EXPERIENCE
2013 – Present Holland Partners, Los Angeles
Project Manager
6
th
& Bixel Apartments, Los Angeles, CA
• Participated in the pricing, design management, permitting, and buyout of this 606 unit, mixed-use development on
the west side of downtown Los Angeles.
• Wrote subcontracts for shoring, mass excavation, concrete, wood framing, etc. With the assistance of a Senior
Project Manager, oversaw/supervised the writing of the majority of the subcontracts.
• Supervise a team of Associate Project Managers, who are in turn directly responsible for overseeing the work of the
various trades.
• Have primary responsibility for maintaining the project’s cost reports.
Notable Issues: Dealing with the regulatory, contractual, safety, schedule and execution-of-the-work issues
associated with a site suffused with hydrocarbon contaminates / Oversight of the construction of a complex
concrete superstructure while contending with the contaminated soils issues impacting the schedule and cost of
that scope of work / Post start-of-work modification of the (installed) perimeter shoring system resulting from the
absence of appropriate bearing soils at the elevations anticipated by the soils report
2012 – 2013 Holland Partners, Los Angeles
Consultant
La Brea Gateway Apartments, Los Angeles, CA
• Assisted with the design management and permitting of this 179 unit, mixed-use development on the edge of West
Hollywood.
• Prepared the majority of the prime subcontracts for the project.
Notable Issues: Dewatering and treatment of the ground water on a site with a high water table and contaminated
soils / Negotiated a design-build subcontract for the concrete superstructure
Pricing of Mid and High Rise Multi-Family Housing Projects in Southern California
• Assistance to the Construction and Real Estate groups in pricing mid and high rise multi-family projects for
construction and development in the Southern California market.
• ‘Emphasis on design-build of structural, enclosure and mechanical/electrical/plumbing systems
• Consultation with third party engineers and specialty contractors with respect to the most efficient and cost effective
systems
• Assistance in the development of a prototype high rise suitable for a number of Southern California sites in which
Holland Partners has an interest
2011 – 2012 Onward Investors, Minneapolis
Project Management Consultant
The Commencement, Ruston, WA
• Project manager for the resurrection and completion, on behalf of Onward Investors, of a 60 unit Seattle-area
condominium project, which had stood unoccupied in a state of 75 to 80% completion for the previous two years
• Oversight of third party design and construction resources retained to complete the work
• Resolution of numerous unresolved and unfilled commitments to the town of Ruston made as part of the original
development agreement
• Completion of all unfinished exterior and interior work
• Coordination and cooperation with the third party property manager retained by Onward to lease the completed
units as apartments
• Procurement of certificates of occupancy from the town of Ruston for all apartment units, common areas, right of
ways surrounding the property, and work completed off-site on the town’s behalf as required by the development
agreement
Notable Issues: Replacement of 70% of the original enclosure system / Oversight of and coordination with an
enclosure system consultant retained to ensure compliance with EHB 1848, the state of Washington statute
requiring certification by a third party engineer that the as-built condition of the enclosure system on a multi-family
housing project is consistent with the approved documents
2009 – 2011 Jensen Homes
Senior Project Manager
Lake of the Isles Residence, Minneapolis
• Oversight of mid-project reorganization of design team
• Focus on procurement of long lead time custom items
Notable Issues: Procurement of numerous artisan-produced custom finishes and fixtures
2006 – 2009 CresaPartners
Senior Advisor – Selected Projects
St. Jude Medical, Technology Center in Little Canada
• Responsibility for procurement of pre-construction governmental approvals and submittals including Environmental
Assessment Worksheet
• Oversight of selection of design and construction resources
• Negotiation of design and construction contracts
• Oversight of the design process
• Review and approval of project GMP and oversight of the construction process / Monthly review of contractor’s
application for payment
• Oversight of project closeout and phased turnover to owner
Notable Issues: Site planning for future expansion / Achievement of LEED Gold Certification for New Construction
St. Jude Medical, Pre-Purchase Due Diligence of Manufacturing Facility Built by Others, San Juan, Puerto Rico
• Pre-purchase analysis for St. Jude Medical of Guidant-constructed facility for the manufacture of defibrillator leads
• Oversight of civil, structural, architectural, mechanical and electrical analysis of existing systems
• Clarification of outstanding (Guidant) commitments to local governing authorities
• Pre-purchase-decision delivery to client of comprehensive facility analysis
Notable Issues: Identification of qualified local resources for facility analysis / Achievement of a balance between a
level of systems analysis sufficient to permit ‘go’ or ‘no-go’ decision and the cost of such analysis
University of Minnesota Physicians Mill City Clinic, Minneapolis
• Oversight of selection of design and construction resources
• Negotiation of design agreement and construction contract
• Review and approval of project GMP
• Oversight of design and construction process
Notable Issue: Sizing clinic for an untested location resulted in numerous design iterations prior to achieving a
balance between build-out and expansion space
2003 – 2006 Jensen Homes
Senior Project Manager
Red Mountain Residence, Aspen, CO
• Management of third party design resources
• Overall responsibility for construction including procurement of Pitkin County and Red Mountain Ranch
Homeowner’s Association permits and approvals; bidding and negotiation of subcontracts; reconciliation of
concerns posed by owners of adjacent properties
Notable Issues: Protracted Pitkin County and Red Mountain Ranch Homeowner’s Association permitting and
approval process / Challenges posed by a limited pool of skilled tradespeople
1996 – 2003 Ellerbe Becket
VP Ellerbe Becket Construction Services – Selected Projects
Carilion Stonewall Jackson Hospital, 25-Bed Critical Access Facility, Lexington, VA
• Overall responsibility for construction including preparation of project schedule; bidding and negotiation of
subcontracts; and interface with local governing and permitting authorities
• Ongoing coordination with hospital administration designed to accommodate the needs of patients and staff while
maintaining the project schedule
Notable Issues: Major addition and comprehensive renovation to an active, fully functioning hospital / Significant
concealed conditions encountered during installation of deep foundations
Center for Health Improvement, Fitness Center & Clinic, Hays, KS
• Oversight of design revisions required to achieve desired scope and budget
• Overall responsibility for construction including preparation of project schedule and owner-approved GMP; bidding
and negotiation of subcontracts; accommodation of owner-directed modifications; and achievement of project
schedule
Notable Issue: Phased occupancy of clinic versus fitness center areas
State Farm Distribution Center, 200,000 SF Office & Distribution Center, Rock Hill, SC
• Oversight of in-house design resources
• Overall responsibility for construction including preparation of project schedule; bidding and negotiation of
subcontracts; and phased turnover to owner of office and distribution spaces
Notable Issues: Significant, sporadic and unanticipated veins of subsurface granite / Scarcity of skilled
tradespersons
Taylor Center, Athletic Facility and Admissions Office Minnesota State University, Mankato
• Oversight of in-house design resources
• Overall responsibility for construction including preparation of project schedule; bidding and negotiation of
subcontracts; and project completion prior to basketball home opener
Notable Issues: Emphasis on inclusion of local subcontractors and tradespeople / Accommodation of ongoing
University activities during construction
Cox Pavilion, Athletic and Concert Venue, University of Nevada, Las Vegas
• Oversight of in-house design resources
• Overall responsibility for construction including preparation of project schedule; bidding and negotiation of
subcontracts; achievement of project schedule; and reconciliation of owner-requested extra’s versus original GMP
Notable Issues: Protracted permitting process with State of Nevada’s Public Works Division / Accommodation of
ongoing University activities during construction
1993 – 1996 David-James Homes
Principal – Builder of Single Family Custom Homes, Twin Cities
• Design and construction of single family homes on both a build-to-suit and speculative basis
Notable Issues: Competitive challenge posed by the retail purchase of individual lots relative to the development of
tracts of raw land by others / Brokerage commissions on non-presold houses
1980 – 1993 Opus Corporation
Senior Project Manager – Selected Projects
First Bank Place, 56-Story Office Tower in Downtown Minneapolis
• Preparation of schematic and design development schedules and estimates and preparation of final GMP
• Participation in construction contract negotiations and negotiation of lump sum general conditions
• Overall responsibility for base building construction including oversight of systems-based project management
team; bidding and negotiation of subcontracts; negotiation of change orders with owner; and achievement of project
schedule
Notable Issues: Negotiation of more than 1,500 work authorizations with owner’s representative / Underpinning of
adjacent 14-story building
150 South Fifth Street, 36-Story Office Tower in Downtown Minneapolis
• Oversight of in-house design resources
• Preparation of schematic and design development schedules and estimates
• Overall responsibility for base building construction including oversight of systems-based project management
team; bidding and negotiation of subcontracts; and achievement of project schedule
Notable Issues: Equipment and materials management on a quarter-block site / Tie-in to existing 25-story office
tower
West Publishing, 400,00 SF Production & Storage Facility in Eagan, MN
• Oversight of in-house design resources
• Overall responsibility for construction including bidding and negotiation of subcontracts and achievement of the
project schedule
Notable Issue: Reconciliation of owner’s desired storage and production layout with horizontal exiting requirements
for large undivided spaces
EDUCATION
Iowa State University, B.S., Construction Engineering
University of Iowa, B.A., Business Administration

More Related Content

What's hot (9)

16.06.27 Resume_Jeff Thompson
16.06.27 Resume_Jeff Thompson16.06.27 Resume_Jeff Thompson
16.06.27 Resume_Jeff Thompson
 
Fred Bonar, CV December 2015
Fred Bonar, CV December 2015Fred Bonar, CV December 2015
Fred Bonar, CV December 2015
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
Heather McCall Resume
Heather McCall ResumeHeather McCall Resume
Heather McCall Resume
 
C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
CV - John Fisher 161206 PUBLIC
CV - John Fisher 161206 PUBLICCV - John Fisher 161206 PUBLIC
CV - John Fisher 161206 PUBLIC
 
013112 mds resume9
013112 mds resume9013112 mds resume9
013112 mds resume9
 

Similar to JDH Resume 03-20-16

J. Pena Resume 12.2015
J. Pena Resume 12.2015J. Pena Resume 12.2015
J. Pena Resume 12.2015Jesse Pena
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Ray Freiha
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib
 
Wesley White Resume
Wesley White ResumeWesley White Resume
Wesley White ResumeWes White
 
Key Projects Summary
Key Projects SummaryKey Projects Summary
Key Projects SummaryBrian Lorenc
 
Optimum cm presentation 6-15-12
Optimum cm presentation  6-15-12Optimum cm presentation  6-15-12
Optimum cm presentation 6-15-12TomKummer
 
Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Kevin Munkittrick
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmNicholas Koehler
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCEJackie Mims-Rivera
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume CopyLori Mitchell
 

Similar to JDH Resume 03-20-16 (20)

J. Pena Resume 12.2015
J. Pena Resume 12.2015J. Pena Resume 12.2015
J. Pena Resume 12.2015
 
GOEFF STEBBINS RESUME
GOEFF STEBBINS RESUMEGOEFF STEBBINS RESUME
GOEFF STEBBINS RESUME
 
Don Mac Donald CV
Don Mac Donald CVDon Mac Donald CV
Don Mac Donald CV
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016
 
Wesley White Resume
Wesley White ResumeWesley White Resume
Wesley White Resume
 
NTG Resume 102016
NTG Resume 102016NTG Resume 102016
NTG Resume 102016
 
Key Projects Summary
Key Projects SummaryKey Projects Summary
Key Projects Summary
 
Resume of Djuan Jackson
Resume of Djuan JacksonResume of Djuan Jackson
Resume of Djuan Jackson
 
Resume
Resume Resume
Resume
 
Optimum cm presentation 6-15-12
Optimum cm presentation  6-15-12Optimum cm presentation  6-15-12
Optimum cm presentation 6-15-12
 
Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
Resume RJD
Resume RJDResume RJD
Resume RJD
 
Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pm
 
Ora_Melissa_Adams
Ora_Melissa_AdamsOra_Melissa_Adams
Ora_Melissa_Adams
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 

JDH Resume 03-20-16

  • 1. DAVE HILL 612.801.8042 jdh0122@msn.com EXPERIENCE 2013 – Present Holland Partners, Los Angeles Project Manager 6 th & Bixel Apartments, Los Angeles, CA • Participated in the pricing, design management, permitting, and buyout of this 606 unit, mixed-use development on the west side of downtown Los Angeles. • Wrote subcontracts for shoring, mass excavation, concrete, wood framing, etc. With the assistance of a Senior Project Manager, oversaw/supervised the writing of the majority of the subcontracts. • Supervise a team of Associate Project Managers, who are in turn directly responsible for overseeing the work of the various trades. • Have primary responsibility for maintaining the project’s cost reports. Notable Issues: Dealing with the regulatory, contractual, safety, schedule and execution-of-the-work issues associated with a site suffused with hydrocarbon contaminates / Oversight of the construction of a complex concrete superstructure while contending with the contaminated soils issues impacting the schedule and cost of that scope of work / Post start-of-work modification of the (installed) perimeter shoring system resulting from the absence of appropriate bearing soils at the elevations anticipated by the soils report 2012 – 2013 Holland Partners, Los Angeles Consultant La Brea Gateway Apartments, Los Angeles, CA • Assisted with the design management and permitting of this 179 unit, mixed-use development on the edge of West Hollywood. • Prepared the majority of the prime subcontracts for the project. Notable Issues: Dewatering and treatment of the ground water on a site with a high water table and contaminated soils / Negotiated a design-build subcontract for the concrete superstructure Pricing of Mid and High Rise Multi-Family Housing Projects in Southern California • Assistance to the Construction and Real Estate groups in pricing mid and high rise multi-family projects for construction and development in the Southern California market. • ‘Emphasis on design-build of structural, enclosure and mechanical/electrical/plumbing systems • Consultation with third party engineers and specialty contractors with respect to the most efficient and cost effective systems • Assistance in the development of a prototype high rise suitable for a number of Southern California sites in which Holland Partners has an interest 2011 – 2012 Onward Investors, Minneapolis Project Management Consultant The Commencement, Ruston, WA • Project manager for the resurrection and completion, on behalf of Onward Investors, of a 60 unit Seattle-area condominium project, which had stood unoccupied in a state of 75 to 80% completion for the previous two years • Oversight of third party design and construction resources retained to complete the work
  • 2. • Resolution of numerous unresolved and unfilled commitments to the town of Ruston made as part of the original development agreement • Completion of all unfinished exterior and interior work • Coordination and cooperation with the third party property manager retained by Onward to lease the completed units as apartments • Procurement of certificates of occupancy from the town of Ruston for all apartment units, common areas, right of ways surrounding the property, and work completed off-site on the town’s behalf as required by the development agreement Notable Issues: Replacement of 70% of the original enclosure system / Oversight of and coordination with an enclosure system consultant retained to ensure compliance with EHB 1848, the state of Washington statute requiring certification by a third party engineer that the as-built condition of the enclosure system on a multi-family housing project is consistent with the approved documents 2009 – 2011 Jensen Homes Senior Project Manager Lake of the Isles Residence, Minneapolis • Oversight of mid-project reorganization of design team • Focus on procurement of long lead time custom items Notable Issues: Procurement of numerous artisan-produced custom finishes and fixtures 2006 – 2009 CresaPartners Senior Advisor – Selected Projects St. Jude Medical, Technology Center in Little Canada • Responsibility for procurement of pre-construction governmental approvals and submittals including Environmental Assessment Worksheet • Oversight of selection of design and construction resources • Negotiation of design and construction contracts • Oversight of the design process • Review and approval of project GMP and oversight of the construction process / Monthly review of contractor’s application for payment • Oversight of project closeout and phased turnover to owner Notable Issues: Site planning for future expansion / Achievement of LEED Gold Certification for New Construction St. Jude Medical, Pre-Purchase Due Diligence of Manufacturing Facility Built by Others, San Juan, Puerto Rico • Pre-purchase analysis for St. Jude Medical of Guidant-constructed facility for the manufacture of defibrillator leads • Oversight of civil, structural, architectural, mechanical and electrical analysis of existing systems • Clarification of outstanding (Guidant) commitments to local governing authorities • Pre-purchase-decision delivery to client of comprehensive facility analysis Notable Issues: Identification of qualified local resources for facility analysis / Achievement of a balance between a level of systems analysis sufficient to permit ‘go’ or ‘no-go’ decision and the cost of such analysis University of Minnesota Physicians Mill City Clinic, Minneapolis • Oversight of selection of design and construction resources • Negotiation of design agreement and construction contract • Review and approval of project GMP • Oversight of design and construction process Notable Issue: Sizing clinic for an untested location resulted in numerous design iterations prior to achieving a balance between build-out and expansion space
  • 3. 2003 – 2006 Jensen Homes Senior Project Manager Red Mountain Residence, Aspen, CO • Management of third party design resources • Overall responsibility for construction including procurement of Pitkin County and Red Mountain Ranch Homeowner’s Association permits and approvals; bidding and negotiation of subcontracts; reconciliation of concerns posed by owners of adjacent properties Notable Issues: Protracted Pitkin County and Red Mountain Ranch Homeowner’s Association permitting and approval process / Challenges posed by a limited pool of skilled tradespeople 1996 – 2003 Ellerbe Becket VP Ellerbe Becket Construction Services – Selected Projects Carilion Stonewall Jackson Hospital, 25-Bed Critical Access Facility, Lexington, VA • Overall responsibility for construction including preparation of project schedule; bidding and negotiation of subcontracts; and interface with local governing and permitting authorities • Ongoing coordination with hospital administration designed to accommodate the needs of patients and staff while maintaining the project schedule Notable Issues: Major addition and comprehensive renovation to an active, fully functioning hospital / Significant concealed conditions encountered during installation of deep foundations Center for Health Improvement, Fitness Center & Clinic, Hays, KS • Oversight of design revisions required to achieve desired scope and budget • Overall responsibility for construction including preparation of project schedule and owner-approved GMP; bidding and negotiation of subcontracts; accommodation of owner-directed modifications; and achievement of project schedule Notable Issue: Phased occupancy of clinic versus fitness center areas State Farm Distribution Center, 200,000 SF Office & Distribution Center, Rock Hill, SC • Oversight of in-house design resources • Overall responsibility for construction including preparation of project schedule; bidding and negotiation of subcontracts; and phased turnover to owner of office and distribution spaces Notable Issues: Significant, sporadic and unanticipated veins of subsurface granite / Scarcity of skilled tradespersons Taylor Center, Athletic Facility and Admissions Office Minnesota State University, Mankato • Oversight of in-house design resources • Overall responsibility for construction including preparation of project schedule; bidding and negotiation of subcontracts; and project completion prior to basketball home opener Notable Issues: Emphasis on inclusion of local subcontractors and tradespeople / Accommodation of ongoing University activities during construction Cox Pavilion, Athletic and Concert Venue, University of Nevada, Las Vegas • Oversight of in-house design resources • Overall responsibility for construction including preparation of project schedule; bidding and negotiation of subcontracts; achievement of project schedule; and reconciliation of owner-requested extra’s versus original GMP Notable Issues: Protracted permitting process with State of Nevada’s Public Works Division / Accommodation of ongoing University activities during construction
  • 4. 1993 – 1996 David-James Homes Principal – Builder of Single Family Custom Homes, Twin Cities • Design and construction of single family homes on both a build-to-suit and speculative basis Notable Issues: Competitive challenge posed by the retail purchase of individual lots relative to the development of tracts of raw land by others / Brokerage commissions on non-presold houses 1980 – 1993 Opus Corporation Senior Project Manager – Selected Projects First Bank Place, 56-Story Office Tower in Downtown Minneapolis • Preparation of schematic and design development schedules and estimates and preparation of final GMP • Participation in construction contract negotiations and negotiation of lump sum general conditions • Overall responsibility for base building construction including oversight of systems-based project management team; bidding and negotiation of subcontracts; negotiation of change orders with owner; and achievement of project schedule Notable Issues: Negotiation of more than 1,500 work authorizations with owner’s representative / Underpinning of adjacent 14-story building 150 South Fifth Street, 36-Story Office Tower in Downtown Minneapolis • Oversight of in-house design resources • Preparation of schematic and design development schedules and estimates • Overall responsibility for base building construction including oversight of systems-based project management team; bidding and negotiation of subcontracts; and achievement of project schedule Notable Issues: Equipment and materials management on a quarter-block site / Tie-in to existing 25-story office tower West Publishing, 400,00 SF Production & Storage Facility in Eagan, MN • Oversight of in-house design resources • Overall responsibility for construction including bidding and negotiation of subcontracts and achievement of the project schedule Notable Issue: Reconciliation of owner’s desired storage and production layout with horizontal exiting requirements for large undivided spaces EDUCATION Iowa State University, B.S., Construction Engineering University of Iowa, B.A., Business Administration