SlideShare a Scribd company logo
C.V.
Ahmed M. H. Raai
(MEP Construction Manager)
MEP CM
Apr. 2014
United Arab Emirates
Last Update: 01/04/2014
AHMED M. RAAI Mobile: +971 551 55 955 37 31
1 of - 6 -
C.V.
ahmedraai@yahoo.com
Abu Dhabi, UAE
SUMMARY
 Profile: Male, 36 , Married
 Nationality: Syria
 Current Location: UAE
 Current position: MEP Construction Manager / MEP CM
 Company: JACOBS International Holdings Inc.
(Reporting to: Operations Director)
 Preferred Locations: UAE, All GCC Countries, All Middle East Countries
WORK EXPERIENCE
Dec. 2012 - Present JACOBS International Holdings Inc. Abu Dhabi, UAE
MEP Construction Manager
Jacobs, with 2013 revenues of nearly $12 billion, is one of the world's largest and
most diverse providers of technical, professional, and construction services.
Building strong, long-term relationships with our clients is the key to our success
as a company.
Achievements:
Cleveland Clinic Abu Dhabi:
With $ 1.9 billion is a world-class multispecialty hospital being built on Al
Maryah Island in Abu Dhabi, United Arab Emirates.
The hospital was designed and developed by Abu Dhabi’s Mubadala Healthcare
and leading US-based hospital, Cleveland Clinic, to address a range of complex
and critical care requirements unique to the Abu Dhabi population. Mubadala
Healthcare is helping to address the region’s most pressing healthcare needs
through the creation of specialist healthcare facilities, building regional capability
and stimulating the overall development of the sector.
Client: Mubadala – Abu Dhabi
Consultant: AEDAS / AECOM / KEO
Main Cont: Samsung – SIX Construction
On this project, Cleveland Clinic – Abu Dhabi I held the position of MEP
Construction Manager, My Scope was Managing, supervising the installation,
Testing and Commissioning of all MEP Works in the Patient Tower which
consists of 13 Floors as follows:
• 7 Floors Ordinary Patient Rooms (36 Rooms each)with Medical rooms
• 2 Floors for VIP Patient Rooms (18 Rooms Each)
• 1 Floor for VIP Patient Suites (6 Nos.) with Services.
• 3 Mechanical Floors.
My Responsibilities were:
- Planning, Managing and supervising the installation of 1st and 2nd fix
of all electromechanical activities (which were done on time) by
2 of - 6 -
coordinating the services with RLOS drawings and with the site
conditioning in order to have the final product functional, useful, fits for
purpose and accessible for future maintenance above false ceiling, And
by solving all the problems related to that with the designer and the
architect and the installation team without affecting the overall design.
- Managing and supervising FIREM (Final Fix) installations and approvals
by the engineer, this is also done on time as per the planned targets, by
having the final product with the best condition ready to be tested.
- CIR, ICDR Follow up.
- Testing and commissioning for all MEP Services Like (Fire Alarm,
MSFD, Central Battery, Emergency System, Lighting Control System,
Access Control, Nurse Call System, Pneumatic System, Medical Gas
System, Novac System, Fire Fighting System, PAS, CCTV, AVS, DB and
SMDB Life Test, EMCS, Air Proportional Test, Pressurization and
smoke Fans, Air Balancing, Water Balancing, Plumbing System, Drainage
System, PFT and FT for all systems. Assuring that all testing stages and
integrations between related systems with BMS and EMCS is in the best
condition exactly the way it meant to be in the specification and by
witnessing and signing off all the above systems by an third party
specialist. Up to the client expectation and satisfactory.
- Safety is always our first responsibility as we are a part of Beyond Zero
Program and behavior, by attending the safety issues once it happened
and reporting directly by Safety Observation report.
- Arranging daily, weekly and monthly meetings with all parties to monitor
and to make sure that the KPI’s targets were met on time.
- Repotting to the client.
- Safety.
Oct.2007 - Dec.2012 REMCO (Reliance Electro-Mech. Plumbing Contracting Co) Dubai, UAE
MEP Construction Manager
Remco is one of the leading electro-mechanical contracting companies in UAE,
The turnover of REMCO is reaching AED 1.5 billion handling large range of
high quality projects. I had joined REMCO as Senior Mechanical Engineer in and
had promoted to Asst. Project Manager.
Achievements:
1- Global Village Project – Dubai, Grand themed shopping mall with
residential phase
Value: AED 150 Million MEP Contract
Client of the project is Dubai Land (Tatweer Dubai)
Consultant: AECOM/CANSULT Mauncel Limited
Project Managers. TATWEER
2- Ajman Residential Complex , 12 high rise towers (G+5P+36 Floors)
in the gate of Ajman State with total MEP contract value of $ 0.5 billion.
The client is Ajman Ruler Sheikh Hmaid Bin Rashid Al Nuaemi and the
developer is M/s. Aqaar Properties.
Handling the following activities:
• Managing and monitoring the Mechanical Activities with the MEP staff of
3 of - 6 -
engineers and supervisors to ensure that all works are executed as per
specification, consultant and client requirement and engineer's requirements
to meet their satisfaction and approval.
• Dealing and managing the project finance like payments, variation, etc.
• Handling the sub-contractors, Labor supply, Third Parties.
• Follow up and manage work team performance and site works, progress,
material delivery, ordering, etc.
• Handling all meetings with the client, consultant and other contractors such
as (Progress Meeting, MEP Meeting, Coordination meeting, Construction
meeting, Safety meeting etc.) and prepare all kind of reports required in the
meetings.
• All Method statements, ITP, Plans, Schedules and check lists required for
the inspections and tests, Third parties
• Quality control and quality assurance (QC/QA) and monitor all
correspondences, Transmittals, Workshop Drawings, etc.., and arrange the
records for that to evaluate and quality and progress comparing with base
line program.
Oct 2004 - Sep. 2007 Bhatia General Cont. Co.
Mechanical Co-ordinator
Bhatia Gen. Cont. is a member of Bhatia Group and an ISO-9000 well reputed
company dealing with construction activities for a lot of clients including Dubai
Municipality.
My Duty was Dealing with the following activities:
• Managing and all MEP works at the construction sites.
• Testing and commissioning and handing over the projects.
• Preparing the handing over documents and O&M Manuals.
Achievements:
Important Projects Executed are:
•B+G+10 Building at Dubai Marina (Consultant: Chawla Engg.)
•2B+G+4P+22 Building at Bur Dubai (Consultant: NEB)
•B+G+16 Building at Dubai Knowledge Village, Dubai (Consultant:
Team Cons.Engg.)
•B+G+14 Building at Al Barsha first, Dubai (Consultant: NEB)
•240 Nos. Villas for DM in Lahbab, Dubai (Consultant: Dar Al Khaleej)
Dec. 2001 - Sep. 2004 Sky Way Gen. Cont. co. Abu Dhabi, UAE
Project Engineer
Sky way is an electro-mechanical company and Dealing with the Mechanical
works (A/C, Fire fighting, Plumping & Drainage), we did a lot of a specific
projects for PWD (Public Works Department) in Abu Dhabi and some other
projects Fujairah and RAK.
Achievements:
• Blood Bank at Abu Dhabi & Al Ain (Consultant: James Cubbit & Partners)
4 of - 6 -
• G+6 Residential Building at Abu Dhabi (Consultant: CASSIA)
• 2 Nos. Schools in Fujairah & Ras Al Khaimah (Consultant : TAHEL)
• Al Rowad Model School in Abu Dhabi (Consultant: Al Ajami Engg.)
• G+M+14 Building at Abu Dhabi (Consultant: ECG Consultants)
Sep. 2001- Nov. 2001 Al Omran Transport co. Lattakia, Syria
Technical Engineer
I Worked as a Technical Engineer in the Maintenance department of Lattakia
Branch.
Responsible of inspections at all kinds of the company’s Mechanical equipments
(as AC equipments, Boilers, Heavy Equipment in the Workshop.)
EDUCATION
Oct 1996 - Jul 2001 Damascus/Teshreen Syria
Mechanical Engineering, Bachelor(BSc/BA), GPA 73.6%
Member of the Syrian Syndicate for Engineers
OTHER CERTIFICATES
2007 BA-H2S Safety Aware
Certificate
Venture Gulf Training Center - Qatar
2002 ICDL ILAF Computer Center - Syria
2010 Primavera P-6 Vision Training Institute - UAE
2010 PMP Vision Training Institute - UAE
IT Skills
Windows & Office tools
 Windows Expert
 Word, Excel, Power Point Advanced
Non-web programming languages
 Hourly Anlisis Program (HAP) Advanced
 Carrier E20-II Advanced
 AutoCAD Advanced
 Visual Basic Intermediat
e
• Primavera Program Intermediat
e
5 of - 6 -
OTHER QUALIFICATIONS
• AC Design for different types of buildings using Block Load and Carrier
E20-II programs as per ASHREA standards, Extract air system, Fresh Air
System, Ventilation, Duct designing, sizing and selection, Electric Load
Calculation, U Value Calculation and General AC Machines Selections.
• Fire fighting system (wet riser system, dry riser system, sprinkler system)
Installation & commissioning.
• Plumping & Drainage systems, design Knowledge.
LANGUAGES
 Arabic Native
 English Fluent
 Hindi Work Knowledge
* * *
6 of - 6 -
OTHER QUALIFICATIONS
• AC Design for different types of buildings using Block Load and Carrier
E20-II programs as per ASHREA standards, Extract air system, Fresh Air
System, Ventilation, Duct designing, sizing and selection, Electric Load
Calculation, U Value Calculation and General AC Machines Selections.
• Fire fighting system (wet riser system, dry riser system, sprinkler system)
Installation & commissioning.
• Plumping & Drainage systems, design Knowledge.
LANGUAGES
 Arabic Native
 English Fluent
 Hindi Work Knowledge
* * *
6 of - 6 -

More Related Content

What's hot

Amer Jundi Resume ABCD Makah Mega Projects Division Update Feb. 2016
Amer Jundi Resume  ABCD Makah Mega Projects Division Update Feb. 2016Amer Jundi Resume  ABCD Makah Mega Projects Division Update Feb. 2016
Amer Jundi Resume ABCD Makah Mega Projects Division Update Feb. 2016Amer Jundi
 
Ervin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & ResumeErvin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & ResumeErvin Buagas
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014Michael Khalil
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammedahmed ali
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad
 
C.V. Ahmed Ghaleb - Updated
C.V. Ahmed Ghaleb - UpdatedC.V. Ahmed Ghaleb - Updated
C.V. Ahmed Ghaleb - UpdatedAhmed Ghaleb
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJSiva Kumar
 
Eng Luai Al-Rabadi CV
Eng Luai Al-Rabadi CVEng Luai Al-Rabadi CV
Eng Luai Al-Rabadi CVLuai Alrabadi
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016Mohamed Gamal
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERKhaled mohamed
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015???? ?????
 
Eng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 newEng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 newJihad Amro
 

What's hot (20)

CV mohamed
CV mohamedCV mohamed
CV mohamed
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 
Amer Jundi Resume ABCD Makah Mega Projects Division Update Feb. 2016
Amer Jundi Resume  ABCD Makah Mega Projects Division Update Feb. 2016Amer Jundi Resume  ABCD Makah Mega Projects Division Update Feb. 2016
Amer Jundi Resume ABCD Makah Mega Projects Division Update Feb. 2016
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
 
UP Date resume Mohd Azeem
UP Date resume Mohd AzeemUP Date resume Mohd Azeem
UP Date resume Mohd Azeem
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
F.M.Camus (CV 2016)
F.M.Camus (CV 2016)F.M.Camus (CV 2016)
F.M.Camus (CV 2016)
 
Ervin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & ResumeErvin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & Resume
 
CV1
CV1CV1
CV1
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
C.V. Ahmed Ghaleb - Updated
C.V. Ahmed Ghaleb - UpdatedC.V. Ahmed Ghaleb - Updated
C.V. Ahmed Ghaleb - Updated
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
Eng Luai Al-Rabadi CV
Eng Luai Al-Rabadi CVEng Luai Al-Rabadi CV
Eng Luai Al-Rabadi CV
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
Eng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 newEng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 new
 

Viewers also liked

Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz Ahmad
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
Arun Das
 
MEP Construction Manager - JD
MEP Construction Manager - JDMEP Construction Manager - JD
MEP Construction Manager - JDericaeksander
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16Saleem MD
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos BalanaoFroilan Balanao
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
Arun Das
 

Viewers also liked (7)

Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
MEP Construction Manager - JD
MEP Construction Manager - JDMEP Construction Manager - JD
MEP Construction Manager - JD
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 

Similar to Ahmed cv 2014

Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
Derek Swift
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016Ahmed Sakr
 
Engr Rizwan asif cv
Engr Rizwan asif cvEngr Rizwan asif cv
Engr Rizwan asif cv
Engr Rizwan Asif
 
Engr Rizwan asif cv
Engr Rizwan asif cvEngr Rizwan asif cv
Engr Rizwan asif cv
Engr Rizwan Asif
 
Engr Rizwan asif cv
Engr Rizwan asif cvEngr Rizwan asif cv
Engr Rizwan asif cv
Engr Rizwan Asif
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability EngineerAngela Lopez
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
Mohammed Yousuf Sabir
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
Mohamed Khairy M. Hussein
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
Ehab A. Azeem
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 

Similar to Ahmed cv 2014 (20)

Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
Engr Rizwan asif cv
Engr Rizwan asif cvEngr Rizwan asif cv
Engr Rizwan asif cv
 
Engr Rizwan asif cv
Engr Rizwan asif cvEngr Rizwan asif cv
Engr Rizwan asif cv
 
Engr Rizwan asif cv
Engr Rizwan asif cvEngr Rizwan asif cv
Engr Rizwan asif cv
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
 
Zain Ul Abideen_281116
Zain Ul Abideen_281116Zain Ul Abideen_281116
Zain Ul Abideen_281116
 
CV MZ
CV MZCV MZ
CV MZ
 
Mohammed Yousuf cv
Mohammed Yousuf cvMohammed Yousuf cv
Mohammed Yousuf cv
 
Resume_Justin
Resume_JustinResume_Justin
Resume_Justin
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
السي في
السي فيالسي في
السي في
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

Ahmed cv 2014

  • 1. C.V. Ahmed M. H. Raai (MEP Construction Manager) MEP CM Apr. 2014 United Arab Emirates Last Update: 01/04/2014 AHMED M. RAAI Mobile: +971 551 55 955 37 31 1 of - 6 -
  • 2. C.V. ahmedraai@yahoo.com Abu Dhabi, UAE SUMMARY  Profile: Male, 36 , Married  Nationality: Syria  Current Location: UAE  Current position: MEP Construction Manager / MEP CM  Company: JACOBS International Holdings Inc. (Reporting to: Operations Director)  Preferred Locations: UAE, All GCC Countries, All Middle East Countries WORK EXPERIENCE Dec. 2012 - Present JACOBS International Holdings Inc. Abu Dhabi, UAE MEP Construction Manager Jacobs, with 2013 revenues of nearly $12 billion, is one of the world's largest and most diverse providers of technical, professional, and construction services. Building strong, long-term relationships with our clients is the key to our success as a company. Achievements: Cleveland Clinic Abu Dhabi: With $ 1.9 billion is a world-class multispecialty hospital being built on Al Maryah Island in Abu Dhabi, United Arab Emirates. The hospital was designed and developed by Abu Dhabi’s Mubadala Healthcare and leading US-based hospital, Cleveland Clinic, to address a range of complex and critical care requirements unique to the Abu Dhabi population. Mubadala Healthcare is helping to address the region’s most pressing healthcare needs through the creation of specialist healthcare facilities, building regional capability and stimulating the overall development of the sector. Client: Mubadala – Abu Dhabi Consultant: AEDAS / AECOM / KEO Main Cont: Samsung – SIX Construction On this project, Cleveland Clinic – Abu Dhabi I held the position of MEP Construction Manager, My Scope was Managing, supervising the installation, Testing and Commissioning of all MEP Works in the Patient Tower which consists of 13 Floors as follows: • 7 Floors Ordinary Patient Rooms (36 Rooms each)with Medical rooms • 2 Floors for VIP Patient Rooms (18 Rooms Each) • 1 Floor for VIP Patient Suites (6 Nos.) with Services. • 3 Mechanical Floors. My Responsibilities were: - Planning, Managing and supervising the installation of 1st and 2nd fix of all electromechanical activities (which were done on time) by 2 of - 6 -
  • 3. coordinating the services with RLOS drawings and with the site conditioning in order to have the final product functional, useful, fits for purpose and accessible for future maintenance above false ceiling, And by solving all the problems related to that with the designer and the architect and the installation team without affecting the overall design. - Managing and supervising FIREM (Final Fix) installations and approvals by the engineer, this is also done on time as per the planned targets, by having the final product with the best condition ready to be tested. - CIR, ICDR Follow up. - Testing and commissioning for all MEP Services Like (Fire Alarm, MSFD, Central Battery, Emergency System, Lighting Control System, Access Control, Nurse Call System, Pneumatic System, Medical Gas System, Novac System, Fire Fighting System, PAS, CCTV, AVS, DB and SMDB Life Test, EMCS, Air Proportional Test, Pressurization and smoke Fans, Air Balancing, Water Balancing, Plumbing System, Drainage System, PFT and FT for all systems. Assuring that all testing stages and integrations between related systems with BMS and EMCS is in the best condition exactly the way it meant to be in the specification and by witnessing and signing off all the above systems by an third party specialist. Up to the client expectation and satisfactory. - Safety is always our first responsibility as we are a part of Beyond Zero Program and behavior, by attending the safety issues once it happened and reporting directly by Safety Observation report. - Arranging daily, weekly and monthly meetings with all parties to monitor and to make sure that the KPI’s targets were met on time. - Repotting to the client. - Safety. Oct.2007 - Dec.2012 REMCO (Reliance Electro-Mech. Plumbing Contracting Co) Dubai, UAE MEP Construction Manager Remco is one of the leading electro-mechanical contracting companies in UAE, The turnover of REMCO is reaching AED 1.5 billion handling large range of high quality projects. I had joined REMCO as Senior Mechanical Engineer in and had promoted to Asst. Project Manager. Achievements: 1- Global Village Project – Dubai, Grand themed shopping mall with residential phase Value: AED 150 Million MEP Contract Client of the project is Dubai Land (Tatweer Dubai) Consultant: AECOM/CANSULT Mauncel Limited Project Managers. TATWEER 2- Ajman Residential Complex , 12 high rise towers (G+5P+36 Floors) in the gate of Ajman State with total MEP contract value of $ 0.5 billion. The client is Ajman Ruler Sheikh Hmaid Bin Rashid Al Nuaemi and the developer is M/s. Aqaar Properties. Handling the following activities: • Managing and monitoring the Mechanical Activities with the MEP staff of 3 of - 6 -
  • 4. engineers and supervisors to ensure that all works are executed as per specification, consultant and client requirement and engineer's requirements to meet their satisfaction and approval. • Dealing and managing the project finance like payments, variation, etc. • Handling the sub-contractors, Labor supply, Third Parties. • Follow up and manage work team performance and site works, progress, material delivery, ordering, etc. • Handling all meetings with the client, consultant and other contractors such as (Progress Meeting, MEP Meeting, Coordination meeting, Construction meeting, Safety meeting etc.) and prepare all kind of reports required in the meetings. • All Method statements, ITP, Plans, Schedules and check lists required for the inspections and tests, Third parties • Quality control and quality assurance (QC/QA) and monitor all correspondences, Transmittals, Workshop Drawings, etc.., and arrange the records for that to evaluate and quality and progress comparing with base line program. Oct 2004 - Sep. 2007 Bhatia General Cont. Co. Mechanical Co-ordinator Bhatia Gen. Cont. is a member of Bhatia Group and an ISO-9000 well reputed company dealing with construction activities for a lot of clients including Dubai Municipality. My Duty was Dealing with the following activities: • Managing and all MEP works at the construction sites. • Testing and commissioning and handing over the projects. • Preparing the handing over documents and O&M Manuals. Achievements: Important Projects Executed are: •B+G+10 Building at Dubai Marina (Consultant: Chawla Engg.) •2B+G+4P+22 Building at Bur Dubai (Consultant: NEB) •B+G+16 Building at Dubai Knowledge Village, Dubai (Consultant: Team Cons.Engg.) •B+G+14 Building at Al Barsha first, Dubai (Consultant: NEB) •240 Nos. Villas for DM in Lahbab, Dubai (Consultant: Dar Al Khaleej) Dec. 2001 - Sep. 2004 Sky Way Gen. Cont. co. Abu Dhabi, UAE Project Engineer Sky way is an electro-mechanical company and Dealing with the Mechanical works (A/C, Fire fighting, Plumping & Drainage), we did a lot of a specific projects for PWD (Public Works Department) in Abu Dhabi and some other projects Fujairah and RAK. Achievements: • Blood Bank at Abu Dhabi & Al Ain (Consultant: James Cubbit & Partners) 4 of - 6 -
  • 5. • G+6 Residential Building at Abu Dhabi (Consultant: CASSIA) • 2 Nos. Schools in Fujairah & Ras Al Khaimah (Consultant : TAHEL) • Al Rowad Model School in Abu Dhabi (Consultant: Al Ajami Engg.) • G+M+14 Building at Abu Dhabi (Consultant: ECG Consultants) Sep. 2001- Nov. 2001 Al Omran Transport co. Lattakia, Syria Technical Engineer I Worked as a Technical Engineer in the Maintenance department of Lattakia Branch. Responsible of inspections at all kinds of the company’s Mechanical equipments (as AC equipments, Boilers, Heavy Equipment in the Workshop.) EDUCATION Oct 1996 - Jul 2001 Damascus/Teshreen Syria Mechanical Engineering, Bachelor(BSc/BA), GPA 73.6% Member of the Syrian Syndicate for Engineers OTHER CERTIFICATES 2007 BA-H2S Safety Aware Certificate Venture Gulf Training Center - Qatar 2002 ICDL ILAF Computer Center - Syria 2010 Primavera P-6 Vision Training Institute - UAE 2010 PMP Vision Training Institute - UAE IT Skills Windows & Office tools  Windows Expert  Word, Excel, Power Point Advanced Non-web programming languages  Hourly Anlisis Program (HAP) Advanced  Carrier E20-II Advanced  AutoCAD Advanced  Visual Basic Intermediat e • Primavera Program Intermediat e 5 of - 6 -
  • 6. OTHER QUALIFICATIONS • AC Design for different types of buildings using Block Load and Carrier E20-II programs as per ASHREA standards, Extract air system, Fresh Air System, Ventilation, Duct designing, sizing and selection, Electric Load Calculation, U Value Calculation and General AC Machines Selections. • Fire fighting system (wet riser system, dry riser system, sprinkler system) Installation & commissioning. • Plumping & Drainage systems, design Knowledge. LANGUAGES  Arabic Native  English Fluent  Hindi Work Knowledge * * * 6 of - 6 -
  • 7. OTHER QUALIFICATIONS • AC Design for different types of buildings using Block Load and Carrier E20-II programs as per ASHREA standards, Extract air system, Fresh Air System, Ventilation, Duct designing, sizing and selection, Electric Load Calculation, U Value Calculation and General AC Machines Selections. • Fire fighting system (wet riser system, dry riser system, sprinkler system) Installation & commissioning. • Plumping & Drainage systems, design Knowledge. LANGUAGES  Arabic Native  English Fluent  Hindi Work Knowledge * * * 6 of - 6 -