practices that conform
 to the standards described in these online
resources, review of these sites is
recommended.
MATERIAL MANAGEMENT
 Electronic Data Management Systems
(EDMS)
 Electronic Data Management Systems
(EDMS) will provide the department with a
means of
 maintaining project records that are not
stored in Site Manager electronically.
Several districts
MATERIAL MANAGEMENT
 and divisions now have EDMS to allow
storage of electronic records and allow
scanning and
 storing hard-copy records. Ideally, most, if
not all, documentation will be electronically
stored
 from cradle to grave in the future.
070 Material Management and Construction Productivity

More Related Content

What's hot

Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
Aszahari Aie
 
integrated material management
integrated material managementintegrated material management
integrated material management
Reetu Manglani
 
Materials management –objective, scope & function (2)
Materials management –objective, scope & function (2)Materials management –objective, scope & function (2)
Materials management –objective, scope & function (2)
Vinay Kumar
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016
Murali Naidu
 
CSCM Chapter 1 construction supply chain management
CSCM Chapter 1 construction supply chain managementCSCM Chapter 1 construction supply chain management
CSCM Chapter 1 construction supply chain management
Est
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
 

What's hot (20)

introduction to construction management
 introduction to construction management introduction to construction management
introduction to construction management
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESS
 
Schedule of materials 2
Schedule of materials 2Schedule of materials 2
Schedule of materials 2
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Purchase management
Purchase managementPurchase management
Purchase management
 
integrated material management
integrated material managementintegrated material management
integrated material management
 
Materials management –objective, scope & function (2)
Materials management –objective, scope & function (2)Materials management –objective, scope & function (2)
Materials management –objective, scope & function (2)
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Project management process_Infrastructure Engineering and Management (2170611...
Project management process_Infrastructure Engineering and Management (2170611...Project management process_Infrastructure Engineering and Management (2170611...
Project management process_Infrastructure Engineering and Management (2170611...
 
Construction Supply Chain Management
Construction Supply Chain ManagementConstruction Supply Chain Management
Construction Supply Chain Management
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016
 
Project Resource Management
Project Resource ManagementProject Resource Management
Project Resource Management
 
CSCM Chapter 1 construction supply chain management
CSCM Chapter 1 construction supply chain managementCSCM Chapter 1 construction supply chain management
CSCM Chapter 1 construction supply chain management
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Quality management
Quality managementQuality management
Quality management
 
Introduction to Lean Construction
Introduction to Lean ConstructionIntroduction to Lean Construction
Introduction to Lean Construction
 
Introduction to procurement
Introduction to procurementIntroduction to procurement
Introduction to procurement
 

Viewers also liked

Material Management and ABC analysis
Material Management and ABC analysisMaterial Management and ABC analysis
Material Management and ABC analysis
Dr. Sonal Mandhotra
 
Construction site management material storage
Construction site management material storageConstruction site management material storage
Construction site management material storage
daviesdiaz
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
Ashish Parihar
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
Mostafa Ewees
 

Viewers also liked (20)

Material management
Material managementMaterial management
Material management
 
Material management
Material managementMaterial management
Material management
 
Materials management ppt
Materials management pptMaterials management ppt
Materials management ppt
 
Material Management by akshay kakde
Material Management by akshay kakdeMaterial Management by akshay kakde
Material Management by akshay kakde
 
Sap Mm
Sap   MmSap   Mm
Sap Mm
 
Material Management
Material Management Material Management
Material Management
 
Material Management & Inventory Management
Material Management & Inventory ManagementMaterial Management & Inventory Management
Material Management & Inventory Management
 
Material Management and ABC analysis
Material Management and ABC analysisMaterial Management and ABC analysis
Material Management and ABC analysis
 
Materials Management
Materials ManagementMaterials Management
Materials Management
 
Cmmt 2 final
Cmmt 2 finalCmmt 2 final
Cmmt 2 final
 
Construction site management material storage
Construction site management material storageConstruction site management material storage
Construction site management material storage
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Eoq ppt
Eoq   pptEoq   ppt
Eoq ppt
 
Material management
Material managementMaterial management
Material management
 
Material management
Material managementMaterial management
Material management
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Material Management
Material ManagementMaterial Management
Material Management
 
Material management
Material managementMaterial management
Material management
 
MATERIAL MANAGEMENT
MATERIAL MANAGEMENTMATERIAL MANAGEMENT
MATERIAL MANAGEMENT
 

Similar to 070 Material Management and Construction Productivity

Environmental protection and management Module_1.pptx
Environmental protection and management Module_1.pptxEnvironmental protection and management Module_1.pptx
Environmental protection and management Module_1.pptx
Raju385766
 
Waste management2.1
Waste management2.1Waste management2.1
Waste management2.1
Ankush
 
design for environmental
design for environmental design for environmental
design for environmental
Intan Ayuna
 
Pr 1-textbook-1-a neu
Pr 1-textbook-1-a neuPr 1-textbook-1-a neu
Pr 1-textbook-1-a neu
Agus Witono
 

Similar to 070 Material Management and Construction Productivity (20)

129 waste control
129 waste control129 waste control
129 waste control
 
RICS FLASH Presentation
RICS FLASH PresentationRICS FLASH Presentation
RICS FLASH Presentation
 
130 waste management
130 waste management130 waste management
130 waste management
 
042 integrating lean construction
042 integrating lean construction042 integrating lean construction
042 integrating lean construction
 
042 iIntegrating Lean Construction
042 iIntegrating Lean Construction042 iIntegrating Lean Construction
042 iIntegrating Lean Construction
 
0 5627
0 56270 5627
0 5627
 
Solid waste management presentation
Solid waste management presentationSolid waste management presentation
Solid waste management presentation
 
Report on cleaner production in small sector
Report on cleaner production in small sector  Report on cleaner production in small sector
Report on cleaner production in small sector
 
Environmental protection and management Module_1.pptx
Environmental protection and management Module_1.pptxEnvironmental protection and management Module_1.pptx
Environmental protection and management Module_1.pptx
 
PRACTICAL NO.pptx pptr rwrwrwrwsa ra daad
PRACTICAL NO.pptx pptr rwrwrwrwsa ra daadPRACTICAL NO.pptx pptr rwrwrwrwsa ra daad
PRACTICAL NO.pptx pptr rwrwrwrwsa ra daad
 
Waste management2.1
Waste management2.1Waste management2.1
Waste management2.1
 
Waste minimization
Waste minimization Waste minimization
Waste minimization
 
design for environmental
design for environmental design for environmental
design for environmental
 
Waste management
Waste managementWaste management
Waste management
 
Cleaner Production Management
Cleaner Production Management Cleaner Production Management
Cleaner Production Management
 
E-waste & Management.ppt
E-waste & Management.pptE-waste & Management.ppt
E-waste & Management.ppt
 
Wastes prevention; classification, handling and control measures
Wastes prevention; classification, handling and control measuresWastes prevention; classification, handling and control measures
Wastes prevention; classification, handling and control measures
 
Pr 1-textbook-1-a neu
Pr 1-textbook-1-a neuPr 1-textbook-1-a neu
Pr 1-textbook-1-a neu
 
Solid Waste Generation and Handling
Solid Waste Generation and HandlingSolid Waste Generation and Handling
Solid Waste Generation and Handling
 
Green Supply Chain Management and Reverse Logistics
Green Supply Chain Management and Reverse LogisticsGreen Supply Chain Management and Reverse Logistics
Green Supply Chain Management and Reverse Logistics
 

More from Dr Fereidoun Dejahang

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Recently uploaded (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 

070 Material Management and Construction Productivity

  • 2. MATERIAL MANAGEMENT  Materials management is an important process.  It is about how to reduce waste  Improve productivity  Follow a Sustainable development  It is about how a building is designed and how materials are estimated?  It is about how materials are acquired and how the packaging is specified.
  • 3. MATERIAL MANAGEMENT  It is about how the delivery schedule is designed.  It is about how contractors plan materials use and how they manage previously used materials and cuts.  It is about how waste is managed for use elsewhere or recycling rather than being discarded in a landfill.
  • 4. MATERIAL MANAGEMENT  Often on site usable or reusable pieces of material can be seen in a construction site. -Examples  lighting ballasts,  electrical switches  plasterboards damaged under the rain/bad handling/storage etc.  Torn bags of cement,  Broken tiles, bricks, blocks,  various lengths of piping and conduit.  And many more.
  • 5. MATERIAL MANAGEMENT Cost of Waste  The cost of waste is more than simply the cost of getting it to a landfill and dumping it. The cost of waste is:  Original cost of material  Delivery cost  Handling cost  Management cost  Cleanup cost  Waste hauling cost  Tipping fee =Total cost of construction waste
  • 6. MATERIAL MANAGEMENT Materials use  materials reuse,  reduction and recycling  begins in the planning stages of a project. 1. It starts with the architect, 2. proceeds through the engineer, the estimator, the purchaser, 3. The construction manager 4. finally the contractors.
  • 7. MATERIAL MANAGEMENT  Materials cost control often starts with a plan.  Once the material is on site and especially once its been cut, it is too late to plan.  With carefully well planned operational procedures and construction practices, a plan can be developed and implemented to save significant costs in materials.
  • 8. MATERIAL MANAGEMENT  Researchers in the past have tried to quantify the potential benefits of applying effective material management practice on commercial building practice.  Overall, they found that 25 site factors and conditions potentially affect productivity.  One of which is material management, this is shown diagrammatically in figure below.
  • 9.
  • 10. MATERIAL MANAGEMENT  Ineffective material management reduces labour productivity.  Material handling could be improved by simple measures such a:  organizing the delivering and storage of materials in a sequential manner,  the end result will improve productivity.
  • 11. MATERIAL MANAGEMENT  Researchers have tried to quantify the potential benefits of applying material management practices on construction sites.  They carried out material management on a number of selected sites.  The projects were all constructed under similar conditions.  Only one project used material management technique.  All material related problems were identified, quantified, and linked to site material practice.
  • 12. MATERIAL MANAGEMENT  The number of work hours wasted was calculated.  The result of their study concluded that work hour losses resulting from poor material management caused cost overrun of 18%.
  • 13. MATERIAL MANAGEMENT  The case study also showed that an investment of £1100.00 in the field of material management would have saved £6300.00 in quantified disruption, a benefit/cost ratio of 5.7.  Material management involves organizing the storage area, delivery of materials, material handling and distribution.
  • 14. MATERIAL MANAGEMENT  The construction industry has a major impact on the environment, both in terms of the resources it consumes and the waste it produces.  The construction industry is responsible for producing all kinds of wastes.  The amount and type of which depends on factors such as:  the stage of construction,  type of construction work and practices on site.
  • 15. MATERIAL MANAGEMENT  Over 90% of non -energy minerals extracted in Great Britain are used to supply the construction industry with materials.  Every year more than 70 million tones of construction and demolition waste has been produced in England and Wales
  • 16. MATERIAL MANAGEMENT-POLICY  Reduce > Reuse > Recycle  The construction industry is the UK’s largest user of natural resources, and produces a large amounts of waste.  Everyone in the construction industry can contribute to tackling waste-by.  It is by reducing waste, using materials in a better way, with care.  Collecting waste for recycling.
  • 17. MATERIAL MANAGEMENT 1. 400 MILLION TONNES of material is used 2. 100 MILLION TONNES of waste is produced – more than one-third of the UK’s annual waste 3. 25 MILLION TONNES of construction waste is disposed to landfill
  • 18. MATERIAL MANAGEMENT Waste hierarchy 1. Reuse 2. Recycle 3. Dispose  Firstly, aim to reduce the amount of waste you create.  If waste is created, identify ways you can reuse the materials.  Finally, if materials cannot be reused then collect them to recycle.  Only dispose of waste as a last resort.
  • 19. MATERIAL MANAGEMENT  Try to be involved early in a project to encourage designs that cause less waste to be created.  Use standard sizes and quantities of materials, and plan ahead to reduce off cuts.  Avoid over-ordering.
  • 20. MATERIAL MANAGEMENT  arrange deliveries to match work stages,  avoid materials being stored on site longer than necessary,  ensure storage areas are safe, secure and weatherproof,  Minimise rework from errors and poor workmanship.
  • 21. MATERIAL MANAGEMENT  Refuse poor quality or damaged deliveries.  Don’t remove protective packaging from materials before they are needed. RECOMMENDATIONS  The site induction and toolbox talks are opportunities to raise awareness of good waste management.  Having one person responsible for ordering materials helps avoid surplus being purchased.
  • 22. MATERIAL MANAGEMENT  Buying sand and gravel in bulk bags rather than loose helps reduce wastage.  Computer software is available to estimate required quantities accurately. Your duty of care  All businesses have a duty to ensure that waste they produce is handled safely and within the law.  This is a duty of care we are all part of the process.
  • 23. MATERIAL MANAGEMENT  check that any company removing waste from your site is a registered waste carrier,  make sure that they take the waste to a registered waste management site,  If you do not check and it is illegally disposed of, you could be held responsible.
  • 24. MATERIAL MANAGEMENT  Every load of waste that leaves your site must be accompanied by a Waste Transfer Note.  This provides an accurate description of the waste to enable it to be treated safely.  Keep copies of all waste transfer notes for at least two years
  • 25. MATERIAL MANAGEMENT Site Waste Management Plans  A Site Waste Management Plan (SWMP) is a legal requirement in England for projects over £300,000.  It requires you to forecast and record waste and how it is managed.
  • 26. MATERIAL MANAGEMENT  Using the SWMP as a waste management tool can help the company to: 1. increase profit margins; 2. reduce waste management costs; 3. demonstrate compliance with your legal obligations; and decrease the amount of waste you dispose of to landfill.
  • 27. MATERIAL MANAGEMENT  The true cost of waste is not just the cost of hiring a skip.  It also includes: 1. the cost of the materials that end up as waste; 2. the labour cost to handle the waste on site; and the cost of waste storage, 3. transport, treatment and disposal.
  • 28. MATERIAL MANAGEMENT 1. Most of waste arises on the structure and fitting stages of construction. 2. BENCHMARK DATA There are no agreed bench mark data available. 3. On going study at Centre for Research in the Built Environment is looking at the bench marking for waste minimisation.
  • 29. MATERIAL MANAGEMENT-WASTE CONTROL Environmentally friendly policy  Step1-Sustainable development  Step2-On site Material Management Policy  Step3-On site prevention policy  Step4-On site reduction  Step5-On site reuse Policy  Step6-On site recovery Policy
  • 30. MATERIAL MANAGEMENT Not recommended policy  Off site reuse  Off site recovery  Wastes disposal to Landfill
  • 32. MATERIAL MANAGEMENT RECORD KEEPING  Complete documentation of all contract activities is an important part of material management.  These records provide an accurate record of: 1. material testing, 2. Inspections 3. work performed.  They also provide proof of and support for the decisions and actions taken.  These records show that the contractual obligations of the contractor have been fulfilled and the public’s funds have been properly spent.
  • 33. MATERIAL MANAGEMENT  These records show how the material was used, what was the level of material wastage on site.  I twill provide valuable information on how to reduce waste and have a tight control on material management.
  • 34. MATERIAL MANAGEMENT Good Recordkeeping Practices  Keep records up-to-date, accurate, and complete.  This will save time throughout the process. -To achieve this:  enter records on the day of the event,  enter information in a manner so another person could easily complete the entry,  when needed, without additional instructions.
  • 35. MATERIAL MANAGEMENT  If % waste allowed is =5% a good record keeping will show the level of waste for each activities.  If the waste for let us say activity 100-120 is 6.65% the good record keeping will demonstrate why waste was high for that activity.  Lesson can be learnt from waste increase.  Waste and material management have strong correlation.
  • 36. MATERIAL MANAGEMENT Recordkeeping Policies and Procedures Resources  Record the date first.  Record verbal instructions and minor conditions.  Weather conditions.  Work in progress, including temporary erosion control methods employed.  Location of work (activity 1-2, 2-3,…)  Contractors and subcontractor’s work force  Arrival and departure of equipment
  • 37. MATERIAL MANAGEMENT ♦ Quantity of equipment and its usage at the project for each activity. ♦ Important instructions to the contractor. ♦ Names of official visitors and a summary of any discussions with the visitors ♦ Unusual construction or work conditions ♦ Decision making discussions with the contractor ♦ Disagreements with the contract
  • 38. MATERIAL MANAGEMENT  Detailed information that may have a connection with a probable dispute or claim against the department  Project completion and final inspection  Other important features of the project, such as discussions concerning Disadvantaged  Business Enterprise (DBE) and Equal Opportunity (EEO)  Record time suspension and reason  Record resumption of work
  • 39. MATERIAL MANAGEMENT  Record all materials brought onto the project even if they are material-on-hand and the date  that the material arrived  Record the date that Storm Water Inspections were performed and any violation by the  contractor of Project Specific Locations (PSLs) in the ROW or within one mile of the  project  Record traffic control being used
  • 40. MATERIAL MANAGEMENT  Time inspector is on the project  Credit Days – Enter reason for credit day in Site Manager Daily Work Report (DWR) and Diary. (Exception for Saturday & Sunday – unless the contractor is working.)
  • 41. MATERIAL MANAGEMENT  NOTE: The Site Manager DWR contains 10 different categories on the first tab under ‘Remarks’  to record information. These categories are:  • Accident  • Contractor Work Hours  • Dispute/Claim  • EEO Issues  • GENERAL
  • 42. MATERIAL MANAGEMENT  • General  • Other  • Safety Violations  • Traffic and  • Visitors.  Records Management Resources from GSD  Keeping good records does not mean keeping all records indefinitely. The Records Management  Section of the General Services Division (GSD) provides guidance on general records
  • 43. MATERIAL MANAGEMENT  management issues on their website. Information on the Records Retention Schedule is also  available. Specific information on District Construction Records can be accessed online. The  link to Division/Office Schedules of Unique Records include records maintained by the  Construction Division and other Divisions. To establish record retention practices that conform  to the standards described in these online resources, review of these sites is recommended.
  • 44. MATERIAL MANAGEMENT  Electronic Data Management Systems (EDMS)  Electronic Data Management Systems (EDMS) will provide the department with a means of  maintaining project records that are not stored in Site Manager electronically. Several districts
  • 45. MATERIAL MANAGEMENT  and divisions now have EDMS to allow storage of electronic records and allow scanning and  storing hard-copy records. Ideally, most, if not all, documentation will be electronically stored  from cradle to grave in the future.