SlideShare a Scribd company logo
1 of 6
Curriculum Vitae
Srikanth Kulkarni
Mobile No:+91 99896 47255
Email:srikanthkulkarni@live.com
Career Objective:
To seek a responsible position in a progressive organization which provides me an opportunity
for growth.
Academics:
Qualification Institution Month &Year
of Completion
Percentage
B.Tech
(Electrical and
Electronics)
Anwarul-uloom college of
Engineering & Technology,
Vikarabad, Ranga Reddy District.
Affiliated to JNTU.
June 2009 57.48
Intermediate Sri Krishnaveni Junior College,
Hyderabad.
March 2003 62.24
SSC Sri Krishnaveni Talent School,
Hyderabad
March 2001 74.00
Skill Set:
Languages/GUI Windows Vista/Xp, MS Office.
Experience:
 Working for Indian Register of Shipping, Hyderabad, as an Inspection Electrical
Engineer from March 2008 to till date.
Corporate Profile:
Indian Register of Shipping was founded in 1975 to act as a catalyst of self-regulation
by Indian Shipping industry and to serve as a forum for Research & Development. It is
collectively managed by those whose interests it serves. It is impartial and independent in the
execution of any commercial contract and maintains high standards of technical & moral
integrity.
IRS is a public limited company (under section 25 of the Indian Companies Act 1956)
having no shareholders and profit is not its motive.
For further information please visit: www.irclass.org
Page 1 of 5
Projects: (From march 2008 to September 2013)
Name of the Project : Rajeev Bhima Lift Irrigation Scheme Project,
Lift II, (Stage I & II) Package no.36,
Quality control / Quality assurance department,
Kothakota, Mahbubnagar District, A.P.
Project details : To lift 1100 cusec of water (lift ht: 52mts) in 2 stages
by 3 sets of 12MW capacity motors & pumps in stage 1
and 3 sets of 4MW capacity motors & pumps in stage 2,
with all their required accessories.
Roles & Responsibilities:
 Receipt inspection / Pre-dispatch inspection of electrical equipment.
 Involved in the erection, testing & commissioning works of 132kV double circuit
transmission lines LILO and switch yard.
 Involved in the erection, testing & commissioning works of 20/25MVA & 15/20MVA
transformers.
 Involved in erection and testing of various HT & LT panels, dry type transformers,
synchronous motors soft starters (FCMA, SFC) and battery chargers.
 Ensuring that all the Electrical site works are being carried out as per the approved
construction drawings and scope of work.
 Coordinating with Civil & Mechanical teams to ensure that there shall not be any
mismatch during erection of equipments.
 Checking, Verifying and confirming the Quality requirements of the above.
 Coordinating and Follow up with EPC Agency for corrective & preventive actions of
Non-Conformities.
 Preparation of checklists for various activities being carried out at site.
 Preparation of the Daily progress/inspection report for the work executed at site and
informing the same to the concerned department officials of Government.
 Preparing the Monthly reports of all the Electro-Mechanical activities during the month
and submitting it to the concerned Government departments.
From December 2013 to March 2015
Name of the Project : MANGALA PROCESSING TERMINAL,
CAIRN INDIA Nagana Village,
Quality control / Quality assurance department,
BARMER District, Rajasthan.
Project details : All QA/QC site inspections in the MPT well pads, Bhagyam,
CPF, MPT, NI2, Aishwarya etc.
Roles & Responsibilities:
Page 2 of 5
 Inspection and RFI verification of Installation of Transformer system , HT /LT-Panel ,
Bus duct , Instrumentation panels & JBs, transmitters , cable laying with termination,
cable tray , valve installation , skid inspection, EHT system for heat tracing .
 220KV GIS substation installation for the terminal and associate well pads.
 33 KV – Over Head transmission line (10 Km) with Auto Re-closer system.
 33kV RMU, VCB with LBS, VCB Alone panel with auto Re-closer & 33KV
underground cable laying.
 33 KV operating E-House with All HT / LT/ HVAC/ ICS/Solar system & Telecom
System installation.
 33KV Triple Pole / 4-Pole / DP/ Cable take Off Pole/Sectionalize Pole Structure
 33 KV Bay Extension tie-up from 220 KV Substation.
 Transformers installation 2MVA/315 KVA/6.6KV // 0.433 KV, 11 KV /0.433KV
 Inspection and RFI verification of all the activities of E & I at Central Polymer Facilities
(CPF) site.
 Record and issue the punch points to the contractor for the rectification before the
commissioning activity.
 Inspection of the E & I equipments received in the ware house for their rediness to be used
at site.
 Installation of ESD , PCS panel , Instrument JB , Transmitters – PIT/PSIT/ FIT/
TIT/TE, Installation of Valves as per Drg,
 Installation Tubing of PIT/PSIT/ FIT/ TIT/TE, Installation of Valves as per hook up
drg.
 Loop checking of Instrument cable in between Control room to Transmitters with
intermediate JB.
 Leak test & hydro test of Tubing as per specification.
 Inspection of cable trays, conduit, instrument marshalling cabinets, LCP, Distribution
Box etc.
 Inspection of UG / above Ground Cable laying for verification of RFI.
 Cable Tray routing as per drawing and site condition.
 All the activities inspected reporting on the daily basis to the QC manager.
From June 2015 to September 2015
Project : Wind Mill Power Project of Renew Power,
JOGIHALLI site,
Quality control / Quality assurance department,
Karnataka.
Project details : All QA/QC site inspections of internal and external
33KV lines, panels, tower installations, Machine
Installations, material receipt etc.
Current status: (At Hyderabad office)
Page 3 of 5
• At Hyderabad office attending the factory inspection of the electrical items for the
dispatch clearance like Cables, Transformers, battery banks, panel boards etc.
• Inspection of erection of the Solar Modules at the sites.
• Attending the inspection of installation of the canopies structures for the HPCL retail
outlets and installation of Retail visual identity (RVI) for the canopies.
• Attending the inspection for the BDL projects for the electrical and electronic
components of the rocket motors at various vendors.
Strengths:
1) I can mould myself according to the type of working environment.
2) I am patient, honest, disciplined, regular & punctual.
3) Ability to work with a team effectively and building team spirit.
Hobbies:
1) Playing Games (Shuttle, cricket, caroms).
2) Watching TV (News, Movies & Sports).
Personal Details:
Full Name : Srikanth Kulkarni
Date of Birth : 05/10/1985
Sex : Male
Father’s Name : Sripad Kulkarni
Marital Status : Married
Nationality : Indian
Languages known : Marathi, Hindi, English & Telugu.
Address : H.No : 11-5-520, Street # 16,
Venkateswara colony, Saroornagar,
Hyderabad- 500 035.
DECLARATION:
I here by declare that the above information is true to the best of my knowledge & belief.
Date:
Place: Hyderabad
Yours Sincerely,
Page 4 of 5
(Srikanth Kulkarni)
Page 5 of 5
(Srikanth Kulkarni)
Page 5 of 5

More Related Content

What's hot

RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nicolae Vasiliu
 
SANKET SATKAR4444444444
SANKET SATKAR4444444444SANKET SATKAR4444444444
SANKET SATKAR4444444444SANKET SATKAR
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionvineeth ravi
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))MOHAMMAD KHALID MUSTAFA
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copyarmando doria
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...sudhakar k
 
ALS BIO_DATA_Est_Des_qa final
ALS BIO_DATA_Est_Des_qa finalALS BIO_DATA_Est_Des_qa final
ALS BIO_DATA_Est_Des_qa finalAlpesh Shah
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 

What's hot (20)

Resume_Antony new
Resume_Antony newResume_Antony new
Resume_Antony new
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
 
Corgebelo CURRICULUM VITAE
Corgebelo CURRICULUM VITAECorgebelo CURRICULUM VITAE
Corgebelo CURRICULUM VITAE
 
SANKET SATKAR4444444444
SANKET SATKAR4444444444SANKET SATKAR4444444444
SANKET SATKAR4444444444
 
Electrical site Engineer
Electrical site EngineerElectrical site Engineer
Electrical site Engineer
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Naresh Resume
Naresh ResumeNaresh Resume
Naresh Resume
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))ELECHTRICAL  TECHNICIAN RESUME  (((((2016)))))
ELECHTRICAL TECHNICIAN RESUME (((((2016)))))
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
 
ALS BIO_DATA_Est_Des_qa final
ALS BIO_DATA_Est_Des_qa finalALS BIO_DATA_Est_Des_qa final
ALS BIO_DATA_Est_Des_qa final
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 

Viewers also liked

Viewers also liked (11)

Hero Locksmith
Hero Locksmith Hero Locksmith
Hero Locksmith
 
Estudiante
EstudianteEstudiante
Estudiante
 
Resume of Shahzad alam Final
Resume of Shahzad alam FinalResume of Shahzad alam Final
Resume of Shahzad alam Final
 
Enfermeria
EnfermeriaEnfermeria
Enfermeria
 
Experience Africa safaris
Experience Africa safarisExperience Africa safaris
Experience Africa safaris
 
Dendral
DendralDendral
Dendral
 
Open Day August 2016
Open Day August 2016Open Day August 2016
Open Day August 2016
 
Elevated Consultancy & Training - Brand Story - Pursuing Greater Heights
Elevated Consultancy & Training - Brand Story - Pursuing Greater HeightsElevated Consultancy & Training - Brand Story - Pursuing Greater Heights
Elevated Consultancy & Training - Brand Story - Pursuing Greater Heights
 
Data recovery
Data recoveryData recovery
Data recovery
 
Educational Reforms Of INDIA ppt
Educational  Reforms  Of INDIA pptEducational  Reforms  Of INDIA ppt
Educational Reforms Of INDIA ppt
 
Geologia
GeologiaGeologia
Geologia
 

Similar to Srikanth Kulkarni CV

Similar to Srikanth Kulkarni CV (20)

ilyas-MEP CV
ilyas-MEP CVilyas-MEP CV
ilyas-MEP CV
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
M Imran
M ImranM Imran
M Imran
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Muhammad talha cv
Muhammad talha cvMuhammad talha cv
Muhammad talha cv
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 
Loganathan Resume
Loganathan ResumeLoganathan Resume
Loganathan Resume
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
ankur01
ankur01ankur01
ankur01
 
New Resume JPSD
New Resume JPSDNew Resume JPSD
New Resume JPSD
 
RESUME Kashyap
RESUME KashyapRESUME Kashyap
RESUME Kashyap
 
Tanaji Update new
Tanaji Update newTanaji Update new
Tanaji Update new
 
ilyas_MEP new
ilyas_MEP newilyas_MEP new
ilyas_MEP new
 
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
 

Srikanth Kulkarni CV

  • 1. Curriculum Vitae Srikanth Kulkarni Mobile No:+91 99896 47255 Email:srikanthkulkarni@live.com Career Objective: To seek a responsible position in a progressive organization which provides me an opportunity for growth. Academics: Qualification Institution Month &Year of Completion Percentage B.Tech (Electrical and Electronics) Anwarul-uloom college of Engineering & Technology, Vikarabad, Ranga Reddy District. Affiliated to JNTU. June 2009 57.48 Intermediate Sri Krishnaveni Junior College, Hyderabad. March 2003 62.24 SSC Sri Krishnaveni Talent School, Hyderabad March 2001 74.00 Skill Set: Languages/GUI Windows Vista/Xp, MS Office. Experience:  Working for Indian Register of Shipping, Hyderabad, as an Inspection Electrical Engineer from March 2008 to till date. Corporate Profile: Indian Register of Shipping was founded in 1975 to act as a catalyst of self-regulation by Indian Shipping industry and to serve as a forum for Research & Development. It is collectively managed by those whose interests it serves. It is impartial and independent in the execution of any commercial contract and maintains high standards of technical & moral integrity. IRS is a public limited company (under section 25 of the Indian Companies Act 1956) having no shareholders and profit is not its motive. For further information please visit: www.irclass.org Page 1 of 5
  • 2. Projects: (From march 2008 to September 2013) Name of the Project : Rajeev Bhima Lift Irrigation Scheme Project, Lift II, (Stage I & II) Package no.36, Quality control / Quality assurance department, Kothakota, Mahbubnagar District, A.P. Project details : To lift 1100 cusec of water (lift ht: 52mts) in 2 stages by 3 sets of 12MW capacity motors & pumps in stage 1 and 3 sets of 4MW capacity motors & pumps in stage 2, with all their required accessories. Roles & Responsibilities:  Receipt inspection / Pre-dispatch inspection of electrical equipment.  Involved in the erection, testing & commissioning works of 132kV double circuit transmission lines LILO and switch yard.  Involved in the erection, testing & commissioning works of 20/25MVA & 15/20MVA transformers.  Involved in erection and testing of various HT & LT panels, dry type transformers, synchronous motors soft starters (FCMA, SFC) and battery chargers.  Ensuring that all the Electrical site works are being carried out as per the approved construction drawings and scope of work.  Coordinating with Civil & Mechanical teams to ensure that there shall not be any mismatch during erection of equipments.  Checking, Verifying and confirming the Quality requirements of the above.  Coordinating and Follow up with EPC Agency for corrective & preventive actions of Non-Conformities.  Preparation of checklists for various activities being carried out at site.  Preparation of the Daily progress/inspection report for the work executed at site and informing the same to the concerned department officials of Government.  Preparing the Monthly reports of all the Electro-Mechanical activities during the month and submitting it to the concerned Government departments. From December 2013 to March 2015 Name of the Project : MANGALA PROCESSING TERMINAL, CAIRN INDIA Nagana Village, Quality control / Quality assurance department, BARMER District, Rajasthan. Project details : All QA/QC site inspections in the MPT well pads, Bhagyam, CPF, MPT, NI2, Aishwarya etc. Roles & Responsibilities: Page 2 of 5
  • 3.  Inspection and RFI verification of Installation of Transformer system , HT /LT-Panel , Bus duct , Instrumentation panels & JBs, transmitters , cable laying with termination, cable tray , valve installation , skid inspection, EHT system for heat tracing .  220KV GIS substation installation for the terminal and associate well pads.  33 KV – Over Head transmission line (10 Km) with Auto Re-closer system.  33kV RMU, VCB with LBS, VCB Alone panel with auto Re-closer & 33KV underground cable laying.  33 KV operating E-House with All HT / LT/ HVAC/ ICS/Solar system & Telecom System installation.  33KV Triple Pole / 4-Pole / DP/ Cable take Off Pole/Sectionalize Pole Structure  33 KV Bay Extension tie-up from 220 KV Substation.  Transformers installation 2MVA/315 KVA/6.6KV // 0.433 KV, 11 KV /0.433KV  Inspection and RFI verification of all the activities of E & I at Central Polymer Facilities (CPF) site.  Record and issue the punch points to the contractor for the rectification before the commissioning activity.  Inspection of the E & I equipments received in the ware house for their rediness to be used at site.  Installation of ESD , PCS panel , Instrument JB , Transmitters – PIT/PSIT/ FIT/ TIT/TE, Installation of Valves as per Drg,  Installation Tubing of PIT/PSIT/ FIT/ TIT/TE, Installation of Valves as per hook up drg.  Loop checking of Instrument cable in between Control room to Transmitters with intermediate JB.  Leak test & hydro test of Tubing as per specification.  Inspection of cable trays, conduit, instrument marshalling cabinets, LCP, Distribution Box etc.  Inspection of UG / above Ground Cable laying for verification of RFI.  Cable Tray routing as per drawing and site condition.  All the activities inspected reporting on the daily basis to the QC manager. From June 2015 to September 2015 Project : Wind Mill Power Project of Renew Power, JOGIHALLI site, Quality control / Quality assurance department, Karnataka. Project details : All QA/QC site inspections of internal and external 33KV lines, panels, tower installations, Machine Installations, material receipt etc. Current status: (At Hyderabad office) Page 3 of 5
  • 4. • At Hyderabad office attending the factory inspection of the electrical items for the dispatch clearance like Cables, Transformers, battery banks, panel boards etc. • Inspection of erection of the Solar Modules at the sites. • Attending the inspection of installation of the canopies structures for the HPCL retail outlets and installation of Retail visual identity (RVI) for the canopies. • Attending the inspection for the BDL projects for the electrical and electronic components of the rocket motors at various vendors. Strengths: 1) I can mould myself according to the type of working environment. 2) I am patient, honest, disciplined, regular & punctual. 3) Ability to work with a team effectively and building team spirit. Hobbies: 1) Playing Games (Shuttle, cricket, caroms). 2) Watching TV (News, Movies & Sports). Personal Details: Full Name : Srikanth Kulkarni Date of Birth : 05/10/1985 Sex : Male Father’s Name : Sripad Kulkarni Marital Status : Married Nationality : Indian Languages known : Marathi, Hindi, English & Telugu. Address : H.No : 11-5-520, Street # 16, Venkateswara colony, Saroornagar, Hyderabad- 500 035. DECLARATION: I here by declare that the above information is true to the best of my knowledge & belief. Date: Place: Hyderabad Yours Sincerely, Page 4 of 5