EPTB Vilaine
An old story
With large activities…
IAV was created in 1961 between 3 counties :
Loire Atlantique, Morbihan, Ille et Vilaine
Vilaine marshes dynamic
Flood prevention
Develop new farmland
Restore navigation

56

35

44

A tool to serve the counties
Goals quickly completed with water
supply (Férel plant was inaugurated in
1972) and later with maintenance of
the waterway (1989)
Some key dates

1961 à 1970
Building of the Arzal dam
1972
Water supply plant
1989
Concession of the waterway
1995
First « environmental contributions »
1998
IAV is designated as SAGE operator
2003
Official approval of SAGE Vilaine
2007
EPTB Vilaine
2010
Reviewing of Sage Vilaine
Status
Public Administrative Institution with legal
and financial autonomy
« Etablissement Public Territorial de
Bassin » (waterboard) of the Vilaine
catchment area since 2007

Board :
12 County Conselors (3x4)
1 chairman
2 vice-chairmen
Average budget :
•
•
•
•

Investment budget : 6/10 M€
Operating budget :
12/14 M€
Conties contributions + subsidies
45 Employees
Actions and issues
1- Context/goals
Management of the water
reservoir : water supply,
navigation, flood prevention
Prevent the conjunction of
Vilaine flooding and high tide in
Redon

Arzal dam : keystone of
hydraulic regulation
Minor side hydraulic structures on
Isac et Trévelo
2- Recent and ongoing actions
Maintenance of the waterway
Upgrades of the Arzal dam
Design of a new lock at the
Arzal dam (DROP project)

Original role:
Flood prevention
Development of
agriculture
Commercial navigation

Current role :
Main objectives :
Water supply and flood
prevention
Secondary objectives :
Navigation
Maintain a good balance in
the Vilaine estuary and
marshes
Fish migration
3- Issues
Keep a high standard of
performance in water level
management
Equipments reliability

Make our management more
« visible » and
understandable for public and
users
1- Context/goals
Complex environment with
frequents usage conflicts
Upsets induced by the dam
achievement
Siltage connected to « water
supply » usage
IAV is « in the heart of the
landscape »
2- Recent and ongoing actions
Efficient dialogue within an
Estuary Steering Committee
Building of a ship designed
for specific dredging
operations
3D hydro-sedimentary and
hydro-dynamic modelling
Transfer of mussel culture
installations
3- Issues
Think in terms of sustainable
development …
Work on social acceptance of
development operations

Weight the pros and cons
before embarking on
important dredging programs
1- Context/goals
Founding and statutory mission
of IAV, enhanced by the SAGE
et EPTB status
Expertise at the whole
catchement area scale.
Coordination, assistance to
local organizations
Management of the structuring
projects.
2- Recent and ongoing actions
Hydraulic modelling
Global understanding
Simulation of scenarios : local
protection, flood reservoirs,
structures management…
Reducing vulnerability

Risk Awareness
Put flood marks
Crisis management
Assistance to local
communities

Construction programs
Flooding areas (Chateaubriant)
Dike restauration (Moisdon)
InterReg programs : Wave
3- Issues

Enhance risk awareness
Work on reducing
vulnerability

Develop cost/benefits
analysis for important
construction programs
1- Context/goals
One of the 2 biggets plants in
Britanny : an average of 17
Mm3/year
Towards Morbihan
25%
Towards Ille et Vilaine
5%
Towards Loire Atlantique 70%
Key role of regional regulation
In winter : 30 000 m3/day
In summer : 90 000 m3/day
2- Recent and ongoing actions
New contract of public service
delegation covering the period
2009/2023
Restructuration of the plant to
enhance the process (COT,
micropollutants) : 2016/2020

New feeder towards Rennes :
2017/2020
3- Issues
Maintain the key role of
regional regulation
Improve the process to keep
the plant « up to date » and
to anticipate new
regulations/pollutants
Management of the reservoir
during periods of
drought/water scarcity
1- Context/goals
European framework + EPTB
(Waterboard) status : key role
on water and aquatic
environments
Some remarkable aquatic
environments on the basin
Wetlands locally very important
for water quality
Vilaine is a major axis for fish
migration
2 – Recent and ongoing actions
Monitoring of the Arzal dam
fishpass (strong eel expertise
on the basin)
Natura 2000 operator on the
Vilaine marshes : write the
targets document
Coordination of the of rivers
and wetlands inventory at the
basin scale
Cartography of primrose – local
works of primrose uprooting
3 – Issues
Keep a high level of expertise
Work on local acceptance of
glass eel fishery regulation
Improve the hydraulic
regulation of Vilaine marshes :
not only flood prevention and
water supply, but also
environment issues,
navigation… : Arzal dam
becoming a multi users
hydraulic structure
Context

Multi users area : water supply,
flood prevention, agriculutre,
navigation…
Current lock causes salt
intrusions penalizing water
supply
Siphons to prevent salt
intrusions : losses of huge
amounts of fresh water (300
000 m3/day)
Water scarcity :
-restrictions in the use of lock :
conflict with boaters
-Preventive rise in water levels
to increase the capacity of
storage : conflict with farmers
Project

New lock anti salt intrusions
No need of siphons to prevent
salt water intrusions : no
losses of fresh water
Water scarcity :
- No restrictions in the use of
lock : no conflicts with boaters
- No need of preventive rise in
water levels : no conflict with
farmers
Problems :
-Be sure of the efficiency of the
project
-Cost of the project : 20 M€
Institution d’ Aménagement de la Vilaine

EPTB Vilaine

Intsitution d’Aménagement de la Vilaine - june 2013 - annex 1

  • 1.
  • 4.
    An old story Withlarge activities…
  • 5.
    IAV was createdin 1961 between 3 counties : Loire Atlantique, Morbihan, Ille et Vilaine Vilaine marshes dynamic Flood prevention Develop new farmland Restore navigation 56 35 44 A tool to serve the counties
  • 6.
    Goals quickly completedwith water supply (Férel plant was inaugurated in 1972) and later with maintenance of the waterway (1989)
  • 7.
    Some key dates 1961à 1970 Building of the Arzal dam 1972 Water supply plant 1989 Concession of the waterway 1995 First « environmental contributions » 1998 IAV is designated as SAGE operator 2003 Official approval of SAGE Vilaine 2007 EPTB Vilaine 2010 Reviewing of Sage Vilaine
  • 8.
    Status Public Administrative Institutionwith legal and financial autonomy « Etablissement Public Territorial de Bassin » (waterboard) of the Vilaine catchment area since 2007 Board : 12 County Conselors (3x4) 1 chairman 2 vice-chairmen
  • 9.
    Average budget : • • • • Investmentbudget : 6/10 M€ Operating budget : 12/14 M€ Conties contributions + subsidies 45 Employees
  • 10.
  • 11.
    1- Context/goals Management ofthe water reservoir : water supply, navigation, flood prevention Prevent the conjunction of Vilaine flooding and high tide in Redon Arzal dam : keystone of hydraulic regulation Minor side hydraulic structures on Isac et Trévelo
  • 13.
    2- Recent andongoing actions Maintenance of the waterway Upgrades of the Arzal dam Design of a new lock at the Arzal dam (DROP project) Original role: Flood prevention Development of agriculture Commercial navigation Current role : Main objectives : Water supply and flood prevention Secondary objectives : Navigation Maintain a good balance in the Vilaine estuary and marshes Fish migration
  • 14.
    3- Issues Keep ahigh standard of performance in water level management Equipments reliability Make our management more « visible » and understandable for public and users
  • 15.
    1- Context/goals Complex environmentwith frequents usage conflicts Upsets induced by the dam achievement Siltage connected to « water supply » usage IAV is « in the heart of the landscape »
  • 16.
    2- Recent andongoing actions Efficient dialogue within an Estuary Steering Committee Building of a ship designed for specific dredging operations 3D hydro-sedimentary and hydro-dynamic modelling Transfer of mussel culture installations
  • 17.
    3- Issues Think interms of sustainable development … Work on social acceptance of development operations Weight the pros and cons before embarking on important dredging programs
  • 18.
    1- Context/goals Founding andstatutory mission of IAV, enhanced by the SAGE et EPTB status Expertise at the whole catchement area scale. Coordination, assistance to local organizations Management of the structuring projects.
  • 19.
    2- Recent andongoing actions Hydraulic modelling Global understanding Simulation of scenarios : local protection, flood reservoirs, structures management… Reducing vulnerability Risk Awareness Put flood marks Crisis management Assistance to local communities Construction programs Flooding areas (Chateaubriant) Dike restauration (Moisdon) InterReg programs : Wave
  • 20.
    3- Issues Enhance riskawareness Work on reducing vulnerability Develop cost/benefits analysis for important construction programs
  • 21.
    1- Context/goals One ofthe 2 biggets plants in Britanny : an average of 17 Mm3/year Towards Morbihan 25% Towards Ille et Vilaine 5% Towards Loire Atlantique 70% Key role of regional regulation In winter : 30 000 m3/day In summer : 90 000 m3/day
  • 22.
    2- Recent andongoing actions New contract of public service delegation covering the period 2009/2023 Restructuration of the plant to enhance the process (COT, micropollutants) : 2016/2020 New feeder towards Rennes : 2017/2020
  • 23.
    3- Issues Maintain thekey role of regional regulation Improve the process to keep the plant « up to date » and to anticipate new regulations/pollutants Management of the reservoir during periods of drought/water scarcity
  • 24.
    1- Context/goals European framework+ EPTB (Waterboard) status : key role on water and aquatic environments Some remarkable aquatic environments on the basin Wetlands locally very important for water quality Vilaine is a major axis for fish migration
  • 25.
    2 – Recentand ongoing actions Monitoring of the Arzal dam fishpass (strong eel expertise on the basin) Natura 2000 operator on the Vilaine marshes : write the targets document Coordination of the of rivers and wetlands inventory at the basin scale Cartography of primrose – local works of primrose uprooting
  • 26.
    3 – Issues Keepa high level of expertise Work on local acceptance of glass eel fishery regulation Improve the hydraulic regulation of Vilaine marshes : not only flood prevention and water supply, but also environment issues, navigation… : Arzal dam becoming a multi users hydraulic structure
  • 27.
    Context Multi users area: water supply, flood prevention, agriculutre, navigation… Current lock causes salt intrusions penalizing water supply Siphons to prevent salt intrusions : losses of huge amounts of fresh water (300 000 m3/day) Water scarcity : -restrictions in the use of lock : conflict with boaters -Preventive rise in water levels to increase the capacity of storage : conflict with farmers
  • 28.
    Project New lock antisalt intrusions No need of siphons to prevent salt water intrusions : no losses of fresh water Water scarcity : - No restrictions in the use of lock : no conflicts with boaters - No need of preventive rise in water levels : no conflict with farmers Problems : -Be sure of the efficiency of the project -Cost of the project : 20 M€
  • 33.
    Institution d’ Aménagementde la Vilaine EPTB Vilaine