PREVENTING CORROSION DURING SHUT DOWNS,
PRESERVATION AND MOTHBALLING
YOUR BUSINESS PARTNER IN CORROSION PROTECTION…
PRESERVATION OF PLANT MATERIALS AND
EQUIPMENT
Each preservation project requires consideration of various factors,
including the :
• intended term of protection
• the storage conditions,
• the available resources for installation and
• the value of the equipment
• assessing and understanding preservation products and
• installation options (more specifically what support is available
before & after installation)
We provide MULTIPLE TURNKEY SOLUTIONS to all industries,
including MARINE, PETROCHEMICAL, REFINERIES, CONSTRUCTION,
CORPORATE & DOMESTIC PROJECTS
Our products are GUARANTEED to keep your equipment in a
SERVICEABLE CONDITION and OUR SERVICES ARE PROFESSIONAL &
COMPLETE
Several months prior to PRESERVATION of PLANT MATERIALS &
EQUIPMENT (MOTHBALLING) a PRESERVATION PROGRAM is
compiled. It usually contains the following criteria :
• 1) A Preservation Plan
• 2) Processing Inventory of Plant Materials / Equipment
• 3) Preservation Product Reference Charts (choosing the correct
products & services for each component)
• 4) Project Samples
PLAN, IDENTIFY & RECORD INFORMATION OF PRESERVATION
COMPILING AND FOLLOWING A PLAN is critical to being able to measure the project’s success. Success will be
measured as having ADEQUATE PROTECTION to prevent corrosion at the lowest cost.
ADEQUATE PROTECTION relates to NO CORROSION ON CRITICAL SURFACES and as defined by the Client.
Sometimes “COSMETIC RUST” is acceptable if the cost of preservation is greater than the depreciation, rework or
replacement costs of the part.
Cost should be compared over the term of the mothballing period. Cost of NO PRESERVATION or POOR PROTECTION
includes REPLACEMENT OF EQUIPMENT, PARTS, LABOUR AND DOWNTIME. Cost of preservation includes
preservation products plus the labour to install and remove them. Of all the costs, the ones least likely to impact the project
costs are the preservation products. However, the selection of those products and their proper installation has the greatest
impact on other costs.
A SUCCESSFUL PRESERVATION or “MOTHBALLING” PROJECT DEPENDS
UPON THE FOLLOWING:
1) PROJECT SAMPLING (A PILOT OPERATION TO ASSESS VIABILITY)
2) A PRESERVATION PLAN (WHAT NEEDS TO BE ACHIEVED)
3) PROCESSING PLANT EQUIPMENT (LISTING OF PLANT EQUIPMENT)
4) PROCEDURES AND METHODS (DOCUMENTING ALL THE STEPS)
PRESERVATION OF PLANT MATERIALS AND EQUIPMENT
Costs of PRESERVATION should be compared over the term of the mothballing
period, taking into account :
1. COST OF NO PRESERVATION or POOR PROTECTION includes replacement of
equipment, parts, labour and downtime.
2. COST OF PRESERVATION includes preservation products plus the labour to
install and remove them.
• OF ALL THE COSTS OF A PRESERVATION PROJECT, THE COSTS LEAST LIKELY TO
IMPACT ON THE PROJECT COSTS ARE THE PRESERVATION COSTS.
However, the SELECTION OF THE PRODUCTS & SERVICES and the CORRECT
APPLICATION often has the GREATEST IMPACT on costs
For example, the costs of LIQUID PRESERVATIVES vs ENCAPSULATION and other
safe alternatives that we provide may show that ENCAPSULATION covering the
same area as the LIQUID PRESERVATIVES to be MORE EXPENSIVE. What is often
not taken into account is to REMOVE THE LIQUID PRESERVATIVES with
DANGEROUS SOLVENTS including the associated waste and handling of bi-
products, then the SCALE IS TIPPED TOTALLY TOWARD ENCAPSULATION
In order to help you to understand the ASSOCIATED COSTS and ADDITIONAL
STEPS IN CLEANING AND RESTORING YOUR EQUIPMENT TO AN OPERATIONAL
STATE OF READINESS you will see that NOT ALL EQUIPMENT REQUIRES THE SAME
TREATMENT and A COMBINATION OF SOLUTIONS may best suit your Project.
WE HAVE THE SOLUTION FOR YOU NO MATTER WHAT YOUR REQUIREMENTS
ARE…OUR PRODUCTS & SERVICES ARE GUARANTEED TO PROTECT YOUR
EQUIPMENT & MATERIALS
WE HAVE VARIOUS SOLUTIONS BASED ON DESIGNED DEVELOPED AND
IMPLEMENTED RESEARCH & DEVELOPMENT AS WELL AS SPECIFIC CLIENT
REQUIREMENTS EFFECTIVELY & SUCCESSFULLY
STORAGE & PRESERVATION TERMS
SHORT TERM
Also known as “seasonal” like a
normal ANNUAL SHUT DOWN.
Usually, this period extends for three
months or less, so no equipment
dismantling is involved. Little or no
maintenance is performed and all
components are left ready to run
MEDIUM TERM
Could be anywhere between 3 to 24
months and may have an
undetermined time frame. Typically,
steps must be taken to prevent
corrosion and air and moisture
intrusion. Drainage may be necessary
for fluids, temporary heaters or
dehumidifiers could be required, and
certain equipment may be isolated or
disconnected.
LONG TERM
This is similar to MEDIUM TERM, but
the time frame is indefinite - usually
well over 12 months. It would require
major work and expense to restore
operations. The client may also elect
to sell off pieces of equipment, or the
entire plant. Also referred to as
“MOTHBALLING STAGE”
For STORAGE & PRESERVATION, there is often confusion as to what is meant by “short term”, “medium term”
and “long term”. Here are the explanations of these COMMON TERMS :
3 BIGGEST THREATS TO PLANT EQUIPMENT THAT IS
TAKEN OUT OF COMMISSION
MOISTURE / WATER BUILD UP inside the machine
that can break down into acids that cause internal
corrosion
VIBRATION from external movement causing
“microwelding” of contacting surfaces (better known
as fretting or galvanic corrosion)
FOREIGN CONTAMINANTS that can cause abrasive
wear on plant machinery casings and moving machine
parts. Dust is a leading contributor of machine failure
and can cause extensive damage which is often non
repairable
3 BEST SOLUTIONS TO MINIMISE DAMAGE TO PLANT
EQUIPMENT OUT OF COMMISSION
INTERCEPT provides the best “medium to long term”
Moisture Protection for up to 15 years (replaces ALL
VCI processes)
VISCOTAQ has an effective range of products that
solves this issue. It will prevent galvanic &
atmospheric corrosion, reduce cathodic protection
current and is totally inert
DR SHRINK, VERISAFE and POWER SHRINK ShrinkFoil
provides a strong barrier preventing dirt, dust and
grime settling on non-moisture affected plant
equipment and warehouse stock that causes corrosion
Many industries are often faced with CORROSION &
RUST on their equipment that is stored for medium or
long periods of time. INTERCEPT TECHNOLOGY is
designed to protect equipment for periods of up to 15
YEARS without the need to oil and grease it. It has
been tested and used extensively at ESKOM POWER
STATIONS for the protection of their pumps and
generators that are stored for SHUTDOWNS, REGULAR
MAINTENANCE, PRESERVATION & “MOTHBALLING”
The equipment is wrapped in 200 micron INTERCEPT
SHRINK FILM, DESIGNED FOR EXTRACTING MOISTURE
Where necessary CLAY DESSICANT & INSPECTION
HATCHES are installed and shrunk to a drum tight
finish. The result is an AIRTIGHT COCOON and with
the desiccants actively working to keep moisture out,
it is GUARANTEED to last for up to 15 YEARS provided
it is being installed by a competent INTERCEPT
SERVICE PROVIDER
VERISAFE & DR SHRINK SHRINK FOIL is specifically designed and manufactured for Encapsulation & Containment Projects,
with the main purpose of creating safe working environments for artisans in the event of inclement weather or activities such as
Grit Blasting, Spray Painting & Asbestos Removal and many more…
Mess Room Facilities, Temporary Workshops, Storage Areas & much more can be created by using this material and our artistic
vision
When transporting materials, equipment, prefabricated vessels etc, many clients request that their products are encapsulated
(shrink wrapped) to minimize damages in transit, theft of components and to protect the general condition of their products
INTERNATIONAL CERTIFICATION OF PRODUCTS
INTERNATIONAL CERTIFICATION OF PRODUCTS
I sincerely hope that this information has been helpful to you, whilst PLANNING SHORT, MEDIUM OR LONG TERM OUTAGE
PROJECTS
We have EXPERT TEAMS in GAUTENG & CAPE TOWN that will be happy to assist you to determine which options BEST SUIT
your projects
Our services include ENCAPSULATION, CONTAINMENT, MOISTURE CONTROL, INSULATION & CRATING. We are also working
towards offering PAINTING, and will add this to our profile as soon as we have undergone training and certified
Other VALUE ADDED SERVICES like PROJECT MANAGEMENT & SITE ADMINISTRATION is also available should there be a need
Call us for a free NO OBLIGATION ASSESSMENT of your project, to discover how you can benefit from our PRODUCTS &
SERVICES
ERNEST LINTNAAR
Cell: +27 79 146 6386
ernest@semc.co.za
www.semc.co.za

More Related Content

Similar to PREVENTING CORROSION DURING SHUT DOWNS

Loctite® Maintenance Workshops - Henkel Adhesives
Loctite® Maintenance Workshops - Henkel AdhesivesLoctite® Maintenance Workshops - Henkel Adhesives
Loctite® Maintenance Workshops - Henkel AdhesivesHenkel Adhesives Australia
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018Marcep Inc.
 
MDU Spec Flyer PP
MDU Spec Flyer PPMDU Spec Flyer PP
MDU Spec Flyer PPKyna Saidin
 
PSC Workplace Safety Guidebook - Dropped Objects Prevention
PSC Workplace Safety Guidebook - Dropped Objects PreventionPSC Workplace Safety Guidebook - Dropped Objects Prevention
PSC Workplace Safety Guidebook - Dropped Objects PreventionProject Sales Corp
 
LEV Installations
LEV InstallationsLEV Installations
LEV InstallationsAdrian Sims
 
Fire Protection | weyer special
Fire Protection | weyer specialFire Protection | weyer special
Fire Protection | weyer specialweyer gruppe
 
FIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATIONFIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATIONASGHAR KHALIL
 
An intro to Reliability
An intro to ReliabilityAn intro to Reliability
An intro to ReliabilityBijli Muhammed
 
Engineered Maintenance by Waqas Ali Tunio
Engineered Maintenance by Waqas Ali TunioEngineered Maintenance by Waqas Ali Tunio
Engineered Maintenance by Waqas Ali TunioWaqas Ali Tunio
 
Advance maintenance & corrosion engineering
Advance maintenance & corrosion engineeringAdvance maintenance & corrosion engineering
Advance maintenance & corrosion engineeringMarcep Inc.
 
MDU Spec Malaysia Sdn Bhd
MDU Spec Malaysia Sdn BhdMDU Spec Malaysia Sdn Bhd
MDU Spec Malaysia Sdn BhdKyna Saidin
 
CDS Brochure
CDS BrochureCDS Brochure
CDS Brochureneilcds
 
Techquip Overview Catalogue
Techquip Overview CatalogueTechquip Overview Catalogue
Techquip Overview CatalogueKelvin King
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control OperationspetroEDGE
 

Similar to PREVENTING CORROSION DURING SHUT DOWNS (20)

Loctite® Maintenance Workshops - Henkel Adhesives
Loctite® Maintenance Workshops - Henkel AdhesivesLoctite® Maintenance Workshops - Henkel Adhesives
Loctite® Maintenance Workshops - Henkel Adhesives
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018
 
MDU Spec Flyer PP
MDU Spec Flyer PPMDU Spec Flyer PP
MDU Spec Flyer PP
 
zshan updated cv
zshan updated cvzshan updated cv
zshan updated cv
 
PSC Workplace Safety Guidebook - Dropped Objects Prevention
PSC Workplace Safety Guidebook - Dropped Objects PreventionPSC Workplace Safety Guidebook - Dropped Objects Prevention
PSC Workplace Safety Guidebook - Dropped Objects Prevention
 
LEV Installations
LEV InstallationsLEV Installations
LEV Installations
 
Fire Protection | weyer special
Fire Protection | weyer specialFire Protection | weyer special
Fire Protection | weyer special
 
FIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATIONFIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATION
 
Marketing Summary Report
Marketing Summary ReportMarketing Summary Report
Marketing Summary Report
 
An intro to Reliability
An intro to ReliabilityAn intro to Reliability
An intro to Reliability
 
Engineered Maintenance by Waqas Ali Tunio
Engineered Maintenance by Waqas Ali TunioEngineered Maintenance by Waqas Ali Tunio
Engineered Maintenance by Waqas Ali Tunio
 
Advance maintenance & corrosion engineering
Advance maintenance & corrosion engineeringAdvance maintenance & corrosion engineering
Advance maintenance & corrosion engineering
 
MDU Spec Malaysia Sdn Bhd
MDU Spec Malaysia Sdn BhdMDU Spec Malaysia Sdn Bhd
MDU Spec Malaysia Sdn Bhd
 
CDS Brochure
CDS BrochureCDS Brochure
CDS Brochure
 
Modular Fabrication
Modular FabricationModular Fabrication
Modular Fabrication
 
CR Middle East
CR Middle EastCR Middle East
CR Middle East
 
Techquip Overview Catalogue
Techquip Overview CatalogueTechquip Overview Catalogue
Techquip Overview Catalogue
 
4 FACILITY LAYOUT.ppt
4  FACILITY LAYOUT.ppt4  FACILITY LAYOUT.ppt
4 FACILITY LAYOUT.ppt
 
BR_Mining_Doka
BR_Mining_DokaBR_Mining_Doka
BR_Mining_Doka
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control Operations
 

Recently uploaded

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 

Recently uploaded (20)

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

PREVENTING CORROSION DURING SHUT DOWNS

  • 1. PREVENTING CORROSION DURING SHUT DOWNS, PRESERVATION AND MOTHBALLING YOUR BUSINESS PARTNER IN CORROSION PROTECTION…
  • 2. PRESERVATION OF PLANT MATERIALS AND EQUIPMENT Each preservation project requires consideration of various factors, including the : • intended term of protection • the storage conditions, • the available resources for installation and • the value of the equipment • assessing and understanding preservation products and • installation options (more specifically what support is available before & after installation) We provide MULTIPLE TURNKEY SOLUTIONS to all industries, including MARINE, PETROCHEMICAL, REFINERIES, CONSTRUCTION, CORPORATE & DOMESTIC PROJECTS Our products are GUARANTEED to keep your equipment in a SERVICEABLE CONDITION and OUR SERVICES ARE PROFESSIONAL & COMPLETE Several months prior to PRESERVATION of PLANT MATERIALS & EQUIPMENT (MOTHBALLING) a PRESERVATION PROGRAM is compiled. It usually contains the following criteria : • 1) A Preservation Plan • 2) Processing Inventory of Plant Materials / Equipment • 3) Preservation Product Reference Charts (choosing the correct products & services for each component) • 4) Project Samples
  • 3. PLAN, IDENTIFY & RECORD INFORMATION OF PRESERVATION COMPILING AND FOLLOWING A PLAN is critical to being able to measure the project’s success. Success will be measured as having ADEQUATE PROTECTION to prevent corrosion at the lowest cost. ADEQUATE PROTECTION relates to NO CORROSION ON CRITICAL SURFACES and as defined by the Client. Sometimes “COSMETIC RUST” is acceptable if the cost of preservation is greater than the depreciation, rework or replacement costs of the part. Cost should be compared over the term of the mothballing period. Cost of NO PRESERVATION or POOR PROTECTION includes REPLACEMENT OF EQUIPMENT, PARTS, LABOUR AND DOWNTIME. Cost of preservation includes preservation products plus the labour to install and remove them. Of all the costs, the ones least likely to impact the project costs are the preservation products. However, the selection of those products and their proper installation has the greatest impact on other costs. A SUCCESSFUL PRESERVATION or “MOTHBALLING” PROJECT DEPENDS UPON THE FOLLOWING: 1) PROJECT SAMPLING (A PILOT OPERATION TO ASSESS VIABILITY) 2) A PRESERVATION PLAN (WHAT NEEDS TO BE ACHIEVED) 3) PROCESSING PLANT EQUIPMENT (LISTING OF PLANT EQUIPMENT) 4) PROCEDURES AND METHODS (DOCUMENTING ALL THE STEPS)
  • 4. PRESERVATION OF PLANT MATERIALS AND EQUIPMENT Costs of PRESERVATION should be compared over the term of the mothballing period, taking into account : 1. COST OF NO PRESERVATION or POOR PROTECTION includes replacement of equipment, parts, labour and downtime. 2. COST OF PRESERVATION includes preservation products plus the labour to install and remove them. • OF ALL THE COSTS OF A PRESERVATION PROJECT, THE COSTS LEAST LIKELY TO IMPACT ON THE PROJECT COSTS ARE THE PRESERVATION COSTS. However, the SELECTION OF THE PRODUCTS & SERVICES and the CORRECT APPLICATION often has the GREATEST IMPACT on costs For example, the costs of LIQUID PRESERVATIVES vs ENCAPSULATION and other safe alternatives that we provide may show that ENCAPSULATION covering the same area as the LIQUID PRESERVATIVES to be MORE EXPENSIVE. What is often not taken into account is to REMOVE THE LIQUID PRESERVATIVES with DANGEROUS SOLVENTS including the associated waste and handling of bi- products, then the SCALE IS TIPPED TOTALLY TOWARD ENCAPSULATION In order to help you to understand the ASSOCIATED COSTS and ADDITIONAL STEPS IN CLEANING AND RESTORING YOUR EQUIPMENT TO AN OPERATIONAL STATE OF READINESS you will see that NOT ALL EQUIPMENT REQUIRES THE SAME TREATMENT and A COMBINATION OF SOLUTIONS may best suit your Project. WE HAVE THE SOLUTION FOR YOU NO MATTER WHAT YOUR REQUIREMENTS ARE…OUR PRODUCTS & SERVICES ARE GUARANTEED TO PROTECT YOUR EQUIPMENT & MATERIALS WE HAVE VARIOUS SOLUTIONS BASED ON DESIGNED DEVELOPED AND IMPLEMENTED RESEARCH & DEVELOPMENT AS WELL AS SPECIFIC CLIENT REQUIREMENTS EFFECTIVELY & SUCCESSFULLY
  • 5. STORAGE & PRESERVATION TERMS SHORT TERM Also known as “seasonal” like a normal ANNUAL SHUT DOWN. Usually, this period extends for three months or less, so no equipment dismantling is involved. Little or no maintenance is performed and all components are left ready to run MEDIUM TERM Could be anywhere between 3 to 24 months and may have an undetermined time frame. Typically, steps must be taken to prevent corrosion and air and moisture intrusion. Drainage may be necessary for fluids, temporary heaters or dehumidifiers could be required, and certain equipment may be isolated or disconnected. LONG TERM This is similar to MEDIUM TERM, but the time frame is indefinite - usually well over 12 months. It would require major work and expense to restore operations. The client may also elect to sell off pieces of equipment, or the entire plant. Also referred to as “MOTHBALLING STAGE” For STORAGE & PRESERVATION, there is often confusion as to what is meant by “short term”, “medium term” and “long term”. Here are the explanations of these COMMON TERMS :
  • 6. 3 BIGGEST THREATS TO PLANT EQUIPMENT THAT IS TAKEN OUT OF COMMISSION MOISTURE / WATER BUILD UP inside the machine that can break down into acids that cause internal corrosion VIBRATION from external movement causing “microwelding” of contacting surfaces (better known as fretting or galvanic corrosion) FOREIGN CONTAMINANTS that can cause abrasive wear on plant machinery casings and moving machine parts. Dust is a leading contributor of machine failure and can cause extensive damage which is often non repairable 3 BEST SOLUTIONS TO MINIMISE DAMAGE TO PLANT EQUIPMENT OUT OF COMMISSION INTERCEPT provides the best “medium to long term” Moisture Protection for up to 15 years (replaces ALL VCI processes) VISCOTAQ has an effective range of products that solves this issue. It will prevent galvanic & atmospheric corrosion, reduce cathodic protection current and is totally inert DR SHRINK, VERISAFE and POWER SHRINK ShrinkFoil provides a strong barrier preventing dirt, dust and grime settling on non-moisture affected plant equipment and warehouse stock that causes corrosion
  • 7. Many industries are often faced with CORROSION & RUST on their equipment that is stored for medium or long periods of time. INTERCEPT TECHNOLOGY is designed to protect equipment for periods of up to 15 YEARS without the need to oil and grease it. It has been tested and used extensively at ESKOM POWER STATIONS for the protection of their pumps and generators that are stored for SHUTDOWNS, REGULAR MAINTENANCE, PRESERVATION & “MOTHBALLING” The equipment is wrapped in 200 micron INTERCEPT SHRINK FILM, DESIGNED FOR EXTRACTING MOISTURE Where necessary CLAY DESSICANT & INSPECTION HATCHES are installed and shrunk to a drum tight finish. The result is an AIRTIGHT COCOON and with the desiccants actively working to keep moisture out, it is GUARANTEED to last for up to 15 YEARS provided it is being installed by a competent INTERCEPT SERVICE PROVIDER
  • 8. VERISAFE & DR SHRINK SHRINK FOIL is specifically designed and manufactured for Encapsulation & Containment Projects, with the main purpose of creating safe working environments for artisans in the event of inclement weather or activities such as Grit Blasting, Spray Painting & Asbestos Removal and many more… Mess Room Facilities, Temporary Workshops, Storage Areas & much more can be created by using this material and our artistic vision When transporting materials, equipment, prefabricated vessels etc, many clients request that their products are encapsulated (shrink wrapped) to minimize damages in transit, theft of components and to protect the general condition of their products
  • 11. I sincerely hope that this information has been helpful to you, whilst PLANNING SHORT, MEDIUM OR LONG TERM OUTAGE PROJECTS We have EXPERT TEAMS in GAUTENG & CAPE TOWN that will be happy to assist you to determine which options BEST SUIT your projects Our services include ENCAPSULATION, CONTAINMENT, MOISTURE CONTROL, INSULATION & CRATING. We are also working towards offering PAINTING, and will add this to our profile as soon as we have undergone training and certified Other VALUE ADDED SERVICES like PROJECT MANAGEMENT & SITE ADMINISTRATION is also available should there be a need Call us for a free NO OBLIGATION ASSESSMENT of your project, to discover how you can benefit from our PRODUCTS & SERVICES ERNEST LINTNAAR Cell: +27 79 146 6386 ernest@semc.co.za www.semc.co.za