SlideShare a Scribd company logo
1 of 2
Curriculum Vitae
FFREDRED N. BN. BONARONAR, P.E., P.E.
714-697-7997 fbonar@sbcglobal.net
Years in the Industry: 40
EDUCATION AND REGISTRATION:
B.S. Civil Engineering, Washington State University, 1968
Post Grad Work
Estimating, University of Southern California
Meteorology, Long Beach City College
Design Build Institute Seminar
CURRENT PROFESSIONAL AFFILIATIONS:
American Society of Civil Engineers
Construction Institute
LICENSES:
Registered Professional Engineer:
California 22800
Washington 14013
Oregon 17944PE
Arizona 36219
General Contracting Licenses:
Former General Building &
General Engineering Contractor
Private Pilot - Glider, Motor Glider
EXPERIENCE:
Mr. Bonar’s knowledge of the Construction Industry has
been gained as a General Contractor in the public/private
market for 8 years and 10 years as a Developer/General
Contractor in the Industrial and Office market. He has held
positions as an Owners Representative on a Major
Petroleum Refinery Project and on Unit Expansions and
Upgrades. Construction Management experience includes
the initial Emergency Construction Management at Cal-
State Northridge following the 1994 earthquake and on the
Los Angeles Unified Bond B School Construction and
Renovation Program. Mr. Bonar also provided
Construction Management Services to complete a troubled
Casino/Hotel Project.
As Southwest Regional President for Construction Risk
Technology, Inc, a national construction claims consulting
firm serving the surety and construction industries, He
continued to provide Litigation Support and Expert Witness
Services on the Casino/Hotel Project.
PROJECT EXPERIENCE:
The Reserve
Housing tract in San Clemente with construction defects
related to geotechnical and contract compliance issues .
Bel Air Residence
$18 Million Dollar residence with claimed Construction
Defects involving drainage, hillside slippage of the
property, structural, and water intrusion at windows and
precast elements.
Bella Rosa Condominiums
20 acre condominium complex in Anthem, Arizona, where
the Engineered Topographic Survey was 1.5 feet in error
resulting in the unanticipated export of cut on a grading
plan that was to be balanced.
Charter School
Charter School on a California State University LA campus
constructed as a $10 Million dollar Design Build with
resultant dispute between Architect client and Contractor.
Saint Gobain Madera, Ca
Glass furnace crown fell causing delay in completion and
resulted in repair and delay damages due to faulty
fabrication not in compliance with contract documents.
91st
Street Waste Water Treatment Plant: Expert
Witness and Construction Consultant representing the
Contractor on a $125 million dollar Treatment Plant for the
City of Phoenix, involving termination; claims; delay;
payment; and incomplete, defective and deficient work.
Cardiff by the Sea Residence
Benedict Canyon Residence
Santa Maria High School: Expert Witness on construction
defect litigation involving the Aluminum Glass and Glazing
Window and Storefront System.
Hollywood Residence
Apartment Building
Silver Lake Residence
Commerce Casino and Hotel: Construction Manager for
this $30 million dollar Casino and High Rise Hotel project
troubled by General Contractor delays resulting in a cost of
$54 million. As the Owners Rep returned momentum to
the project for through problem resolution, payments,
change order settlements, scheduling and leadership. On
completion of the project, Expert Witness Services were
provided for litigation support on the resultant Legal
actions.
7/11/2016
Fred N. Bonar – Curriculum Vitae
Page 2
Los Angeles Unified School District, Bond B
Construction and Renovation Program: Project
Manager on Operation Area Number 7 consisting of 100
schools and approximately 460 projects worth $250 million.
This $2.4 billion dollar 5 year program included new
construction, modernization and deferred maintenance
projects with a staff of 31 construction managers,
schedulers, estimators, document control, contact
administrators and support personnel. Services provided
included project scope development, design selection and
management bid and award and site construction
management.
General Manager Construction Division, CMTS, Inc.: As
General Manager management duties included, estimating,
subcontracting, accounting, personnel, business
development and field operations. The Division self
performed structural concrete while subcontracting other
trades.
Claims/Estimating at Ontario International Airport: As
a member of the Bechtel Infrastructure Corporation
Construction Management Team for the project, estimated,
reviewed and negotiated contractor claims.
Project Manager, CMTS Construction Management at
California State Northridge: Project Manager for
emergency earthquake repairs at California State
University, Northridge. Directed a staff of 90 performing
program management, project management, document
control, scheduling (primavera), safety, accounting and
inspection. Damage to over 100 buildings was managed at
a cost of $85 million.
President, Westway Contractors, Inc.: Responsible for
all construction operations for Westway Contractors, which
constructed projects for the parent development
corporation(s); design/ build projects for outside clients and
structural concrete works in the public sector. Responsible
for projects from purchase of land thru occupancy by
tenants. This included preliminary site evaluation and
estimates, design coordination and value engineering,
environmental reports, entitlements, subcontracting and
field management of project and staff. Westway self
performed structural and tilt-up concrete on associated
development projects and as a subcontractor for others
.
Los Angeles International Airport, Remote Terminals &
Taxiways, Brutoco Engineering & Construction:
Managed Remote Terminal and Taxiway Project at LAX,
completing an $8 million contract in 8 months. Supervised
or directed scheduling, change orders, subcontractors,
progress billings and field personnel performing earthwork,
base, concrete paving, structural concrete and
underground utilities. Concrete Paving operations were
accomplished thru a combination of subcontracted placing
and company batch plant.
Partner, Magnus Company, General Contractor:
Founded a public works general contracting firm and
guided its growth to contracts of $1 million and a volume of
$5 million per year. Managed or oversaw accounting,
bonding, legal and insurance. In addition, coordinated
estimating and bidding process to a proposal and contract
with owner. The organization self performed rough
carpentry and structural concrete with a force of four
superintendents and twenty craftsman.
Project Manager, August Company, General
Contractor: Managed multiple projects, field personnel
and subcontractors for a public works building contractor.
Coordinated project RFI’s with Owner, Architect or
Engineer to resolve plan and specification discrepancies or
clarifications. Negotiated subcontracts, purchase orders,
and change orders. Reviewed and approved monthly
progress billings to owners and payments to
subcontractors and vendors. Developed and maintained
schedules with project superintendents and monitored
adherence. Participated in estimating and bidding projects.
Initiated and maintained positive client relationships.
Project Engineer, Atlantic Richfield Company, Carson,
California and Bellingham, Washington: Designed,
budgeted, scheduled, and inspected waste water treatment
facility for refinery effluent. Monitored conformance to
plans and specification as construction engineer on refinery
project and initiated and reviewed field changes. Managed
fractionator, gas recovery and utilities units on shale oil
project as project engineer, coordinating design efforts to
incorporate company standards and specific plant
requirements.
7/11/2016

More Related Content

What's hot

project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy McKinzie
 
Basement remodel rev eh
Basement remodel rev ehBasement remodel rev eh
Basement remodel rev ehesands2437
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Ron White
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentationKunal Gudwani
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resumerstinnett
 
Schamel Resume 2016.3
Schamel Resume 2016.3Schamel Resume 2016.3
Schamel Resume 2016.3Rob Schamel
 
Project Experience
Project ExperienceProject Experience
Project Experienceejfrench4
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1DavidJPCChai
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)JamesMoy7
 
JDH Resume 03-20-16
JDH Resume 03-20-16JDH Resume 03-20-16
JDH Resume 03-20-16Dave Hill
 

What's hot (20)

STM CV 2016
STM CV 2016STM CV 2016
STM CV 2016
 
Project background
Project backgroundProject background
Project background
 
CM Resume
CM Resume CM Resume
CM Resume
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
Jvm resume
Jvm resumeJvm resume
Jvm resume
 
resume
resumeresume
resume
 
Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015
 
DSSCondoppt
DSSCondopptDSSCondoppt
DSSCondoppt
 
Basement remodel rev eh
Basement remodel rev ehBasement remodel rev eh
Basement remodel rev eh
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentation
 
Contracts 2
Contracts 2Contracts 2
Contracts 2
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
 
Farrington
FarringtonFarrington
Farrington
 
Schamel Resume 2016.3
Schamel Resume 2016.3Schamel Resume 2016.3
Schamel Resume 2016.3
 
Project Experience
Project ExperienceProject Experience
Project Experience
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
Resume 05_02_15
Resume 05_02_15Resume 05_02_15
Resume 05_02_15
 
JDH Resume 03-20-16
JDH Resume 03-20-16JDH Resume 03-20-16
JDH Resume 03-20-16
 

Similar to Fred Bonar, CV December 2015

Loutfy_Monif November 2014
Loutfy_Monif  November  2014Loutfy_Monif  November  2014
Loutfy_Monif November 2014Monif Loutfy
 
Affordable Housing Development Consultant
Affordable Housing Development ConsultantAffordable Housing Development Consultant
Affordable Housing Development ConsultantPaul Kruger, PMP
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCEJackie Mims-Rivera
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam Keane
 
JayPatel_Resume_2016
JayPatel_Resume_2016JayPatel_Resume_2016
JayPatel_Resume_2016Jay Patel
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCEJackie Mims-Rivera
 
diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)Lilly K
 
Project Charter Summery
Project Charter SummeryProject Charter Summery
Project Charter SummeryDerek Cooksey
 
John D Parris 2015
John D Parris  2015John D Parris  2015
John D Parris 2015John Parris
 
Peter Leal Resume 2015
Peter Leal Resume 2015Peter Leal Resume 2015
Peter Leal Resume 2015Peter Leal
 
Resume And Detailed Project History
Resume And Detailed Project HistoryResume And Detailed Project History
Resume And Detailed Project Historysgarrison1960
 

Similar to Fred Bonar, CV December 2015 (20)

Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
Loutfy_Monif November 2014
Loutfy_Monif  November  2014Loutfy_Monif  November  2014
Loutfy_Monif November 2014
 
Affordable Housing Development Consultant
Affordable Housing Development ConsultantAffordable Housing Development Consultant
Affordable Housing Development Consultant
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
JayPatel_Resume_2016
JayPatel_Resume_2016JayPatel_Resume_2016
JayPatel_Resume_2016
 
Dudley 2-7-2017
Dudley 2-7-2017Dudley 2-7-2017
Dudley 2-7-2017
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)
 
Evans Barba Bio
Evans Barba BioEvans Barba Bio
Evans Barba Bio
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
Project Charter Summery
Project Charter SummeryProject Charter Summery
Project Charter Summery
 
John D Parris 2015
John D Parris  2015John D Parris  2015
John D Parris 2015
 
Peter Leal Resume 2015
Peter Leal Resume 2015Peter Leal Resume 2015
Peter Leal Resume 2015
 
Resume And Detailed Project History
Resume And Detailed Project HistoryResume And Detailed Project History
Resume And Detailed Project History
 
CLP - resume
CLP - resumeCLP - resume
CLP - resume
 

Fred Bonar, CV December 2015

  • 1. Curriculum Vitae FFREDRED N. BN. BONARONAR, P.E., P.E. 714-697-7997 fbonar@sbcglobal.net Years in the Industry: 40 EDUCATION AND REGISTRATION: B.S. Civil Engineering, Washington State University, 1968 Post Grad Work Estimating, University of Southern California Meteorology, Long Beach City College Design Build Institute Seminar CURRENT PROFESSIONAL AFFILIATIONS: American Society of Civil Engineers Construction Institute LICENSES: Registered Professional Engineer: California 22800 Washington 14013 Oregon 17944PE Arizona 36219 General Contracting Licenses: Former General Building & General Engineering Contractor Private Pilot - Glider, Motor Glider EXPERIENCE: Mr. Bonar’s knowledge of the Construction Industry has been gained as a General Contractor in the public/private market for 8 years and 10 years as a Developer/General Contractor in the Industrial and Office market. He has held positions as an Owners Representative on a Major Petroleum Refinery Project and on Unit Expansions and Upgrades. Construction Management experience includes the initial Emergency Construction Management at Cal- State Northridge following the 1994 earthquake and on the Los Angeles Unified Bond B School Construction and Renovation Program. Mr. Bonar also provided Construction Management Services to complete a troubled Casino/Hotel Project. As Southwest Regional President for Construction Risk Technology, Inc, a national construction claims consulting firm serving the surety and construction industries, He continued to provide Litigation Support and Expert Witness Services on the Casino/Hotel Project. PROJECT EXPERIENCE: The Reserve Housing tract in San Clemente with construction defects related to geotechnical and contract compliance issues . Bel Air Residence $18 Million Dollar residence with claimed Construction Defects involving drainage, hillside slippage of the property, structural, and water intrusion at windows and precast elements. Bella Rosa Condominiums 20 acre condominium complex in Anthem, Arizona, where the Engineered Topographic Survey was 1.5 feet in error resulting in the unanticipated export of cut on a grading plan that was to be balanced. Charter School Charter School on a California State University LA campus constructed as a $10 Million dollar Design Build with resultant dispute between Architect client and Contractor. Saint Gobain Madera, Ca Glass furnace crown fell causing delay in completion and resulted in repair and delay damages due to faulty fabrication not in compliance with contract documents. 91st Street Waste Water Treatment Plant: Expert Witness and Construction Consultant representing the Contractor on a $125 million dollar Treatment Plant for the City of Phoenix, involving termination; claims; delay; payment; and incomplete, defective and deficient work. Cardiff by the Sea Residence Benedict Canyon Residence Santa Maria High School: Expert Witness on construction defect litigation involving the Aluminum Glass and Glazing Window and Storefront System. Hollywood Residence Apartment Building Silver Lake Residence Commerce Casino and Hotel: Construction Manager for this $30 million dollar Casino and High Rise Hotel project troubled by General Contractor delays resulting in a cost of $54 million. As the Owners Rep returned momentum to the project for through problem resolution, payments, change order settlements, scheduling and leadership. On completion of the project, Expert Witness Services were provided for litigation support on the resultant Legal actions. 7/11/2016
  • 2. Fred N. Bonar – Curriculum Vitae Page 2 Los Angeles Unified School District, Bond B Construction and Renovation Program: Project Manager on Operation Area Number 7 consisting of 100 schools and approximately 460 projects worth $250 million. This $2.4 billion dollar 5 year program included new construction, modernization and deferred maintenance projects with a staff of 31 construction managers, schedulers, estimators, document control, contact administrators and support personnel. Services provided included project scope development, design selection and management bid and award and site construction management. General Manager Construction Division, CMTS, Inc.: As General Manager management duties included, estimating, subcontracting, accounting, personnel, business development and field operations. The Division self performed structural concrete while subcontracting other trades. Claims/Estimating at Ontario International Airport: As a member of the Bechtel Infrastructure Corporation Construction Management Team for the project, estimated, reviewed and negotiated contractor claims. Project Manager, CMTS Construction Management at California State Northridge: Project Manager for emergency earthquake repairs at California State University, Northridge. Directed a staff of 90 performing program management, project management, document control, scheduling (primavera), safety, accounting and inspection. Damage to over 100 buildings was managed at a cost of $85 million. President, Westway Contractors, Inc.: Responsible for all construction operations for Westway Contractors, which constructed projects for the parent development corporation(s); design/ build projects for outside clients and structural concrete works in the public sector. Responsible for projects from purchase of land thru occupancy by tenants. This included preliminary site evaluation and estimates, design coordination and value engineering, environmental reports, entitlements, subcontracting and field management of project and staff. Westway self performed structural and tilt-up concrete on associated development projects and as a subcontractor for others . Los Angeles International Airport, Remote Terminals & Taxiways, Brutoco Engineering & Construction: Managed Remote Terminal and Taxiway Project at LAX, completing an $8 million contract in 8 months. Supervised or directed scheduling, change orders, subcontractors, progress billings and field personnel performing earthwork, base, concrete paving, structural concrete and underground utilities. Concrete Paving operations were accomplished thru a combination of subcontracted placing and company batch plant. Partner, Magnus Company, General Contractor: Founded a public works general contracting firm and guided its growth to contracts of $1 million and a volume of $5 million per year. Managed or oversaw accounting, bonding, legal and insurance. In addition, coordinated estimating and bidding process to a proposal and contract with owner. The organization self performed rough carpentry and structural concrete with a force of four superintendents and twenty craftsman. Project Manager, August Company, General Contractor: Managed multiple projects, field personnel and subcontractors for a public works building contractor. Coordinated project RFI’s with Owner, Architect or Engineer to resolve plan and specification discrepancies or clarifications. Negotiated subcontracts, purchase orders, and change orders. Reviewed and approved monthly progress billings to owners and payments to subcontractors and vendors. Developed and maintained schedules with project superintendents and monitored adherence. Participated in estimating and bidding projects. Initiated and maintained positive client relationships. Project Engineer, Atlantic Richfield Company, Carson, California and Bellingham, Washington: Designed, budgeted, scheduled, and inspected waste water treatment facility for refinery effluent. Monitored conformance to plans and specification as construction engineer on refinery project and initiated and reviewed field changes. Managed fractionator, gas recovery and utilities units on shale oil project as project engineer, coordinating design efforts to incorporate company standards and specific plant requirements. 7/11/2016