Cristian	Lengerich	
clengerich@hotmail.com	/	+56-99-884.4146	/	Alvaro	Casanova	4079,	Las	Pircas,	Peñalolen	
	
CAREER	PROFILE	
	
Project	Manager	/	Senior	Mechanical	Engineer	/	Combustion	and	Energy	Systems	Expert	/	Technical	Manager	/	
Project	Manager	/	Projects	Teams	Developer.	Industrial	Sector	Executive	with	thorough	experience	in	developing	
Projects	in	the		Mining,	Oil	&	Gas	and	Pulp	&	Paper	sectors.		Highly	skilled	in	in	all	phases	of	projects	from	the	
concept	 to	 Commissioning	 and	 Start	 Up,	 focus	 on	 Stakeholders,	 responsible	 in	 developing	 project	 teams	 to	
optimize	and	expand	installations.	Experience	in	Capex	control,	leading	big	teams,	project	evaluation,	fluid	and	
combustion	systems.	Interested	in	developing	teams	to	implement	investment	plan	of	the	companies	involved.		
	
CORE	COMPETENCIES	:	
	
• Project	Management	
• Mineral	Processing	
• Pulp	&	Paper	Industry	
• Teams	leadership	
• Oil	y	Gas	Industry	
• BOT/EPC/EPCM	Projects
• Combustion	Systems	
• Comminution	Crushing		
• Prj	Scheduling	&	Control	
• Material	Handling	
• Recovery	Boilers	
• Project	Evaluation	
• Processes	w/	Slurries	
• Energy	Generation	Systems	
• Coaching	/	Mentoring
• Mechanical	/	Piping
• Asme	Code
• Causticizing	&	Lime	Kilns	
RELEVANT	EXPERIENCE	
	
CENTINELA	MINE,	ANTOFAGASTA	MINERALS,	Apoquindo	4001,	Las	Condes,	Chile			(May	2013	–	a	la	Fecha)	
	
PROJECT	MANAGER	
	
- As		20	KTPD	2ª	&	3ª	Crushing	System	Project	Manager,	responsible	of	developing	all	phases	of	the	project	
from	basic	Engineering	to	Start	Up,	developed	in	al	EPC	mode	with	a	crusher	supplier.	Project	met	all	scope	
specifications,	15%	under	budget,	on	time	and	is	in	operation.	All	safety	standards	met.	($	190	MM)	
		
- Stock	Pile	Dome.	Execute	the	construction	of	a	Geodesic	Dome,	with	the	Stock	Pile	in	Operation,	130	meters	
diameter,	the	biggest	dome	in	operation.	All	project	targets	are	met,	developing	advance	technics	to	minimize	
risks	with	outstanding	results.	(U$	11	MM)		
	
- Project	Manager	of	third	high	solids	tailings	(72%)	thickener	to	meet	105	KTPD	production	capacity.	Currently	
80%	of	project	progress,	on	scope	and	schedule	and	under	budget.	(U$	66	MM)	
	
- Assigned	to	lead	re-alignment	and	design	issues	resolve	of	two	older	tailings	thickeners.	Work	with	supplier	to	
develop	technology	and	resolve	reliability	issues.	
	
ACHIEVEMENTS:	
	
• With	 the	 appropiate	 strategies,	 a	 well	 developed	 execution	 plan	 and	 appropiate	 vendor	 selections	 and	
contractual	strategies	in	two	of	the	projects	achieved	saving	of	up	to	15%	in	the	total	project	costs	and	on	
schedule.	
• The	2ª	&3ª	Crushing	system	met	all	specifications	of	throughput	and	product	quality.	
• All	projects	with	no	high	potential	accidents.
Cristian	Lengerich	
	
MINERA	DOÑA	INEZ	DE	COLLAHUASI,		(Oct	2011	-	Abr	2013)	
	
- Al	Project	Manager	responsible	to	develop	10	Stay	in	Business	projects	to	meet	mining	plan	in	next	5	years.	
Investment	of	$	600	MM	in	projects	of	different	phases	of	development.	A	project	management		staff	of	120	
People,	and	900	for	project	execution.		
	
- The	most	important	projects	are	the	following:	
	
- Construction	of	a	High	Rate	Thickener,		125	mts	in	diameter.	
- Relocation	of	a	1600	Ton	Primary	Semi	Mobile	Crusher.		
- Extension	of	the	67	KV	Mine	Electric	supply	line.	
- New	Osmosis	plant	
- Shiploader	upgrade	at	Patache	port	
- New	Coposa-Ujina,	20	km	water	supply	line.	
- New	Lixiviación	Cell		
- New	Pionero	Camp	Building	(Pabellón	S)	
		
- Responsible	 to	 manage	 main	 supply	 and	 service	 contracts,	 like	 supply	 of	 concrete,	 soil	 mechanics	 and		
topography	for	the	company.	
	
ACHIEVEMENTS:	
• Thickener	project	finished	on	schedule,	a	well	planned	and	developed	commissioning	allows	a	very	fast	
startup	of	4	days.		
• Primary	Crusher	relocations	(1600	Ton)	Project	is	finished	one	month	ahead	of	time,	on	Budget	and	scope.	
	
METHANEX	CHILE	S.A.	–	Cabo	Negro,	Punta	Arenas	(Mar	2009	–	Sep	2010)	
	
- As	Project	Manager	in	Methanex	Chile	in	Punta	Arenas,	in	charge	of	developing	a	team	to	search	for	new	
options	for	the	company	to	develop		the	company	with	less	gas	in	Magallanes.		
- In		Team	to	develop	and	negociate	with	Petrobras	a	megaproject	for	a	new	petrochemical	Hub	in	the	Victoria	
área	in	Brasil.	Considers	relocating	two	existing	methanol	plants	to	Brasil.	
- In	a	team	to	explore	new	gasification	technologies	for	Magallanes	Coal,	an	integrated	Project	to	Cogenerate	
Methanol	in	Punta	Arenas.	This	project	was	sponsored	by	the	coal	supplier	and	the	Chilean	government.	
- At	the	site	responsible	to	manage	the	rolling	Capex	priorizing	iniciatives	to	optimize	resources.	
- In	charge	to	fulfill	the	Sarbanes	Oxley		Governance	with	respect	to	investments	in	Chile.	
	
ACHIEVEMENTS:	
	
• Due	to	the	gas	curtailment	in	the	area	involved	in	developing	different	options	to	sustain	the	global	methanol	
operation.		
• Best	option	finally	is	to	transfer	two	methanol	train	to	Luisiana,	USA		
	
METHANEX	TRINIDAD	LTD.	–	Point	Lisas	Hub,	Trinidad	&	Tobago	(Mar	2009	–	Sep	2010)	
	
- Asignement	to	the	Methanex	Trinidad	Operation	as	Technical	Manager,	the	2ª	biggest	methanol	plant	en	the	
world.	
- For	2	year	responsible	to	develop	a	team	for	the	site	plant	engineering,	and	in	charge	of	the	lab	for	the	
product	quality	assurance.	Technical	Dept	with	a	staff	of	55	people,	anual	Capex	budget	of$	165	MM,	and	
Opex	of	$	14	MM.
Cristian	Lengerich	
	
- Assigned	 to	 Lead	 and	 plan	 all	 projects	 in	 the	 major	 plant	 shutdown	 in	 2009	 (turnarround),	 the	 biggest	
shutdown	ever	made	in	Methanex,	with	an	integrated	team	from	maintenance,	operations	and	projects.	No	
accidents,		($	48	MM)	
	
ACHIEVEMENTS:	
	
• Consolidate	a	new	team	in	Technical	department	to	develop	future	projects	in	the	Trinidad	Plant	overcoming	
cultural	barriers	and	focussed	in	companies	objectives.	
• Completely	fulfill	Trinidad	Investment	plan	in	the	Trinidad	Operation	in	teh	asignment	of	two	years.		
• Achieve	main	plant	shutdown	in	budget	and	no	accidents.		
	
METHANEX	CHILE	.	-	Santiago,	Chile	(Jun	2004	-	Feb	2009)	
	
- Performed	as	Project	Superintendant	in	Methanex	Chile	in	Punta	Arenas.	With	an	owner	team	of	10	engineers	
and	30	external	support,	execute	90	sustaining	projects	in	3	years.	(	Total	$	130	MM).	
- Accountable		for	the	evaluation	and	control	of	the	Chile	Capex.		
- Lead	 of	 the	 Global	 Technical,	 a	 joint	 work	 with	 teams	 in	 New	 Zeland,	 Canadá,	 Trinidad	 y	 Egypt	 where	
Methanex	has	its	assets.	
	
ACHIEVEMENTS:	
	
• Integrate	the	global	technical	teams	to	develop	common	Standards	in	projects	and	QA/QC.	
• Implement	the		Rolling	Capex	plan	methodology	where	the	investment	plan	is	revised	and	prioritize	after	new	
conditions	of	the	company.		
	
CMPC	CELULOSA,	PROJECT	MANAGEMENT	DEPT.	
	
SANTA	FE	LINE	II	PROJECT	(Jun	2003	–	May	2004)	
	
- As	Caustisizing	&	Utility	areas	Project	Manager.	Part	of	the	team	to	develop	the	new	Santa	Fe	II	bleached	
eucaliptus	plant	(MMUS$	713,-).	
- Lead	the	design	of	the	caustisizing	and	Lime	Kiln	according	to	new	environmental	standards.		
- Part	in	the	design	of	the	new	river	feedwater	system	(Bocatoma),	Energy	system	for	two	turbogenerators,		
new	Recovery	Boiler,	Revamp	of	existing	biomass	Boiler,	and	effluent	system.	All	system	integrated	with	the	
existing	plant	in	operation.	
	
LAJA	MILL,	GENERATION	PROJECT	(Jan	2003	–	Jun	2003)	
	
- Construction	 y	 commissioning	 Manager	 of	 the	 Generation	 System	 for	 the	 Laja	 Plant,	 that	 includes	 a	
Backpressure	40	MWe	Turbogenerator	and	auxilaries.	Includes	complete	redesign	of	Laja	Mill	energy	system	
($	36	MM).	
	
MININCO	PLANT,	PROPAC	PROJECT	(Nov	2000	–	Jan	2003)	
	
- Project	Manager	in	Caustizicing	and	Energy	generation	Systems.	Acountable	of	the	new	expansion	PROPAC	
project	of	these	areas,	in	the	Pacifico	Mill(	MMUS$	96,-).	
- Expansion	of	the	Caustizicing	plant	and	Lime	Kiln	for	a	42%	increase	capacity,	aligned	to	new	envormental	
regulations.		
- Engineering,	construction	and	Start	Up	of	the	new	generation	system	installing	a	Condensing	40	Mwe	Steam	
Turbine,	complete	condensing	system	and	cooling	tower.
Cristian	Lengerich	
	
SUSTAINING	PROJECTS	SANTA	FE	MILL	(Jul	1996	–	Nov	2000)	
	
- Project	lead	in	Termal	Plant	to	assure	the	reliability	and	bottlenecks	of	all	the	pulp	mill	services	(compressed	
air,	feedwater,	steam,	and	electric	energy)	through	the	conversion	from	black	liquor	to	green	liquor.		
- In	the	team	to	meet	ISO	9000	and	ISO	14000,		Santa	Fe	the	first	Pulp	Mill	to	certify	in	Chile.	
- Implementation	of	Total	Productive	Maintenance	and	Cero	Accidents	processes	to	improve	vaue	chains.		
- Most	important	sustaining	projects	developed:		
- Pilot	 project	 of	 chloride	 	 and	 potasium	 abatement	 in	 the	 black	 liquor.	 Due	 to	 enviromental	
constraints	 liquor	 loops	 were	 closed	 and	 concentration	 of	 these	 chemicals	 developed	 plugging	
problems	in	many	areas.	
- Recovery	 Bioler	 Combustion	 system	 improvements.	 Combustion	 process	 was	 improved	 and	
downtime	reduced	to	half.	
- Saving	of	10%	of	heat	consumption	through	the	impementation	of	Energy	optimization	projects.	
	
ACHIEVEMENTS:	
	
• Achieve	the	definition	of	the	steam	system,	LayOut	of	Causticizing	for	the	new	Santa	fe	Line.	
• Complete	the	design,	erection	and	Start	Up	of	two	Turbogenerators	in	Laja	and	Pacifico	Mills,	adding	80	
MWe	to	own	generation.		
• The	expansion	of	the	Pacifico	Causticizing	area	achieving	the	increase	in	capacity	and	new	environmental	
regulations.		
• Technological	development	in	the	area		of	recovery	bioler	combustion	to	manage	chlorides	with	an	
increase	in	reliability	in	the	process.			
	
FORESTAL		E	INDUSTRIAL	SANTA	FE,	As		Shell,Scott	Paper	and	City	Bank	Co	(Ene	1992	–	Jun	1996)	
	
- Biomass	Boiler	Project	Manager.	Developed	from	the	basic	engineering	the	complete	project	for	a	Biomass	
Bioler	 for	 80.0	 Ton/Hr	 of	 steam	 at	 64	 Bar	 de	 pressure,	 with	 all	 the	 auxiliaries,	 and	 fuel	 feeding	 systems.	
Engineering	developed	in	a	Consultant		in	Brasil.	($	87	MM)	
- SAMP	Project,	as	project	lead	(	Debottlenecking	project	)	at	Santa-Fe	Plant.	Developed	the	conceptual	studies,	
basic	 and	 detail	 engineering	 fro	 an	 increase	 of	 the	 Pulp	 Mill	 capacity	 of	 35%.	 Supported	 by	 intenational	
consultants	a	final	scope	of	all	modifications	is	defined,	(	MMUS$	72).	Later	the	project	was	executed	on	
budget,	schedule	and	scope	achieved.		
	
ACHIEVEMENTS:	
	
• This	 is	 the	 first	 Fuidized	 Bed	 Biomass	 Boiler	 installed	 in	 Chile.	 The	 project	 exceeded	 efficiency	 and	
environmental	results	burning	high	moisture	wood	waste.	After	that	project	the	standard	for	all	chilean	Pulp	
mill	projects	is	this	Bulbing	Fluidized	Bed	Combustion	technology.	
• In	the	SAMP	project	all	specifications	were	met	and	a	40%	capacity	increase	was	achieved.	
	
FORESTAL		E	INDUSTRIAL	SANTA	FE,	As		Shell,Scott	Paper	and	City	Bank	Co		(May	1989-	Jan	1992)	
	
During	Santa	Fe	Mill	Start	Up,	a	list	of	debottlenecking	projects	are	executed,	described	by	area:		
	
Heat	&	Energy	Systems	Area:	
	
-	 Revamp	of	the	Fuel	Oil	system	of	the	Power	Plant.	
-	 Redesign	of	the	Suphate	system	of	the	Recovery	Bioler.		
-	 Black	Liquor	feeding	and	combustion	system	for	high	solids	in	Recovery	Boiler	combustion.	
-	 Modificatons	in	the	Water	intake	system	from	Bio	Bio	River	to	the	Mill.
Cristian	Lengerich	
	
Pulp	Finishing	Area:	
	
- As	client	Engineer	responsible	of	assess	engineering,	procurement	and	erection	of	finishing	area	with			
Jaakko	Poyry	as	consultant.	
- Existing	drying	area	is	modified	from	Kaft	paper	drying	to	Pulp	Drying,	reusing	most	of	the	existing	
systems	($	2.5	MM)	
- Redesign	of	the	Vacuum	system,	Machine	ventilation,	Heat	Recovery,	Foudrinier	and	Pulp	Presses.		
	
Mechanical	Discipline	Engineer.	With	a	staff	of	15	Engineers,	developed	the	commisioning	and	Start	Up	
procedures	for	the	new	Santa	Fe	pulp	mill.		
	 Main	Commissioning	iniciatives:		
	
- As	 Commissioning	 Engineer	 for	 the	 new	 Siemens	 Turbogenerator	 (25	 MW),	 responsible	 of	
finishing	erection,	steam	blows,	commissioning	and	start	up.	
- 	 Design	and	Implementation	of	a	Trainees	Engineers	for	the	Pulp	Mill	start	up.	Hired	32	out	of	
university	Engineers	and	are	trained	for	the	pulp	mill	commissioning.		
INFORSA,	INDUSTRIAS	FORESTALES	S.A.	(Abr	1986	–	Abr	1989)	
- Developed	equipment	selection	and	mechanical	specs	fro	a	40	Ton/hr	Fuel	Oil	Boiler.	
- Project	Lead	of	the	aditives	Cellier	Plant	Project.	Developed	Engineering,	erection	and	Start	Up	including	all	
mechanical	equipment	and	Control	system.	All	operating	logic	is	developed	in	house.	
- Basic	 design	 of	 	 the	 distributed	 control	 system	 (Software	 &	 Hardware)	 to	 reduce	 energy	 consumption	 in	
Defibrators.	 	 	 	
- 	Involved	in	the	installation	of	the	new	Duoformer	for		Paper	Machine		Nr.1	
INFORSA,	INDUSTRIAS	FORESTALES	S.A.	(Ago	1985	–	Mar	1986)	
Worked	as	a	consultan	to	the	Engineering	&	Maintenance	Superintendant	resolving	Energy	and	Mechanical	
issues	in	the	plant:	
- MP-1	heat	ballance,	energy	recovery	and	pocket	vetilation	modifications.	
- MP-2	 heat	 balance,	 building	 ventilation	 mods,	 design	 and	 installation	 of	 new	 Air-Air	 heat	 exchangers	 to	
improve	termal	efficiency.	Modifications	of	the	steam	and	condensate	systems	of	the	paper	machine.		
- Developed	 software	 for	 plant	 engineering	 in	 thermal	 insulation,	 Paper	 machine	 equipment	 heat	 transfer	
coeficients,	hydraulic	ducts	and	headers	pressure	loss	calculations.		Slurries	calculations.	
ARA-CADE-IDEPE	Engineering		Consultant	in	the	Laja		Procel	Project	(Mar	1985	-	Jul	1985)	
	
- Part	of	the	Engineering	team	in	the	Procel	project	(Laja	Mill	Optimization	Project,	CMPC),	in	the	design	of	
piping,	 caustic	 soda	 for	 Recovery	 Boiler	 Scrubber,	 design	 of	 green	 liquor	 channels,	 desgn	 of	 blow	 down	
condensate	from	boilers.	
	
Independant	Consultant	(Jun	1984	–	Jan	1985)	
- Conceptual	design	to	Forestal	Diguillin	to	develop	a	new	Wood	Drying	Facility	and	its	Power	Plant	for	4000	
m3/month	wood.		Developed	the	conceptual	design,	basic	engineering	and	equipment	selection.		
- Project	of	equipment	and	logic	modifications	of	the	Wood	Dryers	for	the		MADEX	saw	mill,	Nacimiento.	
- Redesign	of	the	tire	retreading	Plant,	Recauchajes	Concepción.	
- Complete	design	and	fabircation	of	a	Tire	band	precuring	machine,	Recauchajes	Concepción.
Cristian	Lengerich	
	
hQUALIFICATIONS:	
	
	 1964	-	1976:	 German	School	of		Concepción.	
	 1975	-	1976:	 One	year	in	Senior	High-School,	Lawndale,	California,	U.S.A.	
	 1982	 	 Engineering	Bachelors	degree,	University	of	Concepción	
	1985	 	 Mechanical	 Engineering	 Degree,	 with	 a	 specialization	 in	 Termodynamics	 and	 Fluid	
Mechanics,	University	of	Concepción	
	
PROFESIONAL	DEVELOPMENT	
	
• 1990,	“Manufacturing	Economics”,	Closed	study	by	Shell	in	project	iniciative	evaluation	and	investment	
priorities“	
• 1995	;	Scolarship	at	the	Swedish	Institute	of	Technology	AF-Energie,	a	degree	in	Energy	Generation	and	Heat	
Conservation	for	one	year	in	Malmo,	Sweden.	
• 1998	;	Diploma	in	Business	Administration	at	the	Adolfo	Ibañez	University,	prepared	for	the	pulp	in	Los	
Angeles.	
• 2008,	Training	in	Leadership	in	the	Center	of	Creative	Leadership,	San	Diego,	California	with	mentoring	for	2	
years.	
	
LANGUAGES:	
	
Full	Domain	 	 :		English,	German	and	Spanish	(Mother	language)	
Profesional	Domain		 :	Portuguez

More Related Content

What's hot (20)

RS Darwent pdf
RS Darwent pdfRS Darwent pdf
RS Darwent pdf
 
PAUL FOTHERGILL CV
PAUL FOTHERGILL CVPAUL FOTHERGILL CV
PAUL FOTHERGILL CV
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
Arb2011
Arb2011Arb2011
Arb2011
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Dinesh Chauhan
Dinesh ChauhanDinesh Chauhan
Dinesh Chauhan
 
NauticAWT Subsurface & Wells
NauticAWT Subsurface & WellsNauticAWT Subsurface & Wells
NauticAWT Subsurface & Wells
 
ARB General Presentation
ARB General PresentationARB General Presentation
ARB General Presentation
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT Brochure
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas Website
 
Resume Shahid
Resume ShahidResume Shahid
Resume Shahid
 
DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2DRC Resume 2015 Rev 2
DRC Resume 2015 Rev 2
 
baker hughes Annual Report 2002
baker hughes  Annual Report 2002baker hughes  Annual Report 2002
baker hughes Annual Report 2002
 
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
KASHIF DADA, PMP, P.Eng
KASHIF DADA, PMP, P.EngKASHIF DADA, PMP, P.Eng
KASHIF DADA, PMP, P.Eng
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
 
BDSResume1
BDSResume1BDSResume1
BDSResume1
 

Viewers also liked (20)

English CV MJ Middelkamp
English CV MJ MiddelkampEnglish CV MJ Middelkamp
English CV MJ Middelkamp
 
Academic resume
Academic resumeAcademic resume
Academic resume
 
CLAUDIO GOMEZ_CV 2015 EN P&P
CLAUDIO GOMEZ_CV 2015 EN P&PCLAUDIO GOMEZ_CV 2015 EN P&P
CLAUDIO GOMEZ_CV 2015 EN P&P
 
Christian I Gonzalez CV 2016
Christian I Gonzalez CV 2016Christian I Gonzalez CV 2016
Christian I Gonzalez CV 2016
 
JPierce2015_CV
JPierce2015_CVJPierce2015_CV
JPierce2015_CV
 
Resume
ResumeResume
Resume
 
Resume Ariel EN
Resume Ariel ENResume Ariel EN
Resume Ariel EN
 
CV_AYC_ago-2016_3r_engl
CV_AYC_ago-2016_3r_englCV_AYC_ago-2016_3r_engl
CV_AYC_ago-2016_3r_engl
 
Currículum vitae
Currículum vitaeCurrículum vitae
Currículum vitae
 
Resume Dimitri Sclabos Katevas
Resume Dimitri Sclabos KatevasResume Dimitri Sclabos Katevas
Resume Dimitri Sclabos Katevas
 
CORP_PROF_GLOBALSAT_GROUP_EN
CORP_PROF_GLOBALSAT_GROUP_ENCORP_PROF_GLOBALSAT_GROUP_EN
CORP_PROF_GLOBALSAT_GROUP_EN
 
Sergio Zamorano Ingeniería
Sergio Zamorano IngenieríaSergio Zamorano Ingeniería
Sergio Zamorano Ingeniería
 
Euro CV
Euro CVEuro CV
Euro CV
 
Resume - Daniel Galvao 05-2015
Resume - Daniel Galvao 05-2015Resume - Daniel Galvao 05-2015
Resume - Daniel Galvao 05-2015
 
CV-Europass-20160120-ZeladaRivas-EN
CV-Europass-20160120-ZeladaRivas-ENCV-Europass-20160120-ZeladaRivas-EN
CV-Europass-20160120-ZeladaRivas-EN
 
RC_EnglishCoverLetter
RC_EnglishCoverLetterRC_EnglishCoverLetter
RC_EnglishCoverLetter
 
Creative Resume Edward2
Creative Resume Edward2Creative Resume Edward2
Creative Resume Edward2
 
Scott Ballou Resume
Scott Ballou ResumeScott Ballou Resume
Scott Ballou Resume
 
Curriculum Vitae english version September2015
Curriculum Vitae english version September2015Curriculum Vitae english version September2015
Curriculum Vitae english version September2015
 
CV_Daniel_G_N_Peon
CV_Daniel_G_N_PeonCV_Daniel_G_N_Peon
CV_Daniel_G_N_Peon
 

Similar to Clengerich-_Resume_2016_EN

CV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process ProjectCV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process Project
Jose F. Gonzalez, P. Eng.
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukri
milind phadke
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
Robert Cahill
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
Govinda Raman
 

Similar to Clengerich-_Resume_2016_EN (20)

Jose f gonzalez, p. eng mech & process project
Jose f gonzalez, p. eng mech & process projectJose f gonzalez, p. eng mech & process project
Jose f gonzalez, p. eng mech & process project
 
CV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process ProjectCV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process Project
 
Dhanaji suravase resume
Dhanaji suravase resumeDhanaji suravase resume
Dhanaji suravase resume
 
ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
Alzagon engineering solutions
Alzagon engineering solutionsAlzagon engineering solutions
Alzagon engineering solutions
 
CV rajesh
CV rajeshCV rajesh
CV rajesh
 
Alzagon diversify inc 2014
Alzagon diversify inc 2014Alzagon diversify inc 2014
Alzagon diversify inc 2014
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukri
 
Alzagon engineering solutions dec 2017a
Alzagon engineering solutions dec  2017aAlzagon engineering solutions dec  2017a
Alzagon engineering solutions dec 2017a
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
 
Alzagon engineering solutions 1
Alzagon engineering solutions 1Alzagon engineering solutions 1
Alzagon engineering solutions 1
 
Alzagon engineering solutions
Alzagon engineering solutions Alzagon engineering solutions
Alzagon engineering solutions
 
PB82REV.1
PB82REV.1PB82REV.1
PB82REV.1
 
Resume Jun-2015
Resume Jun-2015Resume Jun-2015
Resume Jun-2015
 
Resume
ResumeResume
Resume
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
 
Cv english
Cv englishCv english
Cv english
 

Clengerich-_Resume_2016_EN

  • 1. Cristian Lengerich clengerich@hotmail.com / +56-99-884.4146 / Alvaro Casanova 4079, Las Pircas, Peñalolen CAREER PROFILE Project Manager / Senior Mechanical Engineer / Combustion and Energy Systems Expert / Technical Manager / Project Manager / Projects Teams Developer. Industrial Sector Executive with thorough experience in developing Projects in the Mining, Oil & Gas and Pulp & Paper sectors. Highly skilled in in all phases of projects from the concept to Commissioning and Start Up, focus on Stakeholders, responsible in developing project teams to optimize and expand installations. Experience in Capex control, leading big teams, project evaluation, fluid and combustion systems. Interested in developing teams to implement investment plan of the companies involved. CORE COMPETENCIES : • Project Management • Mineral Processing • Pulp & Paper Industry • Teams leadership • Oil y Gas Industry • BOT/EPC/EPCM Projects • Combustion Systems • Comminution Crushing • Prj Scheduling & Control • Material Handling • Recovery Boilers • Project Evaluation • Processes w/ Slurries • Energy Generation Systems • Coaching / Mentoring • Mechanical / Piping • Asme Code • Causticizing & Lime Kilns RELEVANT EXPERIENCE CENTINELA MINE, ANTOFAGASTA MINERALS, Apoquindo 4001, Las Condes, Chile (May 2013 – a la Fecha) PROJECT MANAGER - As 20 KTPD 2ª & 3ª Crushing System Project Manager, responsible of developing all phases of the project from basic Engineering to Start Up, developed in al EPC mode with a crusher supplier. Project met all scope specifications, 15% under budget, on time and is in operation. All safety standards met. ($ 190 MM) - Stock Pile Dome. Execute the construction of a Geodesic Dome, with the Stock Pile in Operation, 130 meters diameter, the biggest dome in operation. All project targets are met, developing advance technics to minimize risks with outstanding results. (U$ 11 MM) - Project Manager of third high solids tailings (72%) thickener to meet 105 KTPD production capacity. Currently 80% of project progress, on scope and schedule and under budget. (U$ 66 MM) - Assigned to lead re-alignment and design issues resolve of two older tailings thickeners. Work with supplier to develop technology and resolve reliability issues. ACHIEVEMENTS: • With the appropiate strategies, a well developed execution plan and appropiate vendor selections and contractual strategies in two of the projects achieved saving of up to 15% in the total project costs and on schedule. • The 2ª &3ª Crushing system met all specifications of throughput and product quality. • All projects with no high potential accidents.
  • 2. Cristian Lengerich MINERA DOÑA INEZ DE COLLAHUASI, (Oct 2011 - Abr 2013) - Al Project Manager responsible to develop 10 Stay in Business projects to meet mining plan in next 5 years. Investment of $ 600 MM in projects of different phases of development. A project management staff of 120 People, and 900 for project execution. - The most important projects are the following: - Construction of a High Rate Thickener, 125 mts in diameter. - Relocation of a 1600 Ton Primary Semi Mobile Crusher. - Extension of the 67 KV Mine Electric supply line. - New Osmosis plant - Shiploader upgrade at Patache port - New Coposa-Ujina, 20 km water supply line. - New Lixiviación Cell - New Pionero Camp Building (Pabellón S) - Responsible to manage main supply and service contracts, like supply of concrete, soil mechanics and topography for the company. ACHIEVEMENTS: • Thickener project finished on schedule, a well planned and developed commissioning allows a very fast startup of 4 days. • Primary Crusher relocations (1600 Ton) Project is finished one month ahead of time, on Budget and scope. METHANEX CHILE S.A. – Cabo Negro, Punta Arenas (Mar 2009 – Sep 2010) - As Project Manager in Methanex Chile in Punta Arenas, in charge of developing a team to search for new options for the company to develop the company with less gas in Magallanes. - In Team to develop and negociate with Petrobras a megaproject for a new petrochemical Hub in the Victoria área in Brasil. Considers relocating two existing methanol plants to Brasil. - In a team to explore new gasification technologies for Magallanes Coal, an integrated Project to Cogenerate Methanol in Punta Arenas. This project was sponsored by the coal supplier and the Chilean government. - At the site responsible to manage the rolling Capex priorizing iniciatives to optimize resources. - In charge to fulfill the Sarbanes Oxley Governance with respect to investments in Chile. ACHIEVEMENTS: • Due to the gas curtailment in the area involved in developing different options to sustain the global methanol operation. • Best option finally is to transfer two methanol train to Luisiana, USA METHANEX TRINIDAD LTD. – Point Lisas Hub, Trinidad & Tobago (Mar 2009 – Sep 2010) - Asignement to the Methanex Trinidad Operation as Technical Manager, the 2ª biggest methanol plant en the world. - For 2 year responsible to develop a team for the site plant engineering, and in charge of the lab for the product quality assurance. Technical Dept with a staff of 55 people, anual Capex budget of$ 165 MM, and Opex of $ 14 MM.
  • 3. Cristian Lengerich - Assigned to Lead and plan all projects in the major plant shutdown in 2009 (turnarround), the biggest shutdown ever made in Methanex, with an integrated team from maintenance, operations and projects. No accidents, ($ 48 MM) ACHIEVEMENTS: • Consolidate a new team in Technical department to develop future projects in the Trinidad Plant overcoming cultural barriers and focussed in companies objectives. • Completely fulfill Trinidad Investment plan in the Trinidad Operation in teh asignment of two years. • Achieve main plant shutdown in budget and no accidents. METHANEX CHILE . - Santiago, Chile (Jun 2004 - Feb 2009) - Performed as Project Superintendant in Methanex Chile in Punta Arenas. With an owner team of 10 engineers and 30 external support, execute 90 sustaining projects in 3 years. ( Total $ 130 MM). - Accountable for the evaluation and control of the Chile Capex. - Lead of the Global Technical, a joint work with teams in New Zeland, Canadá, Trinidad y Egypt where Methanex has its assets. ACHIEVEMENTS: • Integrate the global technical teams to develop common Standards in projects and QA/QC. • Implement the Rolling Capex plan methodology where the investment plan is revised and prioritize after new conditions of the company. CMPC CELULOSA, PROJECT MANAGEMENT DEPT. SANTA FE LINE II PROJECT (Jun 2003 – May 2004) - As Caustisizing & Utility areas Project Manager. Part of the team to develop the new Santa Fe II bleached eucaliptus plant (MMUS$ 713,-). - Lead the design of the caustisizing and Lime Kiln according to new environmental standards. - Part in the design of the new river feedwater system (Bocatoma), Energy system for two turbogenerators, new Recovery Boiler, Revamp of existing biomass Boiler, and effluent system. All system integrated with the existing plant in operation. LAJA MILL, GENERATION PROJECT (Jan 2003 – Jun 2003) - Construction y commissioning Manager of the Generation System for the Laja Plant, that includes a Backpressure 40 MWe Turbogenerator and auxilaries. Includes complete redesign of Laja Mill energy system ($ 36 MM). MININCO PLANT, PROPAC PROJECT (Nov 2000 – Jan 2003) - Project Manager in Caustizicing and Energy generation Systems. Acountable of the new expansion PROPAC project of these areas, in the Pacifico Mill( MMUS$ 96,-). - Expansion of the Caustizicing plant and Lime Kiln for a 42% increase capacity, aligned to new envormental regulations. - Engineering, construction and Start Up of the new generation system installing a Condensing 40 Mwe Steam Turbine, complete condensing system and cooling tower.
  • 4. Cristian Lengerich SUSTAINING PROJECTS SANTA FE MILL (Jul 1996 – Nov 2000) - Project lead in Termal Plant to assure the reliability and bottlenecks of all the pulp mill services (compressed air, feedwater, steam, and electric energy) through the conversion from black liquor to green liquor. - In the team to meet ISO 9000 and ISO 14000, Santa Fe the first Pulp Mill to certify in Chile. - Implementation of Total Productive Maintenance and Cero Accidents processes to improve vaue chains. - Most important sustaining projects developed: - Pilot project of chloride and potasium abatement in the black liquor. Due to enviromental constraints liquor loops were closed and concentration of these chemicals developed plugging problems in many areas. - Recovery Bioler Combustion system improvements. Combustion process was improved and downtime reduced to half. - Saving of 10% of heat consumption through the impementation of Energy optimization projects. ACHIEVEMENTS: • Achieve the definition of the steam system, LayOut of Causticizing for the new Santa fe Line. • Complete the design, erection and Start Up of two Turbogenerators in Laja and Pacifico Mills, adding 80 MWe to own generation. • The expansion of the Pacifico Causticizing area achieving the increase in capacity and new environmental regulations. • Technological development in the area of recovery bioler combustion to manage chlorides with an increase in reliability in the process. FORESTAL E INDUSTRIAL SANTA FE, As Shell,Scott Paper and City Bank Co (Ene 1992 – Jun 1996) - Biomass Boiler Project Manager. Developed from the basic engineering the complete project for a Biomass Bioler for 80.0 Ton/Hr of steam at 64 Bar de pressure, with all the auxiliaries, and fuel feeding systems. Engineering developed in a Consultant in Brasil. ($ 87 MM) - SAMP Project, as project lead ( Debottlenecking project ) at Santa-Fe Plant. Developed the conceptual studies, basic and detail engineering fro an increase of the Pulp Mill capacity of 35%. Supported by intenational consultants a final scope of all modifications is defined, ( MMUS$ 72). Later the project was executed on budget, schedule and scope achieved. ACHIEVEMENTS: • This is the first Fuidized Bed Biomass Boiler installed in Chile. The project exceeded efficiency and environmental results burning high moisture wood waste. After that project the standard for all chilean Pulp mill projects is this Bulbing Fluidized Bed Combustion technology. • In the SAMP project all specifications were met and a 40% capacity increase was achieved. FORESTAL E INDUSTRIAL SANTA FE, As Shell,Scott Paper and City Bank Co (May 1989- Jan 1992) During Santa Fe Mill Start Up, a list of debottlenecking projects are executed, described by area: Heat & Energy Systems Area: - Revamp of the Fuel Oil system of the Power Plant. - Redesign of the Suphate system of the Recovery Bioler. - Black Liquor feeding and combustion system for high solids in Recovery Boiler combustion. - Modificatons in the Water intake system from Bio Bio River to the Mill.
  • 5. Cristian Lengerich Pulp Finishing Area: - As client Engineer responsible of assess engineering, procurement and erection of finishing area with Jaakko Poyry as consultant. - Existing drying area is modified from Kaft paper drying to Pulp Drying, reusing most of the existing systems ($ 2.5 MM) - Redesign of the Vacuum system, Machine ventilation, Heat Recovery, Foudrinier and Pulp Presses. Mechanical Discipline Engineer. With a staff of 15 Engineers, developed the commisioning and Start Up procedures for the new Santa Fe pulp mill. Main Commissioning iniciatives: - As Commissioning Engineer for the new Siemens Turbogenerator (25 MW), responsible of finishing erection, steam blows, commissioning and start up. - Design and Implementation of a Trainees Engineers for the Pulp Mill start up. Hired 32 out of university Engineers and are trained for the pulp mill commissioning. INFORSA, INDUSTRIAS FORESTALES S.A. (Abr 1986 – Abr 1989) - Developed equipment selection and mechanical specs fro a 40 Ton/hr Fuel Oil Boiler. - Project Lead of the aditives Cellier Plant Project. Developed Engineering, erection and Start Up including all mechanical equipment and Control system. All operating logic is developed in house. - Basic design of the distributed control system (Software & Hardware) to reduce energy consumption in Defibrators. - Involved in the installation of the new Duoformer for Paper Machine Nr.1 INFORSA, INDUSTRIAS FORESTALES S.A. (Ago 1985 – Mar 1986) Worked as a consultan to the Engineering & Maintenance Superintendant resolving Energy and Mechanical issues in the plant: - MP-1 heat ballance, energy recovery and pocket vetilation modifications. - MP-2 heat balance, building ventilation mods, design and installation of new Air-Air heat exchangers to improve termal efficiency. Modifications of the steam and condensate systems of the paper machine. - Developed software for plant engineering in thermal insulation, Paper machine equipment heat transfer coeficients, hydraulic ducts and headers pressure loss calculations. Slurries calculations. ARA-CADE-IDEPE Engineering Consultant in the Laja Procel Project (Mar 1985 - Jul 1985) - Part of the Engineering team in the Procel project (Laja Mill Optimization Project, CMPC), in the design of piping, caustic soda for Recovery Boiler Scrubber, design of green liquor channels, desgn of blow down condensate from boilers. Independant Consultant (Jun 1984 – Jan 1985) - Conceptual design to Forestal Diguillin to develop a new Wood Drying Facility and its Power Plant for 4000 m3/month wood. Developed the conceptual design, basic engineering and equipment selection. - Project of equipment and logic modifications of the Wood Dryers for the MADEX saw mill, Nacimiento. - Redesign of the tire retreading Plant, Recauchajes Concepción. - Complete design and fabircation of a Tire band precuring machine, Recauchajes Concepción.
  • 6. Cristian Lengerich hQUALIFICATIONS: 1964 - 1976: German School of Concepción. 1975 - 1976: One year in Senior High-School, Lawndale, California, U.S.A. 1982 Engineering Bachelors degree, University of Concepción 1985 Mechanical Engineering Degree, with a specialization in Termodynamics and Fluid Mechanics, University of Concepción PROFESIONAL DEVELOPMENT • 1990, “Manufacturing Economics”, Closed study by Shell in project iniciative evaluation and investment priorities“ • 1995 ; Scolarship at the Swedish Institute of Technology AF-Energie, a degree in Energy Generation and Heat Conservation for one year in Malmo, Sweden. • 1998 ; Diploma in Business Administration at the Adolfo Ibañez University, prepared for the pulp in Los Angeles. • 2008, Training in Leadership in the Center of Creative Leadership, San Diego, California with mentoring for 2 years. LANGUAGES: Full Domain : English, German and Spanish (Mother language) Profesional Domain : Portuguez