SlideShare a Scribd company logo
1 of 6
Curriculum vitea:-
Educational Qualifications:-
Computer Skills
 Microsoft office
 Autocad 2007,Autocad 2012,AUTOCAD 2015
 Visual basics
 Photoshop
 Sketch up
 Internet Browsing
PROFESSION AL SYNOPSIS:
Personal Profile
Name: Abdulkhadar.m.g
Nationality: indian
DOB & Age: 17-7-85 & 31
Highest Educational Qualification: Diploma E&E
Total Years of experience 7 years
Present Salary 4500 SR
Expected Salary 5500 SR
Current designation ASSISTANT ELECTRICAL ENGINEER
Previous employer SBC (Riyadh Saudi arabia)
Gulf experience 5 YEAR 6 Month
EMAIL - ID aknk1703@gmail.com
QUALIFICATION BOARD/UNIVERSITY YEAR PERCENTAGE
DIPLOMA E&E A.E.I.P
COLLEGE/BANGALORE
2007 60.13%
S.S.L.C S.A.P.U COLLEGE
ANNIGERI
2000 68.48%
 7 Years of Experience as 4 years in Building construction projects as electrical supervisor
with electrical draftsman and as 1 years 7 month worked as an Assistant Electrical Engineer in
Malatek tower and 380/115/13.8kv substation in Dammam and 1and Half year worked in
india.
o TOTAL WORK EXPERIENCE (7 YEARS):
From Dec 2015 – Till date
Working as a Assistant Electrical Engineer in Me’d Asim Me’d Bashir Est.in Dammam
Projects Handled:
 RAWABI Holding in Kobar Ksa
 Construction of 380/115/13.8kv BSP II New Dharhan South Substation in Dammam
 Construction of 115/13.8kv Dharhan Home Ownership Substation in Dammam Ksa
NATURE OF WORK:
Duties & Responsibilities:
I was responsible for supervising the electricians to handle all the electrical works at site
considering the safety and quality requirement.
I was responsible for studying the electrical plans and implement it at the site and
sometimes do necessary actions whether to correct or to improve the design.
Coordination with other electrical engineers in the implementation of the electrical
system design and also with other engineers of different fields, such as civil and
mechanical engineers, to make the construction job easier.
Preparing and assigning the resources such as manpower, materials, consumables,
equipment, tools, etc, required for all electrical and related works prior to execution.
Coordination with Client / Consultant’s representatives for any site instructions and
inspection of works.
Preparing site daily reports, inspection requests,and all applicable monitoring reports on
regular basis or as required.
Work Details during Execution:-
 Installations of all electrical works were carried out as per approved shop drawings
ensuring compliance with safety requirements and as per standards.
 Coordinate with Mechanical, civil, Architect Engineers, Discuss technical aspects of
electrical system with Contractor towards successful completion of project.
 Installation and Termination of Electrical items(Internal + External) - Internal & External
Decorative light fixtures, Illumination and dimming systems, Power receptacles, Cable
Routing, Earthing, cable trays and cable ladder for tunnel, Panel Board and Belden cable
pulling for Building Management System, ,Telephone And data outlets, Lightning Protection
System, MDB, SMDB, ILP,ELP,LPOD, ATS panels etc..)
 Calculate the Electrical load calculation, Breaker selection, cable sizing calculation, voltage
drop calculation,
 Preparing BOQ’s and ordering the required materials.
 Preparing Shop drawing and As built Drawing.
 Specialties: Site Engineering, Supervision, Construction and Maintenance,Testing and
Commissioning.
From Oct 2014 to Dec 2015
Worked as a MEP ASSISTANT Electrical Engineer in Me’d Asim Me’d Bashir Est.For
contracting Electrical & Mechanical Works Riyadh Ksa.
Nature of Work :
MALATHEK1 TOWERS King Fahd Street.
Project contains two towers residential (18 floors) & office tower (29 floors).
Prepare shop drawing forlow current ,fire, security & low voltage systems
 Prepare panel schedule,
 Prepare Voltage drop calculation and Prepare Single line diagram
 Prepare cable tray size calculation
 Prepare calculation for weight of cable passing through cable tray
 BOQ for new projects
 Nature of Work :
Darat al-hada project
Project contains 38 villa’s each villa having 3 floors
 Prepare shop drawing for low current ,fire, security& low voltage systems and SLD
 Co-ordinate with the other mechanical system for desired electrical load of machine
like(chiller,pumps,AHU,package units to prapare Panel schdule )
 Prepare panel schedule, voltage drop calculation.
 Make order for material for project.
 Prepare BOQ for new projects
 Preparation of shop drawing for water supply ,modifying of drainage shop drawing
as per consultant comments
 From Jan 2014 to Aug 2014
Worked as a site supervisor in class -1 electrical contractor in gadag karnataka
Working Period :Jan 2014 to AUG 2014
Nature of Work:
 Installation of LDP & PDP Panels with termination.
 Installing 1-phase,3-phase kwh meter.
 Cable pulling for feeders, distribution & main panels.
 Installation of garden lighting fixtures.
 Installation of earthing system.
 Installation and termination of single phase &three phase motor etc
 From July 2009 to july 2013
Worked as a electrical supervisor in Saudi build company,Riyadh Kingdom of Saudi
Arabia
Nature of Work:
 Site Work Management
 Preparing of bill of quantity
 Controlling man power management
 Co-Ordinate With Contractors
 Producing timely results in day to day site work
 Preparation of shop drawing, as built drawing and implementation of projects like
residential building, commercial building mosque and villa’s
 Installation of HV,LV Switchgear motor control centers, bus ducts, cable
tray,Distribution boards, power and Lighting Panels, MDB Panels, Fire alarm
system,CCTV system, Telephone system, intercom system ,Data system, Public
address system and other electrical works.
Maintenance experiences:
Worked as a Technician in JONSON CONTROL PVT LTD,Bangalore
Work period :march 1-03-2009 to 30-05-2009 (3 month)
Nature of Work:
 TO Maintened DG sets ,UPS LT Panels ,Batteries and checking the daily work
schedule of 1010KVA,750KVA and 500KVA DG Sets and also UPS.
 Hourly taking reading of LT Panels,UPS Panels,Package Unit and Split Unit
Maintenance experiences:
Worked as a Supervisor in Akash Enterprises Class-I Electrical contractor,Bangalore
Work period –JUNE 1-06-2008 to 30-11-2008 (6 month)
Nature of Work:
 Totally worked in HT/LT Installation like 11kv Distribution Line .
 Producing timely results in day to day site work
 Controlling man power management
 Troubleshoot for electrical equipment like motor,air compressor,lighting fixture
and energy meter.
Maintenance experiences:
Worked as a Technician in Telecom association ,Bangalore
Work period –jan 1-01-2008 to 30-03-2008 (3 month)
Nature of Work:
 TO Maintened DG sets ,UPS LT Panels ,Batteries and checking the daily work
schedule of 1010KVA,750KVA.500KVA DG Sets and also UPS.
 Hourly taking reading of LT Panels,UPS Panels,Package Unit and Split Unit
Mentality skills,
 Ability to work successfully in any company.
 Ability to learn and apply continues improvement techniques communication and
team work skill (ability to work effectively with others throughout any
organization )
 Ability to solve any problem without despair.
 I have interest in my duty during working hours.
 I have a desire to work with distinct engineers have high experiences.
 I like to work by my hand in any engineering field.
 I like maintenance of power plants, substations and transmission lines.
 I like studding electrical load flow and calculation the capacities for power
stations, load transformers, distribution transformers and transmission lines.
Bodily skills,
I like and prefer an athletics following:
 Cricket, Chess board,Tennis,Kabaddi.
Languages:
 KANNADA-Read,write and speak
 ENGLISH-Read,write and speak
 HINDI-Read,write and speak
 ARABIC-Read,write
PersonalDetails:
 Father Name:Mohammada ali
 Mother Name:Noorjaha
 My Name:Abdulkhadar
 Gender:Male
 Marital status:married
 Nationality: India
 Passport no:H3029883
 Date of issue:20-03-2009
 Place of issue:Bangalore
 Notice of period:1 Month
 Phone no:+966572381854 or +919742727919
Declaration
I here by acknowledge that all the information given above is true to
the best of knowledge and belief.if give opportunity,I will give my full effort to
achieve the objective of the organization.
Date: Signature
ABDULKHADAR.M.G

More Related Content

What's hot

CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed SabekEmad Ahmed Mohamed Sabek
 
Cv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaCv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaahmadalsaqqa1
 
CV-Electrical Engineer (1)
CV-Electrical Engineer (1)CV-Electrical Engineer (1)
CV-Electrical Engineer (1)Mohamed Fadol
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathiFathi Alsunni
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Electrical engineer cv.
Electrical engineer cv.Electrical engineer cv.
Electrical engineer cv.Aqib Bin aqeel
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultzKenneth Michael Shultz
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV NewShujaat Jan
 
Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohamed ibrahim
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...sudhakar k
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015RAHUL P
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
cv electrical engineer
cv electrical engineercv electrical engineer
cv electrical engineerfadel shihab
 

What's hot (20)

CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
 
Cv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaCv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqa
 
CV-Electrical Engineer (1)
CV-Electrical Engineer (1)CV-Electrical Engineer (1)
CV-Electrical Engineer (1)
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathi
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
Electrical engineer cv.
Electrical engineer cv.Electrical engineer cv.
Electrical engineer cv.
 
C.V -updated
C.V -updatedC.V -updated
C.V -updated
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
CV
CVCV
CV
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultz
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV New
 
Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)Mohammed Ibrahim CV ( Electrical Engineer)
Mohammed Ibrahim CV ( Electrical Engineer)
 
Anbu cv
Anbu cvAnbu cv
Anbu cv
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
cv electrical engineer
cv electrical engineercv electrical engineer
cv electrical engineer
 

Viewers also liked

500kva Uk Perkins generator sets With Leroy Somer Data Sheet
500kva Uk Perkins generator sets With Leroy Somer Data Sheet500kva Uk Perkins generator sets With Leroy Somer Data Sheet
500kva Uk Perkins generator sets With Leroy Somer Data SheetSUNSHINE MACHINERY
 
Rajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CVRajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CVRajesh kannan
 
Docfoc.com bgas question and answer
Docfoc.com bgas question and answerDocfoc.com bgas question and answer
Docfoc.com bgas question and answerrajesh vj
 
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)sarmad Azeem
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 

Viewers also liked (8)

500kva Uk Perkins generator sets With Leroy Somer Data Sheet
500kva Uk Perkins generator sets With Leroy Somer Data Sheet500kva Uk Perkins generator sets With Leroy Somer Data Sheet
500kva Uk Perkins generator sets With Leroy Somer Data Sheet
 
Resume/CV
Resume/CVResume/CV
Resume/CV
 
My Resume (1) (3)
My Resume (1) (3)My Resume (1) (3)
My Resume (1) (3)
 
Rajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CVRajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CV
 
Docfoc.com bgas question and answer
Docfoc.com bgas question and answerDocfoc.com bgas question and answer
Docfoc.com bgas question and answer
 
Riyaz cv 2015 -2.DOC
Riyaz   cv 2015 -2.DOCRiyaz   cv 2015 -2.DOC
Riyaz cv 2015 -2.DOC
 
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
Sarmad Azeem Cheema - BGAS Gr 2 Coating Inspector (1)
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 

Similar to CV Electrical Engineer 40+ Experience

Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical enggSEIKH RABANI
 
Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)khaja Ahammad
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
MRIDUL_RESUME_ELECTRICAL ENGINEER.
MRIDUL_RESUME_ELECTRICAL ENGINEER.MRIDUL_RESUME_ELECTRICAL ENGINEER.
MRIDUL_RESUME_ELECTRICAL ENGINEER.MRIDUL K
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh newkaptan singh
 

Similar to CV Electrical Engineer 40+ Experience (20)

Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 
Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
 
MujibCV
MujibCVMujibCV
MujibCV
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Mehtab Niazi CV
Mehtab Niazi CVMehtab Niazi CV
Mehtab Niazi CV
 
Resume
Resume Resume
Resume
 
project engineer
project engineerproject engineer
project engineer
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
MRIDUL_RESUME_ELECTRICAL ENGINEER.
MRIDUL_RESUME_ELECTRICAL ENGINEER.MRIDUL_RESUME_ELECTRICAL ENGINEER.
MRIDUL_RESUME_ELECTRICAL ENGINEER.
 
Resume
ResumeResume
Resume
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
junaid cv
junaid cvjunaid cv
junaid cv
 
Resume of Kaptan Singh new
Resume of Kaptan Singh newResume of Kaptan Singh new
Resume of Kaptan Singh new
 

CV Electrical Engineer 40+ Experience

  • 1. Curriculum vitea:- Educational Qualifications:- Computer Skills  Microsoft office  Autocad 2007,Autocad 2012,AUTOCAD 2015  Visual basics  Photoshop  Sketch up  Internet Browsing PROFESSION AL SYNOPSIS: Personal Profile Name: Abdulkhadar.m.g Nationality: indian DOB & Age: 17-7-85 & 31 Highest Educational Qualification: Diploma E&E Total Years of experience 7 years Present Salary 4500 SR Expected Salary 5500 SR Current designation ASSISTANT ELECTRICAL ENGINEER Previous employer SBC (Riyadh Saudi arabia) Gulf experience 5 YEAR 6 Month EMAIL - ID aknk1703@gmail.com QUALIFICATION BOARD/UNIVERSITY YEAR PERCENTAGE DIPLOMA E&E A.E.I.P COLLEGE/BANGALORE 2007 60.13% S.S.L.C S.A.P.U COLLEGE ANNIGERI 2000 68.48%
  • 2.  7 Years of Experience as 4 years in Building construction projects as electrical supervisor with electrical draftsman and as 1 years 7 month worked as an Assistant Electrical Engineer in Malatek tower and 380/115/13.8kv substation in Dammam and 1and Half year worked in india. o TOTAL WORK EXPERIENCE (7 YEARS): From Dec 2015 – Till date Working as a Assistant Electrical Engineer in Me’d Asim Me’d Bashir Est.in Dammam Projects Handled:  RAWABI Holding in Kobar Ksa  Construction of 380/115/13.8kv BSP II New Dharhan South Substation in Dammam  Construction of 115/13.8kv Dharhan Home Ownership Substation in Dammam Ksa NATURE OF WORK: Duties & Responsibilities: I was responsible for supervising the electricians to handle all the electrical works at site considering the safety and quality requirement. I was responsible for studying the electrical plans and implement it at the site and sometimes do necessary actions whether to correct or to improve the design. Coordination with other electrical engineers in the implementation of the electrical system design and also with other engineers of different fields, such as civil and mechanical engineers, to make the construction job easier. Preparing and assigning the resources such as manpower, materials, consumables, equipment, tools, etc, required for all electrical and related works prior to execution. Coordination with Client / Consultant’s representatives for any site instructions and inspection of works. Preparing site daily reports, inspection requests,and all applicable monitoring reports on regular basis or as required. Work Details during Execution:-  Installations of all electrical works were carried out as per approved shop drawings ensuring compliance with safety requirements and as per standards.  Coordinate with Mechanical, civil, Architect Engineers, Discuss technical aspects of electrical system with Contractor towards successful completion of project.  Installation and Termination of Electrical items(Internal + External) - Internal & External Decorative light fixtures, Illumination and dimming systems, Power receptacles, Cable
  • 3. Routing, Earthing, cable trays and cable ladder for tunnel, Panel Board and Belden cable pulling for Building Management System, ,Telephone And data outlets, Lightning Protection System, MDB, SMDB, ILP,ELP,LPOD, ATS panels etc..)  Calculate the Electrical load calculation, Breaker selection, cable sizing calculation, voltage drop calculation,  Preparing BOQ’s and ordering the required materials.  Preparing Shop drawing and As built Drawing.  Specialties: Site Engineering, Supervision, Construction and Maintenance,Testing and Commissioning. From Oct 2014 to Dec 2015 Worked as a MEP ASSISTANT Electrical Engineer in Me’d Asim Me’d Bashir Est.For contracting Electrical & Mechanical Works Riyadh Ksa. Nature of Work : MALATHEK1 TOWERS King Fahd Street. Project contains two towers residential (18 floors) & office tower (29 floors). Prepare shop drawing forlow current ,fire, security & low voltage systems  Prepare panel schedule,  Prepare Voltage drop calculation and Prepare Single line diagram  Prepare cable tray size calculation  Prepare calculation for weight of cable passing through cable tray  BOQ for new projects  Nature of Work : Darat al-hada project Project contains 38 villa’s each villa having 3 floors  Prepare shop drawing for low current ,fire, security& low voltage systems and SLD  Co-ordinate with the other mechanical system for desired electrical load of machine like(chiller,pumps,AHU,package units to prapare Panel schdule )  Prepare panel schedule, voltage drop calculation.  Make order for material for project.  Prepare BOQ for new projects  Preparation of shop drawing for water supply ,modifying of drainage shop drawing as per consultant comments
  • 4.  From Jan 2014 to Aug 2014 Worked as a site supervisor in class -1 electrical contractor in gadag karnataka Working Period :Jan 2014 to AUG 2014 Nature of Work:  Installation of LDP & PDP Panels with termination.  Installing 1-phase,3-phase kwh meter.  Cable pulling for feeders, distribution & main panels.  Installation of garden lighting fixtures.  Installation of earthing system.  Installation and termination of single phase &three phase motor etc  From July 2009 to july 2013 Worked as a electrical supervisor in Saudi build company,Riyadh Kingdom of Saudi Arabia Nature of Work:  Site Work Management  Preparing of bill of quantity  Controlling man power management  Co-Ordinate With Contractors  Producing timely results in day to day site work  Preparation of shop drawing, as built drawing and implementation of projects like residential building, commercial building mosque and villa’s  Installation of HV,LV Switchgear motor control centers, bus ducts, cable tray,Distribution boards, power and Lighting Panels, MDB Panels, Fire alarm system,CCTV system, Telephone system, intercom system ,Data system, Public address system and other electrical works. Maintenance experiences: Worked as a Technician in JONSON CONTROL PVT LTD,Bangalore
  • 5. Work period :march 1-03-2009 to 30-05-2009 (3 month) Nature of Work:  TO Maintened DG sets ,UPS LT Panels ,Batteries and checking the daily work schedule of 1010KVA,750KVA and 500KVA DG Sets and also UPS.  Hourly taking reading of LT Panels,UPS Panels,Package Unit and Split Unit Maintenance experiences: Worked as a Supervisor in Akash Enterprises Class-I Electrical contractor,Bangalore Work period –JUNE 1-06-2008 to 30-11-2008 (6 month) Nature of Work:  Totally worked in HT/LT Installation like 11kv Distribution Line .  Producing timely results in day to day site work  Controlling man power management  Troubleshoot for electrical equipment like motor,air compressor,lighting fixture and energy meter. Maintenance experiences: Worked as a Technician in Telecom association ,Bangalore Work period –jan 1-01-2008 to 30-03-2008 (3 month) Nature of Work:  TO Maintened DG sets ,UPS LT Panels ,Batteries and checking the daily work schedule of 1010KVA,750KVA.500KVA DG Sets and also UPS.  Hourly taking reading of LT Panels,UPS Panels,Package Unit and Split Unit Mentality skills,  Ability to work successfully in any company.  Ability to learn and apply continues improvement techniques communication and team work skill (ability to work effectively with others throughout any organization )  Ability to solve any problem without despair.
  • 6.  I have interest in my duty during working hours.  I have a desire to work with distinct engineers have high experiences.  I like to work by my hand in any engineering field.  I like maintenance of power plants, substations and transmission lines.  I like studding electrical load flow and calculation the capacities for power stations, load transformers, distribution transformers and transmission lines. Bodily skills, I like and prefer an athletics following:  Cricket, Chess board,Tennis,Kabaddi. Languages:  KANNADA-Read,write and speak  ENGLISH-Read,write and speak  HINDI-Read,write and speak  ARABIC-Read,write PersonalDetails:  Father Name:Mohammada ali  Mother Name:Noorjaha  My Name:Abdulkhadar  Gender:Male  Marital status:married  Nationality: India  Passport no:H3029883  Date of issue:20-03-2009  Place of issue:Bangalore  Notice of period:1 Month  Phone no:+966572381854 or +919742727919 Declaration I here by acknowledge that all the information given above is true to the best of knowledge and belief.if give opportunity,I will give my full effort to achieve the objective of the organization. Date: Signature ABDULKHADAR.M.G