1. Alza-Gon Diversify Inc.
1. Alza-Gon Engineering Solutions Inc.
Provide Engineering services, Evaluation technology, equipment selection: Heavy Oil technologies, Water
treatment, Vapor Combustion Units, Incinerators, Equipment packages including static equipment
(Pressure vessels, separators, tanks, blowcases), rotating equipment (pumps, compressors), heat
transfer equipment (boilers, heaters, OTSGs, S&Ts, spirals, plates & frames, Heat Exchangers, stacks,
specialty items, piping, valves, fittings, pipelines, specialty items and overall consulting related to Oil and
Gas and Heavy Oil Facilities.
About Us
Engineering Services on line
Equipment Selection for Heavy Oil Projects, Evaluation of existing equipment, recommendation to
increase efficiency & productivity in actual facilities
Reliable Manufacturers' contacts for new & used equipment for Oil & Gas Projects
Alza-Gon Engineering Solutions Inc.
Jose F. Gonzalez, P. Eng
403-993-4518 cell (24/7), and 403-257-4378 office
josefgonzalez@shaw.ca
alzagondiversify@gmail.com
jotafrancisco@live.com
jotafgonzalez@gmail.com
Address:
2 Cranfield PK. SE Calgary Alberta,
Canada, T3M 1B2
2. Alza-Gon Engineering Solutions Inc. is a small engineering consulting company located in Calgary which
offers online solutions for heavy oil projects and Refinery equipment. The company began in mid-2007 as
a response to a growing demand for companies looking for a more efficient way to solve their integrated
process and mechanical engineering needs. Alza-Gon Engineering Solutions has been able to provide a
faster and economic way to solve these needs by directly consulting with companies through the web. As
a result, the company is growing quickly and we hope to extent experience in SAGD and CSS
technologies.
Some of our clients include Devon, AOC, Sunshine Oil sands, Exxon, CNRL, Encana, Sherrit Power,
Shell-Black, AOSC, KNOC, Paramount Energy, Petro-Canada, Penn West, a Petro Bank, and the list
continues to grow.
Our goal is to provide a reliable and convenient service to customers by providing a number of different
services. Some of these services include equipment selection and sizing, purchase of heavy oil projects,
evaluation of existing equipment, recommendation to increase efficiency and productivity in actual
facilities. In addition, we offer a manufacturer’s data base contact list for new and used equipment for oil
and gas projects.
Our mission is to provide quality solutions that will contribute to the future successes of the organizations.
3. Engineering Services
In order to serve you better, we have provided a detailed list of services Alza-Gon Engineering Solutions
offers its clients. These services range in various areas of expertise of the company:
Process & Mechanical Engineering
Technical selection, sizing, and evaluation of equipment
Plan detailed methods of solving assigned problems,
Ensure that schedules are met and to coordinate assignments with other disciplines,
Prepare design notes, calculations, drawings, specifications, and data books,
Provide technical direction to purchasing and construction in support of the project installation
activities
Implementation of the corporate QA plan
Liaise directly with the client and act as a company representative on projects
Perform and supervise cost estimates, project planning, scheduling, and cost control functions
Hire, train, and maintain capable personnel dedicated to highly accurate technical deliverables
Mentor junior engineers in process and systems design practices,
Effectively apply the organization’s management processes and practices
Run process simulation programs including HYSIS, Pipeflo, Compress, Coade, In House
spreadsheet.
Evaluate alternate processes and determine the optimum process for each application
Sizing process, mechanical, and utility equipment
Prepare specifications and evaluate vendor bids,
Instruct engineers, designers, draftspersons, and secretaries in the preparation of process
technical documents and drawings,
Verify, correct, modify, and authorize process technical documents and drawings,
Implement training of company personnel to effectively use approved procedures and methods,
Prepare process calculations for the design of facilities for the detailed design of a facility,
Discuss applications with vendors,
Review and approve vendor data,
Prepare engineering man-hour and discipline cost estimates,
Market company expertise for process facilities design,
Assist in the preparation of proposals,
Create and maintain mutually beneficial relations with other departments and project personnel,
Network with professional associations and leading edge institutions in order to monitor trends,
Maintain a dedicated, focused staff with superior expertise to meet current and future needs of
our clients,
Serve as a sounding board and coaching staff, individually and collectively to achieve consistently
superior results
Ensure the effective use of people management system customer relations and standards
Develop and use accurate, relevant financial information for decision making
Seek and apply win-win problem solving approaches to problem resolution
Ensure project milestones are being executed in the proper concurrent sequence
Respectfully and capably representing the best interests of your company in all internal and
external business
Solve technical problems, and investigate root causes
4. Our Clients
Alza-Gon prides itself in offering quality services and looks forward to building long-term partnerships with
its clients. As a result, Alza-Gon Engineering Solutions has been committed to ensuring the success
of our clients, many of which still continue to use our services.
We also have professional affiliations with the Association of Professional Engineers, Geologists and
Geophysicists of Alberta (APEGGA), the Association of Professional Engineers, Geologists and
Geophysicists of Saskatchewan ( APEGS), and the Canadian Council of Professional Engineers
(Member).
Atlas BA Consulting (04/2017- Present) Senior Project Engineer -ABA Consulting , Calgary
Colas Canada colasphalt Clairmont & Acheson AB, Asphalt storage
facility-Heat Medium packages exchangers & heaters equipment
sizing.
Pembina Specifications development: Pipeline testing, Heat Medium
Packages, Flare knock-out systems, PD pumps.
Kinder Morgan Electric Heating System Sherwood PK, AB storage
facility
Fluor Canada (08/ 2013- 2016)
DEVON Pike 1-phase 1A- Detailed design
stage & SUNCOR ETF FootHills
Senior Mechanical Engineer, Responsible Engineer.
CPF Equipment specification, Requisitions, approval fabrication
drawings, including Vapor Combustion units, water treatment
Evaporator & Concentrator systems Steam Gens, Bitumen treating,
heat exchangers, vessels, tanks and pumps
Jacobs Canada (2012 - 08/2013)
AOSC SAGD 40K BOPD
HangingstoneProject Phase 1.
Mechanical Lead & Principal & Mechanical Engineer
CPF Equipment specification, Requisitions, approval fabrication
drawings, including water treatment Evaporator & Concentrator
systems Steam Gens, Bitumen treating, heat exchangers, vessels,
tanks and pumps.
Sunshine Oil Sands (2011- 2012)
West Ells SAGD 10K BOPD Project
Facility Lead Engineer
Plant Equipment specification, Requisitions; approval of fabrication
packages equipment, including water treatment Evaporator, Cogen,
Steam Gens, Bitumen treating, heat exchangers, separators, well
pads, pipelines and pumps. Facility lead heavy oil cold production.
Enercore Projects Limited (2010 –
1Q/2011)
Calgary, AB
Laricina Energy -Germain Demonstration
Project SAGD 5K BOPD CPF and Well pads
Lead Mechanical Engineer
Plat Equipment specification and Requisitions, approval of fabrication
equipment, including water treatment, OTSGs, Steam Gens, Bitumen
treating, heat exchangers, separators, steamers, water treatment,
and pumps.
5. Vista Projects Limited (2009 – 2010)
Calgary, AB
PetroBank Energy, Penn West Energy Trust
May River THAI Project 10K BOPD Well pads,
and interconnecting pipelines
Penn West Energy Trust
Lead Mechanical Engineer & Senior Mechanical Engineer
Plat Equipment specification, RFQ, RFP, manufacturing drawings
approval, including water treatment, Boilers, Steam Gens, pipelines
heat exchangers, separators, steamers, water treatment, and pumps.
Polymer Injection ASP technology, Mechanical equipment selection,
and purchasing.
Seal Main CSS Pilot
Tarpon Energy Services Process Division -
2009 (Prolink)
Manager of Engineering Services, oil and gas equipment
manufacturing equipment
Separator packages, line heaters, dehydration units, pump water
skids, sweetening units, Amine units.
IMV Projects Inc. (2003 – 2007, and 2008-
2009)
Lead Mechanical Engineer & Senior Mechanical Engineer
Mustus Energy
Power Plant Facility 30 MW
Responsible for RFQ, Bid Tab, of water treatment package Biomass
boiler system, and auxiliary for a power plant facility 35 MW
KNOC (Korean National Oil Company)
BlackGold Plant Heavy Oil and steam
generation facilities, 10K BOPD (SAGD)
Sincor EOR (Total) SAGD facility 10K BOPD
FEED
Paramount Energy Resources SAGD 10K
BOPD FEED
Shell & BlackRock Heavy Oil and steam
generation facilities, (SAGD) ( from design to
operation)
CNRL, Primrose North Plant Expansion
Sherritt Power, 70MMSCFD sour gas plant
Lead Mechanical Engineer / Senior Mechanical Engineer
Responsible for the preparation and development of technical
specifications, Datasheets, RFQs, cost estimate, selection, and
equipment sizing and technical evaluation for all major mechanical
equipment
Responsible for RFP Major equipment including water-tube boilers,
heat exchangers, pressures vessel, and evaporator units
Responsible for preparation and development of technical
specifications, mechanical design for the Primrose North Plant
Heavy Oil and steam facilities
Responsible for mechanical aspects of equipment (RFQ’s, bid
evaluations, review vendor drawings and liaison with the vendor
6. Responsible to size, specify, purchase, and installation assistance of
all related equipment
Suncor Energy Oil Sands
Firebag Phase 2
Excess water Facilities- Miscellaneous
Projects
Lead Mechanical Engineer
Responsible for mechanical aspects of equipment RFQs, bid
evaluations, review vendor drawings and liaison with vendors
Capital estimates, optimization studies, and engineering analysis
Equinox Engineering Ltd. 2007
Various Oil & Gas Projects
Project Manager / Mechanical Lead, Senior Mechanical Engineer
Worked on various Oil & Gas projects: well tie-ins, pipelines,
compressors, water injection pumps for Penn-West, Kereco, Lario,
Crescent Point, Alberta Clipper, and BP
SNC–Lavalin (formerly Titan Projects Ltd.)
(1997 – 2003)
Petro Canada Refinery SIG Project
PanCandian Christina Lake 10 KBOPD SAGD
EnCana Oil and Gas Partnership – Foster
Creek Expansion thermal heavy oil plant
(30000 BPD)
West Stoddart Gas Plant 120 MMSCFD
Senior Mechanical Engineer
Inter-discipline coordination of all equipment, installation assistance,
and construction support.
Responsible for preparation and development of technical
specifications for the Foster Creek Expansion Phase I thermal plant
using SAGD technology, selection criteria for equipment / modules,
developing request for quotation, conducting bid evaluation and
technical recommendations, preparing purchase order for all
components, piping and specialty items, reviewing vendor drawings
and liaising with the vendor and client
Responsible for mechanical aspects of equipment RFQs, bid
evaluations, review vendor drawings and liaison with the vendor.
Exxon JV Intercor
(1982 – 1997)
Various Mining Projects
Equipment & Process & Project Engineer
Cerrejon Mine multi-seam Coal Open Pit , capacity: 28.4 Mt/y
Project design coordinator to expand a Coal Preparation, froth
flotation and Wash plant to 3500 t/h capacity, railway to transport
48,000 t/d of crushed coal from the mine’s load out to the port
stockyard, and a Coal port’s 6,000 t/h coal-handling system can
either place the coal on to stockpiles or move it directly to the ship
loader, and port facilities with a single loading pier, capable of
handling vessels up to 150,000 tones.
Supervisor Coal Preparation and Wash plant equipment and
process as floatation units, spirals, hydro cyclones, Lamella
Decanters, thickeners, belt press filters, centrifuges, pumps for
slurries, waste solids disposals.
Start up, commissioning and subsequent operations
7. Operations advisor of coal preparation plant
Troubleshooting guides
On-the-job training for operators
Process & Project Design Coordinator Coal Preparation , Froth
Flotation Wash plant 3500 t/h
Coordinated basic design, and technology selection
Estimated capital estimate, operating cost, prepared module
fabrication, and schedule
Developed equipment specifications and RFQ documentation
Endorsed change orders and monitored contractors
Special Projects Coordinator Multi-Seam Coal Open pit
Consulted, studied and evaluated new engineering products and
processes
Develop Computer program for simulation of expansion capacity
infrastructure model
Prepared bidding process documents for coal preparation plant
project
Managed several analytical project and studies
Estimate cost of class III installation Coal Preparation plant
Pre-screened potential contractors for construction Coal Preparation
plant facilities
Special studies to replace mining equipment as: shovels, front end
loaders, and excavators, among others.