SlideShare a Scribd company logo
1 of 1
Download to read offline
Denisse Vignon Fernández
Executive Summary
The Next Gen Program gave me great exposure to the different products, services and technologies offered within
NOV divisions and how these are linked to different processes, work methodologies and management styles. This
variability among groups contributed to my professional formation as I had to identify which of my technical and
professional skills were better suited to fulfill their performance expectations in each case; both a committed
attitude and good communication skills came to converge in all my rotations to make me feel part of the team. I
will always value the knowledge I acquired and how my suggestions for process improvement were embraced at
various management levels. I consider myself an element aligned to NOV’s vision and work culture, therefore the
offering of solutions will be the cornerstone of any permanent role I achieve within the company.
Artificial Lift Systems
Poza Rica, Ver.
Tuboscope
Veracruz, Ver.
Pressure Control Group
Houston. Tx.
Downhole
Veracruz,Ver
Jun 25 - Sept 21, 2012
• Rig Pass course accreditation (IADC): field operations
• Application of Statistical Control Process for performance troubleshooting
in Rod Pumping Systems (Corlift and Morlift) which included: involvement
in field operations, data gathering-equipment failure analysis and
development of control charts and RCA.
• Comprehensive analysis of business scope and performance. (SWOT)
• Knowledge of DSC process (Inside sales) and development of supporting
documentation for training purposes.
Sept 24, 2012 – Jan 11, 2013
• Coating Plant AIMS implementation, which allowed better control of
maintenance activities.
• Quality department assistance: Creation and review of operations,
maintenance and calibration formats, verification of calibration status in
all facility equipment and translation of procedures into Spanish.
• Productivity analysis of the internal coating process for line pipe and
sleeves 3 ½” y 4 ½” OD.
Jan 14 – Apr 12, 2013
• Technical College Course accreditation: Introduction to NOV Pressure
Control Equipment
• Optimization of Spider welding process; to beat STD (1100 Hrs.) 25-30%,
involving a historical data research, productivity and NCR’s statistical
analysis and creation of work instructions and tracking charts for
standardization.
• Determination of scope (LT and Cost) and tracking of a 13”-10 M LXT BOP
DBL manufacturing process; aided top management in determining
whether or not to bring up the process in-house.
Apr 15 – Jun 28, 2013
• Comprehensive implementation of Quality, Environmental and Safety
Management Systems within the division.
• Follow-up of 5 ´Ss methodology
• Drilling Tools and Drilling Bits Near Miss Statistical analysis (i-Trax and TAT)

More Related Content

What's hot (20)

Daniel Bautista rev2
Daniel Bautista rev2Daniel Bautista rev2
Daniel Bautista rev2
 
Arul_Updated-profile
Arul_Updated-profileArul_Updated-profile
Arul_Updated-profile
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1
 
Kevin Holmes
Kevin HolmesKevin Holmes
Kevin Holmes
 
Resume[1]
Resume[1]Resume[1]
Resume[1]
 
Gary Wyngaardt CV 19072016
Gary Wyngaardt CV 19072016 Gary Wyngaardt CV 19072016
Gary Wyngaardt CV 19072016
 
Resume - Purushoth
Resume - PurushothResume - Purushoth
Resume - Purushoth
 
T. Grayson Resume
T. Grayson ResumeT. Grayson Resume
T. Grayson Resume
 
SHIRAJUL KARIM- Resume
SHIRAJUL KARIM- ResumeSHIRAJUL KARIM- Resume
SHIRAJUL KARIM- Resume
 
Resume - Zonal Manager
Resume - Zonal ManagerResume - Zonal Manager
Resume - Zonal Manager
 
Resume of Anil Kumar K R
Resume of Anil Kumar K RResume of Anil Kumar K R
Resume of Anil Kumar K R
 
D-Squared Consulting
D-Squared ConsultingD-Squared Consulting
D-Squared Consulting
 
Anbalagan_Aug'16
Anbalagan_Aug'16Anbalagan_Aug'16
Anbalagan_Aug'16
 
Resume 2018
Resume 2018Resume 2018
Resume 2018
 
Shajaruddin Baloch 30.06.2015
Shajaruddin Baloch 30.06.2015Shajaruddin Baloch 30.06.2015
Shajaruddin Baloch 30.06.2015
 
Martin Bryan LinkedIn FINAL
Martin Bryan LinkedIn FINALMartin Bryan LinkedIn FINAL
Martin Bryan LinkedIn FINAL
 
M Rearick Resume
M Rearick ResumeM Rearick Resume
M Rearick Resume
 
Resume 12 12 10
Resume 12 12 10Resume 12 12 10
Resume 12 12 10
 
JC 2016 Resume
JC 2016 ResumeJC 2016 Resume
JC 2016 Resume
 
jayam
jayamjayam
jayam
 

Similar to VignonDenisseExecutivesummary

Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1Fekadu Ambissa
 
NicoleMillesResumeQA_Mgr
NicoleMillesResumeQA_MgrNicoleMillesResumeQA_Mgr
NicoleMillesResumeQA_MgrNicole Milles
 
Jesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CVJesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CVJesus Lopez
 
Dana C. Weber Resume
Dana C. Weber ResumeDana C. Weber Resume
Dana C. Weber ResumeDana Weber
 
CV - Windy E Ramoneda 062315
CV - Windy E Ramoneda 062315CV - Windy E Ramoneda 062315
CV - Windy E Ramoneda 062315Windy Ramoneda
 
Charles.Henderson.Res.2016
Charles.Henderson.Res.2016Charles.Henderson.Res.2016
Charles.Henderson.Res.2016Mark Henderson
 
How to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8DHow to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8DStefan Kovacs
 
CV (Professional) - Mr Graham P Alvey
CV (Professional) - Mr Graham P AlveyCV (Professional) - Mr Graham P Alvey
CV (Professional) - Mr Graham P AlveyGraham Alvey
 
Resume marty hudson bloomington
Resume marty hudson bloomingtonResume marty hudson bloomington
Resume marty hudson bloomingtonMarty Hudson
 
AjayMehta-Resume08012016
AjayMehta-Resume08012016AjayMehta-Resume08012016
AjayMehta-Resume08012016Ajay Mehta
 
PROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptxPROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptxSuzyTharwat1
 

Similar to VignonDenisseExecutivesummary (20)

Logistics analyst
Logistics analystLogistics analyst
Logistics analyst
 
Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1Logistics analyst fekadu_ambissa_1
Logistics analyst fekadu_ambissa_1
 
NicoleMillesResumeQA_Mgr
NicoleMillesResumeQA_MgrNicoleMillesResumeQA_Mgr
NicoleMillesResumeQA_Mgr
 
Jesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CVJesus Gerardo Lopez Update CV
Jesus Gerardo Lopez Update CV
 
Dana C. Weber Resume
Dana C. Weber ResumeDana C. Weber Resume
Dana C. Weber Resume
 
Denise van Rooyen
Denise van RooyenDenise van Rooyen
Denise van Rooyen
 
Ismael_Rdguez_resume11
Ismael_Rdguez_resume11Ismael_Rdguez_resume11
Ismael_Rdguez_resume11
 
CV - Windy E Ramoneda 062315
CV - Windy E Ramoneda 062315CV - Windy E Ramoneda 062315
CV - Windy E Ramoneda 062315
 
Charles.Henderson.Res.2016
Charles.Henderson.Res.2016Charles.Henderson.Res.2016
Charles.Henderson.Res.2016
 
How to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8DHow to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8D
 
UpdatedResume-2-2
UpdatedResume-2-2UpdatedResume-2-2
UpdatedResume-2-2
 
CV (Professional) - Mr Graham P Alvey
CV (Professional) - Mr Graham P AlveyCV (Professional) - Mr Graham P Alvey
CV (Professional) - Mr Graham P Alvey
 
Resume marty hudson bloomington
Resume marty hudson bloomingtonResume marty hudson bloomington
Resume marty hudson bloomington
 
AjayMehta-Resume08012016
AjayMehta-Resume08012016AjayMehta-Resume08012016
AjayMehta-Resume08012016
 
C v a.madrigal ingles
C v a.madrigal inglesC v a.madrigal ingles
C v a.madrigal ingles
 
C v a.madrigal ingles
C v a.madrigal inglesC v a.madrigal ingles
C v a.madrigal ingles
 
PROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptxPROJECT QUALITY MANAGEMENT.pptx
PROJECT QUALITY MANAGEMENT.pptx
 
Kristine kowalski resume
Kristine kowalski resume Kristine kowalski resume
Kristine kowalski resume
 
Resume_Dhillon
Resume_DhillonResume_Dhillon
Resume_Dhillon
 
CV_KannanK
CV_KannanKCV_KannanK
CV_KannanK
 

VignonDenisseExecutivesummary

  • 1. Denisse Vignon Fernández Executive Summary The Next Gen Program gave me great exposure to the different products, services and technologies offered within NOV divisions and how these are linked to different processes, work methodologies and management styles. This variability among groups contributed to my professional formation as I had to identify which of my technical and professional skills were better suited to fulfill their performance expectations in each case; both a committed attitude and good communication skills came to converge in all my rotations to make me feel part of the team. I will always value the knowledge I acquired and how my suggestions for process improvement were embraced at various management levels. I consider myself an element aligned to NOV’s vision and work culture, therefore the offering of solutions will be the cornerstone of any permanent role I achieve within the company. Artificial Lift Systems Poza Rica, Ver. Tuboscope Veracruz, Ver. Pressure Control Group Houston. Tx. Downhole Veracruz,Ver Jun 25 - Sept 21, 2012 • Rig Pass course accreditation (IADC): field operations • Application of Statistical Control Process for performance troubleshooting in Rod Pumping Systems (Corlift and Morlift) which included: involvement in field operations, data gathering-equipment failure analysis and development of control charts and RCA. • Comprehensive analysis of business scope and performance. (SWOT) • Knowledge of DSC process (Inside sales) and development of supporting documentation for training purposes. Sept 24, 2012 – Jan 11, 2013 • Coating Plant AIMS implementation, which allowed better control of maintenance activities. • Quality department assistance: Creation and review of operations, maintenance and calibration formats, verification of calibration status in all facility equipment and translation of procedures into Spanish. • Productivity analysis of the internal coating process for line pipe and sleeves 3 ½” y 4 ½” OD. Jan 14 – Apr 12, 2013 • Technical College Course accreditation: Introduction to NOV Pressure Control Equipment • Optimization of Spider welding process; to beat STD (1100 Hrs.) 25-30%, involving a historical data research, productivity and NCR’s statistical analysis and creation of work instructions and tracking charts for standardization. • Determination of scope (LT and Cost) and tracking of a 13”-10 M LXT BOP DBL manufacturing process; aided top management in determining whether or not to bring up the process in-house. Apr 15 – Jun 28, 2013 • Comprehensive implementation of Quality, Environmental and Safety Management Systems within the division. • Follow-up of 5 ´Ss methodology • Drilling Tools and Drilling Bits Near Miss Statistical analysis (i-Trax and TAT)