Solaire San Francisco, CA
• Luxury rental high rise / townhouses
• 32 stories, 409 units
• Affordable component by co-developer
• Single level 1 car underground garage
• Construction: $135,000,000
• Area: 490,000 GSF
• Anticipated completion May 2016
• Lead high rise project in SF TransBay
phased redevelopment program
• LEED Gold targeted
• Significant interaction with & approvals
by SF redevelopment agency
Responsible for all aspects of project delivery, including
implementing the Development & Disposition Agreement
with the SF redevelopment agency and the Developer
Services Agreement with Ownership, adapting Ownership's
development program to a new market, and operating in a
very demanding and dynamic regulatory environment. Have
directed design, solicited and assisted in negotiating GMP
agreement with general contractor, established cost
allocations for shared facilities with Affordable housing co-
developer, administered GMP contract and developer
draws, managed QA, & reported to Ownership.
Coordinated utility services. Managed Owner's consultants
and Project Manager.
Moment Chicago, IL
• Luxury apartment high rise
• 45 stories, 540 units
• 380 car parking garage
• Ground floor retail
• Construction: $145,000,000
• Area: 740,000 GSF
• Anticipated completion mid-2016
• 26 month construction
• Features extensive amenities including
outdoor living areas and rooftop pool
Managed the entitlement process, assisted with pro forma
budgeting, managed development budget, directed design
from Conceptual Design through Design Development
phase. Supported evaluation of affordable housing vs.
market rate options for portion of site. Managed general
contractor solicitation and award process. Working closely
with general contractor, guided value engineering and
structuring of initial GMP scope/value. Coordinated
environmental site investigation and remediation. At end of
DD, turned project over to and supported Development
Manager during transition. LEED Silver targeted.
1001 S. State Chicago, IL
• Luxury rental high rise / lofts
• 40 story, 397 units
• 270 car parking garage
• Ground floor retail
• Construction: $110,000,000
• Area: 550,000 GSF
• Anticipated completion mid 2016
• 24 month construction
• Extensive amenities & outdoor space
• Phased attached low rise loft rental
development/separate Owner
Managed the entitlement process, assisted with pro forma
budgeting, supported Redevelopment Agreement
negotiations with City of Chicago, secured MBE/WBE
participation concession from City of Chicago, directed
design through Schematic Design phase, managed general
contractor solicitation and award process, guided value
engineering to define initial GMP value. Conducted initial
site environmental investigation and negotiated City shared
participation in cost of environmental remediation. At start
of DD, turned project over to and supported Development
Manager during transition. LEED Silver targeted.
Streeter Place Chicago, IL
• Luxury apartment high rise
• 400 car parking garage
• 54 stories, 480 units
• Ground floor retail
• Construction: $124,000,000
• Area: 765,000 GSF
• Completed 2009
• 27 month construction
• Leased ahead of schedule
Responsible for managing development from entitlement
through occupancy. Led design team to meet program
requirements. Value engineered 2% of hard cost savings to
reach an acceptable ROI / secure construction financing.
Contained Owner’s Contingency spending to 1% of project
cost. Delivered on time and on budget in a challenging
economic climate. Secured all zoning and permitting
process to achieve all approvals in a timely basis. Managed
delivery of all utilities. Negotiated agreements with &
managed all Owner consultants.
KEY PROJECTS OF BRIAN LORENC
PROJECT FACTS ROLE & KEY RESPONSIBILITIES
The Streeter Chicago, IL
• Luxury apartment high rise
• 48 stories, 489 units
• 420 car parking garage
• Ground floor retail
• Construction: $99,000,000
• Area: 770,000 GSF
• Completed 2006
• 27 month construction
• Leased faster than pro forma
• Sold for profit above expectation
As first assignment with Golub, assisted with construction
oversight and close out. Procured and directed Owner’s
direct contractors for pool equipment, AV systems, parking
control equipment security / fire alarm / life safety.
Coordinated punch list, Owner’s inspection, acceptance.
Assisted with Change Order approval and project close out,
including evaluation of General Contractor claims. Assisted
management'/leasing team in occupancy/leasing up.
Managed the retail development and build out for three
tenants including a restaurant.
630 N. McClurg Ct. Chicago, IL
• Twin 50 story apartment &
condo high rises
• 200,000 SF medical office
• Ground floor retail
• 700 car parking garage
• Construction: $175,000,000 (est)
• Area: 1,500,000 GSF
• Targeted LEED Silver certification
• Planned phased development
Assisted with program development, led the public approval
and design effort. Negotiated design consultant and Owner
consultant agreements. Performed peer design review.
Directed LEED design decisions. Led construction cost
estimating and value engineering effort with general
contractor. Negotiated utility service agreements.
Performed environmental investigation and remediation of
site and existing structure. Demolished existing CBS
studios structure. Site was sold in a land swap deal during
Design Development phase.
Grand Pier Center Chicago, IL
• 85 story condo tower
• 3 level retail
• 20 screen cinema
• Luxury townhouses
• Atrium hotel
• 1,350 car parking garage
• Area: 2,500,000 GSF
• $375,000,000 (est.)
• Phase 1 (retail/parking) built
As Vice President, directed all design and public approval
activities for a phased 2.5 M SF mixed use center. Assisted
in program development. Performed in-house peer design
reviews. Supported contract negotiations with architect and
Owner consultants. Developed hard & soft cost budgets &
hard cost estimates. Achieved design within budget &
schedule. Defined program scope changes. Assisted in
contractor procurement, planned site logistics, coordinated
construction. Managed all utility service deliveries.
Oakbrook Terrace Tower
Oakbrook Terrace, IL
• 31 story Class A Office
• 481’ tall
• Area: 775,000 SF
• Construction: $75,000,0000
• Completed 1987
• Architect: Murphy/Jahn
• High performance curtain wall
• Tallest building in Chicago suburbs
As Development Project Manager directed the design team
and construction manager from design to occupancy.
Performed in-house peer reviews, directed value
engineering, secured permits. Reviewed bid packages,
managed schedule / budget, approved scope changes,
managed Owner’s consultants. Coordinated utility services.
Developed tenant workletters, incorporated tenant
requirements, managed Landlord design coordination and
as building tenant contractor, built out multiple tenants
totaling 250,000 SF of space.
Paine Webber Tower
Chicago, IL
• 50 story Class A Office
• 680’ tall
• Area: 1,100,000 SF
• Construction: $110,000,0000
• Constructed 1990
• Architect: Cesar Pelli
• High performance curtain wall
As Development Project Manager directed the construction
manager for shell and core construction. Assisted value
engineering, secured building permits. Reviewed bid
packages, managed schedule and budget, approved scope
changes, managed Owner’s consultants / contractors.
Interfaced with anchor tenants, developed tenant
workletters, incorporated special tenant requirements,
including low voltage/IT, into shell construction for early
occupancy of anchor tenant.
KEY PROJECTS OF BRIAN LORENC
PROJECT FACTS ROLE & KEY RESPONSIBILITIES
Navy Pier Redevelopment Master
Plan Chicago, IL
• #1 tourist attraction in Illinois
• Over 8 million visitors annually
• 3,500’ long, 30 acre Pier
• Re-energize Pier, increase revenues
• Incorporate input of tenants and MPEA
• Evaluate & improve vehicular and
pedestrian circulation
• Work within architectural guidelines for
landmark facility
• Second time, provide turnkey
redevelopment plan
Assisted Master Plan Team to define development
constraints and opportunities. Assessed feasibility of
proposed retail, food/beverage and entertainment uses,
floating parking facilities, conversion of ocean liner to a
floating hotel, replanning of vehicular, service and
pedestrian circulation, and marina planning. Developed
estimated order of magnitude cost and schedule. Seven
years later provided development input for another
development team including Merlin Entertainment,
proposing a new observation wheel and repositioning of the
Pier retail component. Redevelopment plan was turnkey
with Merlin providing wheel and retail operations.
Community Colleges of Chicago
Facilities Assessment
• Narrative + data sorted by facility,
priority, building systems.
• Capital improvement recommendations/
cost allowances
• Powerful tool to reach budgeting
decisions per available funding, need
criticality, economy of scale.
As Project Executive, led multi-disciplinary team to evaluate
the condition of 30 separate facilities on City Colleges of
Chicago's 13 campuses to prioritize needs for physical
improvements, and provide a facilities condition
assessment, capital improvements recommendations and
budget. The assessment documented site, exterior
enclosure, roofing, architectural finishes, structural, MEPFP
and life safety systems, and presented the data in executive
summary and a sortable database.
Harold Washington College
Chicago, IL
• 13 story institutional building
• Over 11,000 students (busiest &
flagship campus of City Colleges)
• Reprogramming/complete renovation of
public, classroom, laboratory, and office
spaces
• Construction: $26,000,000
• Area: 330,000 SF
• Four phases tied to College academic
calendar
• $5,000,000 savings in buyout
• Completed on time and on budget
As Owner's Rep, planned, budgeted, coordinated design
and interfaced with College administration and Owner to
resolve priorities and finalize program requirements.
Solicited, evaluated, and procured the general contractor.
Managed the construction process including approving
contractor pay applications. Coordinated punch list,
commissioning, occupancy coordination, and project close-
out. Developed a comprehensive construction staging plan
for the renovation work to minimize project cost, duration
and disruption to College operations, and to maximize
construction efficiency. Developed a construction phasing
plan that met all of CCC's objectives, including maintaining a
required minimum of 75 classrooms in each construction
phase.
Regenstein Small Mammal Reptile
House Lincoln Park Zoo
Chicago, IL
• 2 story animal exhibit facility
• Area: 32,000 SF
• Construction: $13,000,000
• Completed 1997
• 40’ dome high space frame
• 3 separate mechanical systems
• Houses over 200 species
As Owner's Representative, delivered program
management services to 3 entity Ownership with divergent
needs and priorities. Directed design team including
specialty zoo exhibit design consultants. Managed Owner
consultants. Developed cost estimate. Solicited and
awarded general contract. Directed permitting. Oversaw
construction, incorporated scope changes, approved
change orders, approved contractor pay applications.
Coordinated commissioning and occupancy.

More Related Content

What's hot

R&A - Drake Builders - Company Overview & Project Portfolio
R&A - Drake Builders - Company Overview & Project PortfolioR&A - Drake Builders - Company Overview & Project Portfolio
R&A - Drake Builders - Company Overview & Project PortfolioJosh Rendon
 
RAL Project Overview 10052015a
RAL Project Overview 10052015aRAL Project Overview 10052015a
RAL Project Overview 10052015aRon Lindsey
 
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In BreraConvegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In BreraViessmann Italia
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJonathan Hay
 
Recent Work Samples of Peng Wang
Recent Work Samples of Peng WangRecent Work Samples of Peng Wang
Recent Work Samples of Peng Wangwangpengtju
 
Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Kevin Munkittrick
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJonathan Hay
 

What's hot (7)

R&A - Drake Builders - Company Overview & Project Portfolio
R&A - Drake Builders - Company Overview & Project PortfolioR&A - Drake Builders - Company Overview & Project Portfolio
R&A - Drake Builders - Company Overview & Project Portfolio
 
RAL Project Overview 10052015a
RAL Project Overview 10052015aRAL Project Overview 10052015a
RAL Project Overview 10052015a
 
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In BreraConvegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
Convegni 2013/ Marco Amosso, Lombardini22 - Ristritturazione In Brera
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dp
 
Recent Work Samples of Peng Wang
Recent Work Samples of Peng WangRecent Work Samples of Peng Wang
Recent Work Samples of Peng Wang
 
Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16Munk Resume 2016 DC KM 10-9-16
Munk Resume 2016 DC KM 10-9-16
 
J hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dpJ hay resume final com pm 2016 v dp
J hay resume final com pm 2016 v dp
 

Viewers also liked

Fab Change Day Activists School (Leeds)
Fab Change Day Activists School (Leeds)Fab Change Day Activists School (Leeds)
Fab Change Day Activists School (Leeds)NHS Horizons
 
npemisseion CB engines
npemisseion CB enginesnpemisseion CB engines
npemisseion CB enginesAmal Mohanan
 
Revised workshop with additional PM slides
Revised workshop with additional PM slidesRevised workshop with additional PM slides
Revised workshop with additional PM slidesNHS Horizons
 
Phenomenology of Spirit
Phenomenology of SpiritPhenomenology of Spirit
Phenomenology of SpiritEli Nogueira
 
How to rock the boat and stay in it: The School for Health and Care Radicals
How to rock the boat and stay in it: The School for Health and Care RadicalsHow to rock the boat and stay in it: The School for Health and Care Radicals
How to rock the boat and stay in it: The School for Health and Care RadicalsNHS Horizons
 
How to create change that sticks and spreads
How to create change that sticks and spreadsHow to create change that sticks and spreads
How to create change that sticks and spreadsNHS Horizons
 
Minicourse M8: pre-reading and workbook
Minicourse M8: pre-reading and workbookMinicourse M8: pre-reading and workbook
Minicourse M8: pre-reading and workbookNHS Horizons
 
2016 Medicaid Final
2016 Medicaid Final2016 Medicaid Final
2016 Medicaid FinalAri Gottlieb
 
Transcript for August 2016 – Edge Talk: Managing Talent in Health and Social ...
Transcript for August 2016 – Edge Talk: Managing Talent in Health and Social ...Transcript for August 2016 – Edge Talk: Managing Talent in Health and Social ...
Transcript for August 2016 – Edge Talk: Managing Talent in Health and Social ...NHS Horizons
 
Edge Talks November 2016: Fixing Patient Flow
Edge Talks November 2016: Fixing Patient FlowEdge Talks November 2016: Fixing Patient Flow
Edge Talks November 2016: Fixing Patient FlowNHS Horizons
 
Lone wolves, mobilisers and organisers
Lone wolves, mobilisers and organisersLone wolves, mobilisers and organisers
Lone wolves, mobilisers and organisersNHS Horizons
 
Chat from EdgeTalks on 2 December 2016
Chat from EdgeTalks on 2 December 2016Chat from EdgeTalks on 2 December 2016
Chat from EdgeTalks on 2 December 2016NHS Horizons
 
School for change agents - Module 1 transcript
School for change agents - Module 1 transcriptSchool for change agents - Module 1 transcript
School for change agents - Module 1 transcriptNHS Horizons
 
Leading into the future
Leading into the future Leading into the future
Leading into the future NHS Horizons
 
Module 2 study guide
Module 2 study guideModule 2 study guide
Module 2 study guideNHS Horizons
 

Viewers also liked (16)

Fab Change Day Activists School (Leeds)
Fab Change Day Activists School (Leeds)Fab Change Day Activists School (Leeds)
Fab Change Day Activists School (Leeds)
 
npemisseion CB engines
npemisseion CB enginesnpemisseion CB engines
npemisseion CB engines
 
Revised workshop with additional PM slides
Revised workshop with additional PM slidesRevised workshop with additional PM slides
Revised workshop with additional PM slides
 
Phenomenology of Spirit
Phenomenology of SpiritPhenomenology of Spirit
Phenomenology of Spirit
 
How to rock the boat and stay in it: The School for Health and Care Radicals
How to rock the boat and stay in it: The School for Health and Care RadicalsHow to rock the boat and stay in it: The School for Health and Care Radicals
How to rock the boat and stay in it: The School for Health and Care Radicals
 
How to create change that sticks and spreads
How to create change that sticks and spreadsHow to create change that sticks and spreads
How to create change that sticks and spreads
 
Minicourse M8: pre-reading and workbook
Minicourse M8: pre-reading and workbookMinicourse M8: pre-reading and workbook
Minicourse M8: pre-reading and workbook
 
2016 Medicaid Final
2016 Medicaid Final2016 Medicaid Final
2016 Medicaid Final
 
Transcript for August 2016 – Edge Talk: Managing Talent in Health and Social ...
Transcript for August 2016 – Edge Talk: Managing Talent in Health and Social ...Transcript for August 2016 – Edge Talk: Managing Talent in Health and Social ...
Transcript for August 2016 – Edge Talk: Managing Talent in Health and Social ...
 
Edge Talks November 2016: Fixing Patient Flow
Edge Talks November 2016: Fixing Patient FlowEdge Talks November 2016: Fixing Patient Flow
Edge Talks November 2016: Fixing Patient Flow
 
Lone wolves, mobilisers and organisers
Lone wolves, mobilisers and organisersLone wolves, mobilisers and organisers
Lone wolves, mobilisers and organisers
 
Chat from EdgeTalks on 2 December 2016
Chat from EdgeTalks on 2 December 2016Chat from EdgeTalks on 2 December 2016
Chat from EdgeTalks on 2 December 2016
 
School for change agents - Module 1 transcript
School for change agents - Module 1 transcriptSchool for change agents - Module 1 transcript
School for change agents - Module 1 transcript
 
CV
CVCV
CV
 
Leading into the future
Leading into the future Leading into the future
Leading into the future
 
Module 2 study guide
Module 2 study guideModule 2 study guide
Module 2 study guide
 

Similar to Key Projects Summary

J. Pena Resume 12.2015
J. Pena Resume 12.2015J. Pena Resume 12.2015
J. Pena Resume 12.2015Jesse Pena
 
rana projects 2016.pptx (1)
rana projects 2016.pptx (1)rana projects 2016.pptx (1)
rana projects 2016.pptx (1)Rana Kark
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmNicholas Koehler
 
Optimum cm presentation 6-15-12
Optimum cm presentation  6-15-12Optimum cm presentation  6-15-12
Optimum cm presentation 6-15-12TomKummer
 
Project Delivery and Best Practices
Project Delivery and Best PracticesProject Delivery and Best Practices
Project Delivery and Best PracticesAusrine Rakauskaite
 
JDH Resume 03-20-16
JDH Resume 03-20-16JDH Resume 03-20-16
JDH Resume 03-20-16Dave Hill
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Greg frucci resume architect 2010
Greg frucci resume   architect 2010Greg frucci resume   architect 2010
Greg frucci resume architect 2010Greg Frucci
 
JAKE SCHOEFFLER's - Resume
JAKE SCHOEFFLER's - ResumeJAKE SCHOEFFLER's - Resume
JAKE SCHOEFFLER's - Resumejacob schoeffler
 
Brokerage Simplified
Brokerage SimplifiedBrokerage Simplified
Brokerage Simplifiedmcmahonkevin
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012REDceo.net
 

Similar to Key Projects Summary (20)

J. Pena Resume 12.2015
J. Pena Resume 12.2015J. Pena Resume 12.2015
J. Pena Resume 12.2015
 
rana projects 2016.pptx (1)
rana projects 2016.pptx (1)rana projects 2016.pptx (1)
rana projects 2016.pptx (1)
 
RESUMEUPDATE[2]
RESUMEUPDATE[2]RESUMEUPDATE[2]
RESUMEUPDATE[2]
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pm
 
Achieving Modular Multifamily Affordable Housing
Achieving Modular Multifamily Affordable HousingAchieving Modular Multifamily Affordable Housing
Achieving Modular Multifamily Affordable Housing
 
Optimum cm presentation 6-15-12
Optimum cm presentation  6-15-12Optimum cm presentation  6-15-12
Optimum cm presentation 6-15-12
 
Project Delivery and Best Practices
Project Delivery and Best PracticesProject Delivery and Best Practices
Project Delivery and Best Practices
 
JDH Resume 03-20-16
JDH Resume 03-20-16JDH Resume 03-20-16
JDH Resume 03-20-16
 
Resume
Resume Resume
Resume
 
150911 Resume
150911 Resume150911 Resume
150911 Resume
 
Resume of Djuan Jackson
Resume of Djuan JacksonResume of Djuan Jackson
Resume of Djuan Jackson
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
Builder builder
Builder builderBuilder builder
Builder builder
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Greg frucci resume architect 2010
Greg frucci resume   architect 2010Greg frucci resume   architect 2010
Greg frucci resume architect 2010
 
JAKE SCHOEFFLER's - Resume
JAKE SCHOEFFLER's - ResumeJAKE SCHOEFFLER's - Resume
JAKE SCHOEFFLER's - Resume
 
Brokerage Simplified
Brokerage SimplifiedBrokerage Simplified
Brokerage Simplified
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
 

Key Projects Summary

  • 1. KEY PROJECTS OF BRIAN LORENC PROJECT FACTS ROLE & KEY RESPONSIBILITIES Solaire San Francisco, CA • Luxury rental high rise / townhouses • 32 stories, 409 units • Affordable component by co-developer • Single level 1 car underground garage • Construction: $135,000,000 • Area: 490,000 GSF • Anticipated completion May 2016 • Lead high rise project in SF TransBay phased redevelopment program • LEED Gold targeted • Significant interaction with & approvals by SF redevelopment agency Responsible for all aspects of project delivery, including implementing the Development & Disposition Agreement with the SF redevelopment agency and the Developer Services Agreement with Ownership, adapting Ownership's development program to a new market, and operating in a very demanding and dynamic regulatory environment. Have directed design, solicited and assisted in negotiating GMP agreement with general contractor, established cost allocations for shared facilities with Affordable housing co- developer, administered GMP contract and developer draws, managed QA, & reported to Ownership. Coordinated utility services. Managed Owner's consultants and Project Manager. Moment Chicago, IL • Luxury apartment high rise • 45 stories, 540 units • 380 car parking garage • Ground floor retail • Construction: $145,000,000 • Area: 740,000 GSF • Anticipated completion mid-2016 • 26 month construction • Features extensive amenities including outdoor living areas and rooftop pool Managed the entitlement process, assisted with pro forma budgeting, managed development budget, directed design from Conceptual Design through Design Development phase. Supported evaluation of affordable housing vs. market rate options for portion of site. Managed general contractor solicitation and award process. Working closely with general contractor, guided value engineering and structuring of initial GMP scope/value. Coordinated environmental site investigation and remediation. At end of DD, turned project over to and supported Development Manager during transition. LEED Silver targeted. 1001 S. State Chicago, IL • Luxury rental high rise / lofts • 40 story, 397 units • 270 car parking garage • Ground floor retail • Construction: $110,000,000 • Area: 550,000 GSF • Anticipated completion mid 2016 • 24 month construction • Extensive amenities & outdoor space • Phased attached low rise loft rental development/separate Owner Managed the entitlement process, assisted with pro forma budgeting, supported Redevelopment Agreement negotiations with City of Chicago, secured MBE/WBE participation concession from City of Chicago, directed design through Schematic Design phase, managed general contractor solicitation and award process, guided value engineering to define initial GMP value. Conducted initial site environmental investigation and negotiated City shared participation in cost of environmental remediation. At start of DD, turned project over to and supported Development Manager during transition. LEED Silver targeted. Streeter Place Chicago, IL • Luxury apartment high rise • 400 car parking garage • 54 stories, 480 units • Ground floor retail • Construction: $124,000,000 • Area: 765,000 GSF • Completed 2009 • 27 month construction • Leased ahead of schedule Responsible for managing development from entitlement through occupancy. Led design team to meet program requirements. Value engineered 2% of hard cost savings to reach an acceptable ROI / secure construction financing. Contained Owner’s Contingency spending to 1% of project cost. Delivered on time and on budget in a challenging economic climate. Secured all zoning and permitting process to achieve all approvals in a timely basis. Managed delivery of all utilities. Negotiated agreements with & managed all Owner consultants.
  • 2. KEY PROJECTS OF BRIAN LORENC PROJECT FACTS ROLE & KEY RESPONSIBILITIES The Streeter Chicago, IL • Luxury apartment high rise • 48 stories, 489 units • 420 car parking garage • Ground floor retail • Construction: $99,000,000 • Area: 770,000 GSF • Completed 2006 • 27 month construction • Leased faster than pro forma • Sold for profit above expectation As first assignment with Golub, assisted with construction oversight and close out. Procured and directed Owner’s direct contractors for pool equipment, AV systems, parking control equipment security / fire alarm / life safety. Coordinated punch list, Owner’s inspection, acceptance. Assisted with Change Order approval and project close out, including evaluation of General Contractor claims. Assisted management'/leasing team in occupancy/leasing up. Managed the retail development and build out for three tenants including a restaurant. 630 N. McClurg Ct. Chicago, IL • Twin 50 story apartment & condo high rises • 200,000 SF medical office • Ground floor retail • 700 car parking garage • Construction: $175,000,000 (est) • Area: 1,500,000 GSF • Targeted LEED Silver certification • Planned phased development Assisted with program development, led the public approval and design effort. Negotiated design consultant and Owner consultant agreements. Performed peer design review. Directed LEED design decisions. Led construction cost estimating and value engineering effort with general contractor. Negotiated utility service agreements. Performed environmental investigation and remediation of site and existing structure. Demolished existing CBS studios structure. Site was sold in a land swap deal during Design Development phase. Grand Pier Center Chicago, IL • 85 story condo tower • 3 level retail • 20 screen cinema • Luxury townhouses • Atrium hotel • 1,350 car parking garage • Area: 2,500,000 GSF • $375,000,000 (est.) • Phase 1 (retail/parking) built As Vice President, directed all design and public approval activities for a phased 2.5 M SF mixed use center. Assisted in program development. Performed in-house peer design reviews. Supported contract negotiations with architect and Owner consultants. Developed hard & soft cost budgets & hard cost estimates. Achieved design within budget & schedule. Defined program scope changes. Assisted in contractor procurement, planned site logistics, coordinated construction. Managed all utility service deliveries. Oakbrook Terrace Tower Oakbrook Terrace, IL • 31 story Class A Office • 481’ tall • Area: 775,000 SF • Construction: $75,000,0000 • Completed 1987 • Architect: Murphy/Jahn • High performance curtain wall • Tallest building in Chicago suburbs As Development Project Manager directed the design team and construction manager from design to occupancy. Performed in-house peer reviews, directed value engineering, secured permits. Reviewed bid packages, managed schedule / budget, approved scope changes, managed Owner’s consultants. Coordinated utility services. Developed tenant workletters, incorporated tenant requirements, managed Landlord design coordination and as building tenant contractor, built out multiple tenants totaling 250,000 SF of space. Paine Webber Tower Chicago, IL • 50 story Class A Office • 680’ tall • Area: 1,100,000 SF • Construction: $110,000,0000 • Constructed 1990 • Architect: Cesar Pelli • High performance curtain wall As Development Project Manager directed the construction manager for shell and core construction. Assisted value engineering, secured building permits. Reviewed bid packages, managed schedule and budget, approved scope changes, managed Owner’s consultants / contractors. Interfaced with anchor tenants, developed tenant workletters, incorporated special tenant requirements, including low voltage/IT, into shell construction for early occupancy of anchor tenant.
  • 3. KEY PROJECTS OF BRIAN LORENC PROJECT FACTS ROLE & KEY RESPONSIBILITIES Navy Pier Redevelopment Master Plan Chicago, IL • #1 tourist attraction in Illinois • Over 8 million visitors annually • 3,500’ long, 30 acre Pier • Re-energize Pier, increase revenues • Incorporate input of tenants and MPEA • Evaluate & improve vehicular and pedestrian circulation • Work within architectural guidelines for landmark facility • Second time, provide turnkey redevelopment plan Assisted Master Plan Team to define development constraints and opportunities. Assessed feasibility of proposed retail, food/beverage and entertainment uses, floating parking facilities, conversion of ocean liner to a floating hotel, replanning of vehicular, service and pedestrian circulation, and marina planning. Developed estimated order of magnitude cost and schedule. Seven years later provided development input for another development team including Merlin Entertainment, proposing a new observation wheel and repositioning of the Pier retail component. Redevelopment plan was turnkey with Merlin providing wheel and retail operations. Community Colleges of Chicago Facilities Assessment • Narrative + data sorted by facility, priority, building systems. • Capital improvement recommendations/ cost allowances • Powerful tool to reach budgeting decisions per available funding, need criticality, economy of scale. As Project Executive, led multi-disciplinary team to evaluate the condition of 30 separate facilities on City Colleges of Chicago's 13 campuses to prioritize needs for physical improvements, and provide a facilities condition assessment, capital improvements recommendations and budget. The assessment documented site, exterior enclosure, roofing, architectural finishes, structural, MEPFP and life safety systems, and presented the data in executive summary and a sortable database. Harold Washington College Chicago, IL • 13 story institutional building • Over 11,000 students (busiest & flagship campus of City Colleges) • Reprogramming/complete renovation of public, classroom, laboratory, and office spaces • Construction: $26,000,000 • Area: 330,000 SF • Four phases tied to College academic calendar • $5,000,000 savings in buyout • Completed on time and on budget As Owner's Rep, planned, budgeted, coordinated design and interfaced with College administration and Owner to resolve priorities and finalize program requirements. Solicited, evaluated, and procured the general contractor. Managed the construction process including approving contractor pay applications. Coordinated punch list, commissioning, occupancy coordination, and project close- out. Developed a comprehensive construction staging plan for the renovation work to minimize project cost, duration and disruption to College operations, and to maximize construction efficiency. Developed a construction phasing plan that met all of CCC's objectives, including maintaining a required minimum of 75 classrooms in each construction phase. Regenstein Small Mammal Reptile House Lincoln Park Zoo Chicago, IL • 2 story animal exhibit facility • Area: 32,000 SF • Construction: $13,000,000 • Completed 1997 • 40’ dome high space frame • 3 separate mechanical systems • Houses over 200 species As Owner's Representative, delivered program management services to 3 entity Ownership with divergent needs and priorities. Directed design team including specialty zoo exhibit design consultants. Managed Owner consultants. Developed cost estimate. Solicited and awarded general contract. Directed permitting. Oversaw construction, incorporated scope changes, approved change orders, approved contractor pay applications. Coordinated commissioning and occupancy.