EPTB Vilaine
An old story
With large activities…
IAV was created in 1961 between 3 counties :
Loire Atlantique, Morbihan, Ille et Vilaine
Vilaine marshes dynamic
Flood prevention
Develop new farmland
Restore navigation

56

35

44

A tool to serve the counties
Goals quickly completed with water
supply (Férel plant was inaugurated in
1972) and later with maintenance of
the waterway (1989)
Some key dates

1961 à 1970
Building of the Arzal dam
1972
Water supply plant
1989
Concession of the waterway
1995
First « environmental contributions »
1998
IAV is designated as SAGE operator
2003
Official approval of SAGE Vilaine
2007
EPTB Vilaine
2010
Reviewing of Sage Vilaine
Status
Public Administrative Institution with legal
and financial autonomy
« Etablissement Public Territorial de
Bassin » (waterboard) of the Vilaine
catchment area since 2007

Board :
12 County Conselors (3x4)
1 chairman
2 vice-chairmen
Average budget :
•
•
•
•

Investment budget : 6/10 M€
Operating budget :
12/14 M€
Conties contributions + subsidies
45 Employees
Actions and issues
1- Context/goals
Management of the water
reservoir : water supply,
navigation, flood prevention
Prevent the conjunction of
Vilaine flooding and high tide in
Redon

Arzal dam : keystone of
hydraulic regulation
Minor side hydraulic structures on
Isac et Trévelo
2- Recent and ongoing actions
Maintenance of the waterway
Upgrades of the Arzal dam
Design of a new lock at the
Arzal dam (DROP project)

Original role:
Flood prevention
Development of
agriculture
Commercial navigation

Current role :
Main objectives :
Water supply and flood
prevention
Secondary objectives :
Navigation
Maintain a good balance in
the Vilaine estuary and
marshes
Fish migration
3- Issues
Keep a high standard of
performance in water level
management
Equipments reliability

Make our management more
« visible » and
understandable for public and
users
1- Context/goals
Complex environment with
frequents usage conflicts
Upsets induced by the dam
achievement
Siltage connected to « water
supply » usage
IAV is « in the heart of the
landscape »
2- Recent and ongoing actions
Efficient dialogue within an
Estuary Steering Committee
Building of a ship designed
for specific dredging
operations
3D hydro-sedimentary and
hydro-dynamic modelling
Transfer of mussel culture
installations
3- Issues
Think in terms of sustainable
development …
Work on social acceptance of
development operations

Weight the pros and cons
before embarking on
important dredging programs
1- Context/goals
Founding and statutory mission
of IAV, enhanced by the SAGE
et EPTB status
Expertise at the whole
catchement area scale.
Coordination, assistance to
local organizations
Management of the structuring
projects.
2- Recent and ongoing actions
Hydraulic modelling
Global understanding
Simulation of scenarios : local
protection, flood reservoirs,
structures management…
Reducing vulnerability

Risk Awareness
Put flood marks
Crisis management
Assistance to local
communities

Construction programs
Flooding areas (Chateaubriant)
Dike restauration (Moisdon)
InterReg programs : Wave
3- Issues

Enhance risk awareness
Work on reducing
vulnerability

Develop cost/benefits
analysis for important
construction programs
1- Context/goals
One of the 2 biggets plants in
Britanny : an average of 17
Mm3/year
Towards Morbihan
25%
Towards Ille et Vilaine
5%
Towards Loire Atlantique 70%
Key role of regional regulation
In winter : 30 000 m3/day
In summer : 90 000 m3/day
2- Recent and ongoing actions
New contract of public service
delegation covering the period
2009/2023
Restructuration of the plant to
enhance the process (COT,
micropollutants) : 2016/2020

New feeder towards Rennes :
2017/2020
3- Issues
Maintain the key role of
regional regulation
Improve the process to keep
the plant « up to date » and
to anticipate new
regulations/pollutants
Management of the reservoir
during periods of
drought/water scarcity
1- Context/goals
European framework + EPTB
(Waterboard) status : key role
on water and aquatic
environments
Some remarkable aquatic
environments on the basin
Wetlands locally very important
for water quality
Vilaine is a major axis for fish
migration
2 – Recent and ongoing actions
Monitoring of the Arzal dam
fishpass (strong eel expertise
on the basin)
Natura 2000 operator on the
Vilaine marshes : write the
targets document
Coordination of the of rivers
and wetlands inventory at the
basin scale
Cartography of primrose – local
works of primrose uprooting
3 – Issues
Keep a high level of expertise
Work on local acceptance of
glass eel fishery regulation
Improve the hydraulic
regulation of Vilaine marshes :
not only flood prevention and
water supply, but also
environment issues,
navigation… : Arzal dam
becoming a multi users
hydraulic structure
Context

Multi users area : water supply,
flood prevention, agriculutre,
navigation…
Current lock causes salt
intrusions penalizing water
supply
Siphons to prevent salt
intrusions : losses of huge
amounts of fresh water (300
000 m3/day)
Water scarcity :
-restrictions in the use of lock :
conflict with boaters
-Preventive rise in water levels
to increase the capacity of
storage : conflict with farmers
Project

New lock anti salt intrusions
No need of siphons to prevent
salt water intrusions : no
losses of fresh water
Water scarcity :
- No restrictions in the use of
lock : no conflicts with boaters
- No need of preventive rise in
water levels : no conflict with
farmers
Problems :
-Be sure of the efficiency of the
project
-Cost of the project : 20 M€
Institution d’ Aménagement de la Vilaine

EPTB Vilaine

More Related Content

What's hot

Dumaguete City Septage Management System
Dumaguete City Septage Management SystemDumaguete City Septage Management System
Dumaguete City Septage Management SystemOswar Mungkasa
 
Storm water collection (itp)
Storm water collection (itp)Storm water collection (itp)
Storm water collection (itp)AjayPatel389
 
Nichi.11-12-13.netherlands.dale morris
Nichi.11-12-13.netherlands.dale morrisNichi.11-12-13.netherlands.dale morris
Nichi.11-12-13.netherlands.dale morrisNICHI_USA
 
IRJET- De-Silting Artifice for Dams
IRJET-  	  De-Silting Artifice for DamsIRJET-  	  De-Silting Artifice for Dams
IRJET- De-Silting Artifice for DamsIRJET Journal
 
The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)Iwl Pcu
 
Social science fa4 (1)
Social science   fa4 (1)Social science   fa4 (1)
Social science fa4 (1)Stuti Majmudar
 
North Carolina: Designing Rain Gardens - Bio-Retention Areas
North Carolina: Designing Rain Gardens - Bio-Retention AreasNorth Carolina: Designing Rain Gardens - Bio-Retention Areas
North Carolina: Designing Rain Gardens - Bio-Retention AreasSotirakou964
 
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South AsiaKrishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South AsiaGlobal Risk Forum GRFDavos
 
Construction of dams
Construction of damsConstruction of dams
Construction of damskoach1787
 
2016 11 08_ewa_storm_water_overflow_final
2016 11 08_ewa_storm_water_overflow_final2016 11 08_ewa_storm_water_overflow_final
2016 11 08_ewa_storm_water_overflow_finalBruno Rakedjian
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Ekonnect
 
Drainage masterplan for delhi - recommendations
Drainage masterplan for delhi  - recommendationsDrainage masterplan for delhi  - recommendations
Drainage masterplan for delhi - recommendationsAkanksha Chopra
 

What's hot (19)

Dumaguete City Septage Management System
Dumaguete City Septage Management SystemDumaguete City Septage Management System
Dumaguete City Septage Management System
 
Storm water collection (itp)
Storm water collection (itp)Storm water collection (itp)
Storm water collection (itp)
 
Stormwater Management Bylaw
Stormwater Management BylawStormwater Management Bylaw
Stormwater Management Bylaw
 
Nichi.11-12-13.netherlands.dale morris
Nichi.11-12-13.netherlands.dale morrisNichi.11-12-13.netherlands.dale morris
Nichi.11-12-13.netherlands.dale morris
 
IRJET- De-Silting Artifice for Dams
IRJET-  	  De-Silting Artifice for DamsIRJET-  	  De-Silting Artifice for Dams
IRJET- De-Silting Artifice for Dams
 
iWater_PPT_Vanha
iWater_PPT_VanhaiWater_PPT_Vanha
iWater_PPT_Vanha
 
The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)
 
City ordinances of dumaguete
City ordinances of dumagueteCity ordinances of dumaguete
City ordinances of dumaguete
 
Social science fa4 (1)
Social science   fa4 (1)Social science   fa4 (1)
Social science fa4 (1)
 
North Carolina: Designing Rain Gardens - Bio-Retention Areas
North Carolina: Designing Rain Gardens - Bio-Retention AreasNorth Carolina: Designing Rain Gardens - Bio-Retention Areas
North Carolina: Designing Rain Gardens - Bio-Retention Areas
 
UNEP Eco DRR project
UNEP Eco DRR projectUNEP Eco DRR project
UNEP Eco DRR project
 
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South AsiaKrishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
Krishna Vatsa - Resilience-based approach to Flood Risk Management in South Asia
 
Drainage System in Manila
Drainage System in ManilaDrainage System in Manila
Drainage System in Manila
 
Lake restoration
Lake restorationLake restoration
Lake restoration
 
Construction of dams
Construction of damsConstruction of dams
Construction of dams
 
Dutch floods
Dutch floodsDutch floods
Dutch floods
 
2016 11 08_ewa_storm_water_overflow_final
2016 11 08_ewa_storm_water_overflow_final2016 11 08_ewa_storm_water_overflow_final
2016 11 08_ewa_storm_water_overflow_final
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
 
Drainage masterplan for delhi - recommendations
Drainage masterplan for delhi  - recommendationsDrainage masterplan for delhi  - recommendations
Drainage masterplan for delhi - recommendations
 

Viewers also liked

Islaami Akhlaqo Aadaab
Islaami Akhlaqo AadaabIslaami Akhlaqo Aadaab
Islaami Akhlaqo AadaabWajid Malik
 
OPINIA�N: La Gala Met de Nueva York, llena de contrastes en la moda
OPINIA�N: La Gala Met de Nueva York, llena de contrastes en la modaOPINIA�N: La Gala Met de Nueva York, llena de contrastes en la moda
OPINIA�N: La Gala Met de Nueva York, llena de contrastes en la modapremiumeffects485
 
IRSTEA - june 2013 - annex 3
IRSTEA - june 2013 - annex 3IRSTEA - june 2013 - annex 3
IRSTEA - june 2013 - annex 3DROP_project
 
Urb case stdy sana yemen
Urb case stdy sana   yemenUrb case stdy sana   yemen
Urb case stdy sana yemenRupesh Kyate
 
درس في السّيرة النبويّة (27) | الشيخ وائل عبلا
درس في السّيرة النبويّة (27) | الشيخ وائل عبلادرس في السّيرة النبويّة (27) | الشيخ وائل عبلا
درس في السّيرة النبويّة (27) | الشيخ وائل عبلاAmine Mosque
 
درس في السّيرة النبويّة (29) | الشيخ وائل عبلا
درس في السّيرة النبويّة (29) | الشيخ وائل عبلادرس في السّيرة النبويّة (29) | الشيخ وائل عبلا
درس في السّيرة النبويّة (29) | الشيخ وائل عبلاAmine Mosque
 
TALENT MANAGEMENT BY BRAJESH KUMAR PARASHAR , JWM In ORDNANCE FACTORIES OFK J...
TALENT MANAGEMENT BY BRAJESH KUMAR PARASHAR , JWM In ORDNANCE FACTORIES OFK J...TALENT MANAGEMENT BY BRAJESH KUMAR PARASHAR , JWM In ORDNANCE FACTORIES OFK J...
TALENT MANAGEMENT BY BRAJESH KUMAR PARASHAR , JWM In ORDNANCE FACTORIES OFK J...BRAJESH KUMAR PARASHAR
 
IRSTEA - june 2013 - annex 2
IRSTEA - june 2013 - annex 2IRSTEA - june 2013 - annex 2
IRSTEA - june 2013 - annex 2DROP_project
 
Wasserverband Eifel Rur - june 2013 - annex 7
Wasserverband Eifel Rur - june 2013 - annex 7Wasserverband Eifel Rur - june 2013 - annex 7
Wasserverband Eifel Rur - june 2013 - annex 7DROP_project
 
Wasserverband Eifel Rur - june 2013 annex 6
Wasserverband Eifel Rur - june 2013 annex 6Wasserverband Eifel Rur - june 2013 annex 6
Wasserverband Eifel Rur - june 2013 annex 6DROP_project
 
E. Rouquette, C. Ser, La valorisation du patrimoine de Camargue
E. Rouquette, C. Ser, La valorisation du patrimoine de CamargueE. Rouquette, C. Ser, La valorisation du patrimoine de Camargue
E. Rouquette, C. Ser, La valorisation du patrimoine de Camarguecirili_web
 
Tooth Paste Aur Miswaak
Tooth Paste Aur MiswaakTooth Paste Aur Miswaak
Tooth Paste Aur MiswaakWajid Malik
 

Viewers also liked (18)

Islaami Akhlaqo Aadaab
Islaami Akhlaqo AadaabIslaami Akhlaqo Aadaab
Islaami Akhlaqo Aadaab
 
UP_Redovno-Bak-EEEO
UP_Redovno-Bak-EEEOUP_Redovno-Bak-EEEO
UP_Redovno-Bak-EEEO
 
OPINIA�N: La Gala Met de Nueva York, llena de contrastes en la moda
OPINIA�N: La Gala Met de Nueva York, llena de contrastes en la modaOPINIA�N: La Gala Met de Nueva York, llena de contrastes en la moda
OPINIA�N: La Gala Met de Nueva York, llena de contrastes en la moda
 
Fhs
FhsFhs
Fhs
 
IRSTEA - june 2013 - annex 3
IRSTEA - june 2013 - annex 3IRSTEA - june 2013 - annex 3
IRSTEA - june 2013 - annex 3
 
Urb case stdy sana yemen
Urb case stdy sana   yemenUrb case stdy sana   yemen
Urb case stdy sana yemen
 
درس في السّيرة النبويّة (27) | الشيخ وائل عبلا
درس في السّيرة النبويّة (27) | الشيخ وائل عبلادرس في السّيرة النبويّة (27) | الشيخ وائل عبلا
درس في السّيرة النبويّة (27) | الشيخ وائل عبلا
 
درس في السّيرة النبويّة (29) | الشيخ وائل عبلا
درس في السّيرة النبويّة (29) | الشيخ وائل عبلادرس في السّيرة النبويّة (29) | الشيخ وائل عبلا
درس في السّيرة النبويّة (29) | الشيخ وائل عبلا
 
Eshita
EshitaEshita
Eshita
 
TALENT MANAGEMENT BY BRAJESH KUMAR PARASHAR , JWM In ORDNANCE FACTORIES OFK J...
TALENT MANAGEMENT BY BRAJESH KUMAR PARASHAR , JWM In ORDNANCE FACTORIES OFK J...TALENT MANAGEMENT BY BRAJESH KUMAR PARASHAR , JWM In ORDNANCE FACTORIES OFK J...
TALENT MANAGEMENT BY BRAJESH KUMAR PARASHAR , JWM In ORDNANCE FACTORIES OFK J...
 
Star venus related mythology document .
Star venus related  mythology  document .Star venus related  mythology  document .
Star venus related mythology document .
 
Anaemia in ckd
Anaemia in ckdAnaemia in ckd
Anaemia in ckd
 
IRSTEA - june 2013 - annex 2
IRSTEA - june 2013 - annex 2IRSTEA - june 2013 - annex 2
IRSTEA - june 2013 - annex 2
 
Wasserverband Eifel Rur - june 2013 - annex 7
Wasserverband Eifel Rur - june 2013 - annex 7Wasserverband Eifel Rur - june 2013 - annex 7
Wasserverband Eifel Rur - june 2013 - annex 7
 
Wasserverband Eifel Rur - june 2013 annex 6
Wasserverband Eifel Rur - june 2013 annex 6Wasserverband Eifel Rur - june 2013 annex 6
Wasserverband Eifel Rur - june 2013 annex 6
 
Simbolos patrios
Simbolos patriosSimbolos patrios
Simbolos patrios
 
E. Rouquette, C. Ser, La valorisation du patrimoine de Camargue
E. Rouquette, C. Ser, La valorisation du patrimoine de CamargueE. Rouquette, C. Ser, La valorisation du patrimoine de Camargue
E. Rouquette, C. Ser, La valorisation du patrimoine de Camargue
 
Tooth Paste Aur Miswaak
Tooth Paste Aur MiswaakTooth Paste Aur Miswaak
Tooth Paste Aur Miswaak
 

Similar to Intsitution d’Aménagement de la Vilaine - june 2013 - annex 1

The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)Iwl Pcu
 
The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)Iwl Pcu
 
MBSDMP NAP Expo 2019
MBSDMP NAP Expo 2019MBSDMP NAP Expo 2019
MBSDMP NAP Expo 2019NAP Events
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfTheaMan11
 
Cecconi the venice project
Cecconi the venice projectCecconi the venice project
Cecconi the venice projectOECD Environment
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...UNESCO Venice Office
 
14th Riversymposium, keynote presentation from Ingwer de Boer (2011)
14th Riversymposium, keynote presentation from Ingwer de Boer (2011)14th Riversymposium, keynote presentation from Ingwer de Boer (2011)
14th Riversymposium, keynote presentation from Ingwer de Boer (2011)International WaterCentre
 
Tagum-Workshop-Presentation-02_Tagum-City-LCCAP.pdf
Tagum-Workshop-Presentation-02_Tagum-City-LCCAP.pdfTagum-Workshop-Presentation-02_Tagum-City-LCCAP.pdf
Tagum-Workshop-Presentation-02_Tagum-City-LCCAP.pdfSumWhosin
 
LVEMP II KENYA 2016 march FINAL ISSUE march
LVEMP II KENYA  2016  march FINAL ISSUE marchLVEMP II KENYA  2016  march FINAL ISSUE march
LVEMP II KENYA 2016 march FINAL ISSUE marchvincent Ayanga
 
Friends of the rivers of hout bay COLL courtesy of THRIVE
Friends of the rivers of hout bay COLL courtesy of THRIVE Friends of the rivers of hout bay COLL courtesy of THRIVE
Friends of the rivers of hout bay COLL courtesy of THRIVE Guerillateacher
 
ICPDR - Danube River Basin Experience
ICPDR - Danube River Basin ExperienceICPDR - Danube River Basin Experience
ICPDR - Danube River Basin ExperienceOECD Environment
 
Environmental Study of The RíA
Environmental Study of The RíAEnvironmental Study of The RíA
Environmental Study of The RíAmjcnavarro
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...UNESCO Venice Office
 
Urban and peri urban water management nexus to a dying river_Prof MS Khan-Ban...
Urban and peri urban water management nexus to a dying river_Prof MS Khan-Ban...Urban and peri urban water management nexus to a dying river_Prof MS Khan-Ban...
Urban and peri urban water management nexus to a dying river_Prof MS Khan-Ban...SaciWATERs
 

Similar to Intsitution d’Aménagement de la Vilaine - june 2013 - annex 1 (20)

The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)
 
The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)The Case of the Senegal River Basin (Niasse, Madiodio)
The Case of the Senegal River Basin (Niasse, Madiodio)
 
MBSDMP NAP Expo 2019
MBSDMP NAP Expo 2019MBSDMP NAP Expo 2019
MBSDMP NAP Expo 2019
 
Thessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdfThessaly master plan- WWF presentation_18.04.24.pdf
Thessaly master plan- WWF presentation_18.04.24.pdf
 
Evolution of Storm Surge Barrier Design - Dale Morris
Evolution of Storm Surge Barrier Design  - Dale MorrisEvolution of Storm Surge Barrier Design  - Dale Morris
Evolution of Storm Surge Barrier Design - Dale Morris
 
Lc islands
Lc islandsLc islands
Lc islands
 
Cecconi the venice project
Cecconi the venice projectCecconi the venice project
Cecconi the venice project
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
Regional Newsletter 1-2/2011
Regional Newsletter 1-2/2011Regional Newsletter 1-2/2011
Regional Newsletter 1-2/2011
 
Causes of flooding
Causes of floodingCauses of flooding
Causes of flooding
 
14th Riversymposium, keynote presentation from Ingwer de Boer (2011)
14th Riversymposium, keynote presentation from Ingwer de Boer (2011)14th Riversymposium, keynote presentation from Ingwer de Boer (2011)
14th Riversymposium, keynote presentation from Ingwer de Boer (2011)
 
Tagum-Workshop-Presentation-02_Tagum-City-LCCAP.pdf
Tagum-Workshop-Presentation-02_Tagum-City-LCCAP.pdfTagum-Workshop-Presentation-02_Tagum-City-LCCAP.pdf
Tagum-Workshop-Presentation-02_Tagum-City-LCCAP.pdf
 
LVEMP II KENYA 2016 march FINAL ISSUE march
LVEMP II KENYA  2016  march FINAL ISSUE marchLVEMP II KENYA  2016  march FINAL ISSUE march
LVEMP II KENYA 2016 march FINAL ISSUE march
 
Friends of the rivers of hout bay COLL courtesy of THRIVE
Friends of the rivers of hout bay COLL courtesy of THRIVE Friends of the rivers of hout bay COLL courtesy of THRIVE
Friends of the rivers of hout bay COLL courtesy of THRIVE
 
ICPDR - Danube River Basin Experience
ICPDR - Danube River Basin ExperienceICPDR - Danube River Basin Experience
ICPDR - Danube River Basin Experience
 
Coastal Best Practices - July21
Coastal Best Practices - July21Coastal Best Practices - July21
Coastal Best Practices - July21
 
Volta Basin
Volta BasinVolta Basin
Volta Basin
 
Environmental Study of The RíA
Environmental Study of The RíAEnvironmental Study of The RíA
Environmental Study of The RíA
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
Urban and peri urban water management nexus to a dying river_Prof MS Khan-Ban...
Urban and peri urban water management nexus to a dying river_Prof MS Khan-Ban...Urban and peri urban water management nexus to a dying river_Prof MS Khan-Ban...
Urban and peri urban water management nexus to a dying river_Prof MS Khan-Ban...
 

Recently uploaded

Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 

Recently uploaded (20)

Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 

Intsitution d’Aménagement de la Vilaine - june 2013 - annex 1

  • 2.
  • 3.
  • 4. An old story With large activities…
  • 5. IAV was created in 1961 between 3 counties : Loire Atlantique, Morbihan, Ille et Vilaine Vilaine marshes dynamic Flood prevention Develop new farmland Restore navigation 56 35 44 A tool to serve the counties
  • 6. Goals quickly completed with water supply (Férel plant was inaugurated in 1972) and later with maintenance of the waterway (1989)
  • 7. Some key dates 1961 à 1970 Building of the Arzal dam 1972 Water supply plant 1989 Concession of the waterway 1995 First « environmental contributions » 1998 IAV is designated as SAGE operator 2003 Official approval of SAGE Vilaine 2007 EPTB Vilaine 2010 Reviewing of Sage Vilaine
  • 8. Status Public Administrative Institution with legal and financial autonomy « Etablissement Public Territorial de Bassin » (waterboard) of the Vilaine catchment area since 2007 Board : 12 County Conselors (3x4) 1 chairman 2 vice-chairmen
  • 9. Average budget : • • • • Investment budget : 6/10 M€ Operating budget : 12/14 M€ Conties contributions + subsidies 45 Employees
  • 11. 1- Context/goals Management of the water reservoir : water supply, navigation, flood prevention Prevent the conjunction of Vilaine flooding and high tide in Redon Arzal dam : keystone of hydraulic regulation Minor side hydraulic structures on Isac et Trévelo
  • 12.
  • 13. 2- Recent and ongoing actions Maintenance of the waterway Upgrades of the Arzal dam Design of a new lock at the Arzal dam (DROP project) Original role: Flood prevention Development of agriculture Commercial navigation Current role : Main objectives : Water supply and flood prevention Secondary objectives : Navigation Maintain a good balance in the Vilaine estuary and marshes Fish migration
  • 14. 3- Issues Keep a high standard of performance in water level management Equipments reliability Make our management more « visible » and understandable for public and users
  • 15. 1- Context/goals Complex environment with frequents usage conflicts Upsets induced by the dam achievement Siltage connected to « water supply » usage IAV is « in the heart of the landscape »
  • 16. 2- Recent and ongoing actions Efficient dialogue within an Estuary Steering Committee Building of a ship designed for specific dredging operations 3D hydro-sedimentary and hydro-dynamic modelling Transfer of mussel culture installations
  • 17. 3- Issues Think in terms of sustainable development … Work on social acceptance of development operations Weight the pros and cons before embarking on important dredging programs
  • 18. 1- Context/goals Founding and statutory mission of IAV, enhanced by the SAGE et EPTB status Expertise at the whole catchement area scale. Coordination, assistance to local organizations Management of the structuring projects.
  • 19. 2- Recent and ongoing actions Hydraulic modelling Global understanding Simulation of scenarios : local protection, flood reservoirs, structures management… Reducing vulnerability Risk Awareness Put flood marks Crisis management Assistance to local communities Construction programs Flooding areas (Chateaubriant) Dike restauration (Moisdon) InterReg programs : Wave
  • 20. 3- Issues Enhance risk awareness Work on reducing vulnerability Develop cost/benefits analysis for important construction programs
  • 21. 1- Context/goals One of the 2 biggets plants in Britanny : an average of 17 Mm3/year Towards Morbihan 25% Towards Ille et Vilaine 5% Towards Loire Atlantique 70% Key role of regional regulation In winter : 30 000 m3/day In summer : 90 000 m3/day
  • 22. 2- Recent and ongoing actions New contract of public service delegation covering the period 2009/2023 Restructuration of the plant to enhance the process (COT, micropollutants) : 2016/2020 New feeder towards Rennes : 2017/2020
  • 23. 3- Issues Maintain the key role of regional regulation Improve the process to keep the plant « up to date » and to anticipate new regulations/pollutants Management of the reservoir during periods of drought/water scarcity
  • 24. 1- Context/goals European framework + EPTB (Waterboard) status : key role on water and aquatic environments Some remarkable aquatic environments on the basin Wetlands locally very important for water quality Vilaine is a major axis for fish migration
  • 25. 2 – Recent and ongoing actions Monitoring of the Arzal dam fishpass (strong eel expertise on the basin) Natura 2000 operator on the Vilaine marshes : write the targets document Coordination of the of rivers and wetlands inventory at the basin scale Cartography of primrose – local works of primrose uprooting
  • 26. 3 – Issues Keep a high level of expertise Work on local acceptance of glass eel fishery regulation Improve the hydraulic regulation of Vilaine marshes : not only flood prevention and water supply, but also environment issues, navigation… : Arzal dam becoming a multi users hydraulic structure
  • 27. Context Multi users area : water supply, flood prevention, agriculutre, navigation… Current lock causes salt intrusions penalizing water supply Siphons to prevent salt intrusions : losses of huge amounts of fresh water (300 000 m3/day) Water scarcity : -restrictions in the use of lock : conflict with boaters -Preventive rise in water levels to increase the capacity of storage : conflict with farmers
  • 28. Project New lock anti salt intrusions No need of siphons to prevent salt water intrusions : no losses of fresh water Water scarcity : - No restrictions in the use of lock : no conflicts with boaters - No need of preventive rise in water levels : no conflict with farmers Problems : -Be sure of the efficiency of the project -Cost of the project : 20 M€
  • 29.