1. Needs, motivations, goals and principles that led to the creation or modification
of the document:
• Compliancy inter General Specification for pre-commissioning and commissioning.
• General update necessary to follow technology improvements and standards evolution.
Nature of changes:
• Update to Opercom references (GS EP EXP 101, GS EP EXP 103, GS EP EXP 105,
GS EP EXP 107).
• Addition of ITU-T G.657 reference and explanations
• Increased requirement for availability
• Simplified requirements for connectors’ type
• Addition of specifications for splicing boxes located in hazardous areas
Support document – 10/ 2013 1
GS EP TEL 191 03 – TELECOM FIBRE OPTIC SYSTEM DESIGN
10/2013