SlideShare a Scribd company logo
1 of 11
Download to read offline
Lighting Design
Park.our House, Kajang Art Centre
CALCULATIONS ON ANALYSIS
BUILDING SCIENCE II BLD 61303
CARMEN CHAN SHEN WEN 0326485
TUTOR : MR EDWIN CHAN
Space A : Music Studio
Term Working Calculation Answer
Area of windows (W) (7.1 + 6.0 + 5.7 + 6.5) m X 2.1 m 53.13 m2
Total area of internal
surfaces (A)
Area of walls
(5.55 X 6.1) + (2.7 X 10.3) + (2.85 X
6.8) + (2.7 X 4.5) + (2.7 X 4.5) + (2.7 X
3.5) + (7.2 X 5.55) = 142.61 m2
Area of floor and ceiling
(59.76 + 59.76) m2
Total internal surface area
(142.61 + 59.76 + 59.76) m2
262.13 m2
Glass transmittance
corrected for dirt (T)
0.6
Visible sky angle in
degrees from centre of
window (°)
14°
Average reflectance of
Area A (R)
0.5
Average Daylight
Factor
3.4104
According to MS 1525, room
is considered fair.
262.13 (1 - 0.5)
i) Average Daylight Factor (LDF)
Average Daylight Factor formula
W TQ
A
X
(1-R)
53.13 0.6 X 14
X
= 0.203 X 16.8
KFC
14°
Figure 1 : Visible sky angle for music room.
Hm X (L + W)
ii) Room Index (RI)
Room Index (RI) formula
L X W
Term Working Calculation Answer
Floor area (m2) 15.6 m2
Mounted Height of
Fitting above Working
Plane (Hm)
2.7 m - 0 m 2.7 m
Reflectance value of
Ceiling, Wall, Floor
Light Coloured Ceiling = 0.8
Medium Grey Wall = 0.5
Light Concrete Floor = 0.1
Room Index (RI) for
Part A
0.63
iia) Part A of space
2.7 X (3.1 + 6.1)
15.6 m2
Term Working Calculation Answer
Floor area (m2) 44.2 m2
Mounted Height of
Fitting above Working
Plane (Hm)
5.55 - 1.27 4.28 m
Reflectance value of
Ceiling, Wall, Floor
Light Coloured Ceiling = 0.8
Medium Grey Wall = 0.5
Light Concrete Floor = 0.1
Room Index (RI) for
Part B
0.78
iib) Part B of space
4.28 X (6.1 + 7.2)
44.2 m2
Figure 2 : Parts of analysis study in Music Studio
*For Hm value, refer to the following page for justification.
Term Working Calculation Answer
Total Room Index (RI) 0.63 + 0.78 1.41
Reflectance value of
Ceiling, Wall, Floor
Light Coloured Ceiling = 0.8
Medium Grey Wall = 0.5
Light Concrete Floor = 0.1
Utilisation Factor (UF) Based on UF Table,
If 1.25 = 0.52, then
x = 0.73/1.25
0.58
ii) Room Index (RI)
1.25
iic) Total Room Index and UF Value
0.52
x1.41
=
Figure 3 : Workplane height of Music Studio
Part A Part B
F X UF X MF
iii) Lumen Method
Lumen Method formula
E X A
Term Working Calculation Answer
Floor area (m2) (A) 15.6 m2
Illuminance Level
Required (E)
200
Average Luminous Flux
from each lamp (F)
67 X 9 603
Utilisation Factor (UF) 0.58
Maintenance Factor (MF) Standard 0.8
No. of lamps required
(N)
= 11.15
11 lamps
Mounted Height of Fitting
above Working Plane
(Hm)
2.7 m - 0 m 2.7 m
Maximum spacing For filament lamps,
2.7 m X 1.0 m
2.7 m
iiia) Part A of space
N =
603 X 0.58 X 0.8
200 X 15.6
Term Working Calculation Answer
Floor area (m2) (A) 44.2 m2
Illuminance Level
Required (E)
200
Average Luminous Flux
from each lamp (F)
67 X 9 603
Utilisation Factor (UF) 0.58
Maintenance Factor (MF) Standard 0.8
No. of lamps required
(N)
= 31.6
32 lamps
Mounted Height of Fitting
above Working Plane
(Hm)
5.55 m - 1.27 m 4.28 m
Maximum spacing For filament lamps,
4.28 m X 1.0 m
4.28 m
iiia) Part B of space
603 X 0.58 X 0.8
200 X 44.2
Space B : Practice Studio
Exhibition Hall
Shophouse
Term Working Calculation Answer
Area of windows (W) (3.95 X 0.9) + (½ X 0.9 X 1.02) + (6.0 X
2.1) + 51.61
= (2.56 + 0.46 + 12.6 + 51.61) m2
68.23 m2
Total area of internal
surfaces (A)
Area of walls
(88.69 X 2.7) m2 = 239.46 m2
Area of facade ceiling
(28.66 + 24.41 + 10.31 + 31.9) + 51.61
= 146.89 m2
Area of floor
138.1 m2
Total internal surface area
(239.46 + 146.89 + 138.1) m2
524.45 m2
Glass transmittance
corrected for dirt (T)
0.6
Visible sky angle in
degrees from centre of
window (°)
33.8°
Average reflectance of
Area A (R)
0.5
Average Daylight
Factor
5.27
According to MS 1525, room
is considered strongly daylit.
524.45 (1 - 0.5)
i) Average Daylight Factor (LDF)
Average Daylight Factor formula
W TQ
A
X
(1-R)
68.23 0.6 X 33.8
X
= 0.13 X 40.56
33.8°
Figure 4 : Visible sky angle for practice studio.
Hm X (L + W)
ii) Room Index (RI)
Room Index (RI) formula
L X W
Term Working Calculation Answer
Floor area (m2) 138.1 m2
Mounted Height of
Fitting above Working
Plane (Hm)
2.7 m - 0 m 2.7 m
Reflectance value of
Ceiling, Wall, Floor
Light Coloured Ceiling = 0.8
Medium Grey Wall = 0.5
Timber Floor = 0.3
Room Index (RI) for
Part A
0.63
Utilisation Factor (UF) Based on UF Table,
If 2.00 = 0.67, then
x = 2/1.31
0.66
iia) Part A of space
2.7 X (16.1 + 10.1)
138.1 m2
1.95
2.00
x
0.67
=
Figure 5 : Workplane height of Practice Studio
F X UF X MF
iii) Lumen Method
Lumen Method formula
E X A
Term Working Calculation Answer
Floor area (m2) (A) 138.1 m2
Illuminance Level
Required (E)
300
Average Luminous Flux
from each lamp (F)
12 X 87 1044
Utilisation Factor (UF) 0.66
Maintenance Factor (MF) Standard 0.8
No. of lamps required
(N)
= 75.1
75 lamps
Mounted Height of Fitting
above Working Plane
(Hm)
2.7 m - 0 m 2.7 m
Maximum spacing For LED Tube,
2.7 m X 1.5 m
4.05 m
N =
1044 X 0.66 X 0.8
300 X 138.1

More Related Content

What's hot

Lighting design considerations
Lighting design considerationsLighting design considerations
Lighting design considerations
mominzaki
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
Ritesh Ambadkar
 
Illumination Engineering.pdf
Illumination Engineering.pdfIllumination Engineering.pdf
Illumination Engineering.pdf
MurarekarNeha
 

What's hot (20)

Lighting
Lighting Lighting
Lighting
 
Lighting architecture notes lectureLighting architecture lecture 5
Lighting architecture notes lectureLighting architecture  lecture 5Lighting architecture notes lectureLighting architecture  lecture 5
Lighting architecture notes lectureLighting architecture lecture 5
 
Definitions related to illumination
Definitions related to illuminationDefinitions related to illumination
Definitions related to illumination
 
Daylighting
DaylightingDaylighting
Daylighting
 
Lighting design
Lighting designLighting design
Lighting design
 
Lighting design considerations
Lighting design considerationsLighting design considerations
Lighting design considerations
 
Day lighting
Day lightingDay lighting
Day lighting
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
 
Building Services (Fire)
Building Services (Fire)Building Services (Fire)
Building Services (Fire)
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)
 
Types of Lighting and Luminaire
Types of Lighting and LuminaireTypes of Lighting and Luminaire
Types of Lighting and Luminaire
 
artificial lighting
artificial lightingartificial lighting
artificial lighting
 
Fire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyFire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case study
 
219291453 interior-lighting
219291453 interior-lighting219291453 interior-lighting
219291453 interior-lighting
 
Lighting ppt 1
Lighting ppt 1Lighting ppt 1
Lighting ppt 1
 
Case Study
Case StudyCase Study
Case Study
 
Illumination Engineering.pdf
Illumination Engineering.pdfIllumination Engineering.pdf
Illumination Engineering.pdf
 
Final Project: Odense Residential Building Renovation
Final Project: Odense Residential Building RenovationFinal Project: Odense Residential Building Renovation
Final Project: Odense Residential Building Renovation
 
Types of lighting & lighting fixtures
Types of lighting & lighting fixturesTypes of lighting & lighting fixtures
Types of lighting & lighting fixtures
 
Fire fighting passive system
Fire fighting passive systemFire fighting passive system
Fire fighting passive system
 

Similar to CALCULATIONS ON LIGHTING DESIGN

Building science-2-report
Building science-2-reportBuilding science-2-report
Building science-2-report
deadmk
 
Lighting Integration Project
Lighting Integration ProjectLighting Integration Project
Lighting Integration Project
jisunfoo
 

Similar to CALCULATIONS ON LIGHTING DESIGN (20)

Lighting Analysis: Integration project (Community library)
Lighting Analysis: Integration project (Community library)Lighting Analysis: Integration project (Community library)
Lighting Analysis: Integration project (Community library)
 
Final report
Final reportFinal report
Final report
 
Building science project 2
Building science project 2 Building science project 2
Building science project 2
 
Building science-2-report
Building science-2-reportBuilding science-2-report
Building science-2-report
 
Nadia bsc2 p2
Nadia bsc2 p2Nadia bsc2 p2
Nadia bsc2 p2
 
CALCULATIONS - Integration with Studio 5
CALCULATIONS - Integration with Studio 5CALCULATIONS - Integration with Studio 5
CALCULATIONS - Integration with Studio 5
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
 
Building Science II
Building Science IIBuilding Science II
Building Science II
 
B Science Report Project 2
B Science Report Project 2B Science Report Project 2
B Science Report Project 2
 
Lighting Integration Project
Lighting Integration ProjectLighting Integration Project
Lighting Integration Project
 
Bscience
BscienceBscience
Bscience
 
BUILDING SCIENCE II INDIVIDUAL REPORT
BUILDING SCIENCE II INDIVIDUAL REPORTBUILDING SCIENCE II INDIVIDUAL REPORT
BUILDING SCIENCE II INDIVIDUAL REPORT
 
Building Science 2
Building Science 2Building Science 2
Building Science 2
 
Building Science_02_Report_Integration Project
Building Science_02_Report_Integration ProjectBuilding Science_02_Report_Integration Project
Building Science_02_Report_Integration Project
 
B science project 2
B science project 2B science project 2
B science project 2
 
Building Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration projectBuilding Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration project
 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2
 
CALCULATION
CALCULATIONCALCULATION
CALCULATION
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2
 
Bscience ii
Bscience ii Bscience ii
Bscience ii
 

More from Carmen Chan

More from Carmen Chan (20)

Construction Solutions
Construction SolutionsConstruction Solutions
Construction Solutions
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building Systems
 
Acoustic Analysis on Permata Pintar Auditorium (Report)
Acoustic Analysis on Permata Pintar Auditorium (Report)Acoustic Analysis on Permata Pintar Auditorium (Report)
Acoustic Analysis on Permata Pintar Auditorium (Report)
 
Acoustic Analysis on Permata Pintar Auditorium (presentation)
Acoustic Analysis on Permata Pintar Auditorium (presentation)Acoustic Analysis on Permata Pintar Auditorium (presentation)
Acoustic Analysis on Permata Pintar Auditorium (presentation)
 
Interpretation and Analysis
Interpretation and AnalysisInterpretation and Analysis
Interpretation and Analysis
 
Food and Culture : Chow Kit
Food and Culture : Chow KitFood and Culture : Chow Kit
Food and Culture : Chow Kit
 
Comparative Essay - Carmen Chan 0326485
Comparative Essay - Carmen Chan 0326485Comparative Essay - Carmen Chan 0326485
Comparative Essay - Carmen Chan 0326485
 
Structural Analysis of SIRI House
Structural Analysis of SIRI HouseStructural Analysis of SIRI House
Structural Analysis of SIRI House
 
Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)
 
Building Services Catalogue on Fragments
Building Services Catalogue on FragmentsBuilding Services Catalogue on Fragments
Building Services Catalogue on Fragments
 
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCase Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
 
Group 1 Proposal - In Search of a Learning Space
Group 1 Proposal - In Search of a Learning SpaceGroup 1 Proposal - In Search of a Learning Space
Group 1 Proposal - In Search of a Learning Space
 
My Portfolio of FNBE Works
My Portfolio of FNBE WorksMy Portfolio of FNBE Works
My Portfolio of FNBE Works
 
Design Process Journal of Wonder Woman
Design Process Journal of Wonder WomanDesign Process Journal of Wonder Woman
Design Process Journal of Wonder Woman
 
My Design Booklet
My Design BookletMy Design Booklet
My Design Booklet
 
The Rube Goldberg Idea Journal
The Rube Goldberg Idea JournalThe Rube Goldberg Idea Journal
The Rube Goldberg Idea Journal
 
The Cube Idea Journal
The Cube Idea JournalThe Cube Idea Journal
The Cube Idea Journal
 
The Mask Idea Journal
The Mask Idea JournalThe Mask Idea Journal
The Mask Idea Journal
 
The Flying Egg Idea Journal
The Flying Egg Idea JournalThe Flying Egg Idea Journal
The Flying Egg Idea Journal
 
Bukit Bintang Site Analysis
Bukit Bintang Site AnalysisBukit Bintang Site Analysis
Bukit Bintang Site Analysis
 

Recently uploaded

Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
AnaAcapella
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
httgc7rh9c
 

Recently uploaded (20)

Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 

CALCULATIONS ON LIGHTING DESIGN

  • 1. Lighting Design Park.our House, Kajang Art Centre CALCULATIONS ON ANALYSIS BUILDING SCIENCE II BLD 61303 CARMEN CHAN SHEN WEN 0326485 TUTOR : MR EDWIN CHAN
  • 2. Space A : Music Studio
  • 3. Term Working Calculation Answer Area of windows (W) (7.1 + 6.0 + 5.7 + 6.5) m X 2.1 m 53.13 m2 Total area of internal surfaces (A) Area of walls (5.55 X 6.1) + (2.7 X 10.3) + (2.85 X 6.8) + (2.7 X 4.5) + (2.7 X 4.5) + (2.7 X 3.5) + (7.2 X 5.55) = 142.61 m2 Area of floor and ceiling (59.76 + 59.76) m2 Total internal surface area (142.61 + 59.76 + 59.76) m2 262.13 m2 Glass transmittance corrected for dirt (T) 0.6 Visible sky angle in degrees from centre of window (°) 14° Average reflectance of Area A (R) 0.5 Average Daylight Factor 3.4104 According to MS 1525, room is considered fair. 262.13 (1 - 0.5) i) Average Daylight Factor (LDF) Average Daylight Factor formula W TQ A X (1-R) 53.13 0.6 X 14 X = 0.203 X 16.8 KFC 14° Figure 1 : Visible sky angle for music room.
  • 4. Hm X (L + W) ii) Room Index (RI) Room Index (RI) formula L X W Term Working Calculation Answer Floor area (m2) 15.6 m2 Mounted Height of Fitting above Working Plane (Hm) 2.7 m - 0 m 2.7 m Reflectance value of Ceiling, Wall, Floor Light Coloured Ceiling = 0.8 Medium Grey Wall = 0.5 Light Concrete Floor = 0.1 Room Index (RI) for Part A 0.63 iia) Part A of space 2.7 X (3.1 + 6.1) 15.6 m2 Term Working Calculation Answer Floor area (m2) 44.2 m2 Mounted Height of Fitting above Working Plane (Hm) 5.55 - 1.27 4.28 m Reflectance value of Ceiling, Wall, Floor Light Coloured Ceiling = 0.8 Medium Grey Wall = 0.5 Light Concrete Floor = 0.1 Room Index (RI) for Part B 0.78 iib) Part B of space 4.28 X (6.1 + 7.2) 44.2 m2 Figure 2 : Parts of analysis study in Music Studio *For Hm value, refer to the following page for justification.
  • 5. Term Working Calculation Answer Total Room Index (RI) 0.63 + 0.78 1.41 Reflectance value of Ceiling, Wall, Floor Light Coloured Ceiling = 0.8 Medium Grey Wall = 0.5 Light Concrete Floor = 0.1 Utilisation Factor (UF) Based on UF Table, If 1.25 = 0.52, then x = 0.73/1.25 0.58 ii) Room Index (RI) 1.25 iic) Total Room Index and UF Value 0.52 x1.41 = Figure 3 : Workplane height of Music Studio Part A Part B
  • 6. F X UF X MF iii) Lumen Method Lumen Method formula E X A Term Working Calculation Answer Floor area (m2) (A) 15.6 m2 Illuminance Level Required (E) 200 Average Luminous Flux from each lamp (F) 67 X 9 603 Utilisation Factor (UF) 0.58 Maintenance Factor (MF) Standard 0.8 No. of lamps required (N) = 11.15 11 lamps Mounted Height of Fitting above Working Plane (Hm) 2.7 m - 0 m 2.7 m Maximum spacing For filament lamps, 2.7 m X 1.0 m 2.7 m iiia) Part A of space N = 603 X 0.58 X 0.8 200 X 15.6
  • 7. Term Working Calculation Answer Floor area (m2) (A) 44.2 m2 Illuminance Level Required (E) 200 Average Luminous Flux from each lamp (F) 67 X 9 603 Utilisation Factor (UF) 0.58 Maintenance Factor (MF) Standard 0.8 No. of lamps required (N) = 31.6 32 lamps Mounted Height of Fitting above Working Plane (Hm) 5.55 m - 1.27 m 4.28 m Maximum spacing For filament lamps, 4.28 m X 1.0 m 4.28 m iiia) Part B of space 603 X 0.58 X 0.8 200 X 44.2
  • 8. Space B : Practice Studio Exhibition Hall
  • 9. Shophouse Term Working Calculation Answer Area of windows (W) (3.95 X 0.9) + (½ X 0.9 X 1.02) + (6.0 X 2.1) + 51.61 = (2.56 + 0.46 + 12.6 + 51.61) m2 68.23 m2 Total area of internal surfaces (A) Area of walls (88.69 X 2.7) m2 = 239.46 m2 Area of facade ceiling (28.66 + 24.41 + 10.31 + 31.9) + 51.61 = 146.89 m2 Area of floor 138.1 m2 Total internal surface area (239.46 + 146.89 + 138.1) m2 524.45 m2 Glass transmittance corrected for dirt (T) 0.6 Visible sky angle in degrees from centre of window (°) 33.8° Average reflectance of Area A (R) 0.5 Average Daylight Factor 5.27 According to MS 1525, room is considered strongly daylit. 524.45 (1 - 0.5) i) Average Daylight Factor (LDF) Average Daylight Factor formula W TQ A X (1-R) 68.23 0.6 X 33.8 X = 0.13 X 40.56 33.8° Figure 4 : Visible sky angle for practice studio.
  • 10. Hm X (L + W) ii) Room Index (RI) Room Index (RI) formula L X W Term Working Calculation Answer Floor area (m2) 138.1 m2 Mounted Height of Fitting above Working Plane (Hm) 2.7 m - 0 m 2.7 m Reflectance value of Ceiling, Wall, Floor Light Coloured Ceiling = 0.8 Medium Grey Wall = 0.5 Timber Floor = 0.3 Room Index (RI) for Part A 0.63 Utilisation Factor (UF) Based on UF Table, If 2.00 = 0.67, then x = 2/1.31 0.66 iia) Part A of space 2.7 X (16.1 + 10.1) 138.1 m2 1.95 2.00 x 0.67 = Figure 5 : Workplane height of Practice Studio
  • 11. F X UF X MF iii) Lumen Method Lumen Method formula E X A Term Working Calculation Answer Floor area (m2) (A) 138.1 m2 Illuminance Level Required (E) 300 Average Luminous Flux from each lamp (F) 12 X 87 1044 Utilisation Factor (UF) 0.66 Maintenance Factor (MF) Standard 0.8 No. of lamps required (N) = 75.1 75 lamps Mounted Height of Fitting above Working Plane (Hm) 2.7 m - 0 m 2.7 m Maximum spacing For LED Tube, 2.7 m X 1.5 m 4.05 m N = 1044 X 0.66 X 0.8 300 X 138.1