SlideShare a Scribd company logo
1 of 3
1
Jesse Pena
1000 Day Rd. Gilroy, CA 95020 (720) 409-7670 vicinatobuilders@gmail.com
Highlights of Experience
Over 35 years of Construction Management
• Multi Family Construction Management 30,000 units +-
• Commercial Construction 500,000 Sq. Ft +-
• Supervise all aspects of construction: land development and ground breaking through occupancy
• Utilized strong organizational skills and experience to perform critical path scheduling
• Hired and directed subcontractors; monitored work for quality and timing
• Ordered construction supplies; negotiated with vendors for lowest costs and just in time delivery service; approved
accounts payable
• Monitored cost and progress to insure project completion on time and within budget
• Facilitated communication between subcontractors, employees and management
• Collaborated with owners and architects regarding requests for deviation to plans
• Represented company in interaction with public works, planning and building departments
• Coordination of multiple projects
• Hired field and office personnel
Work Experience:
Vicinato Builders, Inc. Castle Rock, CO 2009 - Present
• Repair and Remodels Residential, Tenant Improvement Commercial
• Spec Homes
Kephart Architects, Denver, CO 2006-2009
Construction Administration Manager
• Responsible for the Construction Administration of all projects being built by various General Contractors where Kephart
was the Architect of Record. This involved OAC meetings, Job inspections to insure compliance with Architects
drawings, RFI’s, Submittals, Approval of Pay Applications.
Builders Worked with: Lennar Homes, DR Horton, Trammel Crow, Alliance, A.G. Spanos, Metropolitan Homes,
Embry
The Weitz Company, Denver, CO 2005-2006
Senior Project Manager
• Responsible for profitably managing all administrative and field construction activities related to assigned projects.
• In addition, my responsibilities include preparing procedures and/or job progress reports, monitoring job cost & work
status, preparing a project safety plan, maintaining a working relationship with
owners/architects/vendors/subcontractors, creating project schedules, and change orders management.
Current Employer Projects:
• Lead Senior Project Manager at Snowmass Village-240, 000 Commercial sq. ft project including 7 buildings, 94 condos,
and a 360,00 sq. ft. parking garage, $151,000,000 Value
WPM Construction, Merrillville, IN 2003-2005
Senior Project Manager
• Provided overall management direction for major projects.
• Responsibilities included: plan, organize, and staff key project positions, provide training and development of project
personnel, establish project objectives, policies, procedures and performance standards within boundaries of corporate
policy.
• Maintained relationship with client, A/E contacts, subcontractors, and suppliers to facilitate construction activities.
• Monitored construction through administrative direction of on-site staff to ensure project was built on schedule in
accordance with design, and within budget
WPM Construction Projects:
• Mediterranean Apartments $18 million 224 Unit B+ in Palm Springs, CA
• Marriott Hotel 14 Story 27 million 220 Rooms in Houston, TX
• Marriott Hotel 10 Story $21 million 210 Rooms in Maryland
2
• Hilton Homewood Suites 14 Story 4 Story parking 10 Story 204 Rooms $23 million in Houston, TX
BRE Properties, San Francisco/Irvine, CA 2000-2003
Regional Project Manager
• Completed construction projects by planning, organizing, and controlling construction projects; including supervision of
subcontract work; scheduling and completing quality inspections and local jurisdictional inspections; supervised and
coordinated sub-contractors work with direction from VP Construction.
• Managed and coordinated the field work of sub-contractors and suppliers. Worked with home office procurement and
project management to locate, evaluate, and select sub-contractors; monitoring and controlling performance.
• Worked closely with Project Manages and home office to manage the client and client expectations.
• Met operational standards by contributing construction information to strategic plans and reviews; implementing
production, productivity, quality, and customer-service standards; resolving problems; identifying potential
construction and scheduling conflicts and proposessolutions.
• Assisted Project Managers in controlling construction budget by monitoring project expenditures; identifying variances;
implementing corrective actions.
• Managed construction field changes and reports changes and cost impacts to the Project Manager.
• Prevented fines and interruptions by complying with, and enforcing, codes.
• Enhanced organization reputation by accepting ownership for accomplishing new and different requests; exploring
opportunities to add value to job accomplishments
BRE Properties Projects:
• Pinnacle at Otay I $15 million 204 Unit walk up A+ $2 million under budget 1 month ahead of schedule
• Pinnacle at Otay II $13 million 160 Unit walk up A+ two weeks ahead of schedule
Lincoln Property Management, Irvine, CA 1997-2000
Project Manager
• Worked closely with onsite Apartment Managers, Bank representatives, Partners and Contractors.
• Handled all the functions of Project Management from project investigation to completion.
• Responsibilities involved: Project evaluation with estimating capabilities to determine the scope of work required to
solve; fix and repair problems in the day to day workings of all divisions of the construction industry
• Prepared weekly project progress reports for upper management; monitored work in progress to ensure quality of
workmanship of contractors; and development of bid packages from Contractors
Lincoln Property Management Projects:
• Regents Court $29 million 250 Unit and 7 story Parking Garage ahead of schedule
Brisbane Development, Wheat Ridge, CO 1995-1997
Senior Project Manager
Brisbane Development Projects:
• Park Meadows $29 million 518 Unit A+ $1.5 million under budget
• Gold Mountain Village $6.5 million 168 Unit Apartment Complex; A takeover to bring up to schedule
• Marston Pointe $7.2 million 160 Unit Apartment Complex; A takeover to bring up to schedule with savings of a ½ M
• Pershing Pointe $5.8 million 128 Unit Apartment Complex under budget and on time
• Village at West Meadows $14.3 million 212 Unit 1 month ahead of schedule
• Rancho Park $3.9 million 54 Unit Town Home Complex under budget and ahead of schedule
• Rancho Park Phase II 60 Home Subdivision underground utilities only
• University Park $17.5 million 250 Unit under budget
• Bear Creek $34 million 320 Unit 2 months ahead of schedule
South County Housing Authority, Gilroy, CA 1992-1994
A Non-Profit, Low Income Housing Developer
Senior Project Manager
• Managed and coordinated the field work of sub-contractors and suppliers. Worked with home office procurement and
project management to locate, evaluate, and select sub-contractors; monitoring and controlling performance.
• Enhanced organization reputation by accepting ownership for accomplishing new and different requests; exploring
opportunities to add value to job accomplishments
South County Housing Projects:
3
• Wheeler Manor - Gilroy, CA A Congregate Care Facility. Demo an existing 5 story hospital and renovated a 64 room
hospital built in 1928.
• The Rustic Gardens Apartments
• Rancho Park - Town Home Complex
• Rancho Park Phase II – 60 Home Subdivision – Underground Utilities only
• Rustic Court Townhomes
• The Willows Townhomes
Pacific West Investment Group, Foster City, CA 1989-1991
Senior Project Manager
• Provided leadership and assume responsibility for the functional control of the construction department including
development and control of the all construction schedules and budgets.
• Ensured that all construction positions are well staffed with individuals that are competent in technical abilities, cost
control measures, administrative skills and customer service skills.
• Managed Account Department
• Managed properties
• Provided pre-construction services (cost estimating, purchasing, scheduling, logistics analysis) for conventional
construction projects
• Implemented value engineering directives during all phases of development
• Prepared budgets and generating monthly status reports.
• Developed and implemented operating procedures and standards
• Interfaced with and coordinated with various areas of the company regarding projects.
• Supported and implemented companywide construction policies and procedures including proper insurance
documentation.
• Prepared and managed master project schedule
• Monitored progress of each project and performed regular inspections to ensure that the project plan, including budget,
schedule and quality were being maintained.
• Participated and or conduct regular departmental meetings
Albert Kobayashi, Inc., Waipahu, HI 1986-1989
Senior Project Manager
• Established & maintained Master Progress Schedule.
• Maintained Owner, Architect, Subcontractor & Vendor relations.
• Prepared Budget and Financial Reporting.
• Maintained General Contract and Subcontract Documents.
• Maintained Quality Assurance and Control.
• Established & monitored administrative procedures for the project.
• Organized work & trained staff organization on projects.
• Kept informed on requirements for Insurance, Safety, Labor Relations, Employee Relations, maintained EEO
compliances, etc.
• Assured applications for payment and collection were properly disbursed.
• Kept management informed on progress of project and budget.
• Performed other duties and take on other responsibilities as required
Projects:
• Hilton Hawaiian Village Hotel $63 million Renovation 19 Story Diamond Head Twin Towers, 17 Story
Ocean Tower, Entry Building; under budget and two weeks ahead of schedule
• Inter Island Airport Terminal Renovation Honolulu HI
Additional Skills:
• Proficient in Microsoft Office, Excel, Word, Outlook
• Microsoft Project
• Primavera
• JD Edwards
• Pro Log

More Related Content

What's hot

Johnson Samuel Perumkuzhiyil - Resume - Final
Johnson Samuel Perumkuzhiyil - Resume - FinalJohnson Samuel Perumkuzhiyil - Resume - Final
Johnson Samuel Perumkuzhiyil - Resume - FinalJohnson Samuel
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profilepheyer351
 
yuyi_chen_resume[1][1]
yuyi_chen_resume[1][1]yuyi_chen_resume[1][1]
yuyi_chen_resume[1][1]Yuyi Chen
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profileSaikat Roy
 
Larry Finley Resume
Larry Finley ResumeLarry Finley Resume
Larry Finley ResumeLarry Finley
 
DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16Don Castaldo
 
Reinaldo Rivera Resume (3)
Reinaldo Rivera Resume (3)Reinaldo Rivera Resume (3)
Reinaldo Rivera Resume (3)Reinaldo rivera
 
Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller
 
Lincolnia Senior Center - Phase B
Lincolnia Senior Center - Phase BLincolnia Senior Center - Phase B
Lincolnia Senior Center - Phase BFairfax County
 
Roger Carrillo Resume June 2016 w pic PROOF FNL _0006 fnl
Roger Carrillo Resume June 2016  w  pic PROOF FNL _0006 fnlRoger Carrillo Resume June 2016  w  pic PROOF FNL _0006 fnl
Roger Carrillo Resume June 2016 w pic PROOF FNL _0006 fnlRoger T. Carrillo, AIA
 
Resume - Ken M. Lucianovich
Resume - Ken M. LucianovichResume - Ken M. Lucianovich
Resume - Ken M. LucianovichKen Lucianovich
 
Copy of Abcede Solidanio (1)
Copy of Abcede Solidanio (1)Copy of Abcede Solidanio (1)
Copy of Abcede Solidanio (1)Abcede Solidanio
 

What's hot (20)

Johnson Samuel Perumkuzhiyil - Resume - Final
Johnson Samuel Perumkuzhiyil - Resume - FinalJohnson Samuel Perumkuzhiyil - Resume - Final
Johnson Samuel Perumkuzhiyil - Resume - Final
 
Danelle Da Nelle Resume
Danelle Da Nelle ResumeDanelle Da Nelle Resume
Danelle Da Nelle Resume
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
Rich Gesimondo
Rich GesimondoRich Gesimondo
Rich Gesimondo
 
yuyi_chen_resume[1][1]
yuyi_chen_resume[1][1]yuyi_chen_resume[1][1]
yuyi_chen_resume[1][1]
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
 
Larry Finley Resume
Larry Finley ResumeLarry Finley Resume
Larry Finley Resume
 
DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16DonaldCastaldoResume 2_10_16
DonaldCastaldoResume 2_10_16
 
fpbcurrent1
fpbcurrent1fpbcurrent1
fpbcurrent1
 
Reinaldo Rivera Resume (3)
Reinaldo Rivera Resume (3)Reinaldo Rivera Resume (3)
Reinaldo Rivera Resume (3)
 
mtb resume
mtb resumemtb resume
mtb resume
 
RESUMEUPDATE[2]
RESUMEUPDATE[2]RESUMEUPDATE[2]
RESUMEUPDATE[2]
 
Resume of Djuan Jackson
Resume of Djuan JacksonResume of Djuan Jackson
Resume of Djuan Jackson
 
Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller _04.30.15
Michael Mueller _04.30.15
 
Lincolnia Senior Center - Phase B
Lincolnia Senior Center - Phase BLincolnia Senior Center - Phase B
Lincolnia Senior Center - Phase B
 
anis khayrallah cv .doc
anis khayrallah cv .docanis khayrallah cv .doc
anis khayrallah cv .doc
 
Resume
ResumeResume
Resume
 
Roger Carrillo Resume June 2016 w pic PROOF FNL _0006 fnl
Roger Carrillo Resume June 2016  w  pic PROOF FNL _0006 fnlRoger Carrillo Resume June 2016  w  pic PROOF FNL _0006 fnl
Roger Carrillo Resume June 2016 w pic PROOF FNL _0006 fnl
 
Resume - Ken M. Lucianovich
Resume - Ken M. LucianovichResume - Ken M. Lucianovich
Resume - Ken M. Lucianovich
 
Copy of Abcede Solidanio (1)
Copy of Abcede Solidanio (1)Copy of Abcede Solidanio (1)
Copy of Abcede Solidanio (1)
 

Viewers also liked

21171_10.21_46_39_Thesis_Davis-1
21171_10.21_46_39_Thesis_Davis-121171_10.21_46_39_Thesis_Davis-1
21171_10.21_46_39_Thesis_Davis-1Bill Davis
 
Get rich by social
Get rich by socialGet rich by social
Get rich by socialpimvipada
 
Diccionario de los tic’s
Diccionario de los tic’sDiccionario de los tic’s
Diccionario de los tic’sStefi Mayorines
 
Accelerated Reader class performance w/c 2.5.16
Accelerated Reader class performance w/c 2.5.16Accelerated Reader class performance w/c 2.5.16
Accelerated Reader class performance w/c 2.5.16NicSwan1
 
Accelerated Reader class performance w/c 18/4/16
Accelerated Reader class performance w/c 18/4/16Accelerated Reader class performance w/c 18/4/16
Accelerated Reader class performance w/c 18/4/16NicSwan1
 
El signo lingüístico
El signo lingüísticoEl signo lingüístico
El signo lingüísticoluz ceron
 
Connecting with the physical world through a library makerspace
Connecting with the physical world through a library makerspaceConnecting with the physical world through a library makerspace
Connecting with the physical world through a library makerspaceKim Flintoff
 
Conquista del Tahuantinsuyo
Conquista del TahuantinsuyoConquista del Tahuantinsuyo
Conquista del TahuantinsuyoMalenamimi
 
ΠΛΗ31 ΤΥΠΟΛΟΓΙΟ ΕΝΟΤΗΤΑΣ 2
ΠΛΗ31 ΤΥΠΟΛΟΓΙΟ ΕΝΟΤΗΤΑΣ 2ΠΛΗ31 ΤΥΠΟΛΟΓΙΟ ΕΝΟΤΗΤΑΣ 2
ΠΛΗ31 ΤΥΠΟΛΟΓΙΟ ΕΝΟΤΗΤΑΣ 2Dimitris Psounis
 
Online Payment System - Debit Cards, Direct Debit and Electronic Cash
Online Payment System - Debit Cards, Direct Debit and Electronic CashOnline Payment System - Debit Cards, Direct Debit and Electronic Cash
Online Payment System - Debit Cards, Direct Debit and Electronic CashJewel George Thomas
 

Viewers also liked (12)

21171_10.21_46_39_Thesis_Davis-1
21171_10.21_46_39_Thesis_Davis-121171_10.21_46_39_Thesis_Davis-1
21171_10.21_46_39_Thesis_Davis-1
 
Get rich by social
Get rich by socialGet rich by social
Get rich by social
 
Diccionario de los tic’s
Diccionario de los tic’sDiccionario de los tic’s
Diccionario de los tic’s
 
Accelerated Reader class performance w/c 2.5.16
Accelerated Reader class performance w/c 2.5.16Accelerated Reader class performance w/c 2.5.16
Accelerated Reader class performance w/c 2.5.16
 
Accelerated Reader class performance w/c 18/4/16
Accelerated Reader class performance w/c 18/4/16Accelerated Reader class performance w/c 18/4/16
Accelerated Reader class performance w/c 18/4/16
 
El signo lingüístico
El signo lingüísticoEl signo lingüístico
El signo lingüístico
 
Raksystems kevät 2015 koulutus
Raksystems kevät 2015 koulutusRaksystems kevät 2015 koulutus
Raksystems kevät 2015 koulutus
 
Connecting with the physical world through a library makerspace
Connecting with the physical world through a library makerspaceConnecting with the physical world through a library makerspace
Connecting with the physical world through a library makerspace
 
Conquista del Tahuantinsuyo
Conquista del TahuantinsuyoConquista del Tahuantinsuyo
Conquista del Tahuantinsuyo
 
ΠΛΗ31 ΤΥΠΟΛΟΓΙΟ ΕΝΟΤΗΤΑΣ 2
ΠΛΗ31 ΤΥΠΟΛΟΓΙΟ ΕΝΟΤΗΤΑΣ 2ΠΛΗ31 ΤΥΠΟΛΟΓΙΟ ΕΝΟΤΗΤΑΣ 2
ΠΛΗ31 ΤΥΠΟΛΟΓΙΟ ΕΝΟΤΗΤΑΣ 2
 
Online Payment System - Debit Cards, Direct Debit and Electronic Cash
Online Payment System - Debit Cards, Direct Debit and Electronic CashOnline Payment System - Debit Cards, Direct Debit and Electronic Cash
Online Payment System - Debit Cards, Direct Debit and Electronic Cash
 
HIPAA
HIPAAHIPAA
HIPAA
 

Similar to J. Pena Resume 12.2015

Key Projects Summary
Key Projects SummaryKey Projects Summary
Key Projects SummaryBrian Lorenc
 
Don Schuett Resume 1016
Don Schuett Resume 1016Don Schuett Resume 1016
Don Schuett Resume 1016Donald Schuett
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resumerstinnett
 
Resume for Michael Jernigan
Resume for Michael JerniganResume for Michael Jernigan
Resume for Michael JerniganMike Jernigan
 
RonaldBennett_Resume 2016
RonaldBennett_Resume 2016RonaldBennett_Resume 2016
RonaldBennett_Resume 2016Ronnie Bennett
 
Dino 2016 Resume PDF
 Dino 2016 Resume PDF Dino 2016 Resume PDF
Dino 2016 Resume PDFDino Caforio
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016Aimee Chiore
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmNicholas Koehler
 
SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016Fazlullah Khan
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume CopyLori Mitchell
 
Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Managementgrahamelanders
 

Similar to J. Pena Resume 12.2015 (20)

Key Projects Summary
Key Projects SummaryKey Projects Summary
Key Projects Summary
 
Don Schuett Resume 1016
Don Schuett Resume 1016Don Schuett Resume 1016
Don Schuett Resume 1016
 
Dale Riley - Resume2016
Dale Riley - Resume2016Dale Riley - Resume2016
Dale Riley - Resume2016
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
 
Resume
Resume Resume
Resume
 
Resume for Michael Jernigan
Resume for Michael JerniganResume for Michael Jernigan
Resume for Michael Jernigan
 
RonaldBennett_Resume 2016
RonaldBennett_Resume 2016RonaldBennett_Resume 2016
RonaldBennett_Resume 2016
 
Dino 2016 Resume PDF
 Dino 2016 Resume PDF Dino 2016 Resume PDF
Dino 2016 Resume PDF
 
Final - CV Gopal
Final - CV GopalFinal - CV Gopal
Final - CV Gopal
 
Resume 05_02_15
Resume 05_02_15Resume 05_02_15
Resume 05_02_15
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Gary new new 11082015
Gary new new 11082015Gary new new 11082015
Gary new new 11082015
 
GOEFF STEBBINS RESUME
GOEFF STEBBINS RESUMEGOEFF STEBBINS RESUME
GOEFF STEBBINS RESUME
 
Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016Aimee Chiore _ Resume_2016
Aimee Chiore _ Resume_2016
 
Current 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pmCurrent 2015 resume koehler, nicholas -pm
Current 2015 resume koehler, nicholas -pm
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016SFK_ Resume-jobchange_dec2016
SFK_ Resume-jobchange_dec2016
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Management
 

J. Pena Resume 12.2015

  • 1. 1 Jesse Pena 1000 Day Rd. Gilroy, CA 95020 (720) 409-7670 vicinatobuilders@gmail.com Highlights of Experience Over 35 years of Construction Management • Multi Family Construction Management 30,000 units +- • Commercial Construction 500,000 Sq. Ft +- • Supervise all aspects of construction: land development and ground breaking through occupancy • Utilized strong organizational skills and experience to perform critical path scheduling • Hired and directed subcontractors; monitored work for quality and timing • Ordered construction supplies; negotiated with vendors for lowest costs and just in time delivery service; approved accounts payable • Monitored cost and progress to insure project completion on time and within budget • Facilitated communication between subcontractors, employees and management • Collaborated with owners and architects regarding requests for deviation to plans • Represented company in interaction with public works, planning and building departments • Coordination of multiple projects • Hired field and office personnel Work Experience: Vicinato Builders, Inc. Castle Rock, CO 2009 - Present • Repair and Remodels Residential, Tenant Improvement Commercial • Spec Homes Kephart Architects, Denver, CO 2006-2009 Construction Administration Manager • Responsible for the Construction Administration of all projects being built by various General Contractors where Kephart was the Architect of Record. This involved OAC meetings, Job inspections to insure compliance with Architects drawings, RFI’s, Submittals, Approval of Pay Applications. Builders Worked with: Lennar Homes, DR Horton, Trammel Crow, Alliance, A.G. Spanos, Metropolitan Homes, Embry The Weitz Company, Denver, CO 2005-2006 Senior Project Manager • Responsible for profitably managing all administrative and field construction activities related to assigned projects. • In addition, my responsibilities include preparing procedures and/or job progress reports, monitoring job cost & work status, preparing a project safety plan, maintaining a working relationship with owners/architects/vendors/subcontractors, creating project schedules, and change orders management. Current Employer Projects: • Lead Senior Project Manager at Snowmass Village-240, 000 Commercial sq. ft project including 7 buildings, 94 condos, and a 360,00 sq. ft. parking garage, $151,000,000 Value WPM Construction, Merrillville, IN 2003-2005 Senior Project Manager • Provided overall management direction for major projects. • Responsibilities included: plan, organize, and staff key project positions, provide training and development of project personnel, establish project objectives, policies, procedures and performance standards within boundaries of corporate policy. • Maintained relationship with client, A/E contacts, subcontractors, and suppliers to facilitate construction activities. • Monitored construction through administrative direction of on-site staff to ensure project was built on schedule in accordance with design, and within budget WPM Construction Projects: • Mediterranean Apartments $18 million 224 Unit B+ in Palm Springs, CA • Marriott Hotel 14 Story 27 million 220 Rooms in Houston, TX • Marriott Hotel 10 Story $21 million 210 Rooms in Maryland
  • 2. 2 • Hilton Homewood Suites 14 Story 4 Story parking 10 Story 204 Rooms $23 million in Houston, TX BRE Properties, San Francisco/Irvine, CA 2000-2003 Regional Project Manager • Completed construction projects by planning, organizing, and controlling construction projects; including supervision of subcontract work; scheduling and completing quality inspections and local jurisdictional inspections; supervised and coordinated sub-contractors work with direction from VP Construction. • Managed and coordinated the field work of sub-contractors and suppliers. Worked with home office procurement and project management to locate, evaluate, and select sub-contractors; monitoring and controlling performance. • Worked closely with Project Manages and home office to manage the client and client expectations. • Met operational standards by contributing construction information to strategic plans and reviews; implementing production, productivity, quality, and customer-service standards; resolving problems; identifying potential construction and scheduling conflicts and proposessolutions. • Assisted Project Managers in controlling construction budget by monitoring project expenditures; identifying variances; implementing corrective actions. • Managed construction field changes and reports changes and cost impacts to the Project Manager. • Prevented fines and interruptions by complying with, and enforcing, codes. • Enhanced organization reputation by accepting ownership for accomplishing new and different requests; exploring opportunities to add value to job accomplishments BRE Properties Projects: • Pinnacle at Otay I $15 million 204 Unit walk up A+ $2 million under budget 1 month ahead of schedule • Pinnacle at Otay II $13 million 160 Unit walk up A+ two weeks ahead of schedule Lincoln Property Management, Irvine, CA 1997-2000 Project Manager • Worked closely with onsite Apartment Managers, Bank representatives, Partners and Contractors. • Handled all the functions of Project Management from project investigation to completion. • Responsibilities involved: Project evaluation with estimating capabilities to determine the scope of work required to solve; fix and repair problems in the day to day workings of all divisions of the construction industry • Prepared weekly project progress reports for upper management; monitored work in progress to ensure quality of workmanship of contractors; and development of bid packages from Contractors Lincoln Property Management Projects: • Regents Court $29 million 250 Unit and 7 story Parking Garage ahead of schedule Brisbane Development, Wheat Ridge, CO 1995-1997 Senior Project Manager Brisbane Development Projects: • Park Meadows $29 million 518 Unit A+ $1.5 million under budget • Gold Mountain Village $6.5 million 168 Unit Apartment Complex; A takeover to bring up to schedule • Marston Pointe $7.2 million 160 Unit Apartment Complex; A takeover to bring up to schedule with savings of a ½ M • Pershing Pointe $5.8 million 128 Unit Apartment Complex under budget and on time • Village at West Meadows $14.3 million 212 Unit 1 month ahead of schedule • Rancho Park $3.9 million 54 Unit Town Home Complex under budget and ahead of schedule • Rancho Park Phase II 60 Home Subdivision underground utilities only • University Park $17.5 million 250 Unit under budget • Bear Creek $34 million 320 Unit 2 months ahead of schedule South County Housing Authority, Gilroy, CA 1992-1994 A Non-Profit, Low Income Housing Developer Senior Project Manager • Managed and coordinated the field work of sub-contractors and suppliers. Worked with home office procurement and project management to locate, evaluate, and select sub-contractors; monitoring and controlling performance. • Enhanced organization reputation by accepting ownership for accomplishing new and different requests; exploring opportunities to add value to job accomplishments South County Housing Projects:
  • 3. 3 • Wheeler Manor - Gilroy, CA A Congregate Care Facility. Demo an existing 5 story hospital and renovated a 64 room hospital built in 1928. • The Rustic Gardens Apartments • Rancho Park - Town Home Complex • Rancho Park Phase II – 60 Home Subdivision – Underground Utilities only • Rustic Court Townhomes • The Willows Townhomes Pacific West Investment Group, Foster City, CA 1989-1991 Senior Project Manager • Provided leadership and assume responsibility for the functional control of the construction department including development and control of the all construction schedules and budgets. • Ensured that all construction positions are well staffed with individuals that are competent in technical abilities, cost control measures, administrative skills and customer service skills. • Managed Account Department • Managed properties • Provided pre-construction services (cost estimating, purchasing, scheduling, logistics analysis) for conventional construction projects • Implemented value engineering directives during all phases of development • Prepared budgets and generating monthly status reports. • Developed and implemented operating procedures and standards • Interfaced with and coordinated with various areas of the company regarding projects. • Supported and implemented companywide construction policies and procedures including proper insurance documentation. • Prepared and managed master project schedule • Monitored progress of each project and performed regular inspections to ensure that the project plan, including budget, schedule and quality were being maintained. • Participated and or conduct regular departmental meetings Albert Kobayashi, Inc., Waipahu, HI 1986-1989 Senior Project Manager • Established & maintained Master Progress Schedule. • Maintained Owner, Architect, Subcontractor & Vendor relations. • Prepared Budget and Financial Reporting. • Maintained General Contract and Subcontract Documents. • Maintained Quality Assurance and Control. • Established & monitored administrative procedures for the project. • Organized work & trained staff organization on projects. • Kept informed on requirements for Insurance, Safety, Labor Relations, Employee Relations, maintained EEO compliances, etc. • Assured applications for payment and collection were properly disbursed. • Kept management informed on progress of project and budget. • Performed other duties and take on other responsibilities as required Projects: • Hilton Hawaiian Village Hotel $63 million Renovation 19 Story Diamond Head Twin Towers, 17 Story Ocean Tower, Entry Building; under budget and two weeks ahead of schedule • Inter Island Airport Terminal Renovation Honolulu HI Additional Skills: • Proficient in Microsoft Office, Excel, Word, Outlook • Microsoft Project • Primavera • JD Edwards • Pro Log