SlideShare a Scribd company logo
1 of 3
Download to read offline
PAGE 1
SSccootttt RR.. MMoollssttaadd,, PPEE
3295 S. Tatum Lane Phone: 218.230.8108 (M)
Gilbert, Arizona 85297 Email: smolstad@earthlink.net
PROFILE: Technically-strong, successful Professional Engineer with a desire to become a mentor and project manager
for an engineering firm or public entity with such needs for success.
Expertise in providing viable and constructible solutions for highly technical and complex engineering projects.with the
same or similar objectives. Expertise in providing viable and constructible solutions for highly technical and complex
projects. Highly experienced in construction management, site engineering and inspection.
HIGHLIGHTS OF QUALIFICATIONS
 AutoCAD / Microstation  Business Marketing  Civil / Environmental
 Civil / Municipal Engineering  Hec-RAS training  Permitting requirements
 Land Development  Project Design  Business Management
 Project Management
 Staff Management
 Water / Wastewater
Treatment
 Hydraulics Engineering
 Municipal Infrastructure
SELECTED ACHIEVEMENTS
 Resident Engineer
Location: Lake Havasu City, AZ
Construction Cost: $10.5M
Requirements: Overall project management and administration of engineering and inspection staff, site
construction management and administration, construction pay quantities, resident interaction,
federal and state wage program administration and sanitary sewer permitting through ADEQ.
Provided weekly project status reports and construction estimates to the client and interested
parties throughout the project duration.
Prepared necessary documentation summarizing the construction status, completion items,
client interactions, resident complaints and conflict resolution.
 Project Design / Construction Management
Location: Lake Havasu City, AZ
Construction Cost: $8.25M
Requirements: Provided overall design of completed plans for the grading/drainage (Phase I) and the
utilities/roadways (Phase II) for a proposed ethanol plant located in SE North Dakota. The
successful plans and subsequent construction management solidified possibilities of future
design sites.
Provided successful construction management and construction scheduling and coordination
for Phase I and Phase II.
 Project Design / Engineer-at-Risk
Location: Maricopa County, AZ
Construction Cost: $2.5M
Requirements: Served as the Project Manager and Designer for this project, providing many design solutions
and drainage calculations for storm sewer retention, drainage pipe capacity, sanitary sewer
piping, water main pipe capacity and fire flow coverage, roadway capacity and structural
pavement designs.
Also served as Engineer-at-Risk for the construction of the entire storm sewer system, sanitary
sewer system, drainage system and roadway subgrade construction.
 Project Design / Construction Management
Location: East Grand Forks, MN
Construction Cost: $ N/A
Requirements: Operation and management of a startup engineering firm, providing engineering design and
construction management services to a number of clients, public entities and private
developers. I was able to secure work from both local and regional clients that produced net
profit earnings for Municipal Engineering, Inc. throughout the first two years of existence.
Responsibilities included successful client marketing and development, building and
maintenance of a consistent client basis; numerous repeat clients.
PAGE 2
OBJECTIVE: To utilize my professional experience, engineering knowledge, skills and abilities in a technical leadership
role in Civil Engineering. Highly trained and experienced in Project Management, project design and construction
management.
PROFESSIONAL EXPERIENCE
Arizona State Land Department Phoenix, AZ 2013 - 2016
Water Resource Engineer
 Provided engineering expertise and recommendations to the engineering department regarding land value based
upon accessibility to utilities, transportation, drainage and permit conformance.
 Completed research and due diligence of individual properties, including accessibility and location of potable
water, sanitary sewer, transportation and drainage.
 Desert Ridge / Paradise Ridge / Azara property management, including mitigation monitoring, USACE Section
404 Permit conformance and project design monitoring.
 Provided review and monitoring of project development plans and reports, including drainage corridors,
stormwater retention, sediment transport analysis and jurisdictional wash flow determinations.
City of Williston, ND Williston, ND 2011 - 2013
Operations Engineer
 Provided daily operations oversight and guidance to city maintenance teams of public infrastructure, construction
management, governing agency coordination, resident concerns and city commission directives..
 Performed as the Operations Engineer / Manager for 12 municipal departments, consisting of approximately 65
employees and department heads. This further included management of department budgets and expenditures.
 Prepared stormwater standards for compliance with current requirements of ND Department of Health.
 Provided monitoring, maintenance and construction of existing potable water transmission systems, water
treatment and water usage.
PBS&J / An Atkins Company Lake Havasu City, AZ 2010 - 2011
Sr. Engineer I / Resident Engineer (Contract position)
 Provided overall project management and construction inspection/evaluation/documentation of the Chemehuevi
Area of the Lake Havasu City Wastewater System Expansion Program. This project consisted of approximately
$10.5 M of sanitary sewer system improvements and other related items to convert all sewer service to gravity
collection from individual septic systems.
 Responsibilities included overall staff management and coordination; construction management and
administration, construction pay quantities, resident interaction, wage rate program evaluation / documentation
and sanitary sewer permitting in accordance with ADEQ requirements.
ICS, Inc. of Grand Forks Grand Forks, ND 2009 - 2010
Sr. Design Engineer (Contract position)
 Provided daily construction management services for large conference center and bleacher system for the Minot
Park District in Minot, ND.
 Performed as Site Superintendent, providing construction and engineering expertise for this design-build
construction project. Project included extensive stormwater management requirements.
Municipal Engineering, Inc. East Grand Forks, MN 2004 - 2009
Project Engineer/Business Owner
 Provided daily business services and management, along with business marketing, engineering, staff coordination,
billings, estimations, etc.
 Provided design support for numerous wastewater treatment plants in southwest Minnesota, mainly treating for
phosphorous removal.
 Performed necessary construction and boundary survey whenever necessary.
Floan-Sanders, Inc./CPS, Ltd. East Grand Forks, MN 1990 - 2004
Professional Engineer
 Served as City Engineering Representative for numerous communities, public entities and private developers
throughout NW Minnesota and Eastern North Dakota. This long-term position allowed me to work with and design
many different clients and project types, diverse in size, scope and complexity.
 Proven success in project design, management, administration and completion, with minimal changes in scope,
budget and timeline.
 Maintained a successful client base, providing annual engineering design and construction management solutions
throughout Northern Minnesota and Eastern North Dakota.
PAGE 3
PROFESSIONAL AFFILIATIONS TECHNICAL APPLICATIONS
Chapter/ National member - NSPE Microsoft Word, Excel, Powerpoint, Project
ND Firm Member - ACEC AutoCAD 2008 and Microstation V8
Phoenix chapter member - APWA (current) Hec-RAS training
Phoenix chapter member – ASPE (current) Related design programs including WaterCAD,
StormCAD, FLO-2D
PROFESSIONAL LICENSURE EDUCATION
Professional Engineer License, Arizona BSCE Degree - University of North Dakota
Professional Engineer License, North Dakota Project Management courses - Mesa CC
Professional Engineer License, Minnesota

More Related Content

What's hot

Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera
 
AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2Ashwin Beosumbar
 
Resume / Project List
Resume / Project ListResume / Project List
Resume / Project Listamerolla
 
constructionresumeasof02102015long4page
constructionresumeasof02102015long4pageconstructionresumeasof02102015long4page
constructionresumeasof02102015long4pageFred Thompson
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profilepheyer351
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Ray Freiha
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16David Beverly
 
7 2016 l-janney_la_resume
7 2016 l-janney_la_resume7 2016 l-janney_la_resume
7 2016 l-janney_la_resumeLouise Janney
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18stan_shipley
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, RobsonRobson Lima
 

What's hot (20)

CV of CCEquibal
CV of CCEquibalCV of CCEquibal
CV of CCEquibal
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
 
AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2AHBeosumbarPrTechEngCV2013Vol2
AHBeosumbarPrTechEngCV2013Vol2
 
Word Doc CV
Word Doc CVWord Doc CV
Word Doc CV
 
Resume / Project List
Resume / Project ListResume / Project List
Resume / Project List
 
Resume July 2016
Resume July 2016Resume July 2016
Resume July 2016
 
constructionresumeasof02102015long4page
constructionresumeasof02102015long4pageconstructionresumeasof02102015long4page
constructionresumeasof02102015long4page
 
Resume
ResumeResume
Resume
 
Resume 04 17-13
Resume 04 17-13Resume 04 17-13
Resume 04 17-13
 
Resume
ResumeResume
Resume
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
Alexis Feliciano Resume r
Alexis Feliciano Resume rAlexis Feliciano Resume r
Alexis Feliciano Resume r
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
 
Sean Cody - Resume
Sean Cody - ResumeSean Cody - Resume
Sean Cody - Resume
 
Guadalupe Marquez-Resume
Guadalupe Marquez-ResumeGuadalupe Marquez-Resume
Guadalupe Marquez-Resume
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
7 2016 l-janney_la_resume
7 2016 l-janney_la_resume7 2016 l-janney_la_resume
7 2016 l-janney_la_resume
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, Robson
 

Viewers also liked

A cielo Aperto - 18 Novembre
A cielo Aperto - 18 NovembreA cielo Aperto - 18 Novembre
A cielo Aperto - 18 Novembrefuturpera
 
Why arent the earliest sunsets on the solstice
Why arent the earliest sunsets on the solsticeWhy arent the earliest sunsets on the solstice
Why arent the earliest sunsets on the solsticeLisa Schmidt
 
Busshelter Đà Nẵng city - Unique ads
Busshelter Đà Nẵng city  - Unique adsBusshelter Đà Nẵng city  - Unique ads
Busshelter Đà Nẵng city - Unique adsUnique 1
 
Research proposal emotional health and foster care adolescents
Research proposal emotional health and foster care adolescentsResearch proposal emotional health and foster care adolescents
Research proposal emotional health and foster care adolescentsKaren McWaters
 
One Health and Resilience: A New Biological Modelling Framework, Gary A VROEG...
One Health and Resilience: A New Biological Modelling Framework, Gary A VROEG...One Health and Resilience: A New Biological Modelling Framework, Gary A VROEG...
One Health and Resilience: A New Biological Modelling Framework, Gary A VROEG...Global Risk Forum GRFDavos
 
1.Entendiendo la salud mental
1.Entendiendo la salud mental1.Entendiendo la salud mental
1.Entendiendo la salud mentalGloria Loupiac
 
ERP: Sistemas de Gestion integrados para la Empresa
ERP: Sistemas de Gestion integrados para la EmpresaERP: Sistemas de Gestion integrados para la Empresa
ERP: Sistemas de Gestion integrados para la EmpresaDigital Learning SL
 
Contaminación del Aire y de las Aguas
Contaminación del Aire y de las AguasContaminación del Aire y de las Aguas
Contaminación del Aire y de las AguasLuis Mata
 
5. Sanando heridas del pasado
5. Sanando heridas del pasado5. Sanando heridas del pasado
5. Sanando heridas del pasadoGloria Loupiac
 

Viewers also liked (16)

A cielo Aperto - 18 Novembre
A cielo Aperto - 18 NovembreA cielo Aperto - 18 Novembre
A cielo Aperto - 18 Novembre
 
Brandquad presentation
Brandquad presentationBrandquad presentation
Brandquad presentation
 
Ritual Cave Use Paper
Ritual Cave Use PaperRitual Cave Use Paper
Ritual Cave Use Paper
 
Why arent the earliest sunsets on the solstice
Why arent the earliest sunsets on the solsticeWhy arent the earliest sunsets on the solstice
Why arent the earliest sunsets on the solstice
 
Busshelter Đà Nẵng city - Unique ads
Busshelter Đà Nẵng city  - Unique adsBusshelter Đà Nẵng city  - Unique ads
Busshelter Đà Nẵng city - Unique ads
 
Marco historico del evangelio de lucas
Marco historico del evangelio de lucasMarco historico del evangelio de lucas
Marco historico del evangelio de lucas
 
Teste 1
Teste 1Teste 1
Teste 1
 
Research proposal emotional health and foster care adolescents
Research proposal emotional health and foster care adolescentsResearch proposal emotional health and foster care adolescents
Research proposal emotional health and foster care adolescents
 
Yurgenis linarez
Yurgenis linarezYurgenis linarez
Yurgenis linarez
 
One Health and Resilience: A New Biological Modelling Framework, Gary A VROEG...
One Health and Resilience: A New Biological Modelling Framework, Gary A VROEG...One Health and Resilience: A New Biological Modelling Framework, Gary A VROEG...
One Health and Resilience: A New Biological Modelling Framework, Gary A VROEG...
 
Ministerio de juan el bautista
Ministerio de juan el bautistaMinisterio de juan el bautista
Ministerio de juan el bautista
 
Tar sands
Tar sandsTar sands
Tar sands
 
1.Entendiendo la salud mental
1.Entendiendo la salud mental1.Entendiendo la salud mental
1.Entendiendo la salud mental
 
ERP: Sistemas de Gestion integrados para la Empresa
ERP: Sistemas de Gestion integrados para la EmpresaERP: Sistemas de Gestion integrados para la Empresa
ERP: Sistemas de Gestion integrados para la Empresa
 
Contaminación del Aire y de las Aguas
Contaminación del Aire y de las AguasContaminación del Aire y de las Aguas
Contaminación del Aire y de las Aguas
 
5. Sanando heridas del pasado
5. Sanando heridas del pasado5. Sanando heridas del pasado
5. Sanando heridas del pasado
 

Similar to Scott_Molstad 8

Similar to Scott_Molstad 8 (20)

Project list
Project listProject list
Project list
 
16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
Universal Resume-updated_Ben Slater
Universal Resume-updated_Ben SlaterUniversal Resume-updated_Ben Slater
Universal Resume-updated_Ben Slater
 
MPC Resume 2015
MPC Resume 2015MPC Resume 2015
MPC Resume 2015
 
Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2
 
Shammet_2016
Shammet_2016Shammet_2016
Shammet_2016
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
 
Document1 (1)
Document1 (1)Document1 (1)
Document1 (1)
 
Resume-Vrsalovich 2015
Resume-Vrsalovich 2015Resume-Vrsalovich 2015
Resume-Vrsalovich 2015
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 
Resume - Megan McIntyre
Resume - Megan McIntyreResume - Megan McIntyre
Resume - Megan McIntyre
 
David Bausmith Experience Synopsis
David Bausmith Experience SynopsisDavid Bausmith Experience Synopsis
David Bausmith Experience Synopsis
 
MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
 
Scott resume
Scott resumeScott resume
Scott resume
 
Dobbins resume - new
Dobbins resume - newDobbins resume - new
Dobbins resume - new
 

Scott_Molstad 8

  • 1. PAGE 1 SSccootttt RR.. MMoollssttaadd,, PPEE 3295 S. Tatum Lane Phone: 218.230.8108 (M) Gilbert, Arizona 85297 Email: smolstad@earthlink.net PROFILE: Technically-strong, successful Professional Engineer with a desire to become a mentor and project manager for an engineering firm or public entity with such needs for success. Expertise in providing viable and constructible solutions for highly technical and complex engineering projects.with the same or similar objectives. Expertise in providing viable and constructible solutions for highly technical and complex projects. Highly experienced in construction management, site engineering and inspection. HIGHLIGHTS OF QUALIFICATIONS  AutoCAD / Microstation  Business Marketing  Civil / Environmental  Civil / Municipal Engineering  Hec-RAS training  Permitting requirements  Land Development  Project Design  Business Management  Project Management  Staff Management  Water / Wastewater Treatment  Hydraulics Engineering  Municipal Infrastructure SELECTED ACHIEVEMENTS  Resident Engineer Location: Lake Havasu City, AZ Construction Cost: $10.5M Requirements: Overall project management and administration of engineering and inspection staff, site construction management and administration, construction pay quantities, resident interaction, federal and state wage program administration and sanitary sewer permitting through ADEQ. Provided weekly project status reports and construction estimates to the client and interested parties throughout the project duration. Prepared necessary documentation summarizing the construction status, completion items, client interactions, resident complaints and conflict resolution.  Project Design / Construction Management Location: Lake Havasu City, AZ Construction Cost: $8.25M Requirements: Provided overall design of completed plans for the grading/drainage (Phase I) and the utilities/roadways (Phase II) for a proposed ethanol plant located in SE North Dakota. The successful plans and subsequent construction management solidified possibilities of future design sites. Provided successful construction management and construction scheduling and coordination for Phase I and Phase II.  Project Design / Engineer-at-Risk Location: Maricopa County, AZ Construction Cost: $2.5M Requirements: Served as the Project Manager and Designer for this project, providing many design solutions and drainage calculations for storm sewer retention, drainage pipe capacity, sanitary sewer piping, water main pipe capacity and fire flow coverage, roadway capacity and structural pavement designs. Also served as Engineer-at-Risk for the construction of the entire storm sewer system, sanitary sewer system, drainage system and roadway subgrade construction.  Project Design / Construction Management Location: East Grand Forks, MN Construction Cost: $ N/A Requirements: Operation and management of a startup engineering firm, providing engineering design and construction management services to a number of clients, public entities and private developers. I was able to secure work from both local and regional clients that produced net profit earnings for Municipal Engineering, Inc. throughout the first two years of existence. Responsibilities included successful client marketing and development, building and maintenance of a consistent client basis; numerous repeat clients.
  • 2. PAGE 2 OBJECTIVE: To utilize my professional experience, engineering knowledge, skills and abilities in a technical leadership role in Civil Engineering. Highly trained and experienced in Project Management, project design and construction management. PROFESSIONAL EXPERIENCE Arizona State Land Department Phoenix, AZ 2013 - 2016 Water Resource Engineer  Provided engineering expertise and recommendations to the engineering department regarding land value based upon accessibility to utilities, transportation, drainage and permit conformance.  Completed research and due diligence of individual properties, including accessibility and location of potable water, sanitary sewer, transportation and drainage.  Desert Ridge / Paradise Ridge / Azara property management, including mitigation monitoring, USACE Section 404 Permit conformance and project design monitoring.  Provided review and monitoring of project development plans and reports, including drainage corridors, stormwater retention, sediment transport analysis and jurisdictional wash flow determinations. City of Williston, ND Williston, ND 2011 - 2013 Operations Engineer  Provided daily operations oversight and guidance to city maintenance teams of public infrastructure, construction management, governing agency coordination, resident concerns and city commission directives..  Performed as the Operations Engineer / Manager for 12 municipal departments, consisting of approximately 65 employees and department heads. This further included management of department budgets and expenditures.  Prepared stormwater standards for compliance with current requirements of ND Department of Health.  Provided monitoring, maintenance and construction of existing potable water transmission systems, water treatment and water usage. PBS&J / An Atkins Company Lake Havasu City, AZ 2010 - 2011 Sr. Engineer I / Resident Engineer (Contract position)  Provided overall project management and construction inspection/evaluation/documentation of the Chemehuevi Area of the Lake Havasu City Wastewater System Expansion Program. This project consisted of approximately $10.5 M of sanitary sewer system improvements and other related items to convert all sewer service to gravity collection from individual septic systems.  Responsibilities included overall staff management and coordination; construction management and administration, construction pay quantities, resident interaction, wage rate program evaluation / documentation and sanitary sewer permitting in accordance with ADEQ requirements. ICS, Inc. of Grand Forks Grand Forks, ND 2009 - 2010 Sr. Design Engineer (Contract position)  Provided daily construction management services for large conference center and bleacher system for the Minot Park District in Minot, ND.  Performed as Site Superintendent, providing construction and engineering expertise for this design-build construction project. Project included extensive stormwater management requirements. Municipal Engineering, Inc. East Grand Forks, MN 2004 - 2009 Project Engineer/Business Owner  Provided daily business services and management, along with business marketing, engineering, staff coordination, billings, estimations, etc.  Provided design support for numerous wastewater treatment plants in southwest Minnesota, mainly treating for phosphorous removal.  Performed necessary construction and boundary survey whenever necessary. Floan-Sanders, Inc./CPS, Ltd. East Grand Forks, MN 1990 - 2004 Professional Engineer  Served as City Engineering Representative for numerous communities, public entities and private developers throughout NW Minnesota and Eastern North Dakota. This long-term position allowed me to work with and design many different clients and project types, diverse in size, scope and complexity.  Proven success in project design, management, administration and completion, with minimal changes in scope, budget and timeline.  Maintained a successful client base, providing annual engineering design and construction management solutions throughout Northern Minnesota and Eastern North Dakota.
  • 3. PAGE 3 PROFESSIONAL AFFILIATIONS TECHNICAL APPLICATIONS Chapter/ National member - NSPE Microsoft Word, Excel, Powerpoint, Project ND Firm Member - ACEC AutoCAD 2008 and Microstation V8 Phoenix chapter member - APWA (current) Hec-RAS training Phoenix chapter member – ASPE (current) Related design programs including WaterCAD, StormCAD, FLO-2D PROFESSIONAL LICENSURE EDUCATION Professional Engineer License, Arizona BSCE Degree - University of North Dakota Professional Engineer License, North Dakota Project Management courses - Mesa CC Professional Engineer License, Minnesota