Ahmed Raai is a 36-year-old married Syrian national currently working as a MEP Construction Manager for Jacobs International Holdings Inc. in Abu Dhabi, UAE.
He has over 12 years of experience managing MEP construction projects in the UAE and GCC regions.
A recent project he managed was the Cleveland Clinic Abu Dhabi hospital project with a value of $1.9 billion, where he oversaw MEP installation, testing, and commissioning.
Dear Sir,
Based in UAE, I am currently employed as a MEP Construction Manager at Jacobs International Holding in Cleveland Clinic Abu Dhabi ($ 2 billion).
I have a total of 13 years of full-time work experience in Managing all MEP works at different types of projects like Hospitals, High Rise buildings, commercial, schools.
Managing materials, design, site activities, Payments, Manpower, Variations, schedules, method statements, approvals, weekly and monthly targets, installation testing and commissioning and handing over.
AHMED RAAI
Abu Dhabi, UAE
Tel: +971-559553731
ahmedraai@yahoo.com
Dear Sir,
Based in UAE, I am currently employed as a MEP Construction Manager at Jacobs International Holding in Cleveland Clinic Abu Dhabi ($ 2 billion).
I have a total of 13 years of full-time work experience in Managing all MEP works at different types of projects like Hospitals, High Rise buildings, commercial, schools.
Managing materials, design, site activities, Payments, Manpower, Variations, schedules, method statements, approvals, weekly and monthly targets, installation testing and commissioning and handing over.
AHMED RAAI
Abu Dhabi, UAE
Tel: +971-559553731
ahmedraai@yahoo.com
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
My self Imteyaz. Ahmad. having reach experience(12 yrs) in MEP field Site /Project management (specially hotel project) . with design review & drawing coordination, tendering , cost budgeting , bill verification.
I got technical education from central university i.e A.M.U. Aligarh.
Currently working with Maxim infrastructure & real estate Pvt. Ltd.(HM GROUP) on the Marriott Hotel Project Shillong (Meghalaya).
Thanks & Regards
8014316443
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
My self Imteyaz. Ahmad. having reach experience(12 yrs) in MEP field Site /Project management (specially hotel project) . with design review & drawing coordination, tendering , cost budgeting , bill verification.
I got technical education from central university i.e A.M.U. Aligarh.
Currently working with Maxim infrastructure & real estate Pvt. Ltd.(HM GROUP) on the Marriott Hotel Project Shillong (Meghalaya).
Thanks & Regards
8014316443
Dear Sir,
Respectfully, I am Engr. Rizwan Asif and have been working with Multinational Engineering Companies in UAE since last six years plus one year in Pakistan. I am graduate in Mechanical Engineering and completed my degree with 3.4 GPA (85%).I have MEP Facilities management, maintenance, Mechanical Mega projects construction experiences on high rise buildings, residential, commercial , airport and Healthcare projects with different Multinational companies.
My CV/Resume provides you with details of my skills and accomplishments, but I am certain that a personal interview would more fully reveal my desire and ability to contribute to your organization.
All the information that I have given are true and best of my knowledge and my record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
Thank you for your time and consideration, and do not hesitate to contact me if you have any questions.
I look forward to speaking with you soon.
Thanks & Kind Regards,
Engr. Rizwan Asif
00971-55-3879768
Dear Sir,
Respectfully, I am Engr. Rizwan Asif and have been working with Multinational Engineering Companies in UAE since last six years plus one year in Pakistan. I am graduate in Mechanical Engineering and completed my degree with 3.4 GPA (85%).I have MEP Facilities management, maintenance, Mechanical Mega projects construction experiences on high rise buildings, residential, commercial , airport and Healthcare projects with different Multinational companies.
My CV/Resume provides you with details of my skills and accomplishments, but I am certain that a personal interview would more fully reveal my desire and ability to contribute to your organization.
All the information that I have given are true and best of my knowledge and my record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
Thank you for your time and consideration, and do not hesitate to contact me if you have any questions.
I look forward to speaking with you soon.
Thanks & Kind Regards,
Engr. Rizwan Asif
00971-55-3879768
Dear Sir,
Respectfully, I am Engr. Rizwan Asif and have been working with Multinational Engineering Companies in UAE since last six years plus one year in Pakistan. I am graduate in Mechanical Engineering and completed my degree with 3.4 GPA (85%).I have MEP Facilities management, maintenance, Mechanical Mega projects construction experiences on high rise buildings, residential, commercial , airport and Healthcare projects with different Multinational companies.
My CV/Resume provides you with details of my skills and accomplishments, but I am certain that a personal interview would more fully reveal my desire and ability to contribute to your organization.
All the information that I have given are true and best of my knowledge and my record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
Thank you for your time and consideration, and do not hesitate to contact me if you have any questions.
I look forward to speaking with you soon.
Thanks & Kind Regards,
Engr. Rizwan Asif
00971-55-3879768
•Professional Engineering, Management and Contractual issues in the mega projects. Expe-rience (21 years) Contributed in international contracts (FIDIC, Lump Sum/Turn Key/EPC , Re-measurement, , Reimbursement Contract, Arbitration, A.D.R,Consortium,J.V) and inter-national specifications and codes since early start by joining world-wide companies in the Middle East (Gulf Experience) and Africa such as: SBG,ABB,ASEC,DSD, and Mohram / Bahkhoum office. Consortium with Dar Al Handasa.
•Preparing the technical proposal , commercial proposal and Project Management for tender of Transportation
- Orange Metro and (ICONIC) Obhur Creek Bridge & Secondary Bridges with Related Ap-proaches & Tunnel & Highways & Service Infrastructure.
- Modernization upper Egypt railways and Central Control Regions Building as sub-contractor to Alstom.
• Master Degree, High Degree Diploma from Cairo University, Consultant Member (84/20), in additional to Contractual and Legal aspects in Contraction form American University Collage (AUC)/ PMP.
•More than (14 years) experience with ABB Co. in energy plants, Transportation and wa-ter/Sewage plants. Delighted to me the position of Civil Engineering Department Manager for 7 years.
•The past strong experience and the managerial skills provide the capability to act the civil work as key successfully package in the project from initiating stage to close out stage including maintenance stage.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
1. C.V.
Ahmed M. H. Raai
(MEP Construction Manager)
MEP CM
Apr. 2014
United Arab Emirates
Last Update: 01/04/2014
AHMED M. RAAI Mobile: +971 551 55 955 37 31
1 of - 6 -
2. C.V.
ahmedraai@yahoo.com
Abu Dhabi, UAE
SUMMARY
Profile: Male, 36 , Married
Nationality: Syria
Current Location: UAE
Current position: MEP Construction Manager / MEP CM
Company: JACOBS International Holdings Inc.
(Reporting to: Operations Director)
Preferred Locations: UAE, All GCC Countries, All Middle East Countries
WORK EXPERIENCE
Dec. 2012 - Present JACOBS International Holdings Inc. Abu Dhabi, UAE
MEP Construction Manager
Jacobs, with 2013 revenues of nearly $12 billion, is one of the world's largest and
most diverse providers of technical, professional, and construction services.
Building strong, long-term relationships with our clients is the key to our success
as a company.
Achievements:
Cleveland Clinic Abu Dhabi:
With $ 1.9 billion is a world-class multispecialty hospital being built on Al
Maryah Island in Abu Dhabi, United Arab Emirates.
The hospital was designed and developed by Abu Dhabi’s Mubadala Healthcare
and leading US-based hospital, Cleveland Clinic, to address a range of complex
and critical care requirements unique to the Abu Dhabi population. Mubadala
Healthcare is helping to address the region’s most pressing healthcare needs
through the creation of specialist healthcare facilities, building regional capability
and stimulating the overall development of the sector.
Client: Mubadala – Abu Dhabi
Consultant: AEDAS / AECOM / KEO
Main Cont: Samsung – SIX Construction
On this project, Cleveland Clinic – Abu Dhabi I held the position of MEP
Construction Manager, My Scope was Managing, supervising the installation,
Testing and Commissioning of all MEP Works in the Patient Tower which
consists of 13 Floors as follows:
• 7 Floors Ordinary Patient Rooms (36 Rooms each)with Medical rooms
• 2 Floors for VIP Patient Rooms (18 Rooms Each)
• 1 Floor for VIP Patient Suites (6 Nos.) with Services.
• 3 Mechanical Floors.
My Responsibilities were:
- Planning, Managing and supervising the installation of 1st and 2nd fix
of all electromechanical activities (which were done on time) by
2 of - 6 -
3. coordinating the services with RLOS drawings and with the site
conditioning in order to have the final product functional, useful, fits for
purpose and accessible for future maintenance above false ceiling, And
by solving all the problems related to that with the designer and the
architect and the installation team without affecting the overall design.
- Managing and supervising FIREM (Final Fix) installations and approvals
by the engineer, this is also done on time as per the planned targets, by
having the final product with the best condition ready to be tested.
- CIR, ICDR Follow up.
- Testing and commissioning for all MEP Services Like (Fire Alarm,
MSFD, Central Battery, Emergency System, Lighting Control System,
Access Control, Nurse Call System, Pneumatic System, Medical Gas
System, Novac System, Fire Fighting System, PAS, CCTV, AVS, DB and
SMDB Life Test, EMCS, Air Proportional Test, Pressurization and
smoke Fans, Air Balancing, Water Balancing, Plumbing System, Drainage
System, PFT and FT for all systems. Assuring that all testing stages and
integrations between related systems with BMS and EMCS is in the best
condition exactly the way it meant to be in the specification and by
witnessing and signing off all the above systems by an third party
specialist. Up to the client expectation and satisfactory.
- Safety is always our first responsibility as we are a part of Beyond Zero
Program and behavior, by attending the safety issues once it happened
and reporting directly by Safety Observation report.
- Arranging daily, weekly and monthly meetings with all parties to monitor
and to make sure that the KPI’s targets were met on time.
- Repotting to the client.
- Safety.
Oct.2007 - Dec.2012 REMCO (Reliance Electro-Mech. Plumbing Contracting Co) Dubai, UAE
MEP Construction Manager
Remco is one of the leading electro-mechanical contracting companies in UAE,
The turnover of REMCO is reaching AED 1.5 billion handling large range of
high quality projects. I had joined REMCO as Senior Mechanical Engineer in and
had promoted to Asst. Project Manager.
Achievements:
1- Global Village Project – Dubai, Grand themed shopping mall with
residential phase
Value: AED 150 Million MEP Contract
Client of the project is Dubai Land (Tatweer Dubai)
Consultant: AECOM/CANSULT Mauncel Limited
Project Managers. TATWEER
2- Ajman Residential Complex , 12 high rise towers (G+5P+36 Floors)
in the gate of Ajman State with total MEP contract value of $ 0.5 billion.
The client is Ajman Ruler Sheikh Hmaid Bin Rashid Al Nuaemi and the
developer is M/s. Aqaar Properties.
Handling the following activities:
• Managing and monitoring the Mechanical Activities with the MEP staff of
3 of - 6 -
4. engineers and supervisors to ensure that all works are executed as per
specification, consultant and client requirement and engineer's requirements
to meet their satisfaction and approval.
• Dealing and managing the project finance like payments, variation, etc.
• Handling the sub-contractors, Labor supply, Third Parties.
• Follow up and manage work team performance and site works, progress,
material delivery, ordering, etc.
• Handling all meetings with the client, consultant and other contractors such
as (Progress Meeting, MEP Meeting, Coordination meeting, Construction
meeting, Safety meeting etc.) and prepare all kind of reports required in the
meetings.
• All Method statements, ITP, Plans, Schedules and check lists required for
the inspections and tests, Third parties
• Quality control and quality assurance (QC/QA) and monitor all
correspondences, Transmittals, Workshop Drawings, etc.., and arrange the
records for that to evaluate and quality and progress comparing with base
line program.
Oct 2004 - Sep. 2007 Bhatia General Cont. Co.
Mechanical Co-ordinator
Bhatia Gen. Cont. is a member of Bhatia Group and an ISO-9000 well reputed
company dealing with construction activities for a lot of clients including Dubai
Municipality.
My Duty was Dealing with the following activities:
• Managing and all MEP works at the construction sites.
• Testing and commissioning and handing over the projects.
• Preparing the handing over documents and O&M Manuals.
Achievements:
Important Projects Executed are:
•B+G+10 Building at Dubai Marina (Consultant: Chawla Engg.)
•2B+G+4P+22 Building at Bur Dubai (Consultant: NEB)
•B+G+16 Building at Dubai Knowledge Village, Dubai (Consultant:
Team Cons.Engg.)
•B+G+14 Building at Al Barsha first, Dubai (Consultant: NEB)
•240 Nos. Villas for DM in Lahbab, Dubai (Consultant: Dar Al Khaleej)
Dec. 2001 - Sep. 2004 Sky Way Gen. Cont. co. Abu Dhabi, UAE
Project Engineer
Sky way is an electro-mechanical company and Dealing with the Mechanical
works (A/C, Fire fighting, Plumping & Drainage), we did a lot of a specific
projects for PWD (Public Works Department) in Abu Dhabi and some other
projects Fujairah and RAK.
Achievements:
• Blood Bank at Abu Dhabi & Al Ain (Consultant: James Cubbit & Partners)
4 of - 6 -
5. • G+6 Residential Building at Abu Dhabi (Consultant: CASSIA)
• 2 Nos. Schools in Fujairah & Ras Al Khaimah (Consultant : TAHEL)
• Al Rowad Model School in Abu Dhabi (Consultant: Al Ajami Engg.)
• G+M+14 Building at Abu Dhabi (Consultant: ECG Consultants)
Sep. 2001- Nov. 2001 Al Omran Transport co. Lattakia, Syria
Technical Engineer
I Worked as a Technical Engineer in the Maintenance department of Lattakia
Branch.
Responsible of inspections at all kinds of the company’s Mechanical equipments
(as AC equipments, Boilers, Heavy Equipment in the Workshop.)
EDUCATION
Oct 1996 - Jul 2001 Damascus/Teshreen Syria
Mechanical Engineering, Bachelor(BSc/BA), GPA 73.6%
Member of the Syrian Syndicate for Engineers
OTHER CERTIFICATES
2007 BA-H2S Safety Aware
Certificate
Venture Gulf Training Center - Qatar
2002 ICDL ILAF Computer Center - Syria
2010 Primavera P-6 Vision Training Institute - UAE
2010 PMP Vision Training Institute - UAE
IT Skills
Windows & Office tools
Windows Expert
Word, Excel, Power Point Advanced
Non-web programming languages
Hourly Anlisis Program (HAP) Advanced
Carrier E20-II Advanced
AutoCAD Advanced
Visual Basic Intermediat
e
• Primavera Program Intermediat
e
5 of - 6 -
6. OTHER QUALIFICATIONS
• AC Design for different types of buildings using Block Load and Carrier
E20-II programs as per ASHREA standards, Extract air system, Fresh Air
System, Ventilation, Duct designing, sizing and selection, Electric Load
Calculation, U Value Calculation and General AC Machines Selections.
• Fire fighting system (wet riser system, dry riser system, sprinkler system)
Installation & commissioning.
• Plumping & Drainage systems, design Knowledge.
LANGUAGES
Arabic Native
English Fluent
Hindi Work Knowledge
* * *
6 of - 6 -
7. OTHER QUALIFICATIONS
• AC Design for different types of buildings using Block Load and Carrier
E20-II programs as per ASHREA standards, Extract air system, Fresh Air
System, Ventilation, Duct designing, sizing and selection, Electric Load
Calculation, U Value Calculation and General AC Machines Selections.
• Fire fighting system (wet riser system, dry riser system, sprinkler system)
Installation & commissioning.
• Plumping & Drainage systems, design Knowledge.
LANGUAGES
Arabic Native
English Fluent
Hindi Work Knowledge
* * *
6 of - 6 -