Objective
Responsibilities:
 Presently working with M/S Shapoorji Pallonji & co. ltd. As an electrical in-charged at DLF
Garden city Lucknow .
installation, commissioning and testing of transformer, D.G. sets, street lighting poles, cable lying
as per drawing, H.T. and L.T. panels, A.P.F.C. panel, H.T. and L.T. Motors, air circuit breakers,
vacuum circuit breakers .fault finding in control panels
●Vendor selection, check the contractors billing and certified.
● PLC programming and different type sensors setting.
Read the MEP drawings and assists site execution team...
♦ Fault finding in control panel, transformers ,H.T. & LT panels, Switch gears ,Air circuit
breakers, vacuums circuit breakers, H.T. & L.T. motors, D.G. sets, invertors,
♦ Make’s the maintenance schedule of major & minor equipment..
♦ Makes the inventory plan of spares & indenting the spares in ERP system.
♦ Maintain the ISO documentation for internal and external audit..
Work Experience Total 11year
1. Presently working with M/S Shapoorji Pallonji & co. ltd, as an Senior
Engineer electrical from 17th
May 2006 to till date project details given below-
• Project name -DLF Garden City, Lucknow – 04th
July 2012 to till date.
Project cost- 140 cr
Project completion time- 02 year
•Tata Motors, Lucknow. – 03rd
Nov 2009 to 03rd
July 2012
Project cost- 350 cr
Project completion time – 05 year
•DLF Cyber City, Gurgaon –17th
May 2006 to 02nd
Nov 2009.
Project cost-400cr
Completion time-06 year
2. Completed one year training with M/s Eveready Industries India Limited Phase-II, Sec
-82, Noida .from 25th
June 2004 to 24th
June 2005.
Job Profile:
♦ Sound Knowledge of Fault Finding in Automation and control panel.
♦ Draw layout plan of power distribution systems according the project.
♦ P.L.C. Programming and different type’s sensors setting.
♦ Erection and commissioning of H.T, L.T. panels, motors & Transformers.
♦ Repair & maintenance of following electrical , Mechanical & Electronics
equipment’s/instruments – Motor vision rely , Auto voltage regulator, AC Drive,
Rectifier welding machines, Proximity sensors, Photo Electric Sensors, Invertors,
transformers, Circuit breakers, Electrical Concrete Pump, Vacuum pumps, Water Pump,
Batching Plant ,D.G Set, ETP,RO plant, Cooling Towers, Compressors, concrete pumps,
Tower crane, passenger hoist, hydra crane, transit mixer, RM-800 , monkey hoist
,Builder hoist , electrical & mechanical earth compactor ,air compressor, Bar bending &
cutting machine, different type ups , JCB, and other different type construction
equipments.
♦ Handling contractors , sub-contractors & checking the bills.
♦ Erection and commissioning of Batching plant CP-30, Simen-120 &Tower crane
Key Result Areas
Planning, power distribution, fault finding in electrical control panel, construction major
& miner equipment, documentation,
.
Project management
♦ Handling project activities involving working out various requirements with respect to utilities,
monitoring overall project operations for ensuring timely completion.
♦ Liaising with the consultants, project managers for resolving design-related issues and troubles
on site,
♦ Issuing the construction documents & drawing to the contractor, for successful completion of
the project schedule.
Site management
♦ Supervising on site construction activities to ensure the operations are carried out smoothly and
resource are effectively utilized maximum output.
♦ Visiting the site regularly, during the course of construction to check proper implementation of
design.
♦ Preparing and reviewing of method statements and work specific quality, control plans.
Resource management
♦ Coordinating with structural, civil engineers & quality engineers and other service
consultants.
♦ Preparing the program of project for successful completion.
♦ Ensuring the complains of site requirement & safety issues and provide the solution.
Team management
• Done Leadership & time management training
♦ Leading monitoring, monitoring the performance of the team to ensure efficacy in process
operations & meeting of individual group targets..
♦ Creating & sustaining a dynamic environment that fosters development opportunities &
motivates high performance amongst team members.
Scholastics
• Passed out Diploma in Electrical Engineering from Board of technical education Uttar
Pradesh, Allahabad securing first division mark.
•Passed out Intermediate from Govt. inter collage Allahabad. Securing second division
•Passed out High school from Govt. inter collage Allahabad securing first division...
Personal Details:
Father’s Name : Late Shri Ram Savak Yadav
Date of Birth : 15th
Aug, 1982
Nationality : Indian
Religion : Hindu
Marital Status : married
Language Known : Hindi & English
Hobby : Swimming, Listening song
Date :
Place: DEVIPRASAD YADAV

More Related Content

What's hot

Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1AHMED RAAI
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentationSomejit Chakraborty
 
Sankar_Electrical Design & Est. Engineer
Sankar_Electrical Design & Est. EngineerSankar_Electrical Design & Est. Engineer
Sankar_Electrical Design & Est. EngineerSANKAR RAJENDRAN
 
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Justin Mathew
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 DecemberSyed Asif Ali
 
SYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMESYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMEOmer Liaquat
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical EngineerDylan Barron
 
Mohammed Lathif TD Mech Eng ref
Mohammed Lathif TD Mech Eng refMohammed Lathif TD Mech Eng ref
Mohammed Lathif TD Mech Eng refMOHAMED LATHIF
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammedahmed ali
 

What's hot (20)

MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Rehan Afzal new
Rehan Afzal newRehan Afzal new
Rehan Afzal new
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentation
 
Ahmad kazlak - CV
Ahmad kazlak - CVAhmad kazlak - CV
Ahmad kazlak - CV
 
Ahmed cv 2014
Ahmed cv  2014Ahmed cv  2014
Ahmed cv 2014
 
C.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawiC.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawi
 
Sankar_Electrical Design & Est. Engineer
Sankar_Electrical Design & Est. EngineerSankar_Electrical Design & Est. Engineer
Sankar_Electrical Design & Est. Engineer
 
CV_Anas Mohammad
CV_Anas MohammadCV_Anas Mohammad
CV_Anas Mohammad
 
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 December
 
SYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMESYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUME
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Ankur Parmar Jan 17
Ankur Parmar Jan 17Ankur Parmar Jan 17
Ankur Parmar Jan 17
 
Mohammed Lathif TD Mech Eng ref
Mohammed Lathif TD Mech Eng refMohammed Lathif TD Mech Eng ref
Mohammed Lathif TD Mech Eng ref
 
Imran-Res
Imran-ResImran-Res
Imran-Res
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
latest resume
latest resumelatest resume
latest resume
 
Vinoth_Resume
Vinoth_ResumeVinoth_Resume
Vinoth_Resume
 
Updated CV
Updated CVUpdated CV
Updated CV
 

Viewers also liked

PetITfriend_ForumPA
PetITfriend_ForumPAPetITfriend_ForumPA
PetITfriend_ForumPAtecla romano
 
150310@0900_MG PHOTO STORY
150310@0900_MG PHOTO STORY150310@0900_MG PHOTO STORY
150310@0900_MG PHOTO STORYInge Hooker
 
What is desing
What is desingWhat is desing
What is desingirianailca
 
Inmédiats LivingLab Handbook
Inmédiats LivingLab HandbookInmédiats LivingLab Handbook
Inmédiats LivingLab HandbookMalvina ARTHEAU
 
PhD Defence_yoy_Print
PhD Defence_yoy_PrintPhD Defence_yoy_Print
PhD Defence_yoy_PrintYongheng Yang
 
RRITools - French Hub presentation - 24th april 2015
RRITools - French Hub presentation - 24th april 2015RRITools - French Hub presentation - 24th april 2015
RRITools - French Hub presentation - 24th april 2015Malvina ARTHEAU
 
실리콘밸리 견문록 북투어 2
실리콘밸리 견문록 북투어 2실리콘밸리 견문록 북투어 2
실리콘밸리 견문록 북투어 2Dong-Hwi Lee
 
Project Scheduling & Tracking
Project Scheduling & TrackingProject Scheduling & Tracking
Project Scheduling & TrackingFahim Tuhin
 
第三回 冬のスイッチ大勉強会 - Particle編 -
第三回 冬のスイッチ大勉強会 - Particle編 -第三回 冬のスイッチ大勉強会 - Particle編 -
第三回 冬のスイッチ大勉強会 - Particle編 -Wataru Kani
 
Formation Outils collaboratifs
Formation Outils collaboratifsFormation Outils collaboratifs
Formation Outils collaboratifsMalvina ARTHEAU
 
第二回 冬のスイッチ大勉強会 - FullColorLED & MPU-6050編 -
第二回 冬のスイッチ大勉強会 - FullColorLED & MPU-6050編 -第二回 冬のスイッチ大勉強会 - FullColorLED & MPU-6050編 -
第二回 冬のスイッチ大勉強会 - FullColorLED & MPU-6050編 -Wataru Kani
 
第一回 冬のスイッチ大勉強会 - XBee編 -
第一回 冬のスイッチ大勉強会 - XBee編 -第一回 冬のスイッチ大勉強会 - XBee編 -
第一回 冬のスイッチ大勉強会 - XBee編 -Wataru Kani
 

Viewers also liked (13)

PetITfriend_ForumPA
PetITfriend_ForumPAPetITfriend_ForumPA
PetITfriend_ForumPA
 
PhotoDiary
PhotoDiaryPhotoDiary
PhotoDiary
 
150310@0900_MG PHOTO STORY
150310@0900_MG PHOTO STORY150310@0900_MG PHOTO STORY
150310@0900_MG PHOTO STORY
 
What is desing
What is desingWhat is desing
What is desing
 
Inmédiats LivingLab Handbook
Inmédiats LivingLab HandbookInmédiats LivingLab Handbook
Inmédiats LivingLab Handbook
 
PhD Defence_yoy_Print
PhD Defence_yoy_PrintPhD Defence_yoy_Print
PhD Defence_yoy_Print
 
RRITools - French Hub presentation - 24th april 2015
RRITools - French Hub presentation - 24th april 2015RRITools - French Hub presentation - 24th april 2015
RRITools - French Hub presentation - 24th april 2015
 
실리콘밸리 견문록 북투어 2
실리콘밸리 견문록 북투어 2실리콘밸리 견문록 북투어 2
실리콘밸리 견문록 북투어 2
 
Project Scheduling & Tracking
Project Scheduling & TrackingProject Scheduling & Tracking
Project Scheduling & Tracking
 
第三回 冬のスイッチ大勉強会 - Particle編 -
第三回 冬のスイッチ大勉強会 - Particle編 -第三回 冬のスイッチ大勉強会 - Particle編 -
第三回 冬のスイッチ大勉強会 - Particle編 -
 
Formation Outils collaboratifs
Formation Outils collaboratifsFormation Outils collaboratifs
Formation Outils collaboratifs
 
第二回 冬のスイッチ大勉強会 - FullColorLED & MPU-6050編 -
第二回 冬のスイッチ大勉強会 - FullColorLED & MPU-6050編 -第二回 冬のスイッチ大勉強会 - FullColorLED & MPU-6050編 -
第二回 冬のスイッチ大勉強会 - FullColorLED & MPU-6050編 -
 
第一回 冬のスイッチ大勉強会 - XBee編 -
第一回 冬のスイッチ大勉強会 - XBee編 -第一回 冬のスイッチ大勉強会 - XBee編 -
第一回 冬のスイッチ大勉強会 - XBee編 -
 

Similar to D.P._Yadav

Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,IQBAL KHAN
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG yogesh kumar
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated ResumeAnkit Agarwal
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intashish saxena
 
ELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERGopi s
 
CHANDAN TECHNO LATEST CV 2015 NEW
CHANDAN TECHNO LATEST CV 2015 NEWCHANDAN TECHNO LATEST CV 2015 NEW
CHANDAN TECHNO LATEST CV 2015 NEWCHANDAN Cranjan50
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV NewShujaat Jan
 

Similar to D.P._Yadav (20)

Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
CV Jawed
CV JawedCV Jawed
CV Jawed
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Rajesh CV -
Rajesh CV - Rajesh CV -
Rajesh CV -
 
DEEPU CV O&G_2
DEEPU CV O&G_2DEEPU CV O&G_2
DEEPU CV O&G_2
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_int
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
Srikanth Kulkarni CV
Srikanth Kulkarni CVSrikanth Kulkarni CV
Srikanth Kulkarni CV
 
ELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEER
 
CHANDAN TECHNO LATEST CV 2015 NEW
CHANDAN TECHNO LATEST CV 2015 NEWCHANDAN TECHNO LATEST CV 2015 NEW
CHANDAN TECHNO LATEST CV 2015 NEW
 
cv 2016
cv 2016cv 2016
cv 2016
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV New
 

D.P._Yadav

  • 1. CURRICULUM-VITAE Deviprasad yadav E.mail id deviprasadyadav@redffmail.com Correspondence Address:- 4/61, , Vijyantkhand, Gomati nagar, Lucknow 7728885922, Objective Responsibilities:  Presently working with M/S Shapoorji Pallonji & co. ltd. As an electrical in-charged at DLF Garden city Lucknow . installation, commissioning and testing of transformer, D.G. sets, street lighting poles, cable lying as per drawing, H.T. and L.T. panels, A.P.F.C. panel, H.T. and L.T. Motors, air circuit breakers, vacuum circuit breakers .fault finding in control panels ●Vendor selection, check the contractors billing and certified. ● PLC programming and different type sensors setting. Read the MEP drawings and assists site execution team... ♦ Fault finding in control panel, transformers ,H.T. & LT panels, Switch gears ,Air circuit breakers, vacuums circuit breakers, H.T. & L.T. motors, D.G. sets, invertors, ♦ Make’s the maintenance schedule of major & minor equipment.. ♦ Makes the inventory plan of spares & indenting the spares in ERP system. ♦ Maintain the ISO documentation for internal and external audit.. Work Experience Total 11year 1. Presently working with M/S Shapoorji Pallonji & co. ltd, as an Senior Engineer electrical from 17th May 2006 to till date project details given below- • Project name -DLF Garden City, Lucknow – 04th July 2012 to till date. Project cost- 140 cr Project completion time- 02 year •Tata Motors, Lucknow. – 03rd Nov 2009 to 03rd July 2012 Project cost- 350 cr Project completion time – 05 year •DLF Cyber City, Gurgaon –17th May 2006 to 02nd Nov 2009.
  • 2. Project cost-400cr Completion time-06 year 2. Completed one year training with M/s Eveready Industries India Limited Phase-II, Sec -82, Noida .from 25th June 2004 to 24th June 2005. Job Profile: ♦ Sound Knowledge of Fault Finding in Automation and control panel. ♦ Draw layout plan of power distribution systems according the project. ♦ P.L.C. Programming and different type’s sensors setting. ♦ Erection and commissioning of H.T, L.T. panels, motors & Transformers. ♦ Repair & maintenance of following electrical , Mechanical & Electronics equipment’s/instruments – Motor vision rely , Auto voltage regulator, AC Drive, Rectifier welding machines, Proximity sensors, Photo Electric Sensors, Invertors, transformers, Circuit breakers, Electrical Concrete Pump, Vacuum pumps, Water Pump, Batching Plant ,D.G Set, ETP,RO plant, Cooling Towers, Compressors, concrete pumps, Tower crane, passenger hoist, hydra crane, transit mixer, RM-800 , monkey hoist ,Builder hoist , electrical & mechanical earth compactor ,air compressor, Bar bending & cutting machine, different type ups , JCB, and other different type construction equipments. ♦ Handling contractors , sub-contractors & checking the bills. ♦ Erection and commissioning of Batching plant CP-30, Simen-120 &Tower crane Key Result Areas Planning, power distribution, fault finding in electrical control panel, construction major & miner equipment, documentation, . Project management ♦ Handling project activities involving working out various requirements with respect to utilities, monitoring overall project operations for ensuring timely completion. ♦ Liaising with the consultants, project managers for resolving design-related issues and troubles on site, ♦ Issuing the construction documents & drawing to the contractor, for successful completion of the project schedule. Site management ♦ Supervising on site construction activities to ensure the operations are carried out smoothly and resource are effectively utilized maximum output. ♦ Visiting the site regularly, during the course of construction to check proper implementation of design. ♦ Preparing and reviewing of method statements and work specific quality, control plans. Resource management
  • 3. ♦ Coordinating with structural, civil engineers & quality engineers and other service consultants. ♦ Preparing the program of project for successful completion. ♦ Ensuring the complains of site requirement & safety issues and provide the solution. Team management • Done Leadership & time management training ♦ Leading monitoring, monitoring the performance of the team to ensure efficacy in process operations & meeting of individual group targets.. ♦ Creating & sustaining a dynamic environment that fosters development opportunities & motivates high performance amongst team members. Scholastics • Passed out Diploma in Electrical Engineering from Board of technical education Uttar Pradesh, Allahabad securing first division mark. •Passed out Intermediate from Govt. inter collage Allahabad. Securing second division •Passed out High school from Govt. inter collage Allahabad securing first division... Personal Details: Father’s Name : Late Shri Ram Savak Yadav Date of Birth : 15th Aug, 1982 Nationality : Indian Religion : Hindu Marital Status : married Language Known : Hindi & English Hobby : Swimming, Listening song Date : Place: DEVIPRASAD YADAV