SlideShare a Scribd company logo
1 of 2
Download to read offline
WWW.LABORSAVERS.US PREFAB@LABORSAVERS.US MAIN: 602.429.3061
Clients turn to prefab for innovative
ways to build the job. In the process they
cut time off their schedule, reduce the
amount of workers on site, receive higher
quality product and increase safety.
PREFAB / PRE-ASSEMBLY / CUSTOM SOLUTIONS
CUT LABOR
We stock material for
no downtime. We use a
manufacturing setting
to achieve labor savings.
Reduces skilled labor
costs per jobsite.
SAVE TIME
Prefab is preplanning.
Preplanning a job will
always be a time saver.
The product can be built
and stored ahead of
schedule until needed.
ENHANCE QUALITY
All products are
built in a controlled
environment using
consistent methods.
This will ensure a
consistent product
on a job to job basis.
SAFETY
Removes hazardous
situations from the
jobsite which is a
cornerstone of a good
safety program.
ESTABLISH CONTROL
Requiring foremen
to use prefab will
standardize a
preplanning practice.
TO PLACE AN
ORDER:
PREFAB@
LABORSAVERS.US
PIPE THREADING
Any custom lengths
½" – 4" Rigid or IMC / Wrap with 10 or 20 mil tape
CUSTOM PIPE BENDING
EMT, RIGID OR IMC ½" – 4"
EMT or rigid pipe racks built to spec.
DATA STUBS OR SLEEVES
Any quantity
Reamed if needed
STRUT
Large quantities of misc. lengths of strut cut.
Sheer machine for factory edge quality.
Strut racks built to spec.
WWW.LABORSAVERS.US PREFAB@LABORSAVERS.US MAIN: 602.429.3061

More Related Content

What's hot

Curriculum Vitae 2015
Curriculum Vitae 2015Curriculum Vitae 2015
Curriculum Vitae 2015
James Ellams
 
Production Supervisor Resume
Production Supervisor ResumeProduction Supervisor Resume
Production Supervisor Resume
Gregg Marciniak
 
Cory.Auringer.Resume.Spring2016
Cory.Auringer.Resume.Spring2016Cory.Auringer.Resume.Spring2016
Cory.Auringer.Resume.Spring2016
Cory Auringer
 
balaji qa-qc
balaji qa-qcbalaji qa-qc
balaji qa-qc
balaji V
 
ResumeEngineer
ResumeEngineerResumeEngineer
ResumeEngineer
Daryn Emke
 
RESUME(md tabish azad)
RESUME(md tabish azad)RESUME(md tabish azad)
RESUME(md tabish azad)
Md Tabish Azad
 
The case of_the_faltering_factory
The case of_the_faltering_factoryThe case of_the_faltering_factory
The case of_the_faltering_factory
Prashant Barsing
 
Thompson, Robbie - Resume (7)
Thompson, Robbie - Resume (7)Thompson, Robbie - Resume (7)
Thompson, Robbie - Resume (7)
Rob Thompson
 

What's hot (19)

Curriculum Vitae 2015
Curriculum Vitae 2015Curriculum Vitae 2015
Curriculum Vitae 2015
 
Production Supervisor Resume
Production Supervisor ResumeProduction Supervisor Resume
Production Supervisor Resume
 
Jose A Perez
Jose A PerezJose A Perez
Jose A Perez
 
Cory.Auringer.Resume.Spring2016
Cory.Auringer.Resume.Spring2016Cory.Auringer.Resume.Spring2016
Cory.Auringer.Resume.Spring2016
 
balaji qa-qc
balaji qa-qcbalaji qa-qc
balaji qa-qc
 
Plant Manager, Mississauga
Plant Manager, MississaugaPlant Manager, Mississauga
Plant Manager, Mississauga
 
ResumeEngineer
ResumeEngineerResumeEngineer
ResumeEngineer
 
Chris Ward Resume.02
Chris Ward Resume.02Chris Ward Resume.02
Chris Ward Resume.02
 
RESUME(md tabish azad)
RESUME(md tabish azad)RESUME(md tabish azad)
RESUME(md tabish azad)
 
Anand Jha-Updated CV
Anand Jha-Updated CVAnand Jha-Updated CV
Anand Jha-Updated CV
 
Operation Management - MBA
Operation Management - MBAOperation Management - MBA
Operation Management - MBA
 
The case of_the_faltering_factory
The case of_the_faltering_factoryThe case of_the_faltering_factory
The case of_the_faltering_factory
 
Thompson, Robbie - Resume (7)
Thompson, Robbie - Resume (7)Thompson, Robbie - Resume (7)
Thompson, Robbie - Resume (7)
 
John Cumming CV
John Cumming CVJohn Cumming CV
John Cumming CV
 
Resume
ResumeResume
Resume
 
BE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in productionBE mechanical engineer with 9.7 years experience in production
BE mechanical engineer with 9.7 years experience in production
 
Kaizen 116010319094
Kaizen   116010319094Kaizen   116010319094
Kaizen 116010319094
 
New Resume
New ResumeNew Resume
New Resume
 
JDKeller vitae 2015
JDKeller vitae 2015JDKeller vitae 2015
JDKeller vitae 2015
 

Similar to MAIN PREFAB FLYER (20)

Prebarication
PrebaricationPrebarication
Prebarication
 
Modular Fabrication
Modular FabricationModular Fabrication
Modular Fabrication
 
59221229 case-study
59221229 case-study59221229 case-study
59221229 case-study
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
PREVENTING CORROSION DURING SHUT DOWNS
PREVENTING CORROSION DURING SHUT DOWNSPREVENTING CORROSION DURING SHUT DOWNS
PREVENTING CORROSION DURING SHUT DOWNS
 
1st presentation
1st presentation1st presentation
1st presentation
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
Krishna Resume
Krishna ResumeKrishna Resume
Krishna Resume
 
CV
CVCV
CV
 
Mali(Cv)
Mali(Cv)Mali(Cv)
Mali(Cv)
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
 
DFMA
DFMADFMA
DFMA
 
JEHMLICH brochure
JEHMLICH brochureJEHMLICH brochure
JEHMLICH brochure
 
Plant layout ppt by me
Plant layout ppt by mePlant layout ppt by me
Plant layout ppt by me
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
 

MAIN PREFAB FLYER

  • 1. WWW.LABORSAVERS.US PREFAB@LABORSAVERS.US MAIN: 602.429.3061 Clients turn to prefab for innovative ways to build the job. In the process they cut time off their schedule, reduce the amount of workers on site, receive higher quality product and increase safety. PREFAB / PRE-ASSEMBLY / CUSTOM SOLUTIONS CUT LABOR We stock material for no downtime. We use a manufacturing setting to achieve labor savings. Reduces skilled labor costs per jobsite. SAVE TIME Prefab is preplanning. Preplanning a job will always be a time saver. The product can be built and stored ahead of schedule until needed. ENHANCE QUALITY All products are built in a controlled environment using consistent methods. This will ensure a consistent product on a job to job basis. SAFETY Removes hazardous situations from the jobsite which is a cornerstone of a good safety program. ESTABLISH CONTROL Requiring foremen to use prefab will standardize a preplanning practice. TO PLACE AN ORDER: PREFAB@ LABORSAVERS.US
  • 2. PIPE THREADING Any custom lengths ½" – 4" Rigid or IMC / Wrap with 10 or 20 mil tape CUSTOM PIPE BENDING EMT, RIGID OR IMC ½" – 4" EMT or rigid pipe racks built to spec. DATA STUBS OR SLEEVES Any quantity Reamed if needed STRUT Large quantities of misc. lengths of strut cut. Sheer machine for factory edge quality. Strut racks built to spec. WWW.LABORSAVERS.US PREFAB@LABORSAVERS.US MAIN: 602.429.3061